Determination 276796

Dispute over scope of storm water damage repairs and cash settlement amount

FirmFinancial Firm (Unknown - Insurer)
Decided2013-01-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$12,300
SourceAFCA PDF

Summary

Storm water damage to ceilings and walls was assessed and cash settled at $5,678, which the applicants disputed as insufficient for full ceiling and wall replacement. AFCA found the offer fair but ordered further assessment of two items.

The expert evidence supports the FSP's repair method and cash settlement amount, but two damaged areas require clarification and assessment under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 276796 Determination Page 1 of 13 Case number: 276796 General Insurance - Domestic Insurance - Home Building - FSP Decision - Extent of Repairs 9 January 2012 Background 1. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the Background as set out in the Recommendation is accurate and is as follows. 2. The Applicants held a home building and contents policy with the Financial Services Provider (FSP). 3. On 1 February 2011, the Applicants‟ property wa s damaged during a storm event. An air conditioner was damaged and water leaked into the property, damaging ceilings and walls. 4. A claim was lodged on 27 May 2011 and the damage was assessed on 1 June 2011. The FSP covered the claim, replacing the air conditioning unit and offering a cash settlement for the damage to the ceilings and walls because the male Applicant was a plasterer by trade and reportedly requested cash settlement. 5. A dispute developed as to the appropriate scope of works, with the Applicants stating the FSP‟s cash settlement offer of $4,158.00 did not cover the work that was required, as the ceilings could not be repaired and they required complete replacement. 6. Further assessment took place and after obtaining a quotation from a builder and agreeing to cover the cost of replacing galvanised corner joiners, the FSP eventually increased its offer to $5,678.00 for the ceiling and wall works. 7. The Applicants maintained the FSP‟s settlement did not cover the scope of works, supplying a quotation for the replacement of the ceilings and walls for $7,500. 8. The FSP maintains its offer meets its obligations for the claim pursuant to its expert opinion and the policy. 9. As t he Applicants did not agree with the FSP‟s decision, the dispute w as the subject of a Recommendation. The Recommendation was in favour of the FSP and not accepted by the Applicants. The FSP accepted the Determination Case No: 276796 Determination Page 2 of 13 Recommendation. In the circumstances, the matter has been referred to me for Determination. Summary of Applicants’ p osition 10. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the Applicants‟ position as set out in the Recommendation is accurate and is as follows. 11. The Applicants say the ceiling in the entry/family room was damaged through water inundation and that water leaked down the light fittings on several occasions and damaged the plasterboard walls. 12. The dispute concerns the replacement/ repair of the walls in the foyer and the ceiling in the adjoining family room / kitchen area. The FSP‟s proposal of repairing the entry and only 10sqm out from the entry area will result in three or four „butt‟ joints in the ceiling, making the ceiling structurally unsound and dangerous. This is also likely to lead to further cracks and strains in other areas of the ceiling and cause further damage. 13. Further, the FSP states it is not required to repair the ceiling to match the other areas and they are concerned with the integrity of the structure and aesthetics of the finish. 14. The original FSP employed carpenter said he recommended the entire ceiling be replaced on 3 occasions. 15. The FSP‟s assessor was ac tually a motor assessor with no building qualifications. 16. The FSP‟s building consultant has reported the old plaster can be cut with a „butt‟ joint in the middle of the large ceiling but the Applicants say that this does not take into account the structura l effect of cutting into old plasterboard and making a square of butt joints in the middle of a large ceiling. 17. Further, the assessor did not turn up at the arranged time and did not call to make other arrangements. 18. The male Applicant is a licensed plasterer and the FSP has failed to take his view of the proposed repairs into account or consider the long-term effects of the proposed sub-standard repairs. 19. The FSP‟s building consultant „N‟ measured up the entire lounge room and said to them: “I don‟t know mate, but [FSP] won‟t cover the whole ceiling, even though it needs to be replaced. I can put it in, but good luck getting anything out of [FSP]”. Case No: 276796 Determination Page 3 of 13 20. The comment in the report that “Stresses were probably induced by long term concrete shrinkage” should not be made without an inspection of the entire property. None of the FSP assessors or building consultants checked anything other than the lounge and kitchen areas. 21. They note there is no other cracking in the home, proving the damaged area is the result of the claimed event. 22. The FSP‟s reports and scope of works do not include damage to the walls in the dining room or the damage to the ceiling in the playroom. It also appears the first „WS‟ report had a more comprehensive scope of works than the second report, indicating that the FSP is seeking to limit the works. 23. They do not agree with the builder‟s recommendations to re -screw the ceilings. This will only add to stressors in the structure and result in issues in the future. 24. The FSP‟s notations also reveal that the Applicants‟ plasterer „P‟ said that if it were his home he would replace all the linings. And while as a plasterer, he is able to hole and stagger butt joints, it is clear this is not what he would do. The FSP did not ask him if this was to industry standards or what his recommendation is. 25. In relation to the FSP‟s submissions that cracking that has occurred due to delays is not covered because the delays are the Applicants‟ fault, the cracking would have occurred anyway, with the FSP‟s repair meth ods. 26. The FSP‟s scope of works also fails to address the costs of re -screwing the entire ceiling, repainting the playroom, the cost of replacing insulation, multiple attendances by an electrician to remove and replace light fittings and the cost to repair the skirting boards. 27. They reject the FSP‟s comments that they have not acted in the utmost good faith, noting they have been insured for seven years prior to this event without a claim. 28. They note the policy requires them to maintain the home in good condition, yet the FSP seeks to use substandard repair methods. 29. The Applicants seek the following repairs / settlement:  The replacement of the full ceiling and entry walls in full - $7,500  The costs of electricians (lighting) and carpenter (skirting boards) - $800  The full cost of painting - $3,000  Insulation in lounge/kitchen and playroom - $1,000 Total: $12,300 Case No: 276796 Determination Page 4 of 13 30. The Applicants rejected the Recommendation and provided further documentary information in support of its position, a Floor Plan, together with an email dated 13 November 2012. In short summary, they say they have been denied procedural fairness as they did not receive the Statutory Declaration, that the Floor Plan of the house supports their contentions, and in the interests of an expeditious settlement they will now settle for $7,500. Summary of FSP’ s position 31. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the FSP‟s position as set out in the Recommendation is accurate and is as follows. 32. The FSP says that it has assessed the claim, appointed a building consultant, obtained a quotation and its offer of $5,678.00 exceeds its liability under the policy. 33. The company „R‟ is a licensed construction and manage ment firm and there is no reason to doubt its reports and quotation. Likewise, „WS‟ have professional quantity surveyors and building consultants and its reports and opinions cannot be discounted because the Applicants want additional works done. 34. The Appl icants‟ concerns have been put to R and WS and they have been discounted. 35. „N‟, an employee of R rejects the Applicants‟ versions of conversations and has confirmed he did not make the statements the Applicants attributed to him. Likewise, „G‟ an employee of WS rejects the Applicants‟ version of their conversation. 36. In relation to the WS reports, WS only attended the property once. The second WS report was merely a correction of clerical errors in the first report. Further, the reference to „playroom‟ was removed from the second report as the room adjoins the foyer, lounge and kitchen areas and is taken into account in the scope of works. It is not a separate room as the first report insinuates. 37. The FSP apologises if the assessor changing times was an inconvenience to the Applicants and it points to system notations which indicate the assessor got caught up at other assessments and called the Applicants to change the assessment time. Further, the Applicants‟ submission that the assessor is a motor assessor and not a building assessor is completely incorrect, noting the assessor has been employed as a building assessor for eight years. 38. Further, the Applicants failed to lodge the claim until almost four months after the event and delayed matters further by refusing its offers to settle the claim. Case No: 276796 Determination Page 5 of 13 39. The Applicants have failed their obligation to act in the utmost good faith, as required under Section 13 of the Insurance Contract Act 1984. 40. The plastering quotation from P provided by the Applicants does not represent the work that is required. The FSP contacted P and was advised the Applicants asked for a quotation for the replacement of the ceilings and walls, which is more than is required to repair the property. The quotation from P does not represent the required works, but rather a request from the Applicants. 41. The re-screwing of plaster that does not require replacement is an acceptable method of repair and in accordance with Australian Standards. 42. There is no evidence to substantiate the Applicant s‟ claim for various attendances by electricians. This work would have been undertaken as part of the quotation from its repairer. 43. The male Applicant cannot simply rely on the fact he is a plasterer to dismiss all other expert evidence. From the discussions with his plasterer, P, it is apparent the Applicants‟ position is based upon personal views of how things should be done, rather than independent expert evidence. 44. Further, it provides a lifetime guarantee on works. Therefore, if the Applicants want the FSP‟s repairers to complete the work, they will have the guarantee. The Applicants have opted for cash settlement and its liability is limited to the actual cost of repairs. 45. It has acted reasonably and in a reasonable timeframe to settle the dispute. The Applicants delayed lodging the claim and have continued to reject settlement offers to finalise the matter in a reasonable timeframe. 46. The FSP relies on the following policy provisions: “ What we pay for Buildings Insurance If we agree to cover your claim under Buildings Insurance, then we will: ► pay the cost to repair or rebuild the part of your home that was damaged – we pay the lower of the cost to repair or rebuild your home … How we settle your buildings claim We will choose to settle your claim for loss or damage to your home or „other cover‟ in one of the following ways: 1. Arrange for repairers, builders or suppliers to repair or rebuild your home. If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild your home. 2. Pay you the reasonable cost to repair or rebuild your home. We can choose to: ► pay you Case No: 276796 Determination Page 6 of 13 ► pay your nominated repairer, supplier or builder, or ► … … How we settle certain things … Under Buildings Insurance ► we only repair the damaged parts of your home. We don‟t pay for materials to match the undamaged parts of your home to create a uniform appearance.” 47. The FSP accepted the Recommendation and did not provide any further documentary information in support of its position. Issue 48. Whether the FSP‟s settlement offer meets its obligations to the Applicants under the policy. Reasons for Decision 49. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 50. Each FOS case is decided on its merits, taking into account the facts of the case. I have carefully reviewed all the material submitted by the parties both before and after the Recommendation was issued, in order to reach my decision. I will only refer to the relevant submissions and materials raised. 51. On 27 May 2011 the Applicants lodged a claim with the FSP claiming a storm caused a power surge, which damaged the TV and ducted air conditioner and caused storm water damage to ceilings and walls. 52. There is no dispute relating to the TV and air conditioning unit and the Applicants have been paid out for that part of the claim less the policy excess. A dispute remains about the scope of the works necessary to repair the water damage to the ceilings and walls and related works . 53. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the following facts as set out in the Recommendation are accurate and relevant and are as follows. 54. The FSP appointed building company R to assess the claim and the assessment occurred on 1 June 2011. The report includes the following: “…An inspection of the entrance and lounge ceilings show signs of water damage, and in the lounge thr joins have cracked back to the centre of the Case No: 276796 Determination Page 7 of 13 room away from the affected area. An inspection of the roof revealed most of the lounge ceiling to be free of water staining, with the majority of the damage over the entrance. Scope of Work Required 1) Remove and replace approx 7 sq metres of water damaged gyprock, cornice and inulation to entrance. Set and sand. 2) Remove and replace approx 10 sq metres of water damaged gyprock and insulation to lounge-dining room and approx 10 lin metres or cornice Set and sand. 3) Patch and paint entrance walls as close as possible to match existing approx 20 sq metres 4) Paunter to apply one coat undercoat to newly installed ceilings approx 17 sq metres and two coats to adjoining ceilings approx 50 sq metres 5) Remove and replace ducted A/C unit to match as close as possible to existing. 6) No allowance for anything other than stated above 7) No allowance for any unforeseen works 8) Insured to provide clear access to workspace prior to commencement of works 9) No allowance made for removal or storage of personal items/furniture” (sic) 55. A dispute as to the appropriate scope of works developed and the FSP appointed a building consultant, WS, who attended the property on 28 July 2011. The first report from WS, dated 29 July 2011, states: “… Externally The plasterboard ceiling is damaged in the Foyer and there is some cracking at joints between the ceiling and the cornice and at external angles to the cornices (refer Photos 1 & 2). Some recessed edge joints between sheets have cracked (refer Photo 3). The ceiling is generally fixed hard up to the soffit of the bottom chord of the roof trusses (refer Photo 4). There is an area in the Foyer where the ceiling has aged and detached from the truss bottom chord (refer Photo 5). There is water damage and staining to the top of the sheets as viewed from within the roof space (refer Photo 6 over the Foyer). The water staining and damage does not continue far from the source of the leak to the air-conditioning unit, which is located above the Foyer. Conclusion: There has clearly been some water which has flooded the roof space and entered the house in and around the Foyer. I recommend that removal of the ceiling and cornices to the Foyer and the areas of ceiling and cornices immediately adjacent to the Foyer and the Family Room. Case No: 276796 Determination Page 8 of 13 I also recommend that the ceilings to the Family Room, Kitchen and adjacent Play Room be “re - screwed”. On completion I further recommend the Foyer, Family Room Kitchen and adjacent Play Room walls and ceilings be re-painted to match the existing. The replaced cornices should not be cut and joined and should be installed in long lengths. Also the damaged ceiling insulation to the Foyer and Family Room and in their immediate surrounds is to be replaced. It is expected that all recessed edge and butt joints to the ceilings, both existing and repaired will match to industry standard, being aware the issue of “glancing light” from the rear glass sliding door will expose any inadequate joints, in particular butt joints to the end of the sheets.” 56. The second report from WS, dated 8 August 2011, is largely the same as the first report, though it does not mention the “Play Room”. The FSP notes that the report was updated to correct typographical mistakes (Externally / Internally) and the reference to “Play Room” was rem oved because the report gave the impression this was a separate room when in fact it adjoins, the foyer, kitchen and lounge areas and is included under the repairs for those areas. 57. The scope of works attached to the second report, includes the following works: “ SCOPE OF WORKS The Scope of Works includes the repair of damages caused by the leaking pipe associated with the air-conditioning unit in the Foyer and Family Room. All works are to be carried out in accordance with Local Authorities, the Building Code of Australia and relevant Australian Standards…… DEMOLITION Extent of work shall include removal from the site and disposal to tip: -  Remove ceiling and cornices to the Foyer and to a 10m 2 area of the Family Room ceiling which is adjacent to the Foyer.  Remove the ceiling insulation to the Foyer and to the damaged area of the Family Room which is adjacent to the Foyer. … EXTENT OF WORKS Ceiling finishes shall include but not be limited to the following: -  Plasterboard ceiling linings to Foyer and Family Room. Case No: 276796 Determination Page 9 of 13  Coved cornice.  Insulation WORKMANSHIP Allow to repair any cracked joints to those areas of the Family Rooms and Kitchen ceilings which are not being replaced. All recessed edge and butt joints to the ceilings, both existing and repaired will match industry standards, being aware that the issue of “glancing light” from the rear glass sliding door will expose any inadequate joints. This applies in particular to butt joints between the ends of sheets. PLASTERBOARD CEILING LININGS The ceiling to the Foyer and a 10m 2 area of the Family Room shall be lined with 10mm Gyprock Supaceil, with flush set joints. BLOCKING Allow to install timber blocking pieces, nailed between the bottom chords of the roof trusses, at joints in plasterboard. RE-SCREW AND SET CEILINGS Allow to re-screw and set the ceilings to the Family Room and Kitchen. CORNICES The cornices shall be 90mm coved, fixed in long lengths, with set joints, in accordance with the man ufacture‟s instructions. INSULATION Provide and install ceiling insulation to approval to match existing. PAINTING GENERALLY Paints shall be applied in accordance with the manufacturer‟s printed instructions. Before painting remove all door hardware, accessories etc and replace after painting. … … EXTENT OF WORK The extent of works are generally as described below, including incidental work not specifically mentioned but integral to the completion of the works: - All walls, ceilings, doors, door frames, skirtings, architraves and trims to the Foyer, Family Room and Kitchen. Case No: 276796 Determination Page 10 of 13 …” (sic) 58. R was asked to quote for the scope of works in the WS report dated 8 August and provided a quote for $5,258. This was later increased to $5,678 to include extra towards the supply of galvanised external corner joiners. 59. Other evidence from the FSP includes a report dated January 2011 from Boral. The comments in that report indicate that while in some cases such as a flood, plasterboard should be replaced, it can be repaired when exposed to water damage if it is dried out. 60. The male Applicant has said to the FSP that Boral have made certain recommendations to him but he has not provided anything from Boral to the FSP despite advising on 3 August 2011 “that the technical d ocuments are being sent through to him.” He also indicated in a telephone conversation with the FSP on 30 September 2011 that he was discussing the matter with Boral but still provided nothing from Boral. 61. The Applicants have provided a quotation dated 8 J uly 2011 from P for $7,500 “to replace the kitchen family room ceiling and cornice where water damage has occurred…to remove and replace water damaged entry walls.” 62. The Applicants say that N the employee of R stated the whole ceiling needed replacement but the FSP would not pay for it. However N denies he said this. The same allegation is made about G from WS who also denies he said this. 63. I can make no conclusive finding about this, as it would require cross- examination of the Applicants and N and G, which this process does not allow. However, the file notes from the FSP about this persuade me on the balance of probabilities that N and G did not make those statements. 64. The Applicants also say the FSP assessor was a motor assessor but this has been refuted by the assessor in a Statutory Declaration from the assessor, stating he has been employed by the FSP as a home assessor for eight years. I accept this statement of fact as it is sworn evidence and because it is unlikely the FSP would employ him in that role otherwise. 65. I note the Applicants did not have this Statutory Declaration and say they were denied procedural fairness. However, I do not rely on the evidence of the assessor in making my Determination and my decision in this matter is not based on the contents of the Statutory Declaration. My Determination is based on other matters before me. 66. The Applicants say that P supports their case, as P has stated he would replace all the ceilings. The FSP tested this and spoke to P on the 25 August 2011. The claims system notations are recorded as follows: “[employee of FSP] has asked that I call [P] and discuss with them if conducting the repairs as noted by Building Consultant is an acceptable method and what the discussions were with the insured at time if his inspection when insured called him to attend and obtain a quote. Case No: 276796 Determination Page 11 of 13 Rang [P] and he advised the insured called him to obtain a quote and insured asked him to quote on removal of “all” ceiling linings. I asked if we were to only replace ceiling in entry and the sqm as noted by Consultant is an acceptable method and he replied by saying this would be an acceptable method, but if it was his place, being a plasterer, he would remove all linings but also indicated that he can successfully conduct the works as noted as he has done this on many occasions.” (sic) 67. If this conversation is an accurate record, then P supports the FSP and not the Applicants and they have not produced anything further from P to refute this is what P said to the FSP. Furthermore, the quote itself does not support the Applicants‟ contentions, as P says nothing in the document that this is the correct way to repair the damage. Rather it is simply a quote to repair all the damaged areas, as is the Applicants‟ wish. 68. P‟s quote does not help the Applicants in another regard as it does not refer to the play room/dining room. The Applicants make the point that the FSP has tried to limit the scope of works to exclude damage to the ceiling in the playroom. They rely on the change from the first report of WS to the second report, which excludes the playroom. They point out that the Floor Plan shows the room to be separate and yet the FSP has said it was excluded from the second report as it was a “clerical error” and that WS said; “I will not include the playroom as a separate room as this room adjoins the Foyer, Lounge and Kitchen and any repairs to the playroom will be covered under the Scope of Works with respect to those rooms.” 69. The file note of the FSP does show that a conversation took place that day with G from WS but that particular part of the statement is not noted. However it is clear that he is to submit another report, which he does the next day with a scope of works. Relevantly, it is noted that he does say; “ [08/08/2011 Spoke to G from WS Consultants who advised he has been on annual leave for the past week. I asked him about the conversation between him and the insured where the insured alleges G advised him that if this wasn‟t an Insurance job he would quote to remove the entire ceiling. G advised this was totally incorrect as he could see that the insured wants all ceilings and 3 walls removed from the affected area and this is not warranted as damages are localised to approx 20sqm of ceiling and simply staining to the painted walls in the foyer and 1 in the dining. G also advised from his point of view that no removal of wall linings are warranted as they are simply stained from water and only require to be painted. I have requested that the report be submitted by G and will then discuss with Team Manager and will also call the insured to advise of what was found by G. Case No: 276796 Determination Page 12 of 13 AWAITING  Report from GW building consultant  Will attach G‟s report for R to submit an estimate on based on his report.” 70. I conclude that some discussion took place that day that caused G of WS to submit another report but what is in the Statuary Declaration about the playroom is not noted in the FSP‟s notes. However what is noted indicates the scope of works is to include “1 (wall) in the dining” (which is also known as the play room). 71. Accordingly, in my view, this does need to be clarified and G from WS should re attend the property to assess the storm damage (if any) in the room on the Floor Plan marked LIVING but which the Applicants say is the playroom/dining room. There may then be a need to get a further quote from R. 72. Otherwise having considered the terms of the policy and the expert evidence from R, WS and P, I am of the view that what is proposed by the FSP is acceptable and the amount offered of $5,678 is a fair compensation to the Applicants for the water damage caused by the storm, save to clarify what damage WS was referring to (if any) in the room marked LIVING on the Floor plan. 73. One small matter remains to be addressed. There is a reference in a file note on 21 January 2012 concerning the main bedroom sensor for the old air conditioner. The Applicants in their dispute notice refer this to as, “we would like to have the additional work (small patch) discussed”. This needs to be assessed and adjusted to see if it is damage from the storm and dealt with pursuant to the terms of the policy. Determination 74. On the basis of the available information and for the reasons stated, I determine that the FSP‟s offer to cash settle the claim for $5,678.00 is supported by the evidence and meets its obligations under the policy 75. The extent of damage caused by the storm to the room called LIVING in the Floor Plan needs to be clarified with WS and assessed and adjusted if necessary once clarified. 76. The extent of damage caused by the storm concerning the main bedroom sensor for the old air conditioner also needs to be assessed and adjusted pursuant to the policy terms and conditions. Case No: 276796 Determination Page 13 of 13 77. If the Applicants accept this Determination, they are to notify the FSP of their acceptance within 7 days of receiving it and then these further assessments referred to in paragraphs 75 and 76 are to be carried out within 7 days of the Applicants advising the FSP that they accept this Determination.