Text of the determination
Case No: 277404 Determination Page 1 of 11
Case number: 277404
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Exclusion/ condition
27 March 2013
Background
1. This is a Determination following the rejection of a Recommendation by the
Applicants who held a home building and contents policy with the Financial
Services Provider (FSP).
2. The claim was lodged after a storm in December 2010. Various discussions
occurred between the Applicants and representatives of the FSP after the
initial inspection of the property by the FS P‟s representatives. Thereafter,
further experts were requested by the FSP to report as to the matter until, in
November 2011 (11 months after the storm) the FSP advised the Applicants
that the claim was denied.
3. After attempts by the parties to resolve the matter, the matter was referred to
this Service. On 14 December 2012, the matter was the subject of a
Recommendation. Because the Recommendation was thorough and set out
the facts in admirable detail, and because the events since the
Recommendation had been largely directed to the issues which were raised
in the Recommendation, I think it now appropriate that I set out the
Recommendation in full. I shall then make additional comments:
“1. The Applicants held a home building and contents policy with the
Financial Services Provider (FSP).
2. In December 2010, the Applicants lodged a claim for damage to the
mud brick wall of a shed following a storm.
3. The FSP appointed building assessm ent company „U‟ to assess the
loss. The FSP received the assessment report in late February 2011.
Following the assessment, an engineer was appointed to report on the
loss.
4. In May 2011, U advised the FSP that the engineer had found some
parts of the sh ed were poorly constructed. The FSP appointed „C‟ to
conduct a further assessment. C provided a quotation to the FSP in
September 2011.
5. The FSP appointed „CO‟ to provide a further report on the property and
in November 2011, the FSP advised the claim would not be covered as
the loss was not caused by an insured event.
6. The Applicants disputed the decision stating the crack in the wall only
appeared after the December 2010 storm. They also noted that the FSP
Determination
Case No: 277404 Determination Page 2 of 11
had delayed making a decision for an unreasonable amount of time and
this has made the damage worse.
7. The Applicants seek a review of the FSP‟s decision to refuse liability.
Summary of Applicants’ position
8. The Applicants say that in December 2010 there was a severe storm
with high winds and torrential rain. A day or so later they discovered a
crack in the southeast corner of the shed. The crack was not there
before the storm.
9. The FSP sent several assessors out but there was no communication
from the FSP as to who they were or what they were there for. There
were no reasons for a delayed decision, yet it took the FSP 11 months
to make a decision.
10. The FSP‟s own assessor stated that a defined event caused the loss. It
appears the FSP started to question the matter when it saw the repair
costs involved. There was such a delay between the assessment and
engineer‟s inspection that a proper assessment could not be made as
the damage progressed significantly over time.
11. There were floods in May 2010, December 2010 and March 2012. If
flood water contributed to the damage, this would be covered under the
policy as the crack occurred within 72 hours of the December 2010
event.
12. They were forced to leave the shed untouched while the FSP assessed
the claim and the damage has spread to the whole structure. A tool box
and contents were also damaged due to rain getting in the shed.
13. They asked for an internal disputes resolution review but after hearing
nothing for five weeks they called the FSP to follow up. The FSP‟s
service and communication has been appalling and the delays will result
in further costs to rectify the issue.
14. The FSP nominated a figure of $48,000 for repairs and they believe
something in this vicinity would be a reasonable resolution.
Summary of FSP’s position
15. The FSP says that the loss is the result of wear and tear and
construction defects rather than an insured event.
16. It provides expert evidence which establishes the loss was not the result
of an insured event.
17. It apologises if the Applicants ‟ expectations with regard to service were
not met.
18. It says the Applicants have not suffered prejudice as the result of the
assessment period because the expert evidence establishes the shed
needs to be demolished.
The FSP relies on the following policy provisions:
“ What your are covered for
…
Case No: 277404 Determination Page 3 of 11
1. Storm and flood
Loss or damage caused by storm and flood e.g. rain, wind, hail, storm
and damage caused by flooding from rivers, streets and canals.
…
What is not covered under any part of your policy
…
We do not cover loss or damage:
…
Erosion or subsidence
Caused by or as a result of erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement, but we will
cover subsidence damage to your home if it is caused by:
˃ insu red event 2 (burst pipes, leaks and overflows)
˃ contents items insured by portable cover
˃ these insured events if the damage occurs within 72 hours of the event
happening:
˃ insured event 1 (storm and flood)
˃ insured event 8 (explosion)
˃ insured event 11 (earthquake and tsunami).
…
We do not cover loss or damage:
Defect, structural fault or design fault
Caused by a defect, structural fault or design that you now about (or should
reasonably have known about) and did not fix before the loss or damage
occurred (e.g. if there are signs that a defect previously caused damage, we
will not pay a later claim for further damage from this defect).
…
Failing to take care of the home or contents
Caused by, or as a result of, your failure to:
˃ take reasonable care of your home and contents
˃ keep the home and contents in good conditions and well maintained
˃ fix faul ts and defects as soon as you become aware of them.
…
We do not cover:
Wear, tear, rust or mould
Case No: 277404 Determination Page 4 of 11
Loss or damage caused by wear, tear, rust fading, gradual deterioration,
mould, rising damp, mildew, action of light, atmospheric or climatic conditions,
corrosion or rot unless this is covered under:
˃ insured event 1 (storm and flood)
˃ insured event 2 (burst pipes, leaks and overflows).”
Issue
19. Whether the FSP is entitled to refuse liability under the terms and
conditions of the policy?
Reasons for Recommendation
20. There has been an exchange of material between the parties and I am
satisfied each party has had an opportunity to address the issues
raised.
21. When an insured lodges a claim, he or she bears the onus to establish
they have a prima facie claim under the terms and conditions of the
policy. That is, they must establish the loss was caused by an event to
which the policy responds. If an Applicant lodges a prima facie claim
and an insurer seeks to refuse the claim on the basis of an exclusion in
the policy, it bears the onus to establish the exclusion applies to the
circumstances of the claim.
22. The Applicants say the loss was caused by a storm in December 2010
and is therefore covered under the terms and conditions of the policy.
They say the first assessor reported that the claim was covered.
23. The FSP says the loss has been caused by wear and tear and poor
construction and it is entitled to refuse liability.
Assessments & expert reports
24. I have reviewed the evidence presented. The FSP‟s claims screen
notations from 24 February 2011, state the following:
“CONCLUSION Given the circumstances of the event , we conclude
that a defined event did occur here to cause the resultant damage that
now exists, We would require a specialist trade to attend site to carry
out a inspect and report to give a educated estimate for the work
required to repair walls, we would also need your approval to change
the construction from mud bricks to corrugated iron . No scope has
been supplied as we wait your decision before proceeding to have trade
attend for proffes ional advice… Have authorised the PRM to appoint a
professional to reprt further and advise of sow as suggested by [building
assessment company „U‟ ] report await engineer/specialist to report
further before confirming acceptance. (sic)
25. The updated rep ort from U following the engineer‟s attendance, states:
“The mud brick structure was constructed in two stages. The original
section measuring 6.0m x 6.0m is the western section and was believed
to be the original dairy for the property. An extension of 6.0m x 7.0m
was constructed to the east using mud brick and openings in the original
walls had windows and sections of walls in filled. At some stage a
Case No: 277404 Determination Page 5 of 11
section of the south wall in stage two of the building had collapsed and
been repaired with a framed and corrugated iron clad wall. The wall at
the east end of the building had failed and is on the verge of collapse.
…
Stage one of the buildings constructed involved the use of adequate
materials in the form of well made mud bricks and mortar…
…
Stage two of construction used poor quality bricks, the erosion of the
bricks from the affects of rain and possible ponding of water near the
base is excessive. A physical investigation of the footing system was
not undertaken but it is suspected that the footings may be inadequate.
The north wall of state two is bowed out indication either failure of the
footings or partial disintegration of the lower course of bricks. A number
of treated pine poles have been installed against this wall possibly to
prevent further movement and or to support the roof.
The south wall of stage two has failed completely and been repaired
inadequately with a substandard timber frame and corrugated iron
cladding (The east has failed and will potentially collapse in the near
future if the area around the base of the wall becomes inundated. A
collapse of the wall may bring down part of the roof. The north wall of
stage two has bowed outward. An infill section of wall has eroded to the
extent that the bottom course of bricks is partially dissolved away.
CONCLUSIONS AND RECOMMENDATIONS
The building is beyond practical repair and should be demolished. Stage
one was constructed in an adequate manner but stage two is
substandard and cannot be repaired to be structurally sound… In
discussions with the owner it is apparent that there is no desire to
necessarily retain the mud brick building. It is therefore recommended
that the building be replaced with a steel frame colourbond shed of
similar dimensions. The replacement of the shed will necessitate the
removal and installation of the solar panel array currently on the roof.
This will obviously result in additional costs over and above the
demolition, supply and erection of the new shed.” (sic)
26. A further report from „C‟, dated 28 August 2011, states:
“Prolonged drought has caused cracking to mud brick rear wall of
garage.
Floods in September and November 2010 and February 2011 resulted
in the bottom row of mud bricks to deteriorate, this causing wall to
collapse. The roller door h as buckled due to wall collapsing.”
27. The FSP appointed a loss adjustor „CO‟. The first report, dated 6
October 2011, states:
“We are not convinced the collapse of the mud brick walls and
deterioration of the bottom row of bricks has been caused by a single
storm event, rather the damage appears to be gradual long term
damage due to age, construction and general wear and tear.
Case No: 277404 Determination Page 6 of 11
We note you have a report from C dated 28/08/2011 identifying
prolonged drought as the cause the cracking of the rear wall.
C also note floods in September and November 2010 and February
2011 have resulted in the bottom row of mud bricks deteriorating, thus
causing the walls to collapse.
The statements from C are contradictory and there has been no flood
event in the area on t he dates advised.”
28. The report also includes a number of photographs. They show the
building is in a deteriorating state and notations make reference to a
section of the north wall that had previously been patched over,
“indicating pre - existing damage” .
29. CO provided a second report after it was informed an engineer had
inspected the property earlier in the year. It discusses the engineer‟s
findings in light of the policy exclusions and concludes that the wear and
tear has been ongoing. It states the loss is not the result of a single
insured event and therefore the policy does not respond.
Discussion
30. The Applicants lodged the claim on 29 December 2010 and the FSP did
not receive the initial assessment report until 24 February 2011. After
appointing the engineer, the updated report to the FSP was dated 4
May 2011. Further assessment occurred up until October 2011.
31. My overall view is that the FSP took more than a reasonable time to
assess and make a decision on this claim. The damage was isolated to
the shed and I do not consider there is justification for taking around 11
months to make a decision.
32. That said, the information provided indicates the shed is in a state of
disrepair. The photographs attached to the first report of CO show a
section of guttering is not attached and some sections of roof iron are
rusted. Some bricks also appear to be breaking up.
33. The engineer‟s comments indicate that the affected section of the shed
was poorly constructed and has effectively failed over time.
34. In considering the terms and conditions of the policy, I accept the
exclusions of „erosion or subsidence‟, „defect, structural fault‟ apply to
the claim. The erosion exclusion does not apply where storm or flood
causes the damage within 72 hours of the event.
35. In this case, it would appear the event has been ongoing and I am not
persuaded the noted movement in the structure was an isolated event,
given there is evidence of previous patching to the walls of the structure,
indicating this is not the first instance of movement.
36. The FSP‟s policy is somewhat unusual in that the exclusions include a
number of provisions that act to reinstate cover that the exclusion
appears to take away. For example, the „wear, tear … gradual
deterioration‟ excl usion does not apply where it has been caused it
storm. Therefore if a structure gradually deteriorates due to storm
events while it is insured, it is effectively covered.
37. However, in this case, I am persuaded that the structure was in a state
of decline, which is obvious from the photographs and evidence of the
Case No: 277404 Determination Page 7 of 11
patching to the walls. There is also information in the engineer‟s report
that indicates the pine poles had been installed in what appears to be
an attempt to support the structure.
38. On the balance of probabilities I am persuaded that the FSP has
established that the loss occurred due to structural faults and erosion. In
my view this damage occurred over a period of time and structural
issues with the shed should have been obvious given the photographs
show the patching of walls, rusted sections of the roof and missing
guttering.
39. I acknowledge the Applicants‟ submissions that the initial assessor
reported the claim should be covered. However, the engineer is a more
qualified expert and I find his comments persuasive.
40. Further, as the engineer reports the structure needs to be demolished, I
do not consider the FSP‟s handling of the claim resulted in prejudice
with regards to the repair of the shed.
41. The Applicants report that water got into the shed while they waited for
the FSP to make a decision and caused damage to some contents
items.
42. The FSP has not addressed this issue in its submission. There is no
evidence the FSP carried out a make safe while it took several months
to assess the claim and make a decision.
43. On this basis, I recommend that the Applicant provide a list of the
contents items in the shed that were damaged and present this to the
FSP for replacement or cash settlement.
44. On the issue of the FSP‟s hand ling of the claim, as noted, I accept that
the claim took too long to assess. The Applicants noted this as a major
concern, yet the FSP has offered no explanation as to why a relatively
simple claim took 11 months to assess.
45. In my view, the delay was so excessive that a consideration of
compensation is applicable.
46. Under Paragraph 9.3(b) of the Terms of Reference there must be an
unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applica nt‟s expectation of
enjoyment or peace of mind before compensation for non-financial loss
may be considered.
47. In my view, this claim took far too long to assess and the Applicants
report minimal communication from the FSP throughout the process. I
consider an unusual degree of time was taken and it interfered with the
Applicants‟ expectations and peace of mind.
48. In the circumstances, I recommend the FSP pay $500 compensation to
the Applicants. ”
Additional Comments
4. It will be seen that the thrust of the Recommendation was that the FSP was
entitled to refuse liability for the damage to the shed but that the Applicants
should provide a list of damaged contents items in the shed to the FSP for
replacement or cash settlement. I do not know whether this has taken place
and for the sake of completeness, I will address this issue subsequently.
Case No: 277404 Determination Page 8 of 11
5. The Case Manager also recommended that the sum of $500 should be paid
to the Applicants by the FSP in compensation pursuant to paragraph
9.3(b)(i) of the Terms of Reference for this Service and in recognition of the
extraordinary inconvenience and delays occasioned by the handling of the
matter by the FSP.
6. As noted above, the Applicants have not accepted the Recommendation. In
a telephone discussion with a representative of this Service, they informed
the Service that when the FSP‟s original assessor inspected the property in
February 2011, he advised the Applicants that he was of the opinion that the
damage had been caused by storm.
7. This is consistent with the FSP‟s clai ms screen notations from 24 February
2011. A detailed note as to those notations is contained in paragraph 24 of
the Recommendation above.
8. I have also examined the file notations and I believe that at least until
October 2011, it was the intention of the FSP that the claim would be
allowed. Further attendances by various experts on behalf of the FSP were
directed to the issue of quantum, rather than as to whether the claim had
arisen as a result of an insured event. It was only after the report of CO of 6
October 2011 that the FSP decided to reject the claim.
9. I agree with the comments of the Case Manager that even the initial
inspection of the property was some what delayed (about two months).
Thereafter, the further delay between 24 February 2011, and the report of
CO on 6 October 2011 is extraordinary and most unfortunate.
10. The Applicants have made a further submission on 5 March 2013, coupled
with a further email of 24 March 2013. In the latter, they have confirmed that
that which they indicated by telephone, that at all times they had been
relying upon the initial statement from the assessor, that the claim appeared
to have arisen from an insured event.
11. In their 5 March 2013 submission, the Applicants have said:
“Our concern, after reading the summary of FSP ‟s response, is that at no time
from the initial report to FSP by US on 24/2/11, until the report by C Ltd on
6/10/11, did they give any indication in their internal memorandums that they
disputed the fact that the event causing the damage was due to a storm. It was
only 8 months later after the building had suffered further extensive damage that
this became a reason for denying the claim. From reading the FSP report, it
seems that on more than one occasion (see 10/5/11, 8/9/11, attachment 2), it is
mentioned that the claim should be accepted provided a fair and reasonable
quote could be produced.
When a reasonable quote was produced by C Constructions for $10860.00 it
was recommended that the claim be paid. When C Constructions advised that
further deterioration of the shed meant that their quote had to be revised it was
then that FSP called in C Ltd.
We fail to see how C Ltd was able to state honestly that the original crack was
not due to storm damage when the building had deteriorated to such a state that
it was no longer possible to tell where the original crack was or what it looked
Case No: 277404 Determination Page 9 of 11
like. C Constructions have stated in their report that further deterioration of the
building had meant they needed to adjust their quote substantially (from
$10860.00 to $33462.00) and this was at least a month before C Ltd inspected
the building by which time even more damage had occurred.”
12. The FSP has responded to the 5 March 2013 submission. Amongst its
responses, it has said that “FSP refutes the Applicants‟ submission tha t the
assessors, builder and assessors who had attended the Applicants‟ property
indicated that the FSP were going to accept the Applicants‟ claim. FSP
submits that it is necessary to assess the merits of the Applicants‟ claim prior
to making a decision. The FSP reiterates that it had never communicated to
the Applicants that the claim was for acceptance.
13. Later on, the FSP says that:
“ FSP acknowledges that the Applicants have now become aware through the
FOS process of internal FSP documents that looked at quotations for their shed
which they may have considered. FSP submits that the quotations were not
accepted when the Applicants‟ claim had been declined. FSP reiterates that they
required a specialist report before making a decision. FSP further reiterates that
they had not provided the Applicants with express advice that they were going to
accept their claim or accept a particular quotation. Further, FSP submits that the
Applicants have not acted or have been prejudiced as no such advice was
provided which they have indicated to have relied upon.” (sic)
14. I consider there is a problem however with the FSP‟s submission. It is
worthwhile considering what would have been the case had the FSP‟s
assessor who first inspected the property in February 2012, advised the
Applicants that he did not consider that the claim could be allowed. I believe
two courses would have been followed. The first is that the Applicants would
have at the very least considered obtaining an alternative report to establish
whether or not the FSP‟s assessor was correct.
15. The second step which they are most likely to have followed was to
immediately commence repairs to the building. I note that the building, an
outhouse, had been used for the storage of tack and gear relating to horses,
and I have no doubt that at an early stage the building could have been
“patched up” to the point where it continued to be useful for this purpose.
16. In their later submission, they reiterate that they had been made aware by
the assessor of his opinion that the damage was storm related.
17. In my opinion whilst it is true that until there is a definitive statement from an
organisation such as the FSP, the wise choice might have been for the
Applicants to obtain an expert opinion of their own, there are few in the
community who would follow such a course if informed that the assessor
believed that the damage was storm related.
18. For these reasons, I find myself in disagreement with the FSP‟s submission
that the Applicants have not acted on or been prejudiced by the actions of
the FSP. It seems clear from the claim file notations that indeed the assessor
was of the opinion that the damage was storm related and I am left with the
Case No: 277404 Determination Page 10 of 11
clear conviction that if the quantum of the claim had not escalated
considerably, the FSP would have allowed it.
19. For these reasons, and almost entirely as a result of the additional material
which has been filed since the Recommendation, I have reached a
conclusion different to that of the Case Manager. I consider that this is a
matter in which the FSP is obliged to indemnify the Applicants.
Quantum
20. I do not, however, find it easy to determine the question of quantum. With
respect, I simply do not accept that if the damage was storm related, it could
deteriorate from the time that it was first inspected by the FSP‟s assessor
until, relatively shortly later, it was effectively a total “write off”.
21. I am satisfied that if an appropriate sum had been paid to the Applicants at
an early stage, the building could have been restored to the state in which it
existed at the time of the storm (17 October 2010). After a two month
(unexplained) delay in obtaining a report from an engineer/specialist, when it
was still resolved that the FSP would obtain a quote to replace the existing
structure and “confirm if fair and reasonable and accept”, it was not until 27
June 2011 the FSP resolved to obtain still further quotes. It was then, again,
a six week unexplained delay when by 8 September a quote had been
received from “C” in the sum of $33,462 on the basis that the rear wall of the
shed had now completely collapsed and as a consequence, the mud brick
walls were now more damaged. Five weeks later the FSP decided to appoint
CO.
22. Out buildings on farm properties are not required to have the same
characteristics as, for example, a residential dwelling. Many may have leaks
or cavities in area which would be entirely unacceptable for residential use,
yet they serve an extremely useful purpose.
23. I have given consideration as to whether the quote from C of 30 September
2011 of $33,462 should be regarded as appropriate, but ultimately I have
decided that a somewhat reduced figure is appropriate to compensate the
Applicants for their loss. I consider that the FSP should pay $25,000.
24. I have no evidence as to whether the Applicants have conducted repairs on
their own behalf. In any event, they must have been without the use of the
shed or at least substantial parts of it for a significant time. I think the
appropriate course is to award interest on one half of the sum to which I
have referred. Interest will therefore be payable on the sum of $12,500 from
11 November 2011. I note, incidentally, that there was a still further delay in
the handling of this matter between 11 November 2011 and 16 February
2012. During this time, the Applicants had advised that the matter should be
referred to IDR, but even by 16 February 2012 the FSP maintains that it had
no record of the claim being reviewed at IDR.
The Terms of Reference of this Service
9.3 Other compensation
Case No: 277404 Determination Page 11 of 11
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for
consequential financial loss or damage up to a maximum amount of
$3,000 per claim made in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for non-
financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken
to resolve the situation or interference with the Applicant‟s
expectation of enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual‟s privacy rights
– injury has occurred to the Applicant‟s feelings or humiliation has
been suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute.
25. As I have noted above, when the Case Manager considered this matter, he
was of the view that a payment should be made by the FSP to the Applicants
pursuant to the above paragraph of the Terms of Reference.
26. Were it not for the overall history of the matter and the fact that I consider
that the FSP should now compensate the Applicants, and that the amount of
the compensation will be substantially greater than if the matter had been
resolved expeditiously as could have been the case, I would have decided to
make an award under paragraph 9.3(b)(i) of the Terms of Reference. I do,
however, agree with the Case Manager that the handling of the claim has
been extraordinarily unfortunate and the overall delay very regrettable.
Determination
27. I therefore determine that the FSP shall pay to the Applicants the sum of
$25,000 in resolution of the claim lodged by the Applicants on 29 December
2010.
28. I further determine that the FSP shall pay to the Applicants i nterest at the
statutory rate upon the sum of $12,500 from 11 November 2011 until the
date of settlement.
29. I further determine that if it has not yet occurred, the Applicants provide a list
of damaged contents which were stored within the shed, to the FSP for
replacement or cash settlement.