Home / Financial Firm (Unknown - Insurer) / Determination 277533
Determination 277533
Declined claim for water damage to home and swimming pool
Summary
The homeowner claimed for storm run-off and backflow damage to her home and swimming pool, which the FSP declined as excluded. AFCA found the FSP was entitled to decline, relying on earth movement and inadequate drainage exclusions.
Expert evidence showed the pool and cracking were caused by excluded inadequate drainage, backflow and soil movement, and the applicant offered no expert evidence of another cause.
Issues
- Claim denial primary · not upheld“I determine the FSP was entitled to decline the Applicant's claim.”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 277533 Determination Page 1 of 10
Case number: 277533
General Insurance - Domestic Insurance - Home Building - Service - Delay in
claim handling
21 November 2012
Background
1. The Applicant held a Home and Contents policy of insurance with the
Financial Services Provider (FSP). The policy covered the Applicant up to
$210,000 for the home building and up to $60,600 for contents subject to an
excess of $100.
2. The Applicant lodged a claim with the FSP on 17 May 2010 for damage
caused to her home and swimming pool due to run-off water caused by
neighbours ’ backwashing pool into the ground and ineffective pit drainage
systems off-site.
3. The FSP arranged for an assessment of the property by various experts.
The FSP then declined the claim on the basis the damage arose from
hydrostatic pressure, failure to maintain, earth movement and defective
installation, which are excluded causes of loss.
4. The Applicant disputes the declinature and maintains the damage arose
from stormwater run-off which is a covered event.
Summary of Applicant’s position
5. The Applicant has enclosed a document entitled “RE: ACCOUNTABILITY
FOR WATER DIVERSITY./MAPPING ISSUES:” from which I note the
following:
A downpipe at the insured premise was pushed off the stormwater
pipe. This was repaired to ensure water on the premises drained
properly.
The foundations have moved and the Applicant believes this is due to
water running under foundations from surrounding properties. There is
no gravel pit drain that drains out to the street.
Another property, “7E”, has backwashed a swimming pool onto the
ground. This has caused damage to the swimming pool on site. The
owner of 7E has fixed this problem by arranging for swimming pool
overflow to be directed into the sewerage line of the Applicant’s
Determination
Case No: 277533 Determination Page 2 of 10
adjoining neighbour on street “K” . As a result of this diversion the water
run-off has been reduced by half. However, there is a further notation
that 7E’s pit drain still backs up and overflows causing risk to the
insured property.
There is still water coming through the middle back section of the
insured property due to run-off from 3 nearby properties that do not
drain water out to the street. The Applicant’s adjacent neighbour has
agreed to allow the neighbours and Council to run a drain out to the
street through his property.
In 14 years of ownership of the property the Applicant has had no water
problems. The swimming pool area was free of downward water flow.
This document was prepared by the Applicant who has not produced
expert or independent reports to support her claim.
6. The Applicant has enclosed a quotation for rectification of the swimming pool
in the sum of $29,359 (GST inclusive). The quotation appears limited to the
pool alone and does not include other claimed areas of damage.
7. The Applicant has enclosed photographs depicting a substantial amount of
water running through the boundary fence onto her property. The retaining
wall on the boundary has now given way and the foundations of the
adjoining property can be viewed. The Applicant has indicated how the water
flows out from underneath the slab.
8. The Applicant has enclosed a map of the properties and adjoining properties
together with an indication of the water flow path.
9. The party responsible for the pit drains offsite has not rectified issues with
them or maintained them. This has resulted in extended overflows and
underflows onto other properties including the insured premises.
10. The Applicant has also discovered that the water coming down the hill is
from pit drains from 7E and residences “3E” and “5E”. It falls on a 16º angle
to the property. A fall of 16º down the hill could cause the hydrostatic relief
valve to become faulty.
11. The water also came from the swimming pool of 7E as the owners
backwashed onto the ground and not out onto the street.
12. The Applicant acknowledges the FSP’s report from “Q”. The Applicant states
the following in relation to the report:
The pool was approved by the Council.
Q alleges the natural drainage in the area would have always had the
resultant situation. The Applicant states it is clearly not a natural
drainage issue but due to water coming from a neglected drainage pit
from 3E, 5E and 7E. These properties do not drain to the street.
The Applicant cannot control subterranean water flow.
Case No: 277533 Determination Page 3 of 10
The property was purchased in 1989 and the Applicant has resided at
the property since 1990. The Applicant has not had water running
through the property since this date although she has had a wet spot
on the fence.
13. The Applicant sought a written response from the FSP regarding which party
was responsible for repairing the drain. She has also sought redress from
the Council.
14. The Applicant seeks the man made water issue to be addressed and for
compensation for damage to her property.
Summary of FSP’s position
15. The FSP relies on the following policy terms and conditions:
“You are not covered for any loss or damage caused by or resulting from, or
the costs incurred from or of:
...
- Gradual deterioration, including wear and tear, rust, corrosion,
depreciation, fading or deterioration from exposure to light;
...
- Poor maintenance;
...
- Any earth movement not caused by earthquake, including erosion,
subsidence, landslide, mudslide, collapse, earth shrinkage and
expansion;
...
- Damage to swimming pools or similar structures caused by hydrostatic
pressure. ”
16. The FSP has enclosed the Certificate of Insurance for the relevant period.
The Certificate of Insurance indicates no optional covers were taken out.
17. The FSP has enclosed building report dated 19 May 2010 from “B”, from
which I note the following:
B considers the most likely cause of the pushing inward of the pool
lining is pressure to the side of the pool. The most likely cause of the
pressures is that the excess water from the neighbour’s pool is not
being adequately drained of storm water.
At the time of inspection the pool was empty and had been for a while.
B could not determine the cause of damage and believed a structural
engineer was required.
B estimated $43,938.40 + $4,393.84 (GST) for rectification but then
gives the total cost of works as $43,938.40.
Case No: 277533 Determination Page 4 of 10
18. The FSP has enclosed an engineering report dated June 2010 from “V”. I
note the following from this report:
a. The property is located on the lower slope of a mountain and is
surrounded by properties on three sides. The properties to the
Southern side are accessed from Street ‘E’. The elevation of Street E is
40m and the elevation of the subject site is 27m. The swimming pool is
located between the insured residence at 68K and the boundary fence
of 70K. The pool was built at approximately the same time as the home
in 1989-1990.
b. The damage to the pool includes a large crack and bulge to the wall
nearest the boundary as well as a large crack and bulge to the base of
the swimming pool. When tapped, water could be heard beneath the
base of the swimming pool. The backfill material behind the wall of the
swimming pool at the location of the crack was not present. A 200mm
long screw driver blade was inserted in the crack and did not locate any
material behind the pool wall for approximately the top of 300mm of the
existing surface level. The engineer concluded that the damage was
consistent with large force applied to the outside face of the wall of the
pool. Alternatively it was due to the lifting force caused by hydrostatic
build up of pressure to the base creating a torsional effect in the wall of
the pool.
c. Large volume water flows similar to the effects of swimming pool
discharges and the pressure head created due to the fall of the land
from the neighbouring properties may have created a speed of flow and
pressure that was too great for the existing hydrostatic valve to handle
leading to the damage to the base of the pool. The water which has
ponded under the pool would appear consistent with the opinion that
the damage to the pool is due to water pressure applied to either the
outside side or base of the pool.
d. Approximately 5-6 years ago a crack appeared in the side wall of the
pool nearest the eastern boundary. This crack started as a crack at the
top but over time became wider and longer. The bulge appeared in the
base of the pool at the same time as the crack appeared.
e. V indicated that the drainage issues would need to be resolved prior to
repairs being undertaken. Adequate drainage would need to be
supplied to the base of the perimeter of the swimming pool. The
retaining wall near the pool edge may need to be relocated.
f. Drainage to the property has always been an issue with minor flows
from subsurface sources evident on and off throughout the life of the
residence. These flows were evidenced by the existence of moisture
flowing out of the side of the property. At the time of the damage initially
appearing, larger water flows were evidenced by the existence of
moisture flowing out of the side of the property.
g. When properties further up the mountain were constructed they were
allowed to discharge their stormwater flows into pits on the property. At
the time of inspection, free flowing water was evident exiting the ground
near the driveway of the insured property. V could not determine the
Case No: 277533 Determination Page 5 of 10
cause of the water near the driveway. Further, V could not confirm
whether the roof line had settled in the middle of the house during
inspection.
h. Cracking was evident to the concrete slab in the garage and outdoor
entertaining area. V advised that the cracking has only appeared since
the water flow appears to have diminished. The soil is predominantly
clay soil which expands and shrinks. However, levels would need to be
recorded throughout the home by a surveyor to determine this as a
potential issue/cause. Common effects of differential movement to the
residential foundations can be cracking of concrete slabs, cracking to
external walls and roofing materials and cracking to the internal finishes
and ceilings. Drying under a large structure such as a house can be a
long term process when the area has been subject to long and intense
periods of moisture build up. The cracking evident to the garage and
outdoor entertaining area slabs may be due to soil movements.
19. Th e FSP encloses an engineering report form “Q”, from which I note the
following:
The pool was observed to have a crack in the eastern wall extending
from the very top lip of the pool to approximately 500mm above the
floor. The top of the pool has sunk around 37mm in the south-western
corner. The southern end is generally 15mm lower than the northern
end. The floor of the pool has risen approximately 500mm and the
fibreglass has delaminated and the surface layer has split along the
centreline of the ridge. There was separation of some 300mm between
the pool wall and the earth behind the cavity.
Cracking was observed inside the dwelling to floor tiles in the hallway,
wall cladding near the western corner of the lounge window and floor in
the garage.
Q believed the crack in the bottom of the pool is a result of
delamination of the fibreglass probably after exposure to greater
temperature variations following the removal of the water. The bulging
of the bottom of the pool is probably the end result of elevated
hydrostatic pressure in the pool excavation coupled with a faulty
hydrostatic relief valve. Q is of the opinion that subsurface water flow
has eroded or caused settlement of the granular backfill that would
have been placed during the initial installation. There is no evidence
that overland surface flow has caused erosion of the backfill.
The pool has not been installed in accordance with Australian/New
Zealand Standard AS/NZ 1839:1994 – Swimming pools – premoulded
fibre reinforced plastics – installation. This standard specifies that the
pool should be installed such that the normal operating water level is a
minimum of 50mm above the ground level at its highest point adjacent
to the pool. In this case, the pool was installed with the internal water
level approximately 150mm below the ground immediately surrounding
the pool. Further the standard requires there should be a stand-pipe
and a subsoil drainage system installed around the pool, venting to
atmosphere at a level not less than 100mm below the normal operating
Case No: 277533 Determination Page 6 of 10
water level. There is no evidence of knowledge by the owner of such a
drainage system. The standards also required backfill material to be
mixed with cement to prevent slumping. Whilst there is no evidence
regarding this, it is unlikely that cement was mixed with backfill given
the cavity has formed.
There is likely a subterranean drainage path within the earth bank
between the pool and the eastern boundary. This would have allowed
the movement of water into the pool excavation area and resulted in
the erosion of the backfill.
The cracks within the dwelling are fine and do not require remedial
action. The crack in the concrete floors in the garage and the general
purpose area show no curvature or change in the floor across the
cracks. The cracking should however be monitored to enable an
understanding of whether or not conditions are deteriorating. In Q’s
opinion the cause of cracking is the exposure of the foundation material
to seasonal variations in moisture content along the northern, southern,
western sides of the dwelling.
20. The Applicant has claimed under the insurance for damage which is
excluded under the terms of the contract of insurance.
21. The FSP has arranged for an assessor, two engineers and a loss adjuster to
review the damage when the claim was lodged to ensure that an accurate
record of the damage was available. On the basis of these expert reports the
FSP concludes the cause of the damage is excluded under the terms of the
contract.
22. The Applicant has provided no expert evidence to support an alternative
cause of loss. Accordingly, the FSP maintains its decision.
23. The FSP further notes that the cleaning of pit drains on shared or public land
is not the responsibility of the FSP and there is no insured event to claim
against. Even if the damage was due to this maintenance issue, the Product
Disclosure Statement (PDS) does not cover failure to maintain.
24. The FSP notes that the pool was registered on 22 December 1992 and the
Australian Standard is dated 1994. However, the difference between the
earlier and the current standard would still not meet the current standards. It
specified that for sloping sites (such as the insured property) a drainage
system should be installed around the pool, discharging to atmosphere to
prevent possible damage from erosion and hydrostatic pressure from ground
water. Both standards require backfill material to be mixed with cement to
prevent washaway or slumping to the pool wall.
Issues
25. Whether the FSP was entitled to decline the Applicant’s claim for damage.
Case No: 277533 Determination Page 7 of 10
Reasons for decision
26. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
27. I have read each party’s su bmissions and materials and will only refer to the
relevant submissions and materials raised.
28. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This
is due to the circumstances and quantum of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
29. I note the PDS provides cover to the home which includes domestic
structural improvements on the site that comply with local government or
other statutory requirements. The PDS defines site as “land at the insured
address on the Insurance Certificate. The site does not include common
property.”
30. The PDS provides cover for storm, rainwater and flood but does not include
cover under this benefit for pool covers, plastic or vinyl swimming pool liners.
Water seepage or gradual deterioration from rainwater is also excluded
under this event.
31. The PDS covers bursting, leaking, discharging or overflow of water or liquids
from drainage and sewerage systems at the home but not gradual seepage,
escape of water for a storm water channel or canal or inadequate drainage
systems.
32. The questions before me are how did the damage arise, and what is the
cause of the damage excluded by the FSP.
33. The Applicant states there has been significant surface run-off from
surrounding areas from stormwater and from backwashing of pools onto the
ground. It appears that the stormwater could not properly drain away due to
the state of the pit drains and the drainage available on the surrounding
properties. But in a case such as this with various and complex theories as
to the cause of the damage, it is unfortunate that the Applicant has not
produced any experts or independent opinions.
34. The experts engaged by the FSP have variously indicated the following
causes of damage to the pool:
a. B considers the most likely cause of the pushing inward of the pool
lining is pressure to the side of the pool. The most likely cause of the
pressures is the excess water from the neighbour’s pool not being
drained of storm water.
b. V was of the opinion that a large volume of water may have created a
speed of flow and pressure that was too great for the existing
hydrostatic valve to handle leading to the damage to the base of the
Case No: 277533 Determination Page 8 of 10
pool. The damage to the pool is due to water pressure applied to either
the outside side or base of the pool.
c. Q believed the crack in the bottom of the pool is a result of
delamination of the fibreglass probably after exposure to greater
temperature variations following the removal of the water. The bulging
of the bottom of the pool is probably the end result of elevated
hydrostatic pressure in the pool coupled with a faulty hydrostatic relief
valve. Q is of the opinion that subsurface water flow has eroded or
caused settlement of the granular backfill that would have been placed
during the initial installation. There is no evidence that overland surface
flow has caused erosion of the backfill. Further, the pool was not been
installed in accordance with Australian/New Zealand Standard AS/NZ
1839:1994.
35. The experts appear to agree that water flows have exerted pressure on the
pool. B and V suggest the water run-off from neighbouring properties and the
fall of the land have exerted pressure on the pool. Q is the only expert to
suggest the crack is a result of delamination. Both Q and V have indicated
the ponding of water under the pool has applied pressure to the base. Q
considers the subsurface waterflow to be responsible for the erosion of
backfill.
36. I note that V states the waterflow overwhelmed the hydrostatic valve whilst Q
contends the hydrostatic valve was faulty. Further Q contends that on the
basis of the 1994 Australian Standards the pool installation was faulty. The
1994 Australian Standards however cannot apply retrospectively and do not
apply to pools installed in 1990-1992. The FSP has claimed the relevant
standards were similar to the 1994 Standards and would mean the pool
installation was faulty. This does not appear to form part of Q’s report o r any
supplementary report from Q. The relevant Australian Standard has further
not been fully quoted. Accordingly, I cannot accept the evidence in relation to
faulty installation. Further, there is contrary evidence regarding whether the
hydrostatic valve was faulty. I am minded to accept V’s evidence t hat the
valve was overwhelmed given the photographs of the substantial surface
run-off. Given this, I do not find that the pool itself or the hydrostatic valve
was faulty and accordingly this exclusion has not been made out.
37. I note that the exclusion ‘failure to maintain’ has been applied by the FSP in
relation to the off-site pit drains. It would appear that the Applicant has no
right to enter other properties to maintain the pit drains or the drains on
common/public property that belongs to the Council and water company. I do
not consider such an exclusion can rightly apply to actions the Applicant
cannot take or poor maintenance off the insured site. I am not minded to
accept that the poor maintenance exclusion applies in such circumstances,
although I do note the crack referred to in paragraph 18(d) is said to be 5-6
years old.
38. I will now review the hydrostatic exclusion. There is no definition of
hydrostatic pressure contained in the policy. The plain English meaning of
Case No: 277533 Determination Page 9 of 10
hydrostatic is therefore applicable. The Macquarie Diction defines
hydrostatics as:
“the statics of fluids, a branch of science usually confined to the equilibrium
and pressure of liquids”.
39. The term hydrostatic appears to apply to static fluid and the equilibrium or
pressure of liquid in this state. I consider that there is evidence from the
experts B and V as well as the Applicant of surface run-off of water caused
by rainfall and from backwash from the pools. I would not consider this
hydrostatic pressure as the fluid is not at rest as it flows through the
property. However, it would appear that some of the water has seeped to the
side of the pool to exert pressure on the pool wall. Unfortunately there is also
evidence of the cracking occurring over time as well as the bulge in the
bottom of the pool forming over time. This long term damage would be
excluded under the stormwater benefit of the policy as it does not cover
gradual deterioration from rainwater or water that has seeped into the home
(which includes structural improvements). Similarly, the overflowing of water
benefit excludes seeping water, escape of water from stormwater channel or
canal and inadequate drainage systems. I consider that there is clear
evidence of the excess water occurring due to inadequate drainage systems
and backflow from pit drains. This would be an excluded event under the
policy.
40. The cause of the cracking throughout the home has to be reviewed in order
to determine whether the excluded cause of earth movement applies. Expert
V suggested the cracking evident to the concrete slab in the garage and
outdoor entertaining area would likely be due to soil movements. The soil is
predominantly clay which expands and shrinks. This differential movement to
the residential foundations can cause cracking of concrete slabs, cracking to
external walls and roofing materials and cracking to the internal finishes and
ceilings. Expert Q formed a similar view that the cracking throughout the
dwelling, garage floor and general purpose area was caused by exposure of
the foundation material to seasonal variations in moisture content along the
northern, southern, western sides of the dwelling.
41. Both experts have indicated the cracking in the dwelling, garage and
entertainment/general purpose area was caused by soil movement (from
expansion and shrinkage). Accordingly, I find that the damage to these areas
was caused by earth movement which is an excluded cause of loss.
Case No: 277533 Determination Page 10 of 10
Determination
42. On the basis of the available information I determine the FSP was entitled to
decline the Applicant’s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.