Text of the determination
Case No: 277847 Determination Page 1 of 9
Case number: 277847
General Insurance – Domestic Insurance - Home Building Insurance – Storm
water runoff – Policy exclusions – Water seeping or percolating, gradual
deterioration
13 December 2012
Background
1. The Applicant insured his home building under a Home Insurance Policy
against loss or damage caused by insured events for $963,000 with a $1,200
policy excess. The policy incepted on 27 February 2006 and was renewed
annually to 27 February 2013.
2. The bluestone building was built in approximately 1860 and was located at
Talbot, approximately 15kms south of Maryborough, Victoria. The district
suffered extreme weather conditions between 10 and 14 January 2011 causing
widespread flooding.
3. On 25 May 2011, the Applicant advised the Financial Services Provider (FSP)
of damage to floorboards, ceilings and walls that were getting worse over time.
4. The Applicant has orally obtained costs for repairing the damage as being
between $74,150 and $101,950.
5. The Applicant submits that during the period 10 to 14 January 2011 his locality
suffered record rainfalls that saturated the land and caused rainwater runoff to
flow under his house. His house did not suffer any damage from flood waters.
6. The FSP has denied liability on the grounds the damage to the insured house
was caused directly or indirectly by inherent defects, faulty design, structural
defects, poor workmanship, mould, gradual deterioration and wear and tear,
soil movement, shrinkage or expansion of earth or land which are policy
exclusions.
7. The Applicant contends that the damage to his house was caused by
stormwater runoff.
Summary of Applicant’s Position
8. For the period 10 to 14 January 2011, the Applicant’s locality suffered extreme
storms and rains. Storm water runoff flowed under his house eventually
resulting in cracking and rising damp to walls, cracking and rotting floorboards,
Determination
Case No: 277847 Determination Page 2 of 9
damage to pool paving and a stone fence at the rear of the pool. Rainwater
also entered the ceiling space causing damage to insulation and ceilings.
9. During the storm events, the Applicant and his wife and a neighbour, worked at
keeping water out of the house and preventing water from running down the
lounge room walls, saturating floorboards and ponding to the sub-floor of the
house.
10. The FSP has rejected his claim based on policy exclusions such as inherent
default, poor workmanship, mould, gradual deterioration, wear and tear.
11. The pool, pool paving and stone fence were built in August to December 2005.
In December 2009, there was a photo shoot on the property. The photographs
were taken about 12 months before the storm events.
12. The photographs confirm that there were no cracks or rising damp to the
interior of the building. There were no water stains in the lounge room and the
ceiling was not being supported by a prop. The photographs show the condition
of his house in December 2009 compared with the condition after the January
2011 rainstorms.
13. The FSP has stated that his house had poor workmanship in construction,
structural defects, adequately not maintained and water had not penetrated to
the sub-floor of the house.
14. The Applicant purchased the property in February 2004 and since the purchase
he undertook installation of insulation, a new ceiling, lounge room,
plasterboard, patching, painting and decorating. The floorboards were sanded
and polished.
15. His house was in excellent condition and was featured in ‘Country Style’
magazine issue January/February 2010.
16. The FSP has submitted that the house contained structural defects. The house
was built in the 1860’s and was built to the regulations of the day. The house
has stood for approximately 140 years and not experienced any rising damp or
the amount of cracking which now exists in the building.
17. He does accept that some cracking has occurred over 140 years water
penetration. There are air vents on one side of the house through which
rainwater runoff entered the underside of the house.
18. The FSP has accepted liability for some of the damage but the Applicant does
not agree with proposed repairs and questions costing for repairs. For example:
paving around the pool – the FSP’s quote allows $20.85 per square
metre to lift, re-lay and re-gravel; the Applicant obtained two quotes for
approximately $50 - $75 per square metre;
the FSP has accepted liability for only 50% of the costs of repairs to the
paving; the Applicant submits that the rainwater runoff caused all of the
damage including the damage to the wall at the rear of the pool.
Case No: 277847 Determination Page 3 of 9
the Applicant disagrees with the proposed method of repair to his
house and notes that some damage has not been taken into account
such as insulation that had been saturated by rainwater leaking from
the roof
19. The Applicant submits that FOS determines:
a firm square metre rate to relay pavers around the pool area;
in the lounge room a complete procedure to inspect the ceiling
insulation and plasterboard; repair work to wall and floor;
removing all floorboards, repair to sub-floor, spraying of mould under
the floor boards to all rooms;
drying out of under the sub-floor area to all rooms;
replacing Baltic pine floorboards that are badly damaged in all rooms;
sanding and polishing of floors to all rooms;
repair work of cracking to 50% of all rooms;
repaint all rooms;
repair damaged front door, sub-floor corner may need underpinning;
relaying of pavers to verandah, corner side by the pool may need
underpinning.
20. The Applicant subsequently engaged a structural engineer to inspect and report
on the damage to his house. The structural engineer and a local builder
provided an oral scope of works with an estimated cost of repairs between
$74,150 and $101,950.
Summary of FSP’s Position
21. It relies on reports submitted by its loss assessor, an engineering and building
consultant group and an hydrologist, to deny liability for the damage to the
Applicant’s house.
22. The Applicant’s policy specifically excludes loss or damage as a result of wate r
seeping or percolating into the building as a result of structural defects, faulty
design, faulty workmanship or the failure to adequately maintain the buildings.
23. The policy also excludes loss or damage resulting from gradual deterioration,
natural soil movement and shrinkage and expansion of the earth, as well as
faulty design at initial construction and wear and tear.
24. On appeal by the Applicant the claim was reviewed through the IDR process
and the original decision to deny liability was upheld on the ground the damage
to the Applicant’s property had been caused by water seeping or percolating
into the building as a result of structural defects, faulty design, faulty
workmanship or the failure to adequately maintain the buildings. It was
Case No: 277847 Determination Page 4 of 9
concluded the damage has been occurring over several rainfall events and not
from one single identifiable event.
25. However, the engineering and building consultant group reported damage to
ceilings that had been caused by the roof becoming detached during the storm
allowing water into the western end of the building. The FSP has accepted
liability for the damage to the lounge room ceiling.
26. Further, the paving around the pool also had 50:50 estimates of damages from
water under the slabs and root infestation. On this basis the FSP agreed to
accept 50% of the repair costs to the pool paving.
27. A quotation for repairs was obtained from a building consultant as follows:
Lounge room ceiling repairs $3,186.81
Lounge room wall repairs $1,444.52
50% pool paving repairs $2,294.33
Total $6,925.66
28. A total cash settlement for the amount of $6,925.66 was declined by the
Applicant.
29. Apart from the water that entered the house through the roof, no other water
actually entered the property but rather pooled around the perimeter of the
home and has remained there for some time. This water then saturated all
underneath the home due to lack of drainage and ventilation causing the
remainder of the damage.
30. Its decision has been correct in its interpretation of the policy in declining the
majority of the claim and it is justified in using the information obtained via
reports provided by the engineering and building consultant group and the
hydrologist on which to base the declinature.
31. The FSP relies on the following policy/contract provisions:
‘Insured events we will pay
...
9. Storm, rainwater or run-off
...
We will pay for loss or damage caused by storm, rainwater or run-off.
‘storm’ means violent wind (including cyclones and tornadoes), thunderstorms and
hail which may be accompanied by rain or snow.
‘rainwater’ means rain falling naturally from the sky onto the buildings and/or ground.
‘run - off’ means rainwater that has collected on or has flowed across normally dry
ground or has overflowed from swimming pools or spas.
We will not pay for loss or damage:
a. caused by:
Case No: 277847 Determination Page 5 of 9
flood, or
flood water combined with run-off and rainwater;
...
When we will not pay a claim under your policy
1. This policy does not cover loss, liability, injury or damage:
...
f. Wear and tear
arising out of depreciation, gradual deterioration, wear and tear;
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design, structural
defects or poor workmanship;
...
Conditions of cover
...
2. Taking precautions
We will not pay for loss, liability, injury or damage if you do not:
...
c. maintain your buildings in good repair;’
Issues
32. Whether the Applicant’s house was damaged by the insured event ‘storm,
rainwater or run- off’.
33. Whether the FSP is entitled to rely on a policy exclusion to deny indemnity to
the Applicant.
Reasons for Decision
34. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
35. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
36. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. The
Panel has had regard to the material exchanged and the detailed submissions
made on behalf of the parties.
Case No: 277847 Determination Page 6 of 9
37. The Applicant’s locality of Talbot, a country town in Victoria, suffered extreme
storms and rainfall between 10 and 14 January 2011. Talbot is 15 kilometres
south of Maryborough and 18 Kilometres north of Clunes.
38. Rainfall for the period 10 to 14 January 2011 was, Clunes 208.4mm,
Maryborough 228.0mm. Talbot received a daily rainfall of 91mm on the 14
January 2011 and its wettest January on record with a total of 248.6mm
compared to the January average of 30.3mm.
39. The result of the extreme rainfall was th at the Applicant’s property was
inundated by rainwater runoff. This runoff entered the sub-floor of the house
and was trapped under the house for an extended period of time causing
damage to the interior of the building.
40. Therefore, the Applicant prima facie has a claim that falls within the cover
provided by the policy.
41. The FSP seeks to rely on policy exclusions to deny indemnity to the Applicant.
Therefore, the onus shifts to the FSP to establish that, on the balance of
probabilities, the damage was caused by an event excluded from the cover
provided by the policy.
42. The Applicant’s 140 year old house is constructed of bluestone walls with
bluestone stumps supporting the floor joists.
43. The FSP’s loss assessor reported extensive subsidence or foundation
movement both in the timber framed flooring and in the external bluestone
walls. Major distortion of the brick floored verandah was evident suggesting
substantial swelling had occurred to the foundation materials.
44. The loss assessor stated that major works will be required to lift and level the
house. There is also substantial rising damp in the internal walls which will
require stripping of additional plaster and repair and repainting.
45. The loss assessor’s report dated 6 June 2011 stated, in part:
As a result of the storms the property has been inundated with water,
overflow of large swimming pool and possibly overflow of a well
contributing to the saturation;
... it appears the sub-floor area has been flooded causing damage to
foundations and flooring throughout the dwelling.
46. The FSP appointed an engineering and building consultant group to inspect
and report on the extent of damage to the Applicant’s home and likely cause
including the condition of foundations and then to provide a scope of works.
47. The group’s repo rt dated 2 July 2011 stated, in part:
The water table under the house was quite high causing the base of all
walls to absorb moisture, causing them to expand relative to the tops of
the walls;
Case No: 277847 Determination Page 7 of 9
This induces cracking in the walls at the weakest points it also causes
moisture to rise up through the walls, which damages the lower parts of
the walls;
Mould is probably everywhere under the floor of the house; some floor
boards are cupping.
48. The Applicant engaged a structural engineer to carry out a visual inspection of
the dwelling. His comments and recommendations are made in conjunction
with findings of MCS.
49. In his report dated 29 June 2012 the structural engineer stated, in part:
The condition of the building remained that same as when report by
MCS; the problems of wall cracking dampness in walls and floor still
exists, if not getting worse in the area of the floor structure;
The factors contributing to movement in the building is most likely the
excessive variation of moisture across the dwelling from the adjacent
paved areas of the building to the adjacent landscaped areas;
The site has not dried out since the last flooding of January 2011
50. He agreed with the recommendations and the remedial scope of works
prepared by MCS;
51. In addition he also recommended:
selected underpinning of footings under wall areas showing large
cracking and subsidence of 15mm or greater;
all subfloor framing and lining boards showing dampness and rotting be
replaced.
52. In his opinion, the evidence and previous reports point to the fact that due to
the extraordinary abnormal amount of water in a very short and concentrated
time frame altered the hydraulic equilibrium of the site thus causing the
probable distress to the structure.
53. He also recommended that a Geotechnical Investigation be carried out before
any remedial works program is put in place to determine the time frame for
works to be carried out.
54. The FSP has listed numerous exclusions to establish that the policy of
insurance does not cover the loss or damage to the Applicant’s property.
However, the FSP has not clearly documented how these exclusions should
apply.
55. For example, in its initial letter of declinature of the Applicant’s claim, dated 14
September 2011, it stated:
‘Their reports confirm that the damage to your property is as a result of a combination
of natural soil movement and shrinkage or expansion of earth, faulty design at initial
construction and wear and tear.’
Case No: 277847 Determination Page 8 of 9
56. The Panel is of the opinion that any soil movement was the result of the
inundation of the Sub-soil from the stormwater runoff. Further, the building was
constructed in the 1860’s and the FSP does not document how the construction
was faulty design at initial construction.
57. The FSP also submits that the damage to the building was caused by wear and
tear. The Panel agrees that a building over 140 years old would have evidence
of wear and tear. However, the Applicant has owned the property for
approximately seven years and has carried out extensive maintenance and
improvements during that time. There is also evidence that the building was in
excellent condition in December 2010, approximately 13 months before the
January 2011 storms.
58. In its IDR decision letter dated 30 September 2011, the FSP listed a number of
policy exclusions without explaining how th ey applied to the Applicant’s claim.
The onus is on the FSP to establish that it is entitled to rely on a policy
exclusion to deny liability.
59. The Panel concludes the FSP has failed to provide adequate evidence to
demonstrate the applicability to the claim of the exclusions relied on.
60. On the evidence submitted the Panel finds that the proximate cause of the
damage to the Applicant’s house was the stormwater runoff saturating the soil
around the insured property and, more importantly, water flowing under the
house through air vents. In other words, the damage was caused by the
insured event ‘storm, rainwater or run - off’.
61. Other than the Applicant’s oral scope of works and estimated cost of repairs, no
other quotes or estimates of costs have been provided.
Determination
62. The Panel determines that the FSP has not met the onus on it to establish that,
on the balance of probabilities, the damage to the Applicant’s property was
subject to a relevant exclusion of the policy.
63. Accordingly, the Panel determines that the FSP is to indemnify the Applicant for
the cost of repairs and other remedial work, such as drying the sub-floor and
treatment of the mould, to his house.
64. In preparing a Scope of Works, the Panel determines that the Scope of Works
prepared by the FSP’s engineering and building consultant group and the
Applicant’s structural engineer, be adopted.
65. The Panel notes that the FSP has accepted 50% of the cost of repairs to the
rear wall to the pool. The Panel considers this offer to be fair and reasonable
but the cost is to be based on the actual cost of repairs rather than the estimate
submitted by the FSP.
Case No: 277847 Determination Page 9 of 9
66. Further, the Applicant has submitted that he is prepared to meet 50% of the
cost of repairs to the internal walls which the Panel considers to be a fair and
reasonable proportion.