Home / Financial Firm (Unknown - Insurer) / Determination 277113

Determination 277113

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The FSP denied a subsidence claim linked to January 2011 storms, citing the 72-hour rule, gradual movement and exclusions. AFCA required the FSP to indemnify specified storm damage (including the roof and 50% of the brickwork) and pay $1,500 for non-financial loss from delay.

Storm-caused damage occurring within 72 hours is covered and the FSP's experts did not establish that the listed damage fell outside cover, while unexplained delay warranted non-financial loss compensation under the Terms of Reference.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 277113 Determination Page 1 of 9 Case number: 277113 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Subsidence within 72 Hours of a Storm 27 September 2012 Background 1. The Applicants‟ home building insurance policy commenced with the Financial Service Provider (FSP) on 1 November 2010 and was current at the time of loss. 2. On 1 February 2011, the Applicants lodged a claim with the FSP for the damage sustained to the property as a result of storms in early January 2011 and subsequent subsidence. 3. The FSP denied the Applicants‟ claim on the grounds that the damage to the property was a result of settling, shrinkage, earth movement and gradual deterioration which were excluded under the policy and also that subsidence due to storm did not occur within 72 hours of the loss event. 4. The Applicants expect the FSP to honour the claim. Summary of Applicants ’ position 5. The Applicants submit a local builder‟s statement which says th at he is unable to see previous brick work repairs to the property. 6. They say the building consultant M appointed by the FSP confirmed the damage to the property was caused by the storm. 7. There were many parts of the property which sustained damage within 72 hours of the loss event and the property continued to move thereafter.  Roof leaked;  9 doors jammed;  Door frame out of place;  Lounge ceiling sagging;  Cornice in kitchen pulling away from cupboard; and  Hallway skirting and cornice damaged. Determination Case No: 277113 Determination Page 2 of 9 8. The soil sampling results were incorrect as they were taken ten months after the storms and the soil would have been saturated if taken just after the storm event. 9. The Applicants believe the claim should be covered by the policy and expect the FSP to accept the claim for damage sustained to the ceiling, brickwork and door head. Summary of FSP’s position 10. The Applicants did not say the damage occurred within 72 hours of the loss event when they lodged the claim. 11. Building consultant M who indicated the displacement in the footing of the property may have been due to the storm event did not comment whether the damage occurred within 72 hours of the loss event. 12. The Applicants‟ letter to their broker in June 2011 indicated the property was still suffering from movement. 13. The FSP appointed soil scientist S found the soil was highly reactive. 14. A second engineer L who completed a detailed investigation with the findings of S concluded that the movement occurred due to normal seasonal foundation movements typical of a house constructed in highly reactive clay subsoils. 15. The FSP relies on its experts L‟s and S‟s findings and maintains denial of the claim. 16. It relies on the following policy provisions: “ Landslide or subsidence ... We will cover your buildings or contents for loss or damage as a result of a landslide or subsidence. We will only do this if the loss or damage occurs within 72 hours of ... • a storm, including rainwater or wind, or ... Exclusions to your cover Any cover we provide is subject to the following exclusions. ... Case No: 277113 Determination Page 3 of 9 We will not cover any loss or damage as a result of, or caused by • settling, shrinkage or any movement of earth • erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear ... • landslide or subsidence, unless – we agree to cover the incident as described under „Landslide or subsidence‟” Issue 17. Whether the FSP is entitled to deny the Applicants‟ claim. Reasons for decision 18. Due to the nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 19. The onus of proof rests on the Applicants to establish that, on the balance of probabilities, they have suffered a loss caused by an insured risk. Once the Applicants have established that the loss was caused by a risk insured under their policy, the onus then shifts to the FSP to show that, on the balance of probabilities, the loss falls within an exclusion clause in the policy. 20. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 21. I consider the FOS Terms of Reference relevant to this dispute are: “ 9.3 Other compensation a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to Case No: 277113 Determination Page 4 of 9 res olve the situation or interference with the Applicant‟s expectation of enjoyment or peace of mind has occurred; or (ii) in the case of a Dispute pertaining to an individual‟s privacy rights - injury has occurred to the Applicant‟s feelings or humiliation has be en suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for: (i) consequential financial loss; or (ii) non-financial loss, in a Dispute arising as a result of a claim on a General Insurance Policy that expressly excludes such liability. d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS‟s ability to make an interest award under parag raph 9.5.” 22. The Applicants have not raised an issue in regard to receipt of policy documents and in the circumstances, I am satisfied the FSP has fulfilled its obligation in informing them of the terms and conditions of the policy. 23. Subsequent to the lodgement of the claim, the FSP appointed a loss assessor and M to investigate the circumstances surrounding the loss and to assess the claim. 24. The loss assessor attended the property on 19 February 2011 and his report dated 11 March 2011 states: “A shifting or movement has occurred beneath the house causing cracking in ceilings and walls and doors will not close.” 25. M attended the property on 31 March 2011 and his report dated 7 April 2011 states: “Assessment of damage It appears that the footings and perhaps the slab in the original section of the house, built in 1980, have displaced. This displacement is likely due to the founding soil underneath becoming saturated during the deluge of early January 2011. It appears that the founding soil has had its load-bearing capacity reduced and the footings have displaced downward. In turn the internal timber wall framing which supports the roof rafters and joists has displaced, causing the joists to displace downward, manifest in distortions in the plasterboard ceilings and walls. In addition the footing under the Kitchen wall on the south side has displaced causing the brick wall to crack.” 26. It appears the claim did not progress any further until the Applicants followed up the matter with their broker on 13 June 2011 expressing their concerns with the delays and indicated the property continued to suffer from movement. Case No: 277113 Determination Page 5 of 9 27. Subsequent to the above, the FSP appointed S and L to assess the loss further. The inspection in this regard took place on 20 September and their reports are below. 28. S‟s report is as follows:  “W e have examined the soil profiles from all test holes and taken into account the relevant site conditions and details. We have then classified the site P .  Excluding the effects of trees, rocks (which may cause abnormal moisture conditions within the underlying soils) and future earthworks, we expect a characteristic surface movement, Ys, of 65 - 75mm (... - Section 2). This Ys value is representative of the site under normal soil conditions only and the designer should give due consideration to the effects of the existing abnormal moisture conditions on the foundation design.  Field classification and laboratory testing of the returned materials indicate that the underlying soils have a Very High potential to swell/shrink under varying moisture conditions. This swelling &/or shrinking of the soils is attributed to the absorption &/or loss of moisture and may cause structural damage to a building unless appropriate design procedures are followed  No water table was encountered during our investigation. Should subsequent observations or excavations encounter this problem, the Foundation Designer should be contacted immediately.” 29. Engineer L‟s findings: Report dated 14 October 2011 “SUMMARY In conclusion the following key findings and conclusions are repeated: 1, The foundation movement experienced by the residence (and associated damage) is not considered to be the result of one deluge in January 2011. It is considered that the foundation movement has been caused by normal seasonal foundation movements typical of a house constructed in the 1980 ‟ s on highly reactive clay subsoils; 2. The recorded slab levels are considered to be not consistent with bearing capacity failure of the subsoils under the foundations The recorded movements are consistent with “ flexing ” of the raft foundations under gradual change in subsoil moisture conditions; 3 Generally the damage observed is cosmetic and not of any real structural significance. The exception is the sagged roof structure adjacent to the kitchen. It is recommended that the sagged roof structure and adjacent foundation be investigated further by a properly qualified Structural Engineer ” Report dated 18 January 2012 “ In conclusion the following key findings and conclusions are repeated: 1. The foundation movement experienced by the residence (and associated damage) is not considered to be the result of one deluge in January 2011. It is considered that the foundation movement has been caused by normal seasonal foundation movements typical of a house constructed in the 1980s on highly reactive clay subsoils; Case No: 277113 Determination Page 6 of 9 2. The recorded slab levels are considered to be not consistent with bearing capacity failure of the subsoils under the foundations. The recorded movements are consistent with “ flexing ” of the raft foundations under gradual change in subsoil moisture conditions; 3. The damage observed is cosmetic and not of any real structural significance; 4. The foundation movement adjacent to the existing brick archway is not attributable to the January 2011 deluge. The foundation movement and resultant deflection of the adjacent ceiling has been caused by seasonal foundation movements in conjunction with the existing light and discontinuous foundation system; 5. The existing roof structure adjacent to the brick archway adjacent to the kitchen is structurally adequate and has not been damaged by the foundation movements; 6. The damaged linings and cornice adjacent to the existing brick archway could be repaired by the removal and replacement of the adjacent roof and wall linings. New battens and packing would be required to suit the deflection of the existing concrete floor. It is recommended that the new roof and wall linings be provided with control joints.” Report dated 16 April 2012 “ It is understood that the first engineering inspection and report was conducted by [M] group in March 2011. I am not aware of any other engineering inspections prepared for [FSP] prior to the [L] engagement in September 2011. A review of the report prepared by [M] would indicate that the inspection works did not include the assessment of the nature of the subsoils across the house site or detailed recording of the deflected shape of the residence. It is my understanding that the report conducted by LPCE is the only report that has included the following:  Detailed contour survey of the deflected shape of the concrete floor slab;  Detailed geotechnical survey of the existing subsoils;  Comparison of the deflected shape of the concrete slab to the expected deflected shape under foundation bearing failure;  Comparison of the deflected shape of the concrete slab to the range of potential deflected shapes possible under seasonal moisture changes of the underlying subsoils. ” 30. I have considered the reports from M and L and note that L‟s findings are more detailed and have responded to the various damaged parts of the property. 31. However, the fact remains the investigations and reports by L were only obtained over eight months after the loss event. 32. I also do not agree with the FSP‟s opinion that the movement caused by subsidence would not continue after the 72 hour period. The movement could have commenced within the stipulated time and continued thereafter. Case No: 277113 Determination Page 7 of 9 33. There is no evidence the FSP instructed the loss assessor or M to comment on whether the damage to the Applicants‟ property occurred within 72 hours of the storm event. 34. Furthermore, M did not make any comments that he considered the cracks to be pre-existing and not related to the storm event as suggested by L. 35. L is of the view that the property had sustained cosmetic damage due to foundation movement as a result of normal seasonal variations of house built on highly reactive clay subsoils. 36. I agree that the cosmetic cracks to the property may have been caused by the movement in foundation due to seasonal variations. 37. However, I am influenced by the opinion advanced by the expert “M” , the damage to the following was likely to have been caused by the excessive swelling of the highly reactive clay due to the storms in January 2011:  9 doors jammed;  Door frame out of place;  Lounge ceiling sagging;  Cornice in kitchen pulling away from cupboard; and  Hallway skirting and cornice damaged. 38. M investigated the Applicants ‟ loss closer to the loss event and was satisfied the loss occurred as a result of the storms. 39. Considering the above issues, I am of the view that it is fair in all the circumstances that the FSP reimburses the Applicants the following: a. 9 doors jammed; b. Door frame out of place; c. Lounge ceiling sagging; d. Cornice in kitchen pulling away from cupboard; e. Hallway skirting and cornice damaged; and f. 50% of the damage sustained to the brickwork. 40. The FSP is not required to reimburse the Applicants for the damaged archway and the veranda as I am satisfied these were not related to the storm event. 41. Finally, the Applicants have raised an issue regarding a leaking roof and the engineer L has clearly indicated that the scope of his investigation did not include this part of the damage. 42. Since the FSP has not satisfactorily addressed these issues and considering the time since the loss event, it is fair in all the circumstances that the FSP Case No: 277113 Determination Page 8 of 9 should accept the Applicants ‟ claim for storm damage sustained to the roof and subsequent water damage to the property if any. Compensation for Non-Pecuniary Loss 43. The Applicants have raised an issue regarding the delays and stress caused by the FSP. 44. They have indicated that the delayed denial of the claim has also prejudiced them in not being able to obtain expert evidence to support their case the loss was caused by the insured event and that it occurred within 72 hours of the storm event. 45. The Service‟s Case Manager referred this matter to the FSP and its response is below: “The [Applicant] refers to being jerked around for 16 months however the only reason that the claim lasted that long was because the [Applicant] persisted with pursuing a claim that was not covered by his policy. The [Applicant] was provided with a decision letter advising that his claim was not covered in November 2011.” 46. I note the policy requirement that the loss should occur within 72 hours of the storm event was never discussed or clarified with the Applicants by the loss assessor or the FSP soon after the loss event. 47. Based on M‟s report, it appears the Applicants awaited their claim to be processed and there is no evidence the FSP was working on their claim until their reminder to the broker on 13 June 2011. 48. Thereafter, it took more than three months for the FSP to organise the reports from S and L. 49. I understand the FSP was managing a large inflow of claims after the catastrophe in January 2011. 50. However, I am satisfied the delays caused by the FSP would have caused distress and interfered wit h the Applicants‟ expectation and peace of mind until the claim was finalised in November 2011 and then more so after the denial of the claim. 51. Therefore, pursuant to paragraph 9.3(b)(i) of the Terms of Reference, the FSP shall pay $1,500 as compensation to the Applicants. Determination 52. On the basis of the available information, I determine the FSP is required to indemnify the Applicant for the following: a. 9 doors jammed; b. Door frame out of place; Case No: 277113 Determination Page 9 of 9 c. Lounge ceiling sagging; d. Cornice in kitchen pulling away from cupboard; e. Hallway skirting and cornice damaged; and f. 50% of the damage sustained to the brickwork. 53. The FSP is not required to reimburse the Applicants for the damage sustained to the veranda and archway. 54. The FSP is required to indemnify the Applicants for the storm damage sustained to the roof and consequent weather damage. 55. The FSP should pay compensation of $1,500.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.