Text of the determination
Case No: 278037 Determination Page 1 of 22
Case number: 278037
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
28 May 2013
Background
1. The Applicants held a landlords insurance policy with the Financial Services
Provider (FSP) from 31 March 2006 and the policy was current at the time of
damage. The policy provided landlord tenant protection for the building for its
current replacement value and loss of rent, subject to terms and conditions
of its Product Disclosure Statement (PDS).
2. The Applicants contacted the FSP between 12 January 2010 and 14
January 2010 to advise that severe cracking had occurred to the walls of the
property. The Applicants did not provide a cause of damage at this time and
was investigating same with local council due to an apparent collapse of a
drain in a laneway next to the insured property.
3. The FSP appointed experts to attend and inspect the property to confirm the
cause and extent of damage. The Applicants also sought an expert opinion.
The FSP denied the Applic ants‟ claim for several reasons including the
Applicants failure to prove that the damage had been caused by an insured
event, pre-existing cracking to the building, the actions of trees, wear and
tear, soil movement and subsidence.
4. The Applicants dispute the denial of the claim on the basis that the
proximate cause of the damage was storm water run-off. The Applicants
were also dissatisfied that the FSP failed to respond to telephone and written
requests to action the claim.
Summary of Applicants’ position
5. The Applicants are represented. For the sake of clarity and brevity, the Panel
will refer hereafter to the Applicants and their representative as “the
Applicants”.
6. The Applicants contacted the FSP immediately they became aware of a
problem at their property, which was when they received advice from their
tenants that there was severe cracking to the property.
Determination
Case No: 278037 Determination Page 2 of 22
7. When reporting the loss, they were not aware of the cause of the damage,
however suspected the damage may be attributable to recent heavy rain
storms and possibly the failure of nearby water mains.
8. They arranged for relevant water authorities and local council to inspect
drains etc in the area to see if any of these contributed to the damage.
9. A quotation for repairs was obtained for an amount of $36,190. This
quotation did not include additional cracking to the south wall of the property
and a quotation was not obtained. The Applicants estimate the costs to
repair this wall to be in the vicinity of $10,000.
10. The property could not be tenanted during the claims process due to the
extent of damage and as such, the property remained untenanted until 1
August 2011. The tenants vacated the property at the request of the FSP‟s
assessor.
11. Whilst there were some minor cracks to the property which they had repaired
over the years, the cracks which appeared at the beginning of 2010 were
much larger and had not been present before.
12. Trees which had been removed from the property, on the advice of the
FSP‟s assessor, were not large ; in fact one tree near where the majority of
damage to the building has occurred was only a sapling.
13. The Applicants seek to have their claim accepted and payment made of the
cost of repairs as estimated ($46,190) plus two years loss of rent. In the
alternative, as the Applicants have since so ld the property, they seek the
difference between the received sale amount and the expected sale amount,
had the property been in a sound condition/repaired, plus the loss of rent
claim.
Summary of FSP’s position
14. The FSP says the Applicants reported the claim on 14 January 2010
advising that there appeared to be severe cracking to walls at the property.
At this time the Applicants indicated the damage may be relevant to local
storm water or sewer drains and the Applicants were to investigate further
with the local council.
15. It appointed experts, including an assessor, to inspect and report on the
cause and extent of damage. Based on the information provided by its
experts it denied the Applicants‟ claim on the grounds that the footings of the
house were inadequate and the existence of trees near the house had
contributed to the damage noticed.
16. Further investigations as to the cause of the damage were undertaken by the
FSP via its experts, on receipt of the Applicants‟ dispute regarding the denial
of their claim. This further investigation resulted in a number of causes being
identified as having contributed to the damage. One of these causes was
Case No: 278037 Determination Page 3 of 22
identified as being defects in the hydraulic services located at the rear
extension area of the southern end of the Applicants‟ house which resulted
in some minor damage to the bathroom and laundry area.
17. It maintained its denial of the claim for the majority of items, however did
offer a settlement for the damage to the bathroom and laundry area for an
amount of $3,964.38.
18. The Applicants submitted their own expert report dated 25 July 2011 which
was received by the FSP on 13 November 2011. The report was considered,
however the decision to deny the Applicants‟ claim was upheld.
19. The FSP relies on the following policy provisions of its Product Disclosure
Statement (PDS):
“ What we cover – insured events
This section describes under the headings:
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular
insured events.
Yes No
You are covered for damage or loss
occurring during the period of cover and
caused by the following events to:
when your landlord building is insured, to
that landlord building,
...
You are not covered for:
... ...
Storm and rainwater including stormwater
runoff from areas surrounding the site, or
water escaping from any water main, drain,
pipe, street gutter, guttering or surface.
Storm means violent wind (including a
cyclone or tornado), thunderstorm or a
heavy fall of rain, snow or hail.
The cost of cleaning or clearing debris from
any pool or spa.
Damage or loss caused by water seeping into
or otherwise entering your landlord building
due to:
a defect or fault in the design, structure or
construction of your landlord building
where you could reasonably be expected
to be aware of the defect or fault,
building alterations, renovations or
additions.
Damage or loss caused by dust where your
landlord building has not been otherwise
damaged by storm.”
(Pages 12 to 17)
“ What we do not cover – general exclusions
Case No: 278037 Determination Page 4 of 22
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
an unreasonable failure to properly maintain or repair your insured property,
wear and tear, rust, deterioration or corrosion,
...
soil movement or settlement,
subsidence or landslide unless caused by the insured event of earthquake,
...
The actions of trees, plants or their roots,”
(Page 18)
“ We pay for loss of rent
We will pay for the loss of rent incurred by you while your landlord building is
being rebuilt or repaired if:
your landlord building has been damaged or lost by an insured event, and
we agree your landlord building is no longer habitable, and
your tenant was paying rent due under a current rental agreement with
you for at least four consecutive weeks preceding the date the damage or
loss occurred.
...
Our payment will be actual loss of rent incurred by you during the reasonable
period up to 12 months required to repair or rebuild your landlord building or
to restore access to your landlord building and it is otherwise habitable.”
(Pages 28 to 29)
Issues
20. Whether the FSP is entitled to deny the Applicants‟ building damage claim
other than the part it has settled.
21. Whe ther the FSP is entitled to deny the Applicants‟ loss of rent claim in its
entirety.
22. Whether the Applicants are entitled to compensation.
Reasons for decision
23. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to a Panel in accordance with the Operational Guidelines to
the FOS Terms of Reference. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
Case No: 278037 Determination Page 5 of 22
24. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
25. The Panel is satisfied there has been a full exchange of material between
the parties and that each party has had the opportunity of clarifying the
issues that arise from the material.
Property
26. The insured property is a residential dwelling comprising a single storey solid
brick, iron roofed construction supported on concrete strip footings. The
property is of the Victorian period. The property‟s frontal aspec t faces
roughly east. There is a right of way (laneway) to the southern aspect of the
property.
27. It is agreed by all parties, that the predominant damage the subject of this
claim, is to the centre of the southern side of the dwelling.
28. It is also agreed by the parties that there was some pre-existing cracking to
the property which had previously been repaired. The Applicants say this
cracking was minor compared to the cracks seen in February 2010.
29. The Applicants owned the property for approximately 17 years prior to the
lodgement of the claim and had rented out the property for a period of time.
The property was tenanted at the time of the appearance of the large cracks,
the subject of the Applicants‟ claim.
The claim
30. The FSP says that when the Applicants reported the damage to their
property, no cause was identified. File notes indicate the Applicants ‟ advice
was:
“IO WAS CONT ACTED BY THE AGENTS THAT THERE APPEARS TO BE
SEVERE CRACKING OF BRICK WALLS ON THE PROPERTIES EXTERIOR
WALLALONG ONE SIDE IO HAS INSPECTED THE BUILDING AND HAS
NOTICED IN A LANEWAY NEXT TO THE BUILDING THE STORM WATER
OR SEWER DRAIN APPEARS TO BE COLLAPSING AS HE HAS NOTICED
BLUESTONE PAVERS IN LANE HAVE MOVED APPROX 300MM FROM
THE MAN HOLE COVER AND THIS MAY HAVE SOMETHING TO DO WITH
THE PROBLEM OF HIS BRICK WALLS CRACKING
IO IS CONTACTING LOCAL COUNCIL TO ARRANGE INSPECTION.” (sic)
31. The FSP says the Applicants were advised that the claim was under
consideration until such time a cause of the damage could be identified and
that it would assist in this regard by appointing an assessor.
32. The FSP arranged for the assessor CS to inspect the property to determine
the cause and extent of damage. CS attended the property on 10 February
2010. CS provided the following summary of his findings:
Case No: 278037 Determination Page 6 of 22
“OB SERVATIONS.
PERIOD SOLID BRICK HOUSE.
SOIL IN THIS AREA WOULD BE H- HIGHLY REACTIVE.
EXTENSIVE CRACKING AND SUBSIDENCE TO THE RIGHT SIDE OF THE
HOUSE.
EVIDANCE OF EXTENSIVE PREVIOUS FILLING OF SOME OF THE SAME
CRACKS AND EASING OF DOORS & WINDOWS.
TREES ON SITE - YES.
1 MATURE TREE GROWING WITHIN 600MM OF THE BACK LEFT
CORNER OF BEDROOM 2 WHERE MUCH OF THE CRACKING HAS
OCCURED.
2X LARGE TREES WITHIN 3-4M OF THE BACK LEFT CORNER OF THE
HOUSE.
DOWN PIPES DISCHARGE ONTO THE COBBLE STONES OF THE SIDE
LANEWAY. SEWER PIPES ARE AT THE BACK LEFT OF THE HOUSE AND
ARE IN EARTHENWARE.” [sic]
33. Upon CS ‟s advice, the FSP then appointed a geotechnical expert, SG, to
attend to conduct an inspection and soil testing. SG‟s report contained the
following comment on the findings:
“ 7.0 COMMENT
The laboratory derived soil moisture contents of the silty clay show some
variation between boreholes, with borehole 1 being considerably higher than
borehole 2. Borehole 1 which was conducted adjacent to the central southern
wall of the dwelling is considered to have a slightly higher than normal soil
moisture content. Borehole 2 which was conducted as a control adjacent to
the front of the dwelling had a soil moisture content that was within a normal
range.
The relatively poor site drainage and earthenware pipes may be a factor in the
elevated soil moisture contents.
The concrete strip footings supporting the dwelling have a founding depth of
400mm and depth of concrete of 200mm, which is considerably less than the
minimum 1000mm founding depth and 600mm depth of concrete as stipulated
by Australian Standards. These footings would lack rigidity and unable to
properly withstand volumetric shrinking and swelling of the highly reactive
high plasticity silty clay as soil moisture contents fluctuate. The excessive soil
moisture contents encountered in borehole 1 would have resulted in relative
swelling of these clays.
It is possible that there is a sewer / drainage easement in the adjoining
laneway which is undermining the undersized footings.”
34. The FSP reviewed SG‟s report on 11 March 2010 and informed the
Applicants that the claim was not one for acceptance. The file note of this
date says:
“11 MARCH 2010
SOIL REPORT REVIEWED.
CLAIM DECISION IS NOT FOR ACCEPTANCE.
Case No: 278037 Determination Page 7 of 22
REASON FOR CLAIM DECISION: 1. UNDER SIZED FOOTINGS NOT ABLE
TO WITHSTAND SOIL MOVEMENT ON THIS HIGHLY REACTIVE CLAY
SITE.
2. DRAINAGE ISSUES ON SITE AFFECTING SOIL CONDITIONS.
3. TREES IN CLOSE PROXIMITY TO HOUSE AFFECTING SOIL
CONDITIONS.
4. EVIDANCE OF PREVIOUS CRACKING AND REPAIRS BY MR IO TO
WALLS, DOORS AND WINDOWS.
MR IO HAS BEEN ADVISED OF THE CLAIM DECISION AND APPEAL
PROCESS.” [sic]
35. The Applicants requested a formal denial letter from the FSP on at least two
separate occasions in June 2010 and a denial letter was sent by the FSP on
15 June 2010. The letter detailed the findings of CS and SG and provided
the following reason for denying the Applicants ‟ claim:
“After a thorough review of all the information regarding your claim, [the FSP]
is satisfied that at this stage you have not been able to substantiate that the
damage to the building has been caused by an insured event. Further [the
FSP] has undertaken all reasonable endeavors to assist with determining the
cause of the damages, and at this stage have not been able to confirm that
the damages are as a result of an insured event. As a result, you have not
substantiated that you are covered for this damage under any section of the
policy.
We note that a report from [local water authority] has been requested; we
advise that should this report be provided then we will be in a position to give
further consideration to your claim.” [sic]
36. On receipt of the formal denial letter, the Applicants provided advice to the
FSP in July 2010 that they had spoken with the local water authority, YV,
who had suggested that there had been storm water run-off from a sewer pit.
A report from YV was still awaited at that time. The Applicants requested the
FSP reconsider its decision on their claim based on this information.
37. The FSP agreed to further investigate the claim and appointed AL to conduct
leak detection tests at the property to verify the information provided by the
Applicants. These tests were conducted on 6 August 2010. AL advised:
“ RESULTS AND FINDINGS AT THE TIME OF TEST:
The property has 3 down pipes. Two discharge to a laneway and the other to
the rear south side runs about 1 meter then it is either blocked or does not go
anywhere (capped off) it is made from Vic Clay. The sewer line is also made
of Vic clay and has a major dropage just before the inspection point, approx.
500mm back to the insured sewer line. The sewer shaft also has another
connection point that runs under the slab of the insured bathroom/laundry and
fees up to 3 to 4 other houses heading north. On this line there are cracks at
6.5m from the boundary inspection point (shaft) of the insured and other racks
and small misalignments. Domestic water tested up ok at time of tests.” [sic]
38. At some point after receiving the AL report, the FSP decided to appoint a
forensic/structural e ngineer, FM to also inspect and report on the Applicants‟
Case No: 278037 Determination Page 8 of 22
property. FM attended the property on 12 October 2010 and provided the
following summary of his findings:
“ 8.0 Discussion
The distress to this house falls within the moderate to severe categories
3 and 4 in accordance with AS2870.
The damage to this house is not recent, and has most likely been
occurring for many years. Previous repairs to the walls were very
evident externally due to colour differences in the render finish.
Significant previous movement within the house was also evident due to
doorways being significantly „out of square‟, yet the damage around
these doorways was minimal.
The strip footings were identified as being only 300 mm deep. If the
brick walls were articulated i.e. „ Articul ated full masonry‟ construction,
then, for a Class H site, the footings would be required to be 1000 mm
deep in accordance with a „standard design‟ to section 3 of AS2870.
They would also need to be fully „gridded‟. However, for „ Full Masonry ‟
construction , a „ Design by Engineering Principles ‟ would be required in
accordance with section 4 of AS2870. This would require an even stiffer
footing system.
The pattern and locations of internal and external wall distress were
typical of differential foundation movements.
There are various possible cause(s) of these differential moisture
content changes, which have resulted in the foundation movements,
including the following:-
(i) Seasonal changes in soil moisture contents
(ii) The relatively low rainfall (drought conditions) in Melbourne in
recent years.
(iii) The affects trees (sic) located in close proximity to the house
(in particular, the tree which was removed from the garden
bed outside the southern side of the living room). The tree
roots may be causing soil drying settlements to occur, and
locally amplifying the seasonal changes in soil moisture
contents.
(iv) Poor site drainage
(v) Poor storm water drainage (3 down pipes discharge direction
to ROW).
(vi) The location of unpaved areas immediately adjacent the
house
(vii) Defective / leaking plumbing services.
The most significant damage to the original section of the house has
occurred in the regions of the house closest to the removed tree. In the
writer‟s opinion, this indicates this tree removed from outside the living
room has been a major contributing cause to the damage which has
occurred in recent years.
Relatively minor damage has occurred to the rear extension, however
this damage includes a 5 mm approximate wide horizontal crack to the
SW corner of the extension. In the writer‟ s opinion, the large tree
Case No: 278037 Determination Page 9 of 22
removed from near the SW corner of the building is likely to have
contributed significantly to this crack.
The only defects identified in the hydraulic services are located at the
southern end of the house (extension area), where there is relatively
minimal building damage. The comments below are made in relation
these defects:-
i. In the writer‟s opinion, these defects have not contributed to
the damage to the original section of the house.
ii. In the writer‟s opinion, these defects may have contributed to
some (likely minor) extent to the relatively minor damage to the
rear extension (bathroom and laundry).
In summary, this is an old house, with a grossly inadequate footing
system for a high reactive clay soils. The house has brittle finishes
externally and internally, and is sensitive to minor foundation
movements. The property has been poorly maintained with respect to
AS2870 Appendix B (and the CSIRO publication BTF18). In particular,
trees have been located within the subject property too close to the
house, the site drainage is poor, and the storm water drainage has not
been adequately maintained. Even if the site maintenance is improved
in accordance with AS2870 Appendix B, the house may continue to
perform poorly due to the inadequa te footing system.”
39. On receipt of both of these reports, the FSP denied the Applicants‟ claim for
a number of reasons. The Applicants disputed the findings of AL and FM and
commissioned their own expert report from an engineer, BR who provided
the following summary of his findings:
“ CONCLUSION:
I think in all probability the ground had dried out in underneath the
foundations, that a torrential rain got into the foundations, softened the clay
that was beneath the concrete, softening it to the extent it was incapable of
offering support and thereafter the building settled into it and the most obvious
rapid failure that is picked up on a large scale has then occurred. The
continuum has been the small amounts of bouncing up and down; mailing up
in this case as a bit of correction creeps in cracking the walls and making
them look ugly.”
40. The Applicants forwarded BR‟s report to the FSP for further consideration
however, the FSP did not accept the evidence provided by BR. In fact, in
some instances the FSP opined that BR reported the opinion of FM. As
such, the FSP continued to maintain its decision to deny the Applicants‟
claim.
Consideration of the evidence
41. The onus of proof rests on the Applicants to establish that, on the balance of
probabilities, they have suffered a loss caused by an insured event. Once
the Applicants have established that the loss was caused by an event
insured under their policy, the onus then shifts to the FSP to show that, on
the balance of probabilities, the loss falls within an exclusion clause in the
policy.
Case No: 278037 Determination Page 10 of 22
42. The Applicants say that the report it commissioned from BR indicates that
the most probable cause of the severe cracking they are claiming for, and
which resulted in the property becoming uninhabitable, was storm water
runoff. They say they have therefore proven they have a valid claim under
their insurance policy with the FSP.
43. The FSP notes that BR did not inspect the property until approximately 18
months after the reported event. It also says that two of its experts, CS and
FM agreed that the damage to the property was pre-existing and that FM
and another expert, SG, both found that the presence of trees close to the
house had caused damage to the house. It also says that BR agrees that the
trees referred to by FM and SG were too close to the house in accordance
with the relevant Australian Standard.
44. The FSP relies on the advice of its experts and denied the Applicants‟ claim
based on its experts‟ reports. It says there are several causes of the
damage, namely:
a failure to properly maintain or repair the insured property;
wear, tear and deterioration;
structural or other failure or breakdown;
soil movement and settlement; and
the actions of trees.
All of these causes are excluded from the policy.
45. The Panel has reviewed the findings of all the experts. The Panel
acknowledges that CS and SG inspected the property within two months of
the damage being reported to the FSP; FM inspected the property within
nine months of the damage being reported to the FSP; BR inspected the
property approximately 18 months after the damage was reported to the
FSP.
46. The Panel notes that with respect to the type of soil that the Applicants‟
property has been constructed upon, SG indicates the type as being Class
H. BR has made no comment on the soil type. FM q uestions SG‟s
assessment of the soil type indicating that he would classify the soil as Class
P due to “abnormal soil moisture conditions caused the tree” [sic]. FM later
suggests that a geological survey indicates the property is likely to have a
Class H soil type and acknowledges that this was confirmed by SG‟s
investigation.
47. Given that both SG and FM attended the property after trees were removed,
and SG‟s report is based on findings of the soil tests he conducted, the
Panel is satisfied that SG‟s opinio n on the class of soil is more reliable.
48. The Panel will address each cause of damage identified by the experts
separately.
Case No: 278037 Determination Page 11 of 22
Soil movement and settlement
49. The PDS clearly excludes soil movement and settlement. However in this
instance the Panel notes that the FSP is relying on several other probable
causes of the damage, as detailed above. There is no dispute between the
parties that the soil has in fact moved which has caused the damage to the
Applicants‟ property. What is in dispute is the cause of that soil movement.
Failure to properly maintain or repair the insured property
50. In FM‟s report, he says in relation to the maintenance of the Applicants‟
property:
“... The house has brittle finishes externally and internally, and is sensitive to
minor foundation movements. The property has been poorly maintained with
respect to AS2870 Appendix B (and the CSIRO publication BTF18). In
particular, trees have been located within the subject property too close to the
house, the site drainage is poor, and the storm water drainage has not been
adequately maintained. Even if the site maintenance is improved in
accordance with AS2870 Appendix B, the house may continue to perform
poorly due to the inadequate footing system.”
51. FM does not detail why the site drainage is poor or in what way the storm
water drainage would be required to be maintained, or even who would be
responsible for this, i.e. local council, YV or the Applicants. Trees in the
vicinity are discussed further in this Determination.
52. The Panel has not been provided with a copy of Australian Standard 2870
(AS2870) Appendix B or the CSIRO publication BTF18. As such, the Panel
has not been afforded the ability to assess FM‟s comments in relation to
maintenance of the site and its relevance to the Applicants‟ property .
Additionally, FM has not specified what actions or inactions of the Applicants
are relevant to these publications.
53. Of particular concern to the Panel is the relevance of these publications to
the Applicants‟ property given the construction of the propert y occurred in
excess of 100 years prior to the damage being noted. There is no
information contained in the material as to when these publications came
into being and whether or not they applied to the Applicants‟ property during
their ownership of it.
54. The Panel is therefore not satisfied that there is enough evidence to support
FM‟s opinion in this regard.
Wear, tear and deterioration
55. The FSP has included in its denial of the Applicants‟ claim, the exclusion
contained within its PDS regarding wear, tear and depreciation. The only
relevant comments made by the experts in this regard is reference to the
drought experienced in Victoria in the preceding 15 or so years prior to the
claim being made, pre-existing cracks which have been previously repaired
and doo rways being significantly „out of square‟.
Case No: 278037 Determination Page 12 of 22
56. FM noted and photographed cracks within the property which appear to have
been repaired previously. The Applicants agree that minor cracking had
appeared and it had been repaired and that they are not claiming for these
minor cracks. The Panel therefore accepts that there was some minor
cracking at the property prior to the discovery of the larger cracks, the
subject of the Applicants‟ claim.
57. The FSP and its experts however have not provided any link to how these
existing minor cracks have caused or contributed to the larger cracks now
evident at the Applicants‟ property. As the Applicants‟ claim relates to the
larger more severe cracks at the property, the Panel is not satisfied that the
pre-existing cracks have contributed to the current claim. The Panel is
therefore not satisfied that this exclusion applies in this instance.
Structural or other failure or breakdown
58. FM has suggested that the footings of the Applicants‟ property are
inadequate given the soil type in the area. FM relies on AS2870 in respect to
the correct type of footings required. He says:
“The strip footings were identified as being only 300 mm deep. If the brick
walls were articulated i.e. „ Articulated full masonry‟ construction, then, for a
Class H site, the footings would be required to be 1000 mm deep in
accordance with a „standard design‟ to section 3 of AS2870. They would also
need to be fully „gridded‟. However, for „ Full Masonry ‟ construction, a „ Design
by Engineering Principles ‟ would be req uired in accordance with section 4 of
AS2870. This would require an even stiffer footing system.”
59. Again, reference is made to AS2870 and again, there is no supporting
material to confirm how this standard relates to the Applicants‟ property or to
substanti ate FM‟s comments.
60. The Panel is again concerned that FM has made no reference as to when
this standard came into existence. In response, BR in his report commented
in relation to AS2870:
“... using Australian Standard 2870 as the guideline but note never a pplicable
with this construction as it was built well before the document was even
though of.” [sic]
61. The Panel is therefore satisfied that despite the construction of the footings
at the Applicants‟ property and whether or not they meet current Australian
Standards, the Standards referred to were not relevant at the time the
property was constructed.
62. Of note, the Panel refers to the exclusion relevant to rainwater seeping into a
property, as detailed in the PDS, which reads:
“ You are not covered for
... Damage or loss caused by water seeping into or otherwise entering your
landlord building due to:
Case No: 278037 Determination Page 13 of 22
a defect or fault in the design, structure or construction of your landlord
building where you could reasonably be expected to be aware of the
defect or f ault ...”
63. In this instance, the Panel is satisfied that the Applicants could not
reasonably have been expected to be aware of the footings being
inadequate, given that at the time the building was constructed, there were
no relevant standards or codes that would have applied. Accordingly, the
Panel is of the opinion that this exclusion cannot be applied in this instance.
The actions of trees
64. CS has indicated the presence of two “large” trees at the rear of the
Applicants‟ property and a “mature” tree within 600mm of where the majority
of damage has occurred. CS is the only expert who has inspected the
property who sighted the trees and in fact advised the Applicants to remove
them. The Applicants did remove the trees on CS‟s advice. In a file note
within the FSP‟s material dated 8 November 2010 CE refers to the “mature”
tree as a “small tree”.
65. FM makes reference to the trees after having reviewed aerial photographs of
the Applicants‟ property which he retrieved via an online website. He refers
to the trees as being “significant”. Based on the aerial photographs he
discovered, he sought an amendment by SG to SG‟s report in relation to the
presence of trees and the effect this would have on the Applicants‟ property,
which SG provided.
66. BR also made comment on the possible effect trees in the vicinity of the
Applicants‟ property may have had in relation to the cause of the damage to
the property.
67. Unfortunately, none of the experts have provided any information on the
actual size of the trees referred to, either in height or diameter of their trunks.
Whilst CS and FM have attributed much of the damage at the Applicants‟
property to these trees, they have not provided details of the type of trees,
root systems, root activities or how this can or would affect the soil or
property.
68. In contrast, the Applicants have provided a photograph of a tree stump which
remains at the Applicants‟ property after the removal of the tree. The tree
stump depicted in the Applicants‟ photograph, in the Panel‟s opinion, does
not represent a stump of a “large” or “significant” tree.
69. BR has acknowledged that based on where he was advised trees existed at
the property prior to his inspection and prior to their removal, that the tree
referred to by the FSP as being a contributor to the damage, was too close
to the property. BR referred to this tree as “small”. His opinion on the impact
this tree had on the damage is:
“I was further informed that allegations were levelled against the small tree
tucked into the corner behind the second bedroom. I think it was highly
unlikely that a tree of that size, irrespective of how close, would have been
Case No: 278037 Determination Page 14 of 22
able to cause the damage that is attributed, particularly as you get a lot further
towards the back of the property.
Remembering that this event occurred over a year and a half ago and
therefore is somewhat difficult to be 100% certain as to total cause and total
effect. However, I think it does get down to two causes and two effects; the
first one being the reasonably small tree, it contributes to some local drying
out in the ground and I would emphasise the word „local‟.
I believe the major cause and effect of tree drying in this property and all
around it are in fact the rather large trees focused along the lane on the other
side of it, relatively speaking, and thereafter to a lesser extent in the zone
under consideration, the trees in the rear of our own property. There can be
no doubt that over the 15 years of drought that we have currently been
through that the trees did have effect and did cause drying out, local
consolidation and settlement. The major problem occurs is where they have
actually dried out the ground in underneath and have not in fact initiated
collapse of the building above as it is stiff and rigid but with time will eventually
fail.
However, the major trigger to such failure is that the air voids beneath the
footings get filled with water from a very strong rain event and they in turn
soften the soil locally down below the 140 shear vein measurement as picked
up, i.e. the interface between the water and the clay becomes one of acute
wetness and therefore even though the clays now tend to swell, they lose all
bearing capacity as they are so wet, initiating collapse and movement.
I believe this is far more likely the cause and effect situation, but it requires
localised drying out of the ground directly in under the footings and thereafter
water coming down the wall, most likely in this case as the footpath, paving
etc. is not likely to allow it to flood against the building and thereafter the
ground softens and the building collapse locally.
The reason I believe this to be a high probability is that the [SG] investigation
under the footing probe picked up a damp soil, very close to the dry soil
attributed to the tree in behind the building. As a consequence you cannot
have it both ways. The tree will eventually consume the excess moisture and
gradually you will get equilibrium building up, i.e. leaks and trees go together;
terminate one or the other and you get differential movement which we are
now seeing in terms of reversed cracking and closure of some of the cracks
relative to the information as given in the photographs by others.
...
The tree had a very small effect in causing drying out in underneath and the
storm that followed saturated the soil to an extent where it lost shear capacity,
the wall moved and thereafter readjusted, both upwards and downwards. This
we believe, to be the highest probability, based on past experience in this
area.”
70. Whilst BR acknowledges that the “small” tree clo sest to the area of the
significant damage to the Applicants‟ residence could have contributed to
some localised drying out of the soil, he relies on the soil report from SG
which indicates there is damp soil near the dry soil. The FSP‟s experts say
this w as caused by the subject tree. BR notes “you cannot have it both
ways”. The Panel is of the opinion that BR‟s report provides more insight into
the effects of trees at the Applicants‟ property than the FSP‟s experts.
Case No: 278037 Determination Page 15 of 22
71. BR also acknowledges that the subject tree was not at the site at the time of
his inspection and that his inspection was conducted some 18 months after
the event was reported, so he could not be 100% sure of the actual cause
and effect.
72. The FSP argues that its experts attended at the property initially within two
months of the damage having occurred and again only nine months after the
damage occurred. Unfortunately, CS has failed to provide any pertinent
information in relation to the trees and in fact advised the Applicants to
remove them, which occurred prior to any further assessment of the property
by any of the other experts.
73. Nevertheless BR did accept that the trees would have had some effect
although to a lesser extent in the area under consideration.
Storm water runoff/overflowing of water mains/sewer etc
74. BR in his report attributes the cause and effect of the damage to the
Applicants‟ property as being rel ated to torrential rain which got into the
foundations of the Applicants‟ property , causing the failure of the of the
support and ultimately the large cracking to the walls. He also acknowledges
that there were some failings in mains water structures in the vicinity,
however has not sourced any significant effect from these failures to the
cause of damage.
75. In contrast, FM has provided the following opinion in relation to storm water
runoff and mains water structures:
“[FM] disagrees the damage to the [Applicants‟] property has been caused by
leakages from the storm water and sewer drainage services for the following
reasons:-
1. The only known defects in the storm water drainage and hydraulic
services are as follows:-
b. A crack in the earthenware sewer water drain below the house in
[Applicants‟ neighbour‟s property] (refer SK1)
c. The storm water drain from down pipe located in SW corner of
house (bathroom) is either blocked or „capped off‟.
The above defects are located at the southern end of the house, where there
is relatively small amount of distress compared to the remainder of the house.
[FM] agrees that these defects may be contributed to some (likely minor)
extent the (relatively minor) distress to the rear extension (i.e. bathroom and
laundry), however, we do not believe they would be contributing to the
distress to the original section of the house.
...
It is [FM]‟s understanding that the laneway did not „collapse‟, however that,
upon local excavations carried out by [YV], a void was found below the
ground surface with water. The letter from [YV] to [local council] dated 5 May
2010 states:-
„Although subsidence was not evident on th e surface a void was found
with water following excavation of the area‟
Case No: 278037 Determination Page 16 of 22
There is no evidence that the foundations of [the Applicants‟ property] have
been „undermined‟ .”
76. It is interesting that two experts can have such vastly differing opinions with
respect to the effect of storm water runoff. FM, for example, explains that an
old pit, identified by YV to be apparently redundant, could be retaining water
entering the pit via redundant and unplugged drains or ground water. He
makes no mention of this pit retaining water from any storm or rainwater
event and in fact, remains silent on this issue.
77. It would appear that FM was very focussed on the trees at the property and
the effect they have had in contributing to the damage to the Applicants‟
property. The Panel is not satisfied that FM has properly considered the
extent of the heavy rainfall experienced in the Applicants‟ area during
November/December 2009.
Proximate cause
78. The policy covers the event of storm and rainwater, including rainwater
runoff. The evidence provided by the Applicants in their submissions and by
their expert BR, is that the heavy rainfall experienced in November and
December 2009 has caused the soil under the footings of the property to
essentially fail. The FSP does not dispute that water has inundated the
property and gone into the soil under the footings of the property.
79. A review of the exclusions indicates that the policy does not cover any loss
or damage as a result of or caused by soil movement and settlement. The
Panel must therefore consider whether the proximate cause of the loss is the
soil movement or the heavy rainfall.
80. The Panel is satisfied that it is incorrect to look at the most immediate cause
when considering the proximate cause of damage; instead, one looks to the
“quality of the connection between [the] cause and the injury”. The correct
test for proximate cause is that it should be the “active, efficient cause that
sets in motion a train of events without intervention of any independent
force”.
81. On reviewing the issues, it is suggested that the soil movement has not
occurred independently. Further, the property damage occurred temporally
proximate to the heavy rainfall.
82. The Panel cannot accept that the soil movement should be considered an
independently occurring consecutive or concurrent cause of loss to the
rainfall. This is because the soil movement is a result of the rainfall and is a
result conditional on this event. It is doubtful that the damage viewed, would
have occurred but for this heavy rainfall.
83. The exclusion has therefore not been made out, because it is not damage
which is the result of or caused by soil movement and settlement in and of
itself. The damage has arisen due to the water inundation which then
Case No: 278037 Determination Page 17 of 22
resulted in the volumetric changes to the soil and subsequent cracking to the
walls of the property.
84. The Panel further notes it is the policy‟s cl ear intention to cover damage
arising from storm water inundation. Accordingly, the commercial intention of
the policy, should extend to damage caused by stormwater which results in
soil movement rather than soil movement acting naturally and gradually
without any single causal event.
85. In any event the FSP in its letter of 4 March 2011 accepted and made a
settlement of the claim in the amount of $3,964.38. It therefore follows that it
accepted a prima facie claim and has the onus of establishing those parts of
the claim for which its policy does not provide cover.
86. Although a claim has been established, it appears that there were other
contributing factors in the loss, including some contribution from the effect of
the trees. Further, there is evidence of previous movement as evidenced by
repair to a number of older cracks, although said by the Applicants to be
small cracks.
87. Although there were other contributing factors, the Panel is persuaded that
the cause of the majority of the damage was the storms as claimed by the
Applicants. However, in the Panel‟s view it is appropriate to consider an
apportionment of the total cost of repairs relative to the extent of storm
damage and the other damage. The extent to which the storm damage or
the other causes contributed to loss is unclear from the available evidence
and given the loss occurred some three years ago and the house has since
been sold, more probative evidence in that regard is not available.
88. In these circumstances the Panel is inclined to rely on its mandate to do
what is fair in all the circumstances, The Panel therefore determines that it is
fair that the FSP bear the cost of 70% of the damage claimed and the
Applicants bear 30% of the loss.
89. There is little evidence as to the exact cost of rectification, although the
Applicants have provided a quote for underpinning at $36,190. They also
estimate that the cost of internal repairs would be in the order of $10,000
and although not supported by any expert evidence, this appears not
unreasonable. The total thus claimed is $46,190, of which the FSP is to
contribute 70%.
90. Therefore, the Panel determines that the FSP is to pay the Applicants an
amount of $32,333, less any sum already paid (noting its previous offer of
settlement for $3,964.38) in settlement of damage to the house.
Loss of Rent
91. The Applicants seek to have loss of rent paid from the time their tenants
vacated the property on the advice of the FSP‟s assessor (15 February
2010) to the time the property was re-let (1 August 2011).
Case No: 278037 Determination Page 18 of 22
92. The FSP says the fact the Applicants were able to re-let the property with
apparently no rectification or repair work being completed to the property,
indicates that the property was in fact liveable.
93. The Panel notes comments made by the FSP in file notes indicating on 3
May 2011, the FSP claims to have no information or knowledge of when the
tenant vacated. This is contrary to FM‟s report dated 12 November 2010
which indicates FM spoke with the tenant who advised they moved out of the
property on 14 February 2010 on the advice of the „inspector‟.
94. Conversely, the Panel is mindful that the Applicants are required to take
reasonable steps to mitigate their loss, despite the dispute with the FSP.
Mitigation in this instance could be the repair and/or reletting of the property.
However, as is now known, the Applicants ultimately sold the property in its
distressed state.
95. Nevertheless, even if the Applicants had undertaken remedial action, the
house would likely be un-tenantable for a period of time while repairs were
being carried out. On that basis the Panel is again inclined to do what is fair
in all the circumstances and is of the view that a period of up to 3 months
would be required to undertake and complete the required works, including
underpinning, repairs, repainting etc.
96. Given the approach applied on the damage claim, the FSP is required to pay
70% of the rental for that period. The evidence provided indicates that rental
of $1,282 per month was appropriate. Therefore the FSP is required to pay
an amount of $2,692.20, being 70% of the rental for a three month period.
Other matters
97. The Panel also notes concerns raised by the Applicants in respect to FM‟s
request of SG to “amend” SG‟s report. These ame ndments related to the
incorrect reference to bore holes and a request that SG make comment on
trees and their impact in the vicinity of the damage being claimed.
98. The FSP advised that SG physically re-attended the site at the request of
FM and then amended the report. However, from the emails provided by the
FSP between FM and SG, the Panel can detect no such inference that a
reinspection was conducted by SG.
99. The Panel is also somewhat concerned that an expert tasked by the FSP
has requested another expert to amend a report. The question was not
asked of SG to clarify information, rather a request was made to alter SG‟s
original report.
100. The Panel is satisfied that the Applicants‟ concerns in this regard are well
founded and the Panel is therefore not satisfied that the second report from
SG, especially in relation to the trees at the site, can be considered relevant
to the issues in dispute, given that report was clearly influenced by another
expert‟s request.
Case No: 278037 Determination Page 19 of 22
Whether the FSP has acted in a manner which delayed the resolution of this
matter
101. The Panel has reviewed the material and developed the following timeline of
events:
Claim lodged by Applicants on or around 13 January 2010.
The FSP‟s CS attended the property on 10 February 2010 to assess
the damage.
SG was appointed by the FSP to expertly comment on the property on
15 February 2010.
SG‟s report is dated 9 March 2010.
CS contacted the Applicants and verbally advised them that the FSP‟s
decision is to deny their claim on 11 March 2010.
The Applicants sent an email to the FSP requesting a written response
regarding the denial of the claim on 6 June 2010.
The Applicants seek a formal response to their claim on 9 June 2010.
The FSP forwarded a written denial of the claim on 15 June 2010.
The Applicants wrote to the FSP requesting a review of the decision on
7 July 2010.
The matter was considered through the FSP‟s Internal Disputes
Resolution (IDR) process and was passed back to the claims area for
further investigation on 19 July 2010. A letter was sent to the Applicants
advising them of this on the same day.
AL conducted leak detection tests at the Applicants property on 6
August 2010.
FM inspected the property on 10 October 2010.
CS reviews the reports from AL and FM on 29 November 2011 and
advises Applicants on the same day that there is no claim/no cover.
Formal denial letter requested by Applicants on 29 November 2011.
FSP file sent to its administration area for a formal denial letter to be
sent on 18 December 2010.
Applicants contact FSP on 6 January 2011 and were advised that part
of the damage may be accepted and a scope of works is being
arranged for relevant repairs.
File allocated to assessor on 2 February 2011 to create a scope of
works based on FM report.
The Applicants forwarded a letter to the FSP on 4 February 2011
disputing the findings of FM and questioned amendments made by SG
to his original report.
Matter reviewed by FSP and letter sent to Applicants advising of
outcome of that review on 4 March 2011.
Case No: 278037 Determination Page 20 of 22
Applicants request a further review of decision in writing on 10 March
2011.
The FSP maintained its decision through its IDR department on 14 April
2011.
A review of loss of rent claim made by FSP on 3 May 2011 and details
of claim requested from Applicants as there was no information located
by the FSP at this time as to when the tenants moved out.
The Applicants provided a report from their expert, BR, on 13
November 2011. The report was dated 25 July 2011 and the delay in it
being provided to the FSP was due to the Applicants‟ solicitor being on
leave between July and November 2011.
102. The Panel accepts that the FSP is entitled to conduct enquiries in relation to
the full circumstances surrounding the Applicants‟ claim. The Panel also
acknowledges and accepts that during times of catastrophic weather events
the resources of any FSP are stretched to cope with the unusually high influx
of new claims and the additional demands of policyholders who have been
displaced from their usual residences.
103. The storm events in Melbourne during November and December 2009 and
which the Applicants‟ rely on as having caused the damage to their property,
certainly falls into this category. It is therefore reasonable to accept that
some delays would occur during the claims handling process.
104. However, The Panel is of the opinion that unnecessary delays have been
caused by the FSP, particularly in providing the Applicants with formal denial
letters and responding to the Applicants‟ concerns. In addition there appears
to have been an unacceptable delay between assessments completed by AL
and FM and the FSP has not provided any reason for these delays.
105. In its letter to the Applicants on 14 April 2011 the FSP acknowledged that it
had failed to meet the Applicants‟ expectation with respect to its handling of
the claim and it had breached its own Customer Charter and the General
Insurance Code of Practice.
106. Accordingly, the Panel is satisfied that unacceptable delays have been
present during the process of this claim and most of those delays were
caused by the FSP.
Compensation
107. The Panel has given consideration to another aspect of the matter which is
of concern.
FOS Terms of Reference
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for
Case No: 278037 Determination Page 21 of 22
consequential financial loss or damage up to a maximum amount of
$3,000 per claim made in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for non-
financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken
to resolve the situation or interference with the Applicant‟s
expectation of enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual‟s privacy rights
- injury has occurred to the Applicant‟s feelings or humiliation has
been suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute. ”
108. The Applicants seek to be reimbursed for the amount they have lost on the
sale of the property due to the unrepaired damage reducing the value of the
home. In an effort to support their loss, they have provided a letter from their
real estate agent which says:
“There is no doubt in my mind that the condition of the building, namely the
structural damage that was plainly evident to the southern most and adjoining
walls had a negative impact on sale price of this property. This fact is
illustrated to me best by looking at the feedback provided by my follow up
calls of the 52 inspections we had by buyers over a four week period. Only
two buyers were prepared to exchange contracts at a maximum of $450,000,
all the rest had said that it was „too much work‟.
The following recent sales analysis provide a strong indication of 2 bedroom
properties in [Applicants‟ suburb] with a land size of between 100m2 and
150m2. ([Applicants‟ property] is 135m2 approximately).
The median price per square meter for these properties is $4385.
Multiply this by the land of [the Applicants‟ property] and you have a price
guide of close to $600,000. this is what [the Applicants‟ property] would have
achieved in this market if it were a sound, undamaged construction .. .”
109. The FSP says it is not liable for this amount. Whilst the FSP remains
satisfied that its decision to deny the Applicants‟ claim is correct, it says that
should FOS find in favour of the Applicants, its liability is limited to the cost of
repairing the damage to the building. Additionally, it says FOS is only able to
award a maximum of $3,000 in accordance with 9.3 a) of the TOR.
110. The Panel is of the view that the FSP is correct in assessing its liability to be
limited to the cost of repairs to the Applica nts‟ building. In addition, whilst the
Applicants‟ real estate agent has confirmed that the property sold for a good
deal less than what he believes could have been realised had the property
been in a sound condition, the Panel has not been provided with e nough
information to accept that the total difference in the price is relative to the
condition of the property.
111. The Panel is aware that there are a number of factors which affect the sale
of a property, the condition of the property being one such factor. The Panel
Case No: 278037 Determination Page 22 of 22
is satisfied that the repairs required to rectify the damage as claimed by the
Applicants‟ would have been significant enough to contribute to a loss in sale
price.
112. For the reasons detailed above, the Panel is of the opinion that the FSP
should have authorised the relevant repairs for which it is liable. As it did not,
it cannot now rely on reducing its liability to the cost of repairs only, given
that the Applicants would on the balance of probabilities have suffered some
loss of value on the sale of the property, given the unrepaired damage
present.
113. In the Panel‟s opinion the FSP has failed to authorise the repairs to the
Applicants‟ property and as the Applicants decided to sell the property “as
is”, the Panel is satisfied that some loss on the sale price would have been
attributed to the condition of the property due to repairs no being authorised.
114. The Panel therefore considers that the FSP should further compensate the
Applicants by payment of the sum of $3,000 under this heading.
Determination
115. On the basis of the available information the Panel determines that the FSP
was not entitled to deny the Applicants‟ claim.
116. The FSP is to pay the Applicants an amount of $32,333 in respect of the
damage to the building.
117. The FSP is also required to pay the Applicants an amount of $2,692.20 in
respect of loss of rent.
118. The FSP is entitled to deduct from the amount payable any settlement
amount already paid, together with any excess which may be payable under
the terms of the policy.
119. The Panel further determines the FSP should pay interest on both the cost of
repairs and loss of rent sums from the date the insurer denied the claim
verbally (11 March 2010) to the date when this Determination is satisfied in
accordance with Section 57 of the Insurance Contracts Act 1984 (Cth).
120. The Panel also determines that the Applicants are entitled to compensation
for the loss of value on the sale of the property for the amount of $3,000.