Home / Financial Firm (Unknown - Insurer) / Determination 277799

Determination 277799

Asbestos contamination from repairs and decontamination of rental property, and loss of rent

FirmFinancial Firm (Unknown - Insurer)
Decided2013-02-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants' rental property was contaminated with asbestos during claim repairs and decontamination, and the FSP refused further decontamination and loss of rent. The Panel ordered full decontamination, loss of rent until clearance, reimbursement of expert costs and interest.

The FSP's appointed contractors caused or failed to detect the asbestos contamination, and the Code of Practice required a clearance certificate after recontamination.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 277799 Determination Page 1 of 11 Case number: 277799 General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim Handling/Service Quality 31 January 2013 Background 1. The Applicants held a home insurance policy with the Financial Services Provider (FSP) providing cover for a tenanted property. The policy provided a sum insured for buildings of $159,300 and a sum insured for contents of $5,000 with a $100 applicable policy excess. The policy commenced on 26 January 2008 and was current at the time of loss. 2. On 3 November 2011 the Applicants contacted the FSP to report damage to the tenanted property (the property) as a result of an apparent burst pipe, which had not been advised to them previously by their tenants, who had recently vacated the property. On 8 November 2011 the Applicants again contacted the FSP to advise that on removing items from the property to effect repairs to the burst pipe, holes in the internal walls of the property had been discovered and it appeared tenants had caused this damage. 3. The FSP accepted both claims, and instructed the Applicants to arrange repairs to the burst pipe, and to get a quotation for the repairs as a result of the water leak from the burst pipe. It also arranged for an assessor to contact the Applicants to inspect the damage to walls caused by tenants. It was determined that the damaged walls contained asbestos and appropriate repairs were authorised and completed by the FSP’s appointed builder. 4. At the completion of repairs, the Applicants raised concerns with the FSP in relation to the method used by its appointed builder in the removal and handling of asbestos waste. The FSP agreed to have the property inspected to determine if any asbestos contamination had occurred. 5. The FSP’s appointed expert confi rmed asbestos contamination had occurred at the property and the FSP authorised the contamination to be cleaned appropriately. At the completion of this cleaning process, further contamination was confirmed in a separate area of the property and this too was authorised for decontamination cleaning by the FSP. The FSP is satisfied with the processes undertaken and that the property is now free from claim related asbestos contamination. Determination 6. The Applicants remain dissatisfied with the decontamination processes und ertaken by the FSP’s appointed experts and say that the property is still contaminated by asbestos. Summary of Applicants ’ position 7. The Applicants say the original repairs to the damaged walls completed by the FSP’s appointed builder (F) were not completed in accordance with relevant Worksafe practices applicable to Queensland. 8. As a result of this, asbestos was not discarded correctly and asbestos fibres/material contaminated the property. On alerting the FSP to their concerns, the FSP arranged for the property to be assessed and authorised the decontamination of the affected areas of the property. 9. At the completion of the decontamination process it was noted that three pedestal (portable) fans which had previously been in the contaminated area of the property, had been moved by the FSP’s cleaners (J) into an area which had not been contaminated during the repair process. When alerted to this, the FSP again arranged for the property to be decontaminated. 10. Since the second attendance by “ J ” to decontaminate the property, the Applicants have noticed asbestos material and fibres still present at the property and alerted the FSP to this. 11. As the FSP believed “ J ” had completed the decontamination process properly, the Applicants submitted two independent reports from asbestos experts (A and N) that confirm the existence of asbestos still at the property. 12. The Applicants say the contamination of the property has been caused by “ F ” , during the course of the repairs, and “ J ” , when completing the two decontamination processes. 13. The Applicants seek to have the property properly decontaminated of asbestos and their loss of rent paid until the property is classed as habitable. Summary of FSP’s position 14. The FSP says the Applicant had completed some minor renovations to the property prior to the notification of the first and second claims. 15. It contacted “ A ” , who had been appointed by the Applicants to report on the presence of asbestos at the property after the second decontamination process had been completed, who advised the FSP that the Applicant had conducted further maintenance/other repairs at the property since the claim related repairs had been completed. 16. The FSP is of the opinion that the Applicant has possibly contributed to the asbestos contamination of the property through his non-claim related repairs. In addition “ J ” , who it appointed to decontaminate the property, has confirmed that no asbestos was evident at the completion of the second decontamination process. 17. As such, the FSP has discharged its responsibilities in relation to claim related repairs and cleaning and is not responsible for any further decontamination process or any further loss of rent payment. 18. The FSP relies on the following policy provisions of its Product Disclosure Statement (PDS): “ Section 1 Your home: Additional benefits What IS covered 1. ... 2. If you home becomes uninhabitable as a result of loss or damage insured by this policy, we will pay an amount equal to the loss of rent as stipulated on your certificate at the time of loss or damage. ... What is NOT covered 1. ... 2. Loss of rental cost in excess of a period reasonably required to replace or repair your home or 12 months, whichever is lesser. Claims for loss of rent when there is no rental agreement or periodic tenancy agreement in place at the time of the loss or damage. Any amount which exceeds 20% of the sum insured on your home. ... ” (Pages 26 and 27) Issues 19. Whether the FSP has discharged its responsibility to ensure repairs and cleaning/decontamination process have been satisfactorily completed at the property. 20. Whether the Applicants are entitled to any further loss of rent payment. Reasons for decision 21. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference because of the nature of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 22. I am satisfied there has been a full exchange of material between the parties and that each party has had the opportunity of clarifying the issues that arise from the material. 23. The FSP contends that a FOS Terms of Reference is relevant to this dispute: “ 8.7 Recommendations and Determinations a) Each Recommendation and Determination: (i) must be in writing; (ii) may either reach: ... (B) the view that, given the procedures adopted by FOS, it would not be appropriate for FOS to reach any conclusion as to the merits of the Dispute; ... ” 24. The FSP says there are substantial issues of fact that cannot be resolved given the procedures available to FOS suggesting that several individuals involved in the Applicants’ claim would n eed to be cross-examined under oath prior to a Determination being made. 25. I have considered the FSP’s suggestion and am of the opinion that the FSP had ample opportunity to conduct these enquiries in relation to the information it purports certain individuals could provide and failed to do so. I am satisfied that the material provided by each party is sufficient for a Determination to be made. Relevant Legislation/Codes of Practice 26. The Case Manager in this matter has made independent inquiries in relation to relevant legislation and codes applicable to the removal of asbestos. As a result of those enquiries, it appears that strict controls have been set in place by the Queensland Government regarding the safe removal and disposal of asbestos products. 27. The relevant code of practice in this instance is How to Safely Remove Asbestos Code of Practice 2011 (Qld) . This code commenced on 1 January 2012, prior to the repairs and decontamination processes authorised by the FSP, and provides details as to how the code is to be used. These details are: “ How to use this Code of Practice In providing guidance, the word ‘should’ is used in this code to indicate a recommended course of action, while ‘may’ is used to indicate an optional course of action. This Code also includes various references to provisions of the WHS Act and Regulations to provide context with legal requirements. These references are not exhaustive. The words ‘must’, ‘requires’ or ‘mandatory’ indicate that these legal requirements exis t and must be complied with.” 28. There are a number of definitions found in this Code which has assisted FOS in understanding the issues in dispute. Specifically, the following definitions and explanations have been reviewed for clarification of understanding the dispute and the roles of each party in relation to this Code: “ 1.2 The meaning of key terms ... Asbestos containing material (ACM) means any material or thing that, as part of its design, contains asbestos. Asbestos-contaminated dust or debris (ACD) means dust or debris that has settled within a workplace and is (or assumed to be) contaminated with asbestos. ... Friable asbestos mean material that is in a powder form or that can be crumbles, pulverised or reduced to a powder by hand pressure when dry, and contains asbestos. ... Non-friable asbestos means material containing asbestos that is not friable, including material containing asbestos fibres reinforced with a bonding compound. ...” (Pages 6 and 7) “ 1.3 Licence requirements for asbestos removal work R.458 The WHS Regulations require a person conducting a business or undertaking who commissions the removal of asbestos at the workplace to ensure asbestos removal work is carried out only by a licensed asbestos removalist who is appropriately licensed to carry out the work, unless specified in the WHS Regulations that a licence is not required. There are two types of licences: Class A and Class B. The type of licence required will depend on the type and quantity of asbestos or ACM that is being removed at a workplace. Type of Licence What asbestos can be removed? Class A Can remove any amount or quantity of asbestos or ACM, including: any amount of friable asbestos or ACM any amount of ACD any amount of non-friable asbestos or ACM. Class B Can remove: any amount of non-friable asbestos or ACM (Note: A Class B licence is required for removal of more than 10 m 2 of non - friable asbestos or ACM but the licence holder can also remove up to 10 m 2 of non - friable asbestos or ACM). ACD associated with the removal of non - friable asbestos or ACM. (Note: A class B licence is required for removal of ACD associated with the removal of more than 10 m 2 of non - friable asbestos or ACM but the licence holder can also remove ACD associated with removal of up to 10m 2 of non - friable asbestos or ACM. No licence required Can remove: up to 10 m 2 of non - friable asbestos or ACM ACD that is: o associated with the removal of less than 10 m 2 of non - friable asbestos or ACM o not associated with the removal of friable or non - friable asbestos and is only a minor contamination.” (Pages 7 and 8) Details of the Claim 29. There is no dispute over the details of the claim lodged by the Applicants or the acceptance of the claim. 30. The Applica nts say that after the damage was initially assessed by the FSP’s appointed assessor, a builder, “ F ” , attended the property to effect repairs on 9 January 2012. The Applicants were present during the inspection and photographs were taken of the damage and “F’s” worker during the initial stages of the repairs. 31. The Applicants expressed concern to the FSP at the completion of the repairs regarding “F’s” methods of handling the asbestos wall sheets and noted that asbestos had been left at the property at the completion of repairs. The Applicants also noted the apparent lack of safety equipment/precautions used by “ F ” during the course of the repairs, whilst the Applicants were present at the property. 32. In light of the Applicants’ concerns, the FSP appointed “ P ” to attend the property and conduct relevant testing to determine if the property had sustained asbestos contamination and the extent of that contamination. “ P ” provided details to the FSP confirming contamination had occurred and “ J ” was appointed to conduct the decontamination of the property. At the completion of the decontamination in March 2012, “ P ” provided a certificate of analysis and clearance certificate advising that the property had been properly decontaminated and no evidence of any asbestos was found in the relevant areas of the property. 33. The Applicants advised the FSP that three portable pedestal fans which had been in the contaminated area of the property had been moved to the kitchen area, which had previously been uncontaminated. This had occurred prior to any decontamination process. On receipt of this advice, the FSP arranged for “ J ” to re-attend the property to decontaminate the property in the relevant areas for a second time. This activity was completed on or about 2 May 2012 and a certificate of analysis was issued advising there was no evidence of contamination at the property. 34. According to copies of file notes provided in its response, the FSP received a report from the Applicants’ appointed asbestos expert “ A ” , on or about 17 May 2012. I note that “ A ” identified ACM in the entry room, the northern bedroom, the kitchen and the wheelie bin next to the front door. “ A ” took photographs of the identified debris and said the area should be decontaminated. 35. The FSP says it has spoken to a representative of “ A ” , “ JR ” , who advised the FSP that the Applicants had completed work in the kitchen and bathroom areas since the FSP had completed claim related repairs. It says “ JR ” also advised that the Applicants were aware of asbestos in both these areas and were not worried about it. 36. The FSP relies on a file note dated 17 May 2012, which reads: “Reviewed paperwork from insured – contacted [JR] from [A] to talk through the report – [JR] confirmed no testing has been completed, it was just a visual inspection – advised [JR] that he mentions the kitchen however we did not complete work in the kitchen (explained to [JR] about the fans in the kitchen) – [JR] advised the insured said he was doing private works in the kitchen and bathroom and is aware of the asbestos debris however he is not worried about this at the moment as he will do a decontamination was he has completed his private works. – confirmed with [JR] again that the insured advised he knows he has left asbestos bits in the kitchen and bathroom. [JR] replied “Yes”. ...” 37. The Applicants deny having conducted any private works at the property since the lodgement of the insurance claim. 38. The FSP says the Applicants admit having done private work at the property prior to the lodgement of the claim. This work included the removal of kitchen cabinetry which the Applicants say contained no asbestos material. This has not been disputed by the FSP. 39. The FSP says the Applicants also admitted to removing a wall of the bathroom which contained asbestos in order for repairs to be undertaken to a burst pipe. The FSP says the Applicants informed it, that the repairer who undertook the resultant water damage repairs then removed the inner wall and conducted repairs. 40. It is the opinion of the Applicants that they did not require any licence to conduct such work and did not require a clearance certificate at the completion of the removal of any asbestos or ACM. 41. The FSP does not dispute the App licants’ opinion that they did not require a licence to remove the wall in question as it was less than 10m 2 . However, it questioned the Applicants as to why a clearance certificate was not obtained. 42. After reading the How to Safely Remove Asbestos Code of Practice 2011 (Qld) , I am of the opinion that the Applicants did not require to be licensed to remove the wall in question and that clearance certificates are only required for licensed asbestos removal. 43. I am not satisfied that the discussion the FSP held with “ JR ” categorically demonstrates that the Applicants have completed private works after the FSP’s repairs had been completed. There is no indication from the file note that “ JR ” indicated when the Applicants completed these works or what time frame they had advised to “ JR ” . The FSP has not provided any formal statement from “ JR ” to confirm his comments in this regard and I am reluctant to rely on the details of this file note accordingly. 44. The FSP subsequently denied the Applicants’ request to have the property decontaminated again, saying that the report provided to it by “ J ” was comprehensive, based on samples which had been taken, whereas the report the Applicants had provided from “ A ” was based on a visual inspection only. 45. The Applicants enlisted the services of a hygienist, “ N ” , who was suitably qualified to test and report on the presence of asbestos. “ N ” forwarded a copy of “N’s” report and photographs to the FSP after the inspection on 20 September 2012. The report is dated 21 September 2012. Samples of debris taken from many locations were analysed and found to contain asbestos. Again the FSP refuted the findings of “ N ” as “N’s” inspection had occurred approximately four months after the final inspection completed by “ J ” and the FSP was of the understanding the Applicants had completed further private works to the property during that time. 46. It is my opinion that the two reports obtained by the Applicants from “ A ” and “ N ” , with accompanying photographs, clearly demonstrate the existence of asbestos at the property. The FSP has not produced any photographic information to confirm that the asbestos noted by “ A ” and “ N ” did not exist at the time “ J ” last inspected the property. 47. The FSP does not dispute the content of the reports from “ A ” and “ N ” , rather it says that it or its appointed experts/repairers are not responsible for the remaining asbestos at the property. 48. Whilst the FSP says that the report from “ N ” was completed some four months after its final assessment of the property was completed by “ J ” , the report from “ A ” was received by the FSP on or about 17 May 2012, indicating this inspection was completed shortly after the inspection was completed by “ J ” (on or about 2 May 2012). 49. The significance of this is evidenced in the photographs provided by both “ A ” and “ N ” , in that the photographs appear to be consistent with each other, indicating to me that there has been no additional contamination by the Applicants or the FSP, between the inspections conducted by “ A ” and “ N ” . 50. In the absence of photographic evidence or any other information from the FSP to support “J’s” report, I am compelled to accept the Applicants’ advice that the contamination detected by “ A ” and “ N ” was present at the time of “J’s” report and that the FSP’s appointed experts/re pairers are responsible for said contamination and/or have failed to detect the contamination. Application of relevant Legislation/Code of Practice 51. The relevance of the How to Safely Remove Asbestos Code of Practice 2011 (Qld) in respect of this dispute i s the Code’s requirements for clearance inspections and certificates. In this regard, the Code says: “ 3.10 Clearance inspection A person commissioning licensed asbestos removal work must ensure that, once the licensed asbestos removal work has been completed, a clearance inspection is carried out and a clearance certificate is issued before the workplace can be re-occupied by: an independent licensed asbestos assessor, for work that must be carried out by a Class A licensed asbestos removalist (for example, if the removal work involved friable asbestos) an independent competent person, for asbestos work that is not required to be carried out by a Class A licensed asbestos removalist (for example, if removal work involved more than 10 m 2 of non-friable asbestos). This also includes where the work is being carried out at domestic premises. ... The independent licensed assessor or competent person must not issue a clearance certificate unless they are satisfied that the asbestos removal area and the area immediately surrounding it are free from visible asbestos contamination. To do this, they can conduct a visual inspection for evidence of dust and debris. If air monitoring was also conducted, the results of that test must show that asbestos is below 0.01 fibres/ml. If a clearance certificate has not been obtained, the asbestos removal area must not be re-occupied for normal use or other work activities. A clearance certificate must be issued before the area can be re-occupied for demolition or other work. Unauthorised persons cannot enter the asbestos removal work area prior to a clearance certificate being issued and any protective barricades should remain in place until completion of all licensed asbestos removal work and the final clearance certificate is issue d.” (Pages 18 and 19) 52. It has been established by the FSP that the property was contaminated further by “ J ” when “ J ” moved three pedestal fans from an asbestos contaminated area into a non-contaminated area. This was accepted by the FSP and as a result it authorised “ J ” to re-attend the property to conduct further decontamination. In its response to FOS, the FSP says in relation to this aspect: “A further cleaning and safe disposal of asbestos was conducted by [J] due to concerns with the fans being moved from a contaminated area to a non- contaminated area.” 53. It is my opinion that the FSP acknowledges that a recontamination at the property had occurred which necessitated the property to be cleaned further and that additional asbestos was to be safely disposed of. 54. The Case Manager queried with the FSP as to the issuance of a further clearance certificate at the completion of this further decontamination. The response received from “ J ” via the FSP was: “... in relation to the above stated claim, if a clearance certificate was issued in March 2012 which it was there is no reason for another clearance certificate to be issued again in May 2012 UNLESS, there was recontamination at the property; ...” 55. I am of the opinion that the property was re-contaminated after the completion of the initial certificate was issued in March 2012, in light of the FSP’s response to FOS. I am therefore satisfied that, in accordance with the How to Safely Remove Asbestos Code of Practice 2011 (Qld) , the FSP was to arrange or have its repairer arrange an appropriate clearance certificate in May 2012. 56. I note that a second clearance certificate has not been issued after completion of the clearance inspection conducted by “ J ” in May 2012. I am therefore of the opinion, the property could not be considered habitable. Any protective barricades put in place by “ J ” , which must be put in place in accordance with the How to Safely Remove Asbestos Code of Practice 2011 (Qld) , should not have been removed until the clearance certificate had been issued. In addition, no party, including the Applicants and/or any tenants, should have been allowed access to the property. Determination 57. On the basis of the available information I determine that the FSP is to arrange for the complete decontamination of the Applicants’ property for all areas identified as requiring decontamination, as determined by the Applicants’ appointed hygienist, “ N ” . At the completion of the decontamination works, “ N ” is to inspect the property and arrange for a clearance certificate to be issued by a suitably qualified asbestos assessor upon satisfaction that the property has been decontaminated. The FSP is to pay for all costs associated with the decontamination, assessment by “ N ” and issuing of the relevant clearance certificate. 58. I further determine that the Applicants are to be paid loss of rent from the date of loss as reported to the FSP (8 November 2011) until the date of issue of the Clearance Certificate, less the loss of rent already paid until 4 May 2012, regardless of policy limits, due to the FSP failing to attend to the proper asbestos decontamination of the Applicants’ property and the property being uninhabitable by tenants until such decontamination is satisfactorily completed. 59. I further determine that the FSP is to refund to the Applicants all of their costs associated with the appointment of experts, namely “ A ” and “ N ” , to assess the property for the presence of asbestos upon the Applicants producing relevant invoices and receipts for these costs to the FSP. Reimbursement of these costs is to be made within seven days of the Applicants providing the FSP with the relevant invoices and receipts for these costs. 60. I further determine that the FSP is to pay interest at the statutory rate on the net loss of rent component of the claim from 22 May 2012 (the date of the FSP’s internal review) until the date this aspect is settled. Interest is to also be paid at the statutory rate to the Applicants on the refund of their costs paid to “ A ” and “ N ” from the date the Applicants paid for these services until the date of payment.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.