Case No: 276678 Determination Page 1 of 12
Case number: 276678
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
24 April 2013
Background
1. The Applicant is the owner of a unit which has insurance protection under a
strata residential unit insurance policy with the Financial Services Provider
(FSP). The policy provides cover to a number of units for a total building sum
insured of $3,245,000 which includes common contents. The policy has a
$250 excess which applies to all claims.
2. On 14 June 2011 the FSP received a claim from the Applicant for storm
damage to the roof of his unit which occurred on 21 March 2011. The invoice
submitted with the claim for roof repairs was $506 and the FSP paid this
amount. Shortly after settlement had been made, the FSP received a further
quotation from the Applicant for additional work which had occurred as a
result of the same event.
3. The FSP denied the Applicant‟s additional claim after seeking advice from
building experts on the cause and extent of damage being claimed. The
claim was denied on the grounds that the damage had not been caused by a
storm event, rather it was as a result of long term deterioration, multiple
events of water ingress, faulty workmanship, gradual deterioration and faulty
design.
4. The Ap plicant disputes the FSP‟s decision and seeks to have his claim
accepted and repairs completed to his unit.
Summary of Applicant’s position
5. The Applicant says he noticed a wall was damp in a downstairs room of his
unit in May 2011. After investigating further he found that water had entered
the top of the unit at the front and had gone down through the internal walls
of the unit.
6. He purchased the unit only 12 months prior to discovering the damage and
had no prior knowledge of there being any issues with the property until he
discovered the damage.
Determination
Case No: 276678 Determination Page 2 of 12
7. He says another owner of another unit at the same property experienced
similar damage around the same time to a lesser extent and had a similar
incident approximately five years prior which had been covered by
insurance.
8. The FSP‟s expert appeared to concentrate on the condition of the building
and concluded that he had prior knowledge of the issues with the building,
which he denies.
9. The Applicant says the FSP‟s expert has not been truthful in his reports to
the FSP however, the FSP was not willing to listen to his evidence to support
this.
10. His unit has suffered significant residual damage due to water ingress from
repetitive storm activity which is accidental in nature and something he was
not aware of until May 2011.
11. He seeks to have his claim accepted and repairs for the water damage to be
paid for by the FSP.
Summary of FSP’s position
12. The FSP says the Applicant asserted that the damage to the roof of his unit
occurred during a storm.
13. The initial claim received from the Applicant was for a minimal amount and it
did not investigate further, rather it promptly settled the claim for $506. It was
not until it received a further claim from the Applicant for additional damage
as a result of the same event, that it investigated the claim further.
14. The investigation undertaken by its experts revealed that the Applicant‟s unit
had suffered damage resulting from many building faults and poor
workmanship.
15. The FSP says the damage is not covered by the insurance policy pro vided.
16. The FSP relies on the following policy provisions of its Product Disclosure
Statement (PDS):
“ Exclusions
We will not cover Your Insured Property for Damage arising from or caused
by:
...
6. Damage that occurred outside the Period of Insurance stated on the
Schedule.
...
8. Fading, scratching or marring, developing flaws, normal up-keeping or
making good.
...
Case No: 276678 Determination Page 3 of 12
13. Mould and/or fungi, mildew, atmospheric or climatic conditions.
...
17. Rust, corrosion, oxidization, gradual deterioration, concrete or brick
cancer, wear or tear, wet or dry rot.
18. The failure of or a defect in any item, faulty workmanship, structural defect
or faulty design.
...
20. Water entering Your Building(s) because of a structural defect, faulty
design or faulty workmanship when Your Building(s) were constructed.
21. Water entering Your Building(s) through an opening made for any
building, renovation or repair work.”
(Page 17)
Issue
17. Whether the FSP is entitled to deny the Applicant‟s claim in accordance with
the terms and conditions of the policy.
Reasons for decision
18. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
19. I am satisfied there has been a full exchange of material between the parties
and that each party has had the opportunity of clarifying the issues that arise
from the material.
Claim
20. Upon being notified by the Applicant of roof damage to his Unit at the
insured address, the FSP accepted and paid the cost of repairs to fix a roof
which had been damaged by storm. The amount settled was $506 and the
claim was finalised.
21. Shortly after this time a further approach was made by the Applicant for
additional damage to the property as a result of the same storm event. The
Applicant forwarded a further quotation for additional repairs totalling
$24,486.26. On receipt of this additional quotation, the FSP chose to appoint
an assessor, “ CR ” , to investigate further.
22. It is noted that the claim received by the FSP relates to two Units, only one
of which is owned by the Applicant and it is this Unit that is the subject of
dispute.
Case No: 276678 Determination Page 4 of 12
23. CR reported that he met with the Applicant on site who advised him that the
damage had occurred over a four to six week period, between May and June
2011. CR confirmed that the area had been subjected to notable storm
activity which brought torrential rainfall over a prolonged period as well as
gale force winds. However, CR noted that the damage now being claimed
did not appear to be as a result of recent storm activity.
24. CR says:
“Whilst it is no doubted that the inclement conditions associated with these
storms may have (an in all likelihood did have) resulted in water ingress, the
evidence presents to indicate that such water ingress was borne out of
circumstances including initial design, construction and / or maintenance
flaws.
Further, these damaged are undoubtedly long term with evidence indicating
attempted rectifications through sealants etc. being applied to various window
and door trims over a long period of time.
The reason we suspect long term issues of water ingress is by virtue of the
condition of the internal resultant damages to wall and floor linings to both
units and in particular, advanced rotting of timber wall studs, plates, substrate
chipboard flooring and possibly event timber floor joists. Not to mention
plasterboard wall linings and in the case of [the Applicant‟s Unit], the
chipboard kickboards of the kitchen cupboard assembly.
...
The deterioration and rotting to much of the affected areas ([both Units]) is so
severe that in places, timber framework has virtually disintegrated. As such,
we are adamant this is the result of long term and ongoing water ingress as
opposed to storm damages in the recent weeks resulting from a defined event
and / or storm created opening.
On that note, please be advised that although roof repairs were carried out,
there is no clear and obvious indications of storm created opening/s and
where again, given the severe and widespread nature of the damages to both
[both Units], we doubt that these damages could have been the result of water
entry from the roof alone.
So severe and deteriorated are the claimed damages, especially to the timber
wall frames downstairs to both units that we fell the unit occupants would
have or ought to have reasonably suspected or identified their presents.
Interestingly, in the course of discussions with [the Applicant], he advised that
the premises were purchased just over 12 months ago and in this short period
of ownership, he has noticed accumulating water in the downstairs wall / floor
junctures. [The Applicant] initially attributed this to suspecting a previous
owner may have left a window open during a storm event leading to water
ingress through an open window but on the other hand, in contradiction to this
he did concede having attended to sealing the window / door trims at his own
cost, apparently as a „precaution‟.
Strangely, no pre-purchase inspection of the property was commissioned by
[the Applicant] who advised that he purchased the premises at Auction; it was
under Strata and on that basis he presumed all would be in order.
Overall, whilst we are satisfied that exposure of the true extent of the
damages was realised following the recent storm activity, and where water
ingress occurred during such inclement conditions, the proximate cause was
Case No: 276678 Determination Page 5 of 12
not storm activity at any stage in 2011. In fact, we consider the problem has
existed for at least several years and realisation of this has only come about
once the structural integrity of the wall and floor linings has deteriorated to a
point of failure.” (sic)
25. It was CR‟s suggestion that a specialised building consultant be appointed
and on the FSP‟s authority, “ CS ” was appointed to inspect and report on the
condition of the Applicant‟s Unit. He also noted the following in relation to the
quotations provided by the Applicant for repairs:
“Noting the contents of the sco pe of work contained within repair quotations of
[Q] ([the Applicant‟s Unit] and [IC] (both Units), we are satisfied that the
documents provide a scope that is reflective of damages occasioned.
However, notwithstanding this, for the reasons detailed in the foregoing at this
stage we are not satisfied that all such works can be claimable under the
[insurance policy].” (sic)
26. CS attended the Applicant‟s Unit on 5 August 2011 and provided a report to
the FSP on his findings. CS provided the following informatio n:
The complex of Units is approximately 20 years old and most of the
units are used by the owners as weekenders, as advised to CS by the
Applicant.
Extreme deterioration of timber framing and timber flooring on the
ground floor was noted to a degree that the vast majority of the framing
and flooring had virtually disintegrated.
A section of particleboard flooring appeared in a newer condition to the
remaining flooring – the Applicant advised he was not aware of any
repairs being undertaken to the property prior to his purchase of it.
The timber framing and flooring was still retaining large amounts of
moisture ranging from 70% to 98% as tested by CS‟s moisture meter
which were considered to be extreme. This was despite the fact there
had not been substantial rains for some weeks prior to the inspection.
The masonry brickwork had daylight visible through the perpendicular
mortar joints between the bricks – this was noted as being an obvious
entry point for water, either from wind driven rain or water running down
the external wall.
The twisted veneer ties (galvanised) had completely corroded through
and were no longer providing lateral support between the veneer skin
and the timber frame. Today‟s building standards would see stainless
steel ties being used in this area.
A scratch test was done to the mortar joints between the bricks and this
revealed that the mortar was starting to break down. It also revealed
that the mortar was „lean‟, indicating a minimal amount of cement had
been used at the time of construction).
A TV coaxial cable to the TV antenna on the roof extends down the
brick cavity and penetrates through the cross cavity flashing to the first
floor which renders the cross cavity flashing useless as a drainage
diversion as water was easily escaping around the coaxial cable
Case No: 276678 Determination Page 6 of 12
penetration. This penetration is directly above the most severe area of
damage.
An inspection of the extern elevations and brickwork of the ground floor
area also revealed a very lean mortar mixture between the brick joints.
Several different types of flexible sealants had been applied to the
window reveals, indicating an ongoing attempt to prevent water ingress.
Flashing/door sill is allowing water ingress to the first floor area causing
damage to carpet. The moisture meter recorded a leve l of 50% to 60%
moisture in this area which is considered extremely high and suggested
a failed flashing and/or failed door sill.
Damage to kitchen cupboards and vinyl flooring in the kitchen was
attributable to a retro fitted window which in CS‟s opinion had not been
installed to an acceptable building practice. It was noted that the type of
installation used resulted in a failure to install a head sill above the
window to divert any moisture which enters the cavity and prevent
water penetrating around the window frame.
A large majority of weep holes over the kitchen window and sliding door
to the dining area were filled with flexible filler which was aged and
deteriorated suggesting it had been in place for some time.
All window and door reveals displayed several different types of flexible
sealant suggesting there were ongoing moisture issues with the Unit
and attempts made to rectify the problems.
The aluminium sliding door had been installed with a standard type sill
and due to it being located in an area with no eave overhang, CS
suggested that a sub-sill with an internal drainage system would have
been the preferred method of construction.
The sliding door frame was retaining moisture due to the design flaws
and this was allowing water penetration evident through the staining
under the carpet.
Several broken roof tiles around the area of water ingress were
inspected – these had been rectified prior to CS‟s inspection. The tiles
were aged and had been in place in this condition for an extended
period of time.
Minor cracking to the point of the barge tile at the gable end of the roof
was noticed and this would allow wind driven rain into the cavity and
ultimately into the residence.
The Applicant advised CS that he accessed the roof cavity during a rain
event and noted water running down the inside skin of the veneer
masonry walls.
27. CS opined that the damage to the Applicant‟s Unit had been experienced
over an extended period of time and estimated this to be at least a three
year period. He found no storm created openings to the building which would
allow water ingress.
Case No: 276678 Determination Page 7 of 12
28. CS advised that water had entered the premises through defective
installation of a retro-fitted window; design issues surrounding the aluminium
sliding door, sealed weep holes in the brickwork , deterioration of „lean‟
mortar and the penetration of the cross cavity flashing for the purposes of
installing a TV coaxial cable.
29. CS reviewed the quotation for repairs from IC and advised the following
items relevant to repairs at the Applicant‟s Unit a s being upgrades due to
design flaws or maintenance related issues:
Raking out loose mortar, replacing mortar joints and cleaning;
Removal of aluminium sliding door, cut down and fit a sub -sill and new
angles;
The application of a silicone paste chemical to prevent further water
ingress into the building to the 1,200mm turn down side walls;
Sealing around the penetrations where the coaxial cable has
penetrated through the cavity flashing; and
Removal and replacement of any loose pointing to roof tiles with flexi-
point as required.
30. The FSP relies on the information provided by CS and on receiving this
report, denied the Applicant‟s claim (and the claim of the owner of the
second unit).
31. The Applicant disputed the denial of the claim and raised concerns with the
validity of CS‟s report. These concerns were raised with CS and the
following is noted:
Concern raised – only 1m 2 of flooring was damaged, not the “vast
majority”. CS corrected his previous statement and said “1m 2 of
extremely damaged and deteriorated flooring due to ongoing water
ingress. Vast majority of floor (overall) deteriorated.”
Concern raised – property was inspected on 5 August 2011 and during
20 July 2011 and 4 August 2011 it rained 11 days and a total of 222mm
of rain was recorded in the area – the Applicant disputed CS‟s advice
that no substantial rain had fallen for some week‟s prior to his
inspection. CS responded that if this was the case, that the damage
contained within the building was not as a result of the rains which
occurred during this 15 day period.
Concern raised – the Applicant disputes that high level of rains can
enter through the small hairline cracks in the mortar referred to by CS.
CS responded that water can quite easily enter through these cracks in
the brick opening and that he has not advised that all water has entered
in this fashion.
Concern raised – the Applicant did not see CS conduct any „scratch
test‟ and believes CS‟s comments are pure speculation. CS responded
that he arrived at the property before the Applicant and conducted the
test during this time. He did not have the sample taken tested however ,
Case No: 276678 Determination Page 8 of 12
could arrange for this and as he is a fully qualified bricklayer, he was
able to determine the „lean‟ content of the mortar.
Concern raised – the Applicant advised he had arranged for silicon to
be applied to the window reveals as a pre-construction/finishing task for
a pergola he had received approval to build in the relevant area. He
had no prior knowledge and there was no significant indication that
water was coming through the windows via the reveals. CS responded
that the damage to the kitchen was adjacent to the retro fitted window
where silicon had been applied indicating there was a leak at this
location.
Concern raised – CS‟s report made mention of a significant amount of
carpet being removed and that a window installation specialist had
previously inspected the door and flashing and found it to be correct
and doing its job. The sliding door rollers had deteriorated and the door
did not close properly however, when a garden hose was put on the
area only an insignificant amount of water was entering the property.
He added that the water ingress was via the roof due to repetitive storm
damage. CS responded that carpet had been removed along the full
length of the sliding door and high levels of moisture were found to the
centre of the door opening with no signs of ingress above to the ceiling
or the door head, indicating water was entering under the door. There
was no evidence of roof damage caused by storm at the time of his
inspection.
Concern raised – the building was constructed in accordance with
building codes at the time and approved as such. Suggesting that
additional construction could be carried out to further prevent water
ingress, is speculative and an „after the fact‟ comment. The roof in the
area of the first floor verandah had already been repaired due to storm
damage. CS responded that he is satisfied the property would have
been approved for occupation at the time of its completion however, he
believed that the design issues could be a contributing factor of the
water ingress. Evidence of this is in the form of someone having sealed
the weep holes with flexible sealant to prevent water penetrating
through the external elevation.
Concern raised – the retro fitted window had been approved by the
Strata Company and installed by a professional builder. A window
installation expert had inspected the window who found the window to
be correctly fitted with flashing and header plate in place. Water tests
on the window using a garden hose saw only a small amount of water
enter via the weather strips only. CS responded by providing a copy of
the relevant Building Code, Australian Standard (AS) 3700 Masonry
Structures. He reiterated that at the time of his inspection he failed to
find any signs that the flashings complied with the relevant standard.
There were also indications that the wall ties did not meet the same
standard with respect to spacing and type.
Concern raised – a lot of the water ingress is coming in through several
broken roof tiles, pointing and barge ends which were damaged during
storm events. CS responded that the tiles were aged and were not
Case No: 276678 Determination Page 9 of 12
allowing water entry as there was no staining evident to suggest this is
how water was entering the Unit.
Concern raised – CS found no storm created opening. This is contrary
to storm damage to the roof which had already been repaired and the
Applicant‟s visual sighting of water entering a light fixture of a ceiling.
The main point of entry had been fixed by the Strata Company as
maintenance. CS did not inspect the roof cavity as the batteries to his
torch were flat and therefore, he could not accurately assess the roof or
roof cavity. CS responded that a full inspection of the roof cover was
conducted and no damaged sighted to suggest the roof had been
damaged by any recent storm event. The roof cavity was not inspected
as it was not required to locate a storm created opening.
Concern raised – the damaged to the floor was not noticed through
normal foot traffic as the damaged area had been under a wardrobe
which the Applicant had not moved. There was no mould evident at this
location on the wall and only a small amount of mould was found under
the carpet when it was pulled up. CS requested the Applicant provide a
pre-purchase inspection report to substantiate this claim.
32. The Applicant and the FSP have raised several issues throughout the course
of the claim and subsequent dispute. The Applicant has not provided any
independent building reports. The FSP has relied solely on the one
inspection and one report undertaken by CS.
33. The FSP says that there are additional “gaps” at the property, including a
gap between the house proper and the deck which could have also
contributed to the water ingress.
34. The Applicant has also provided evidence to show that around 1998
approval was sought from the Strata Company to install a window near the
kitchen area, which has been referred to by CS as being incorrectly installed.
35. I note that CS has relied on a number of building codes and Australian
Standards. What is concerning to me is that there is no mention as to when
these codes and standards applied, if they applied at the time of construction
or sometime after construction. Whilst I am persuaded by CS‟s evidence of
the condition of the building, in particular the mortar, sliding door installation,
window installation etc, I am not persuaded that the installation of these
items was in any way in breach of any code or standard at the time they
were installed or constructed.
36. Of quite some concern to the Applicant was CS‟s failure to inspect the roof
cavity. To this end, the Applicant provided photographic evidence of staining
to the ceiling of his Unit, damaged sarking evident in the roof cavity, damage
to the ceiling and water pooling in a light fitting. The FSP‟s response to this
was that CS did not need to access the roof cavity to be able to see that
there was no storm created opening caused to the roof to allow water to
enter.
Case No: 276678 Determination Page 10 of 12
37. However, the FSP had previously paid $506 for roof repairs as a result of the
storm and the Applicant says the damaged tiles noted by CS on his
inspection were also damaged in the storm. CS says the damaged tiles were
aged. I am unsure what this means or how it is attributable to them being
damage d. I am therefore not satisfied, in light of the FSP‟s
acknowledgement that some storm damage had been suffered to the
property, that the damaged roof tiles were not as a result of a storm event, or
several storm events.
Consideration of the Evidence
38. The onus of proof rests on the Applicant to establish that, on the balance of
probabilities, he has suffered a loss caused by an insured event. Once the
Applicant has established that the loss was caused by an event insured
under his policy, the onus then shifts to the FSP to show that, on the balance
of probabilities, the loss falls within an exclusion clause in the policy.
39. The FSP has suggested that the Applicant failed to obtain a pre -purchase
inspection report prior to buying the property and as such, he elected not to
find out about the condition of the property prior to purchasing it. The FSP
says that this is tantamount to saying that the Applicant did not want to know
about the condition of the property. The Applicant says he purchased the
property at auction and did not have an opportunity to obtain such a report.
40. I am of the opinion that it is not expected that a reasonable person would
obtain a pre-purchase condition report for a property going to auction. The
costs involved in obtaining such reports o n a chance that a person may be
the successful bidder, is not a reasonable expectation. In this instance, I also
note that there is no such provision of the FSP‟s PDS to suggest that the
Applicant should have done this prior to purchasing the property.
41. I am also of the opinion that even if a pre -purchase condition report was
obtained, it is unlikely that the degree of damage discovered by the Applicant
would have or could have been identified, without substantial dismantling of
the property. For example, the damage noticed by the Applicant, and agreed
to by CS, involves damage to the internal cavities of walls, floors which had
carpet laid on top of them etc.
42. In this case, the Applicant had purchased the Unit approximately 12 months
prior to noticing the damage, was not living at the property on a permanent
basis (he was using the property as a „weekender‟/holiday home) and only
discovered the extent of the damage when he began removing floor
coverings to lay tiles etc. It appears this occurred shortly prior to the claim in
about May/June 2011. I therefore do not agree with the FSP‟s contention
that the Applicant ought to have been aware of the existing damage at the
time of purchase, in this situation.
43. The FSP‟s policy is an accidental damage policy, providi ng accidental
damage cover for the buildings owned by the Strata Company. There is no
dispute that storm related damage is considered accidental and there is no
denial by the FSP that storm damage is covered by the policy.
Case No: 276678 Determination Page 11 of 12
44. I also note that the PDS has no clause pertaining to whether the damage
must be from a single event. There is no dispute between the parties that
there has been water ingress to the property through rainwater/storm and
that the ingress has occurred over a number of years, from multiple storm
events.
45. I am therefore satisfied in this instance, that the Applicant has met his
obligation of demonstrating he has suffered a loss as a result of an insured
event. The onus now rests with the FSP to demonstrate an exclusion
applies.
46. The FSP has relied on several exclusions of its PDS as detailed above ,
including exclusion 20 that refers to water entering from structural defects,
faulty design or faulty workmanship when the building was constructed.
From the information provided by the FSP, water ingress has occurred due
to faulty workmanship or design at the time of construction. Other exclusions
seem to flow from this one proximate cause.
47. I also note that the roof has been accepted and paid for by the FSP as
having been storm damaged without investigation. As such, it stands to
reason that it accepts there must be some cause for water ingress from the
roof. I am satisfied that the photographs provided by the Applicant support
his claim in this regard and the acknowledgement by CS that he did not
enter the roof cavity to inspect this area, is to the FSP‟s detriment.
Law Involved
48. Section 46 of the Insurance Contracts Act 1984 (Cth) (the Act) provides that
if a claim is made in respect of a loss that occurred in whole or in part as a
result of a defect or imperfection in a thing and the insured was not aware of
the defect or a reasonable person in the circumstances could not be
expected to have been aware of the defect or imperfection the insurer may
not rely on an exclusion clause that refers to the condition of the thing before
the contract was entered into.
49. I note that for section 46 of the Act to be applied, the FSP is required to rely
on a provision in the contract that has the effect of limiting or excluding the
FSP‟s liability under the contract by re ference to the condition, at a time
before the contract was entered into, of the thing.
50. In this case, I note the significant exclusion relied upon by the FSP is,
exclusion 20, which reads:
“20. Water entering Your Building(s) because of a structural defect , faulty
design or faulty workmanship when Your Building(s) were constructed. ”
51. This exclusion clearly refers to the condition of a thing prior to the policy
being entered into as it refers to the condition of the building at the time of
construction. Accordingly, I consider that in this instance, section 46 applies.
52. However, it should be noted that section 46 only applies to those areas of
damage associated with the structural defects, faulty design or faulty
Case No: 276678 Determination Page 12 of 12
workmanship of those items at the time the building was constructed. In this
case, I consider the retro-fitted window to be outside the scope of section 46
as this was an alteration to the construction of the building and was done
circa 1998.
53. There is no information from either party to indicate when the TV coaxial
cable was added to the building or the decking, and I must therefore
consider it reasonable that these items were part of the original building
construction. Accordingly, section 46 would apply to these items.
Determination
54. On the basis of the available information I determine that the FSP must
accept the resultant damage from all items it has identified as being as a
result of the structural defect, faulty design or faulty workmanship associated
with the building‟s construction, namely:
sliding door;
mortar joints;
roof;
deck; and
TV coaxial cable.
55. The FSP is not required to contribute to any damage caused by water
ingress from the retro fitted window installed adjacent to the kitchen.
Resultant damage to this area must be borne by the Applicant.
56. The Applicant or the Strata Company must attend to all maintenance related
issues identified by the FSP prior to any resultant damage being repaired at
the FSP‟s authority.