Home / Financial Firm (Unknown - Insurer) / Determination 277847

Determination 277847

Denial of storm water runoff damage to bluestone home

FirmFinancial Firm (Unknown - Insurer)
Decided2013-01-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$74,150
SourceAFCA PDF

Summary

The owner of a 140-year-old Talbot home claimed for water damage after January 2011 rainfall, and the FSP declined under exclusions after offering $6,925.66. AFCA found the damage was caused by storm, rainwater or run-off and that the FSP had not proved the exclusions, so it ordered indemnity for repairs under an agreed scope of works.

The insurer bears the onus of proving an exclusion applies, and it did not show that wear and tear, defects or soil movement caused the loss rather than the insured storm and run-off event.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 277847 Determination Page 1 of 9 Case number: 277847 General Insurance – Domestic Insurance - Home Building Insurance – Storm water runoff – Policy exclusions – Water seeping or percolating, gradual deterioration 13 December 2012 Background 1. The Applicant insured his home building under a Home Insurance Policy against loss or damage caused by insured events for $963,000 with a $1,200 policy excess. The policy incepted on 27 February 2006 and was renewed annually to 27 February 2013. 2. The bluestone building was built in approximately 1860 and was located at Talbot, approximately 15kms south of Maryborough, Victoria. The district suffered extreme weather conditions between 10 and 14 January 2011 causing widespread flooding. 3. On 25 May 2011, the Applicant advised the Financial Services Provider (FSP) of damage to floorboards, ceilings and walls that were getting worse over time. 4. The Applicant has orally obtained costs for repairing the damage as being between $74,150 and $101,950. 5. The Applicant submits that during the period 10 to 14 January 2011 his locality suffered record rainfalls that saturated the land and caused rainwater runoff to flow under his house. His house did not suffer any damage from flood waters. 6. The FSP has denied liability on the grounds the damage to the insured house was caused directly or indirectly by inherent defects, faulty design, structural defects, poor workmanship, mould, gradual deterioration and wear and tear, soil movement, shrinkage or expansion of earth or land which are policy exclusions. 7. The Applicant contends that the damage to his house was caused by stormwater runoff. Summary of Applicant’s Position 8. For the period 10 to 14 January 2011, the Applicant’s locality suffered extreme storms and rains. Storm water runoff flowed under his house eventually resulting in cracking and rising damp to walls, cracking and rotting floorboards, Determination Case No: 277847 Determination Page 2 of 9 damage to pool paving and a stone fence at the rear of the pool. Rainwater also entered the ceiling space causing damage to insulation and ceilings. 9. During the storm events, the Applicant and his wife and a neighbour, worked at keeping water out of the house and preventing water from running down the lounge room walls, saturating floorboards and ponding to the sub-floor of the house. 10. The FSP has rejected his claim based on policy exclusions such as inherent default, poor workmanship, mould, gradual deterioration, wear and tear. 11. The pool, pool paving and stone fence were built in August to December 2005. In December 2009, there was a photo shoot on the property. The photographs were taken about 12 months before the storm events. 12. The photographs confirm that there were no cracks or rising damp to the interior of the building. There were no water stains in the lounge room and the ceiling was not being supported by a prop. The photographs show the condition of his house in December 2009 compared with the condition after the January 2011 rainstorms. 13. The FSP has stated that his house had poor workmanship in construction, structural defects, adequately not maintained and water had not penetrated to the sub-floor of the house. 14. The Applicant purchased the property in February 2004 and since the purchase he undertook installation of insulation, a new ceiling, lounge room, plasterboard, patching, painting and decorating. The floorboards were sanded and polished. 15. His house was in excellent condition and was featured in ‘Country Style’ magazine issue January/February 2010. 16. The FSP has submitted that the house contained structural defects. The house was built in the 1860’s and was built to the regulations of the day. The house has stood for approximately 140 years and not experienced any rising damp or the amount of cracking which now exists in the building. 17. He does accept that some cracking has occurred over 140 years water penetration. There are air vents on one side of the house through which rainwater runoff entered the underside of the house. 18. The FSP has accepted liability for some of the damage but the Applicant does not agree with proposed repairs and questions costing for repairs. For example:  paving around the pool – the FSP’s quote allows $20.85 per square metre to lift, re-lay and re-gravel; the Applicant obtained two quotes for approximately $50 - $75 per square metre;  the FSP has accepted liability for only 50% of the costs of repairs to the paving; the Applicant submits that the rainwater runoff caused all of the damage including the damage to the wall at the rear of the pool. Case No: 277847 Determination Page 3 of 9  the Applicant disagrees with the proposed method of repair to his house and notes that some damage has not been taken into account such as insulation that had been saturated by rainwater leaking from the roof 19. The Applicant submits that FOS determines:  a firm square metre rate to relay pavers around the pool area;  in the lounge room a complete procedure to inspect the ceiling insulation and plasterboard; repair work to wall and floor;  removing all floorboards, repair to sub-floor, spraying of mould under the floor boards to all rooms;  drying out of under the sub-floor area to all rooms;  replacing Baltic pine floorboards that are badly damaged in all rooms;  sanding and polishing of floors to all rooms;  repair work of cracking to 50% of all rooms;  repaint all rooms;  repair damaged front door, sub-floor corner may need underpinning;  relaying of pavers to verandah, corner side by the pool may need underpinning. 20. The Applicant subsequently engaged a structural engineer to inspect and report on the damage to his house. The structural engineer and a local builder provided an oral scope of works with an estimated cost of repairs between $74,150 and $101,950. Summary of FSP’s Position 21. It relies on reports submitted by its loss assessor, an engineering and building consultant group and an hydrologist, to deny liability for the damage to the Applicant’s house. 22. The Applicant’s policy specifically excludes loss or damage as a result of wate r seeping or percolating into the building as a result of structural defects, faulty design, faulty workmanship or the failure to adequately maintain the buildings. 23. The policy also excludes loss or damage resulting from gradual deterioration, natural soil movement and shrinkage and expansion of the earth, as well as faulty design at initial construction and wear and tear. 24. On appeal by the Applicant the claim was reviewed through the IDR process and the original decision to deny liability was upheld on the ground the damage to the Applicant’s property had been caused by water seeping or percolating into the building as a result of structural defects, faulty design, faulty workmanship or the failure to adequately maintain the buildings. It was Case No: 277847 Determination Page 4 of 9 concluded the damage has been occurring over several rainfall events and not from one single identifiable event. 25. However, the engineering and building consultant group reported damage to ceilings that had been caused by the roof becoming detached during the storm allowing water into the western end of the building. The FSP has accepted liability for the damage to the lounge room ceiling. 26. Further, the paving around the pool also had 50:50 estimates of damages from water under the slabs and root infestation. On this basis the FSP agreed to accept 50% of the repair costs to the pool paving. 27. A quotation for repairs was obtained from a building consultant as follows:  Lounge room ceiling repairs $3,186.81  Lounge room wall repairs $1,444.52  50% pool paving repairs $2,294.33  Total $6,925.66 28. A total cash settlement for the amount of $6,925.66 was declined by the Applicant. 29. Apart from the water that entered the house through the roof, no other water actually entered the property but rather pooled around the perimeter of the home and has remained there for some time. This water then saturated all underneath the home due to lack of drainage and ventilation causing the remainder of the damage. 30. Its decision has been correct in its interpretation of the policy in declining the majority of the claim and it is justified in using the information obtained via reports provided by the engineering and building consultant group and the hydrologist on which to base the declinature. 31. The FSP relies on the following policy/contract provisions: ‘Insured events we will pay ... 9. Storm, rainwater or run-off ... We will pay for loss or damage caused by storm, rainwater or run-off. ‘storm’ means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. ‘rainwater’ means rain falling naturally from the sky onto the buildings and/or ground. ‘run - off’ means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. We will not pay for loss or damage: a. caused by: Case No: 277847 Determination Page 5 of 9  flood, or  flood water combined with run-off and rainwater; ... When we will not pay a claim under your policy 1. This policy does not cover loss, liability, injury or damage: ... f. Wear and tear arising out of depreciation, gradual deterioration, wear and tear; g. Inherent defects caused directly or indirectly through inherent defects, faulty design, structural defects or poor workmanship; ... Conditions of cover ... 2. Taking precautions We will not pay for loss, liability, injury or damage if you do not: ... c. maintain your buildings in good repair;’ Issues 32. Whether the Applicant’s house was damaged by the insured event ‘storm, rainwater or run- off’. 33. Whether the FSP is entitled to rely on a policy exclusion to deny indemnity to the Applicant. Reasons for Decision 34. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s Terms of Reference. 35. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 36. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. The Panel has had regard to the material exchanged and the detailed submissions made on behalf of the parties. Case No: 277847 Determination Page 6 of 9 37. The Applicant’s locality of Talbot, a country town in Victoria, suffered extreme storms and rainfall between 10 and 14 January 2011. Talbot is 15 kilometres south of Maryborough and 18 Kilometres north of Clunes. 38. Rainfall for the period 10 to 14 January 2011 was, Clunes 208.4mm, Maryborough 228.0mm. Talbot received a daily rainfall of 91mm on the 14 January 2011 and its wettest January on record with a total of 248.6mm compared to the January average of 30.3mm. 39. The result of the extreme rainfall was th at the Applicant’s property was inundated by rainwater runoff. This runoff entered the sub-floor of the house and was trapped under the house for an extended period of time causing damage to the interior of the building. 40. Therefore, the Applicant prima facie has a claim that falls within the cover provided by the policy. 41. The FSP seeks to rely on policy exclusions to deny indemnity to the Applicant. Therefore, the onus shifts to the FSP to establish that, on the balance of probabilities, the damage was caused by an event excluded from the cover provided by the policy. 42. The Applicant’s 140 year old house is constructed of bluestone walls with bluestone stumps supporting the floor joists. 43. The FSP’s loss assessor reported extensive subsidence or foundation movement both in the timber framed flooring and in the external bluestone walls. Major distortion of the brick floored verandah was evident suggesting substantial swelling had occurred to the foundation materials. 44. The loss assessor stated that major works will be required to lift and level the house. There is also substantial rising damp in the internal walls which will require stripping of additional plaster and repair and repainting. 45. The loss assessor’s report dated 6 June 2011 stated, in part:  As a result of the storms the property has been inundated with water, overflow of large swimming pool and possibly overflow of a well contributing to the saturation;  ... it appears the sub-floor area has been flooded causing damage to foundations and flooring throughout the dwelling. 46. The FSP appointed an engineering and building consultant group to inspect and report on the extent of damage to the Applicant’s home and likely cause including the condition of foundations and then to provide a scope of works. 47. The group’s repo rt dated 2 July 2011 stated, in part:  The water table under the house was quite high causing the base of all walls to absorb moisture, causing them to expand relative to the tops of the walls; Case No: 277847 Determination Page 7 of 9  This induces cracking in the walls at the weakest points it also causes moisture to rise up through the walls, which damages the lower parts of the walls;  Mould is probably everywhere under the floor of the house; some floor boards are cupping. 48. The Applicant engaged a structural engineer to carry out a visual inspection of the dwelling. His comments and recommendations are made in conjunction with findings of MCS. 49. In his report dated 29 June 2012 the structural engineer stated, in part:  The condition of the building remained that same as when report by MCS; the problems of wall cracking dampness in walls and floor still exists, if not getting worse in the area of the floor structure;  The factors contributing to movement in the building is most likely the excessive variation of moisture across the dwelling from the adjacent paved areas of the building to the adjacent landscaped areas;  The site has not dried out since the last flooding of January 2011 50. He agreed with the recommendations and the remedial scope of works prepared by MCS; 51. In addition he also recommended:  selected underpinning of footings under wall areas showing large cracking and subsidence of 15mm or greater;  all subfloor framing and lining boards showing dampness and rotting be replaced. 52. In his opinion, the evidence and previous reports point to the fact that due to the extraordinary abnormal amount of water in a very short and concentrated time frame altered the hydraulic equilibrium of the site thus causing the probable distress to the structure. 53. He also recommended that a Geotechnical Investigation be carried out before any remedial works program is put in place to determine the time frame for works to be carried out. 54. The FSP has listed numerous exclusions to establish that the policy of insurance does not cover the loss or damage to the Applicant’s property. However, the FSP has not clearly documented how these exclusions should apply. 55. For example, in its initial letter of declinature of the Applicant’s claim, dated 14 September 2011, it stated: ‘Their reports confirm that the damage to your property is as a result of a combination of natural soil movement and shrinkage or expansion of earth, faulty design at initial construction and wear and tear.’ Case No: 277847 Determination Page 8 of 9 56. The Panel is of the opinion that any soil movement was the result of the inundation of the Sub-soil from the stormwater runoff. Further, the building was constructed in the 1860’s and the FSP does not document how the construction was faulty design at initial construction. 57. The FSP also submits that the damage to the building was caused by wear and tear. The Panel agrees that a building over 140 years old would have evidence of wear and tear. However, the Applicant has owned the property for approximately seven years and has carried out extensive maintenance and improvements during that time. There is also evidence that the building was in excellent condition in December 2010, approximately 13 months before the January 2011 storms. 58. In its IDR decision letter dated 30 September 2011, the FSP listed a number of policy exclusions without explaining how th ey applied to the Applicant’s claim. The onus is on the FSP to establish that it is entitled to rely on a policy exclusion to deny liability. 59. The Panel concludes the FSP has failed to provide adequate evidence to demonstrate the applicability to the claim of the exclusions relied on. 60. On the evidence submitted the Panel finds that the proximate cause of the damage to the Applicant’s house was the stormwater runoff saturating the soil around the insured property and, more importantly, water flowing under the house through air vents. In other words, the damage was caused by the insured event ‘storm, rainwater or run - off’. 61. Other than the Applicant’s oral scope of works and estimated cost of repairs, no other quotes or estimates of costs have been provided. Determination 62. The Panel determines that the FSP has not met the onus on it to establish that, on the balance of probabilities, the damage to the Applicant’s property was subject to a relevant exclusion of the policy. 63. Accordingly, the Panel determines that the FSP is to indemnify the Applicant for the cost of repairs and other remedial work, such as drying the sub-floor and treatment of the mould, to his house. 64. In preparing a Scope of Works, the Panel determines that the Scope of Works prepared by the FSP’s engineering and building consultant group and the Applicant’s structural engineer, be adopted. 65. The Panel notes that the FSP has accepted 50% of the cost of repairs to the rear wall to the pool. The Panel considers this offer to be fair and reasonable but the cost is to be based on the actual cost of repairs rather than the estimate submitted by the FSP. Case No: 277847 Determination Page 9 of 9 66. Further, the Applicant has submitted that he is prepared to meet 50% of the cost of repairs to the internal walls which the Panel considers to be a fair and reasonable proportion.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.