Text of the determination
Case No: 277168 Determination Page 1 of 13
Case number: 277168
General Insurance - Small Business - Commercial Property - FSP Decision –
Claim amount
28 November 2012
Background
1. The Applicant insured her medical practice office with the Financial Services
Provider (FSP) on 18 September 2004 which was arranged through an
insurance broker acting as her agent.
2. The policy provided cover as set out under the terms and conditions of the
policy for the building, contents and business interruption in regards to costs
of working, book debts and accountant fees.
3. On 1 November 2010 the Applicant lodged a claim under the policy as a
result of storm damage to the property. It was reported by the Applicant that
on entering the property that day she found the ceiling had collapsed as a
result of water entering through the roof as a result of storm event from the
preceding weekend.
4. The FSP made arrangements for „make safe repairs‟, which included a
tarpaulin placed over the building‟s roof. It was reported water entry had
been caused by “slipped tiles”. The FSP appointed a loss adjuster to attend
the property and report on the damage.
5. The FSP accepted the claim for internal damage to the building and
contents. The FSP was of the view that no damage had been caused to the
roof from the storm event and accordingly denied repairs to the roof.
6. Due to problems and delays associated with endeavouring to have repairs
attended to (for which the FSP held the Applicant responsible), it offered a
cash settlement for the identified repairs. The Applicant rejected the FSP‟s
assessment for damage, scope of works and estimated cost as being
inadequate to recompense her for her loss.
7. The Applicant also claimed for business interruption under the policy due to
the delays but this was rejected by the FSP.
Summary of Applicant’s position
8. The Applicant says:
Determination
Case No: 277168 Determination Page 2 of 13
The property suffered damage as a result of a storm event that occurred
on the weekend 30-31 st October 2012. Roof tiles were damaged which
allowed rainwater entry causing the ceiling to collapse in the waiting room
and reception area. Some of the contents of her surgery were also
damaged.
9. “Make safe” repairs were attended to; removal of water damag ed contents
and carpets and a tarpaulin placed over the roof.
10. As the tarpaulin was left on the roof for over two weeks further damage was
caused to roof tiles as well as causing shearing stress to the building. The
Applicant says the tarpaulin used was inappropriate for the circumstance
and the further damage resulted from it flapping in the wind.
11. When the tarpaulin was removed rainwater re-entered the building causing
further ceiling collapse.
12. Although the FSP accepted that damage had occurred it rejected her claim
due to the roof tiles being old. The Applicant disputed this and referred the
matter through the FSP‟s internal dispute resolution process (IDR).
13. The FSP obtained further reports from engineers which included a scope of
works for the repair of resultant damage.
14. She obtained quotes based on the scope of works. The Applicant says she
was unable to operate her practice adequately due to delays with FSP‟s
claim processes and arranged for her preferred builder to undertake repairs.
15. The Applicant den ies the FSP‟s allegation that she had denied access to its
builders to quote on repairs.
16. The FSP offered a cash settlement which is less than the repair quotes she
obtained. Further, the FSP did not include any loss for business interruption
in its settlement offer.
17. The Applicant is seeking the following resolution from the FSP:
Contents loss $17,320 (exc GST)
Builder‟s quote $52,762 (exc GST)
Business interruption $49,082 (exc GST)
Personal injury/Productivity loss since July 2011 $50,000 (exc GST)
Goodwill loss $50,000
Summary of FSP’s position
18. The FSP says the Applicant has the onus of establishing, on the balance of
probabilities, that the damage claimed to her insured property was caused
by an event covered by the policy.
Case No: 277168 Determination Page 3 of 13
19. The FSP says it has done everything possible to settle the claim and relied
on the builder and engineer reports which concluded cracked roof tiles were
not storm related neither were they damaged by the additional loading due to
the tarpaulin used to waterproof the building.
20. The evidence is clear that the tiles have been damaged by corroded nails
which expanded putting pressure on terracotta tiles causing them to crack
between the nail holes. It says this allowed rain to penetrate and this is fully
outlined in the reports obtained.
21. The Applicant has refused to accept there are defects to the roof which is
her responsibility. It says it has refused to cover rectification of those defects
as part of the claim.
22. The FSP only offered to cover the resultant damage from the water ingress
and offered to undertake repair of that damage. It says the Applicant rejected
this and also its offer of cash settlement.
23. The FSP says in regards to business interruption the Applicant has been
advised she does not have the appropriate cover. I t says the Applicant‟s
insurance broker has confirmed this.
24. It noted the Applicant‟s referral to the Service included a claim for
miscellaneous extras, personal injury/productivity loss and good will loss but
these have not been substantiated. It says, in any case the Applicant‟s policy
does not cover such losses.
25. The FSP relies on the following policy provisions:
“ General Conditions
...
(3) Reasonable Precautions
You must take all reasonable precautions to prevent destruction, loss or
damage to property or bodily injury and comply and ensure that Your
employees, servants and agents comply with, all statutory obligations and by-
laws or regulations imposed by any public authority for the safety of property
or person.
...
Claim Procedure
General – All Sections
...
1. As soon as possible after the happening of any occurrence, accident or
event that may give rise to a claim against Us, You or Your Legal
representative must:
i. advise details to Us, and then send written confirmation within 30 days.
ii. Take all reasonable steps to minimise the loss, damage or liability, and
to prevent any further loss, damage or liability.
...
Case No: 277168 Determination Page 4 of 13
2. When a claim arises, You must not authorise repairs to, or arrange
replacement of, any of the property relevant to the claim without Our
consent other than as provided under clause 1(c).
3. Subject to the provisions of the Insurance Contracts Act 1984, You, or any
person making a claim under this policy, must not make any admission of
liability or payment or promise or offer of payment in connection with any
such claim, without Our written consent.
...
Definitions
In this Section:
Accidental damage means damage to property Insured but does not include
Damage,
(a) Caused by, or as a consequence of:
...
(17) wear and tear, fading, scratching or marring, gradual deterioration,
developing flaws, normal upkeeping or making good.
...
(25) consequential loss of any kind.
...
Business Interruption
Introduction
This Section forms part of the Policy only if shown in the Schedule and, if so,
must be read together with the definitions, terms, conditions, exclusions and
limitations expressed in the General Provisions of the Policy and in the
Schedule .”
Issues
26. Whether the FSP‟s offer of settlement fulfils it obligations under the terms
and conditions of the policy.
27. Whether the Applicant is entitled to be compensated for personal
injury/productivity loss or goodwill within the terms and conditions of the
policy.
Reasons for decision
28. FOS has considered it is appropriate to expedite the dispute in accordance
with clause 8.6 of the FOS Terms of Reference. This is because of the
issue(s) in dispute and substantive quantum involved. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
Case No: 277168 Determination Page 5 of 13
29. There has been an exchange of material between the parties. For the sake
of brevity, the Panel does not intend to recite material in this Determination
except where considered relevant to the FSP‟s decision to deny the claim.
30. The Panel notes the extensive submission provided by the Applicant. In
disputing the FSP‟s offer of settlement, she has also raised multiple issues,
including the FSP‟s handling of the claim, the lack of communication with her
by the FSP and its representatives, as well as the lack of independence of
the FSP‟s representatives, builders and FSP appointed consultants.
31. The Panel does not propose to make light of the issues made by the
Applicant, including allegations of dishonesty and fraud by the FSP
representatives, but will give consideration where deemed appropriate.
However, matters regarding the FSP‟s handling of the claim,
communications and persons acting on its behalf are matters that fall within
the scope of General Insurance Industry‟s Code of Practice (the Code) which
is administered by the Service.
32. Matters of Code Compliance will therefore not be dealt with specifically
within this Determination.
Presentation of material
33. The Applicant was dissatisfied with the presentation of the FSP‟s submission
provided to her. The Applicant says the file lacked chronological order in
regards to emails, pages were missing from many of her emails and that
photographs were in black and white or deliberately produced as illegible,
distorted or not marked.
34. The Applicant believes the FSP‟s present ation of its submission was done
deliberately in an effort to avoid her responding.
35. The Panel notes the FSP‟s submission was received by the Applicant in an
opened and damaged condition and according to Australia Post it either
became loose or damaged during processing.
36. It is unfortunate that the Applicant‟s copy of the Notice of Response was not
presented in the manner she expected. Nonetheless, the Panel notes the
Applicant was provided with a copy of the documents submitted by the FSP
to the Service; although these may not all have been appropriately ordered,
they nevertheless represent a full disclosure of the material on which the
FSP relies.
37. Although the Panel notes the Service would prefer colour photographs be
provided, this may not always be possible. Nonetheless, there are coloured
photographs provided which the Panel notes appear to adequately show the
damage subject of the dispute.
38. The Panel also notes the Applicant has stated she has not been provided
with an original copy of the engineer‟s report (IF). However, a copy of IF‟s
Case No: 277168 Determination Page 6 of 13
report is contained in the material she provided to the Service which appears
to have been exchanged to her.
Business Interruption
39. The Applicant has also claimed for Business Interruption. The FSP has in its
submission referred to clause 7 of the Service‟s Terms of Reference where
business interruption is excluded by the Service.
40. Insofar as the Applicant is claiming business interruption, the claim is not
within the jurisdiction of the Service and regrettably, the Panel is unable to
assist.
41. The Panel notes the Applicant has stated she is covered for Business
Interruption as confirmed on the Certificate of Insurance and that “Gross
Income” is not excluded.
42. However the Panel notes the Applicant is only insured under Business
Interruption for “Increased Costs of Working, Book Debts and Accountant
Fees. The Applicant does not appear to be specifically covered for “Gross
Income” under Business Interruption.
43. The FSP says that as the policy was arranged through an insurance broker
the Applicant would need to raise this with her broker. Although the Applicant
has raised a concern about the status of the broker the Panel is satisfied the
broker was acting as the Applicant‟s agent as noted in letters issued by the
broker to the Applicant on renewal of the policy in 2008 and 2009.
44. As noted above disputes in respect of business interruption are not within
the jurisdiction of the Service. Further, should the Applicant have concerns in
respect of the cover arranged for her, this is a matter between the Applicant
and her broker and is not subject of this Dispute with the FSP.
Storm related damage
45. The FSP has accepted internal water damage to the building and contents
but not for damage to roof tiles. The Applicant disputes the FSP‟s settl ement
offer damage but the Panel will specifically address this later in the
determination in respect of the issue regarding the roof tiles.
46. The Applicant says she is claiming for tiles that were damaged by the storm
or were damaged as a result of an inappropriate tarpaulin having been
placed over the roof. The Applicant says a marine tarpaulin weighing 150kgs
was used when a more appropriate tarpaulin should only have been 50kgs in
weight.
47. The Applicant asserts tiles were damaged when the tarpaulin flapped in
windy conditions. The Applicant says stress shearing was caused to the
ceiling because of the flapping tarpaulin and the tarpaulin was negligently left
on her roof with the intent to cause further damage. The Applicant also
alleges the repairer may have damaged tiles by stomping over the roof.
Case No: 277168 Determination Page 7 of 13
48. In correspondence to the Applicant dated 7 February 2011 the FSP advised
the “make safe” repairer (PPA) noted many broken and slipped tiles and that
this damage that was not caused by the storm.
49. In addition, the FSP indicated in this letter that a building company
representative (BBS) who attended the property to report on the condition of
the roof reported roof tiles were broken as a result of faulty installation, in
that nails used to secure the tiles had deteriorated, rusted and expanded
over time.
50. The Panel has sighted the PPA report dated 17 November 2011 in which it is
stated:
“There is damage because water entered through “slipped tiles”.
Our make safe trade put tiles back in place immediately above the damaged
ceiling that he described as having „slipped down the roof‟ this is not usually
the action of storm, although we cannot identify a specific cause for tiles being
moved down a roof or identify if the insured was aware of this. My
investigation of the roof identified dozens of broken tiles that appear to be
either a tile or installation fault, where the tiles have cracked through the fixing
points, these cracks are regular in pattern and size, and do not identify as
storm damage. Further damage will resul t if not addressed....”
51. The information from the portfolio manager of BBS is contained in an email
to the loss adjuster, incorrectly dated 10 December 2010 and it states:
“A [BBS] roof tiler attended the above property to repair the storm damage
roof tiles as requested. Upon attendance we noted that during the original
installation, the roof tiles were not installed correctly. The original trades have
used steel nails on every third course. Steel nails over time will deteriorate
and rust causing expansion of the nails and cracking to the roof tiles. In our
opinion, there will be an ongoing problem with his in the future if these issues
are not rectified.
52. The FSP arranged for a building consultant (IF) to inspect the roof to
determine if the tarpaulin caused damage to the roof tiles. According to IF‟s
report at the time of his inspection all the leaking tiles had been replaced.
However, his examination of the broken tiles revealed they were fractured
across the corner and not across the centre of the tile. The Panel
understands the broken tiles were still retained at the property.
53. Although IF conceded the flapping tarpaulin may have caused minor
damage to the building which was identified in his scope of works, roof tiles
were not damaged by the tarpaulin. The FSP referred to the policy exclusion
regarding failure of design, faulty materials or faulty workmanship in relation
to the cause of damage for the roof tiles. The Applicant says that when the
roof was installed it was done in accordance with industry standards and
codes and that time.
54. It would appear the FSP was not prepared to undertake internal repairs until
the Applicant has attended to the issue of the roof tiles in that it wanted her
to replace the steel nails with galvanised nails. The Panel was unable to
locate any specific correspondence from the FSP advising that it would not
Case No: 277168 Determination Page 8 of 13
undertake internal repairs until the issues of the roof tiles had been
addressed. Nor is there any evidence from the FSP to establish the roof was
not installed within buildi ng standards.
55. The Applicant has argued against the exclusion(s) relied upon by the FSP
and the Panel accepts that the tiles were installed some 30 years prior to the
storm event. Although building codes may have changed over the years
there is nothing to establish the use of steel nails was inappropriate at the
time the roof was installed.
56. The FSP has an obligation that if it wishes to rely on an exclusion it is
required to provide appropriate reports in support of its position. The Panel
accepts the actions of the FSP delayed the claims process with the
Applicant.
57. The Applicant says the roof is secure and not leaking, based on advice she
obtained. There is no suggestion from the Applicant‟s advice that there are
broken tiles still on the roof.
58. As to the claim for the broken tiles, the Panel is satisfied there was a
storm/substantial rain event on 31 October 2010 and that as a result, there
was damage caused to the tiles. If the Applicant is claiming for the cost of
the damaged tiles and their replacement, she should provide proof of the
cost of replacement and repair to the FSP.
Carpet
59. The Applicant is claiming for replacement of carpet throughout the medical
practice as the existing carpet is no longer available. However, carpet in the
waiting/reception area appears to be the only area damaged.
60. The policy provides cover for damaged property and as damaged carpet was
confined to the waiting/reception area the FSP‟s liability for replacing carpet
does not extend beyond waiting/reception area.
61. The Panel is satisfied the FSP‟s liability for replacement of carpet is limited
to the waiting/reception area.
62. The FSP has offered to settle on a quote for $3,212 for the carpet and the
Panel is satisfied this amount fulfils the FSP‟s obligation for repla cement of
carpet.
Offer of settlement
63. Under the policy, the Applicant is covered for the replacement cost of
damaged property. This is defined in the policy to mean the necessary cost
to replace or rebuild insured property to a condition substantially the same
as but not better or more extensive than its condition when new.
Case No: 277168 Determination Page 9 of 13
64. The Applicant is seeking settlement for damage to contents and internal
building damage. It is the Panel‟s understanding that internal repairs have
been attended to by the Applicant.
65. T he FSP‟s offer of settlement for damage is for the total amount of
$15,641.44 which includes both contents and building damage. Whereas the
Applicant says she is seeking $17,320 for contents and $48,851.02 for
building repairs.
66. The Applicant says she is not disputing the scope of works provided by
MCS. The Panel notes the FSP obtained an updated scope of works from
„S” dated 15 March 2011 on which it based its offer for building repairs. The
Panel accepts “S‟s” scope of works covers building repairs associa ted with
storm related damage.
67. The Applicant provided a calculation for her loss. The Panel has reviewed
the Applicant‟s costing. The building calculation incorporates her builder‟s
quote, as well as including costs associated with replacement of glass and
tinting of windows. The Applicant has included the cost to replace carpet in
the building. The Panel notes the cost to replace carpet has also been
included by the Applicant in her calculation in replacement of contents.
68. There is no evidence that the replacement of glass or window tinting is claim
related. The Panel does not accept the Applicant‟s costing meets the
replacement cost for damage as outlined in the policy.
69. The Panel notes the FSP has had some difficulty in determining its costs.
The Applicant denies not allowing access to the property for the purpose of
obtaining repair quotes. The FSP provides little in the way of evidence to
show access was denied.
70. The Applicant‟s policy also indicates the repairs should not be made without
the FSP‟s consent . However, the FSP has not indicated any prejudice with
the Applicant authorising and undertaking repairs. Further, as the Applicant
was concerned as to likely on-going problems from unrectified damage she
undertook some repairs to mitigate any further loss, as she is required to do
in line with the policy terms.
71. The FSP indicated that “S” was asked to do a costing based on his scope of
works as it says BBS was denied access. There is a detailed cost estimate
by “S” but the Panel acknowledges “S” is not an appropriate party to
undertake repairs.
72. In the Panel‟s view an appropriate replacement costing should be carried out
by a suitable person or firm who is equipped and prepared to undertake the
building repairs. However the Panel understands that an appropriate costing
may be difficult to achieve at this stage given the relationship between the
parties and that all repairs appear to have been completed.
73. The Panel is left with a range of evidence as to the costing but the detail is
less than ideal.
Case No: 277168 Determination Page 10 of 13
74. The Applicant has provided a number of quotes and costings which appear
to go beyond the scope identified, however she has provided (and indicates
she has paid) an amount based on an invoice from builder ECS which
appears to address the building works required. This invoice is for
$18,919.49. A further invoice from ECS appears to be for additional work
beyond the scope of damage attributable to the storm.
75. Conversely the FSP has provided a quote from S which although not entirely
satisfactory, may be a guide. This quote was for $6,626.63.
76. Although either or both of the costings referred to above may not be an
accurate reflection of the damage caused by the storm or the cost of
rectification, as this dispute has been unresolved for a considerable amount
of time, and with no prospect of agreed settlement, the Panel is inclined to
seek a final resolution based on the information to hand. It therefore intends
to rely as per its Terms of Reference section 8.2, to do what in its view is fair
in all of the circumstances.
77. Therefore in settlement of the building repairs an average of the two
amounts noted above will form the basis of settlement. An average of these
produces an amount of $12,773.06.
78. The Applicant has also asked for replacement of ducted air condition/heating
vents which she says could not be salvaged. According to the FSP the vents
were not damaged but were old.
79. The Panel accepts there is no evidence that the vents were damaged as a
result of the storm and their replacement is as a result of a loss which is not
covered by the policy. The FSP is entitled to exclude the vents from
settlement.
80. The Applicant is also seeking the cleaning of ducts which she says is
required due to circulating insulation. The Applicant notes that cleaning of
the ducts may compromise the fragile ducts.
81. The fact that the ducts may be fragile is not claim related. The FSP need
only pay the Applicant for the cost of cleaning the ducts. The Applicant is
claiming $373.50 for this and the Panel determines the FSP is liable for this
amount.
82. The Applicant is also claiming for telephone repairs; i.e. lines to the reception
desk. The Applicant has been quoted $290 for this. The Panel accepts the
FSP is liable only for this amount.
83. The FSP has offered settlement for contents based on replacement costs of
the items damaged:
Reception desk $1,430
3 seater couch $ 499
Toy box $ 600
Case No: 277168 Determination Page 11 of 13
Various toys $ 500
6 chairs (Office works) $ 238.95
Picture frame $ 300
TV $ 800
Total $4,367.95
84. Whereas the Applicant is seeking:
Reception desk “Cornerstone Unit‟ delivery & installation $5,080
Fabric 3 seater couch $1,259
Toy box $ 600
Various toys $ 600
Six waiting room chairs (120kg load)@$295 $1,770
Picture frames (one large and one medium) $ 900
TV, wall mount and installation $ 923
Total $11,132
85. The Panel has had the benefit of sighting photographs of the items claimed
and material on the replacement of items from both the FSP and Applicant.
The Panel is of the view the Applicant is deriving betterment on some of the
replacement items.
86. Again, application of 8.2 of the Terms of Reference, the Panel finds it is
appropriate to allocate 80% of the claim in the sum of $8,905.60. Further, the
FSP should make an allowance for any delivery and installation costs. The
Panel is of the view an amount of $500 should be sufficient in this regard.
Miscellaneous extras
87. The Applicant also requested consideration of costs for:
Changing door and window locks – needed at completion of works
Vacuum cleaner – had to buy a new one as the old one got damaged
following cleaning up of original storm debris.
Ergonomic leather chair – bought to surgery to temporarily replace
waiting room chair. Damaged when sat on by a very heavy person.
88. The Applicant has not provided any succinct argument or evidence as to why
she is covered for these losses under the policy or why the FSP should be
held liable.
89. The Panel is of the view these additional costs sought by the Applicant are
not attributable to the storm. The Panel is satisfied theses cost are not
covered for the event claimed.
Case No: 277168 Determination Page 12 of 13
90. The Applicant is also claiming for personal injury. The FSP says the
Applicant has not substantiated this. No claim for injury has been lodged with
the FSP.
91. The Panel is unsure as to whether the Applicant intends to claim under any
other appropriate cover which may be available under her policy. The
Applicant has not substantiated the nature of the claim or how cover under
her policy may apply.
92. Further it should be noted that under clause 9.6 of the Services Terms of
Reference the Service may not award punitive, exemplary or aggravated
damages.
93. The Panel is not in a position to consider the Applicant‟s request for
compensation for personal injury
94. The Panel notes that clause 9.3 of the FOS Terms of Reference may be
relevant to this dispute:
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for consequential
financial loss or damage up to a maximum amount of $3,000 per claim made
in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for non-financial loss
but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant‟s expectation of
enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual‟s privacy rights -
injury has occurr ed to the Applicant‟s feelings or humiliation has been
suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
(i) consequential financial loss; or
(ii) non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability.
d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS‟s
ability to make an interest award under paragraph 9.5. ”
95. However, the Panel accepts the Applicant‟s policy excludes consequential
loss and as such any loss under 9.3(a) & (b) is not available.
Determination
96. On the basis of the available information the Panel determines:
Case No: 277168 Determination Page 13 of 13
The FSP is to pay an amount of $12,773.06 in respect of the building
repairs;
Pay the Applicant $373.50 for cleaning of the ducts;
Pay $290 for telephone repairs;
Pay $3,212 in respect of carpet damage;
Pay $8,905.60 in respect of contents damage;
Pay $500 for delivery and installation.
97. However, no payment been paid to the Applicant in regards to any aspect of
the claim. The FSP has had the benefit of the funds and although the
Applicant disputed the FSP‟s settlement offer no reason has been given as
to why payment was not made to the Applicant.
98. The Panel determines the FSP is to pay interest as allowed for under
Section 57 of the Insurance Contact Act 1984 (the Act) on the total amount
of the claim as determined above. The interest period is from 1 September
2011 to the finalisation of the claim.
99. Should the Applicant accept this Determination, the FSP is required to make
payment of the above amounts within 10 working days of acceptance,
payment of which will satisfy its obligations in full under the claim.