Home / Financial Firm (Unknown - Insurer) / Determination 277988
Determination 277988
Hail damage repair method and total loss settlement
Summary
The Applicant's hail-damaged car, four months old, was repaired by paintless dent repair and the FSP declined to write it off or settle on a total loss basis. AFCA found the FSP entitled to choose the settlement method and that the policy excludes post-repair diminished value.
The policy lets the FSP choose to repair, pay or write off the vehicle, and the new-parts obligation applies only where parts are replaced during the repair.
Issues
- Repairs or contractors primary · not upheld
“I am satisfied the actions taken by the FSP in relation to this claim are in accordance with the terms and conditions of the policy.”
- Claim amount dispute secondary · not upheld
“The policy clearly excludes any liability in respect of a vehicle's post-repair value.”
- Poor claim handling secondary · not upheld
“I do not believe that the FSP was under any obligation to remind the Applicant of the policy entitlement to nominate a repairer.”
- Delay secondary · not upheld
“I am satisfied that the FSP moved within a reasonable timeframe to have the vehicle assessed and repaired.”
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 277988 Determination Page 1 of 6
Case number: 277988
General Insurance - Domestic Insurance – Motor Vehicle Comprehensive –
FSP Decision – Nature Of Settlement
24 October 2012
Background
1. The Applicant is insured under a motor vehicle policy underwritten by the
Financial Services Provider (FSP).
2. The vehicle insured under this policy was damaged in a major hailstorm on
25 December 2011.
3. The claim was lodged with, and accepted by, the FSP. The vehicle was
assessed on 21 January 2012 and repairs were commenced early to mid
February 2012.
4. On 17 February 2012, the Applicant viewed the repairs in progress,
expressing his dissatisfaction with the repair method and ordering the
repairer to cease work on the vehicle.
5. On the same day (17 February 2012), and subsequent to t he Applicant’s
discussion with the repairer, the FSP discussed with the Applicant the issues
around repair method and whether or not the vehicle should be written off.
No agreement was reached and the FSP instructed the repairer to continue
work.
6. The Applicant is not satisfied with the repairs and maintains that his vehicle,
which was only four months old at the time of the loss, will have been
devalued as a result of the damage and of having been repaired. He
maintains that he is entitled to a replacement vehicle or cash settlement on a
total loss basis.
Summary of Applicant’s position
7. The Applicant advises that, although he was entitled to nominate a repairer
to quote for the repairs to his vehicle, he was not given this option at the time
of the assessment, by the assessor.
8. The repairer did not replace the damaged vehicle with new parts. During a
visit to the repairer’s premises, one of the repairers commented that the roof
of the car needed to be replaced. However, since there was a 3 month
Determination
Case No: 277988 Determination Page 2 of 6
waiting period for the part to be available from Japan, they had instead taken
a short cut and proceeded with a method, which involved hammering out the
dents, applying filler and painting over the surface. The Applicant claims that
this practice is contrary to the FSP’s policy, which guarantees replacement
of damaged parts with new parts in cars less than 12 months old.
9. In making the decision as to whether or not to write off the car, the FSP’s
assessor considered only the financial benefits to be reaped by the FSP and
did not consider the overall devaluation of the vehicle which the Applicant
had only owned for 4 months.
10. The Applicant also advises that, in response to concerns that the car would
not be returned to its previous condition, the FSP’s dispute resolution officer,
in a letter dated 14 March 2011, stated that the paintless dent repair (PDR)
technique would be used to repair minor to large dents and that any dents
that could not be removed using the PDR method would be removed using a
“push to paint” process.
11. However, the Applicant advises that the PDR technique was only considered
after his visit to the repairers on 17 February 2011 by which time 75% of the
repair work had been completed. He cites the timelines stated in the FSP’s
Notice of Response as proof. The Applicant maintains that use of the PDR
technique would have assisted in maintaining the integrity of the metal body
work and the vehicle manufacturer’s paint work and that the FSP should not
have authorised repairs to commence until people skilled in the use of the
PDR technique were available to commence work.
12. The Applicant also advises his dissatisfaction over the time taken to settle
his claim.
Summary of FSP’s position
13. The Applicant’s vehicle was damaged on 25 December 2011 but could no t
be assessed until 21 January 2012. This was due to the high volume of
claims received as a result of the hailstorms.
14. The FSP advises that it was deemed economical to repair the vehicle and
that had the Applicant indicated a wish to source its own repair quote, then
that quote would have been considered along with those obtained by the
FSP.
15. The FSP relies on its policy wording which, at page 26, says:
“ If your car cannot be repaired
Sometimes cars are so badly damaged that they would not be either safe or
economical to repair.
If in our opinion, the damage to your car is so great that it would not be safe or
economical to repair, we will declare your car a write-off and pay the agreed
value or replace it.”
Case No: 277988 Determination Page 3 of 6
Since the agreed value for the vehicle was $24,690 and the cost of repairs
was $9,747, it was economical to repair. The repairs do not compromise the
safety of the vehicle.
16. The FSP confirms that where parts were replaced, they were replaced using
new, genuine parts.
17. The FSP acknowledges that consideration was given to replacing the
vehicle’s roof. This consideration was given at a time when, due to the
volume of hail damage claims received, there was a lengthy delay for PDR
repairs and it was considered the best way to quickly progress the claim.
Once it was established the timeframe for the delivery of the roof would be at
least 3 months the decision to use PDR on the roof was considered the
better option to progress the claim.
18. The Applicant has raised concerns that the damage, and subsequent
repairs, will have devalued the vehicle. The FSP maintains that it is not
responsible for any such devaluations and relies on the exclusion at page 20
of the policy which states
“ We will not pay for
Any reduced value of your car after it has been damaged and repaired and
the repairs have been properly performed”
19. The FSP maintains it is entitled under the terms of the policy to make the
decision as to whether to repair the vehicle, pay the cost of repairing the
vehicle or declare the vehicle a write-off and pay the amount covered.
Issues
20. Whether the FSP has taken too long to settle the claim.
21. Whether the Applicant was denied the right to nominate its own repairer to
provide a repair quotation.
22. Whether the FSP has failed to meet its policy obligations by repairing panels
instead of replacing panels with new genuine parts.
23. Whether the FSP has any obligations to the Applicant in relation to the post-
repair value of the vehicle and, if so, whether those obligations have been
met.
24. Whether the Applicant has any entitlement to a replacement vehicle or to
receive the full agreed value of the vehicle as settlement.
25. Whether the repair techniques were appropriate under the circumstances.
Case No: 277988 Determination Page 4 of 6
Reasons for decision
26. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This
is due to the quantum and complexity of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
27. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
28. Having regard to the scale of hail damage on 25 December 2011, I am
satisfied that the FSP moved within a reasonable timeframe to have the
vehicle assessed and repaired. Reports indicate that over 10,000 vehicles
were hail damaged at that time and, given that there was an intervening
holiday period, it appears reasonable to have had the vehicle assessed
within 1 month and repairs commenced within a further 3 weeks.
29. The policy document says that the insured party may nominate its own
repairer to provide a quotation, although it should be noted that the final
decision as to the repairer chosen remains with the FSP. Having detailed
this entitlement within the policy, I do not believe that the FSP was under any
obligation to remind the Applicant of this or to draw its attention to that policy
entitlement. Neither do I accept there was any ulterior motive or reason for
its not having done so.
30. I note that prior to the assessment, the Applicant and members of the
Applicant’s family had already been in contact with the FSP insisting that the
vehicle be written off. It appears that, far from wanting input to the repair
process, the Applicant’s preferred position was that there should not be a
repair process and that the vehicle should be written off.
31. The FSP has advised that it considered replacing the roof of the vehicle with
a new roof, but that this consideration was based entirely around expediting
the claim. When it became clear that there was no time advantage to
replacing the roof it went back to the repair option. There are two issues to
consider here:
a. The FSP’s entitlement to choose the method of settlement
b. The extent of the FSP’s obligation to use new, genuine parts
32. The policy is quite clear. The FSP is entitled to choose the method of
settlement. On page 9 of the policy document under the heading “The
protection we provide” the policy states:
“When your car has been damaged , we will decide to repair it, pay the cost of
repairing it, declare it a write- off and pay the agreed value, or replace it”
The various options are clearly at the FSP’s discretion.
Case No: 277988 Determination Page 5 of 6
33. In relation to the supply of parts, this aspect is covered at page 24 of the
policy document, which states:
“ Where replacement parts are required for the repair of your car and:
Your car is within its manufacturer’s new car warranty period
New genuine parts will be used except for the replacement of windscreens
and window glass for which Australian manufactured Australian Design Rule
compliant parts may be used.”
This clause does not create an obligation on the part of the FSP to use new
parts as an alternative to repairing existing parts. The obligation is that
where parts are being replaced as part of the normal repair process, then
those parts will be new, genuine parts.
34. In this instance the FSP appears to have considered replacing the roof,
purely from the perspective of time management and, when that option
proved to provide no advantage, it has exercised its rights under the policy to
repair the existing panel.
35. The FSP’s obligation to indemnify the Applicant under the policy is clearly
limited by the terms of the policy and, whilst it must use all care to ensure
that the process of settlement is reasonable under the circumstances, the
policy clearly excludes any liability in respect of a vehicle’s post -repair value.
It should be noted that the Applicant has an ongoing entitlement in respect of
the quality of the repair but has not submitted any expert evidence to the
effect that the nature or quality of the repairs are inadequate.
36. The issue raised by the Applicant in relation to the timing of the decision to
use the PDR technique appears to be without foundation. Having reviewed
the transcripts and timelines provided by the FSP in its response, it appears
to me that the Applicant is inferring an intention that is not evident in the
transcript. The discussion in the transcript appears to relate to the fact that
the availability of PDR specialists negates the value of importing a new roof.
I cannot find any evidence to support the view expressed by the Applicant
that a greater proportion of the work could have been completed using the
PDR technique. Again, no expert evidence has been provided by the
Applicant to support its statement to this effect.
37. I am satisfied that the actions taken by the FSP in relation to this claim are in
accordance with the terms and conditions of the policy held by the Applicant
with the FSP.
Case No: 277988 Determination Page 6 of 6
Determination
38. On the basis of the available information I determine that the FSP has
discharged its obligations under the policy.
39. Accordingly, the FSP is not obliged to write -off this vehicle, nor is it obliged
to settle the claim as a total loss either by cash settlement or replacement.
40. Under the terms of the policy the FSP has an ongoing obligation in respect
of the quality of workmanship and materials used in the repairs.