Text of the determination
Case No: 276658 Determination Page 1 of 11
Case number: 276658
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim (Flood)
19 February 2013
Background
1. The Applicant conducts a radiology business that occupies two addresses in
Coronation Drive Milton. The Applicant held a business policy with the
Financial Services Provider (FSP) that covered various risks, including
property damage and business interruption. The cover commenced on 23
December 2010 and expired on 20 November 2011.
2. During this period, the policy covered for property damage up to a sum
insured of $2,200,000 for one property and up to a sum insured of
$4,734,050 and $50,000 for stock for the second property. Claims for
property damage contained a standard excess of $500.
3. On 17 January 2011, the Applicant‟s employee contacted the FSP to advise
that both premises sustained water inundation following the extreme weather
events experienced in south east Queensland.
4. The FSP, upon reviewing the circumstances of the claims, denied liability for
both risk addresses on the basis they were due to “flood” as defined by the
policy. The Applicant, through his solicitors, has disputed this decision.
5. For the sake of convenience, reference to the Applicant will include his legal
representatives.
6. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicant ’s position
7. The Applicant submits the following as alternative arguments in response to
the FSP‟s decision:
a. The flood exclusion contained in the policy is nonsensical. In particular,
the relevant exclusion does not contain any conjunctive phrase.
Determination
Case No: 276658 Determination Page 2 of 11
b. If the phrase “caused by” were to be inserted to provide a
commonsense meaning to the exclusion clause, then there is an
inherent ambiguity when applying it in circumstances where the initial
damage was caused by water surcharging through the stormwater
drain network. Accordingly, the principle of contra proferentum would
apply in the Applicant‟s favour.
c. A previous Determination issued by FOS (244080) assists the
Applicant in these circumstances.
d. The FSP has sought to rely on the generic hydrology reports p rovided
by the Insurance Council of Australia (ICA). This was inappropriate
given they did not provide evidence specific to the Applicant‟s risk
addresses.
e. The site specific hydrology report obtained by the FSP for the second
property contained no comment and/or analysis about local
topography, is based only on rainfall data and is only one and a half
pages long. This is overly simplistic and inadequate for a claim denial.
8. The Applicant therefore seeks to be indemnified for the losses sought.
Summary of FS P’s position
9. In response to the Applicant ‟s arguments, the FSP submits the following:
a. The “flood” definition clearly encompasses circumstances when water
from the Brisbane River has backed up through the stormwater
drainage network to inundate the property.
b. There is no ambiguity in the policy exclusion. Although there is an
absence of a conjunctive phrase, the meaning is clear and plain in that
damage caused by flood is excluded.
c. The previous Determination is not applicable to these circumstances.
10. The FSP therefore relies on the following policy provisions, two site specific
hydrology reports, hydrology reports commissioned by the ICA, an
assessor ‟s report , the Applicant ‟s description of events and aerial flood
mapping provided by the Queensland Government to substantiate its
position:
“ Section 1A - Property Damage …
What we cover
Loss of or damage to your property at your premises . …
What we exclude
We will not pay for loss or damage : …
flood , the sea, tidal wave, high water, unless damage is caused by or arises
directly from a seismic disturbance;
…
Section 4 - Portable and Valuable Items …
Case No: 276658 Determination Page 3 of 11
What we cover
Loss of or damage to any specified item or unspecified item . …
What we exclude
Any loss or damage caused by : …
flood ;
…
Section 6 - Business Interruption …
What we cover
A reduction in your gross profits , gross income or weekly income or the
increased costs of working caused by one of the following:
1. Loss of or damage
Loss of or damage to your property due to an insured event covered under:
Section 1A - Property Damage;
…
Section 4 - Portable & Valuable Items;
…
Definitions …
flood
The inundation of normally dry land by water escaping or released from the
normal confines of any natural water course or lake, whether or not altered or
modified, or of any res ervoir canal or dam.”
Issue
11. Whether the FSP is entitled to deny the claims on the basis the damage was
due to “flood”.
Reasons for decision
12. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the Service‟s Terms of Reference. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
13. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
Construction of the exclusion for flood
14. The parties had referred to Section 35 of the Insurance Contracts Act 1984
(the Act) with respect to this issue. This was initially raised by the FSP in
support of its position which the Applicant responded to.
Case No: 276658 Determination Page 4 of 11
15. Reference to Section 35 of the Act is misconceived as it is not applicable to
this dispute on a number of bases:
It appears undisputed that the properties were used principally for
commercial purposes. Given this, the insurance contract would not fall
within the definition of a “prescribed contract”. In this regard, the Panel
refers to Section 34 of the Act and Regulations 2(1), 9 and 13 of the
Insurance Contracts Regulations 1985 .
The policy was arranged through a broker who was not acting under a
binder. Accordingly, the FSP is not obliged to comply with Section 35(2)
of the Act given the applicability of Section 71(1) of the Act.
16. The appropriate provision of the Act is Section 37. That provides an i nsurer
may not rely on a provision in a contract of insurance not being a prescribed
contract as in this case, of a kind that is not usually found in contracts that
provide similar cover unless the insured is clearly informed. With respect to
Section 37 of the Act, as the Applicant was acting through a broker, then
Section 71 of the Act applies and the Applicant is deemed to have received
the notice. In any event flood exclusions are common in
commercial/business policies.
17. Given this, contractual principles would therefore need to be considered.
18. The Applicant has provided a number of submissions arguing that the
exclusion clause for flood is nonsensical given the absence of any
conjunctive phrase. In this regard, the Panel accepts there is clearly an
absence of a conjunctive phrase and when reading the relevant exclusion, it
can be perceived as nonsensical.
19. However, the Panel also accepts the FSP‟s rebuttal arguments, in particular
that:
The perceived ambiguity is not of sufficient magnitude such as to
displace the plain meaning and intention behind these terms and
conditions.
It is a principle of contractual interpretation that a Court will strive to
give meaning to a contractual term by means of a fair and ordinary
meaning interpretation of the words employed.
20. This is further supported by case law, particularly the case of Fitzgerald v
Masters [1956] HCA 53. That is, Courts will generally be prepared to rectify
or modify a contract to ensure it accords with the evident intentions of the
parties.
21. In these circumstances, it is clear that the intent of the parties was to exclude
damage caused by flood given the following:
a. The exclusion is included as part of a number of exclusions, all of which
is surrounded by a red border. Further, such a design process is used
consistently throughout the policy with respect to exclusions and
limitations to the cover provided.
Case No: 276658 Determination Page 5 of 11
b. Prior to this, when the policy describes the nature of the cover, it notes
that an insured can claim for loss or damage to property “if … the loss
or damage is not excluded under the „What we exclude‟ column”. The
“What we exclude” column clearly refers to the column of exclusions
surrounded in red that includes flood.
22. In the alternative, the Applicant has argued that if the exclusion is to be given
effect, then the term “caused by” should be incorporated. The FSP in
contrast submits the word “from” should be preferred.
23. The Panel prefers to i ncorporate the term “caused by” on a number of bases:
In this same column and on the following page, the term “caused by” is
used. Accordingly, incorporating the phrase would provide consistency
with how this section has been drafted.
The phrase “caused by” is a commonly used phrase in insurance
contracts, particularly with respect to flood, and is well settled judicially
as meaning “proximate cause”.
The phrase “loss or damage from flood” is an unusual manner of
excluding this type of damage. Instead, use of the word “from” is
generally in conjunction with other terms such as “arising from” or
“directly or indirectly from”. However, the Panel does not prefer to apply
any of these terms as this provides greater scope to the exclusion
which does not appear t o reflect the parties‟ intention.
24. Accordingly, the Panel accepts incorporating the phrase “caused by” would
provide a clearer interpretation and is consistent with both the evident
intentions of the parties and the fact exclusion clauses are construed
restrictively. As such, the Panel intends to apply the policy to the
circumstances as if this phrase was incorporated.
Water Inundation
The Evidence
25. The FSP has provided two site specific hydrology reports regarding both
properties. The first one was dated 8 March 2011 and this dealt with the
inundation at the second property. The report contained the following of
relevance:
The hydrologist took into account the following version of events:
Stormwater pumps in the lowest area of the car park were
running until Tuesday night (11 January 2011) when the building
was evacuated. After that, the car park began to fill with water.
The car park eventually filled through four levels.
There were floodwaters in the street outside the building but
they did not reach the level of the driveway or flow down the
driveway into the car park.
Case No: 276658 Determination Page 6 of 11
This water later combined with water from the Brisbane River
that overflowed Coronation Drive approximately 500m to the
north of the property.
Rainfall recorded from the Toowong Alert Station, located
approximately 1.5km west of the property, was relied upon. According
to this station, 198mm was recorded during 9-13 January 2011. The
peak one hour rainfall intensity was 27mm/hr at 1600 hours on 9
January 2011.
Peak stormwater runoff would have occurred within 10 to 30 minutes of
the peak rainfall. Less than 30mm of rainfall was recorded at Toowong
Alert station after 1200 hours on 11 January.
The property is located approximately 150m from the Brisbane River.
Drains in the underground car park are connected to stormwater drains
which discharge into the Brisbane River.
Floodwater from the Brisbane River surcharged through the drains in
the lowest level of the car park and proceeded to fill the four levels of
the car park. The level of inundation of the car parks is consistent with
the level of floodwaters reached on B Street.
26. Based on this, the hydrologist concluded the following:
“Inundation of the underground car park was caused by floodwaters from
Brisbane River surcharging through car park dr ains.”
27. The second site specific hydrology report was dated 22 May 2012 and
addressed the issue of inundation at the first property. The report contained
the following of relevance:
The building has two levels, one that is raised above C Drive (upper
level) and one that is below. The lower level was inundated to a
maximum depth of 1.9m above floor level. The upper level was not
inundated.
Ground levels at the rear of the property (approximately 5m AHD) are
lower than the levels of C Drive located near the property
(approximately 7m AHD). Stormwater within the vicinity of the property
drains northwards and is collected in a pipe drainage system that
discharges into the Brisbane River.
The version of events relied upon was that the initial inundation
occurred on 12 January 2011. By 0700 hours on 12 January, there was
1m of water above the lower floor level and by 0500 hours on 13
January, the water level was approximately 1.5m above the lower floor
level.
Rainfall data from Toowong Alert Station, located approximately 1.7km
west of the property, was relied upon. The peak 1 hour rainfall intensity
of 18.5mm/hr occurred on 11 January at 1100 hours. Peak stormwater
runoff from the surrounding catchment would have occurred within 30
minutes of peak rainfall. No rainfall was recorded after 0000 hours on
12 January.
Case No: 276658 Determination Page 7 of 11
The average recurrence intervals (ARIs) of recorded rainfalls during the
period of interest were generally less than 1 year. This indicates that
the recorded local rainfall was not particularly severe and that higher
peak rainfall intensities are regularly experienced in Brisbane.
Recorded water levels of the Brisbane River were obtained from the
Oxley Creek Mouth Alert and Brisbane City Alert gauges. An
interpolated hydrograph was constructed to estimate the variation in
Brisbane River water levels in the vicinity of the property.
Based on the fact that the lower level was inundated by 1.9m at the
peak of the flood event, the estimated time of initial inundation was 3am
on 12 January 2011. The initial inundation was due to floodwater from
the river reaching the subject property by flowing back through the
stormwater drainage system. When the river levels exceeded 5m AHD,
floodwater would have flowed overland across C Drive to also inundate
the property.
Since rainfall ceased at approximately 0000 hours on 12 January, any
inundation on 12 January could not have been caused by stormwater
runoff.
28. Based on this, the hydrologist therefore concluded the following:
“The initial inundation of the subject property abov e floor level was caused by
floodwater from the Brisbane River that flowed back through the stormwater
system. The floor level was inundated to a depth of about 0.4m prior to the
arrival of floodwaters by direct overland flow.
Stormwater runoff would not have caused inundation above floor level
because the recorded rainfall intensities in the local areas were not
exceptional and no inundation was reported until about 18 hours after the
peak rainfall intensity on 11 January. Rainfall had ceased some hours prior to
the initial inundation above floor level.”
29. The Applicant provided the following chronology of events regarding the
inundation:
a. At or about 12am 12 January 2011, water entered the „579‟ premises.
b. At or about 7am, water was observed to be approximately 1 metre in
height at the „579‟ premises.
c. At 7am, water entered „601‟ car park.
d. At 8am the premises at „579‟ were evacuated.
e. At about 2pm, Energex shut down power in the Toowong area.
f. At or about 5pm, „601‟ premises were evacuated.
g. At or about 5pm, floodw ater from the Brisbane River entered „579‟
premises.
Case No: 276658 Determination Page 8 of 11
30. The Applicant has not provided any hydrological evidence.
Analysis
31. The Panel, after careful consideration of all of the available evidence, prefers
the hydrologist‟s findings contained in the site specific reports. In particular,
the Panel accepts that it is likely that the water which inundated both
properties originated from the Brisbane River backing up through the storm
water drainage network. This was then followed by the water overflowing the
river‟s banks and travelling across Coronation Drive to inundate the
properties.
32. The Panel makes this finding based on the following :
a. Both reports relied on rainfall data recorded from stations proximate to
the properties which would therefore, on balance, be reflective of the
local rainfall characteristics affecting the property.
b. Their reasoning about why the rainfall recorded was not sufficient to
inundate the property is reasonable on the face of it given the ARI was
less than 1 in a year. In particular, the most intense period of hourly
rainfall for 11 January 2011 occurred more than 12 hours prior to the
initial inundation of either property. This is inconsistent with the fact that
storm water inundation is normally contemporaneous with intense
periods of rainfall.
c. The estimated times of initial inundation and the respective ground
levels of the 2 properties are consistent with the levels of the Brisbane
River measured nearby.
d. The findings are relatively consiste nt with the Applicant‟s evidence.
e. The hydrology firm and the engineers who wrote the findings are
appropriately qualified to examine and report on the likely source of
inundation.
33. The Panel acknowledges the Applicant‟s submissions that the hydrology
report dated 8 March 2011 was brief and appeared to omit relevant factors,
such as topography and measured river levels. However, the FSP has
provided other evidence, such as the second site specific report, the ICA
reports and the aerial flood mapping, all of which corroborates this
hydrologist‟s findings. In addition, the Applicant has not substantively
disputed the finding about where the water came from and as stated
previously, the findings are relatively consistent with the Applicant‟s own
evidence.
34. The Applicant also referred to a previous Determination issued by FOS.
However, that decision was based on minimal site specific hydrology
evidence available. In contrast, the FSP has presented two site specific
hydrology reports, rainfall and river data both pro ximate to the Applicant‟s
properties and other empirical evidence to support its position. As a result,
this dispute is clearly distinguishable from that previous Determination.
Case No: 276658 Determination Page 9 of 11
35. Accordingly, when reviewing the evidence as a whole, the Panel is satisfied
that both properties were initially inundated by water from the Brisbane River
backing up through the stormwater drainage network to which these
properties were connected.
Whether this damage is caused by flood as defined in the policy?
36. The Applicant has submitted that the policy does not clearly exclude
circumstances when water is surcharging through the drains to inundate
property. Even if such a construction could be applied, it was not clearly
evident in the exclusion clause and as exclusion clauses are construed
strictly against an insurer, the contractual principle of contra proferentum
should be applied.
37. In constructing terms of a contract, the High Court in the case of Toll (FGCT)
Pty Ltd v Alphapharm Pty Ltd [2004] HCA 52 reaffirmed the principle that it is
not the subjective belief or intention of the parties that should be taken into
consideration. In this regard, their Honours stated the following:
“ This Court, in Pacific Carriers Ltd v BNP Paribas [6], has recently reaffirmed
the principle of objectivity by which the rights and liabilities of the parties to a
contract are determined. It is not the subjective beliefs or understandings
of the parties about their rights and liabilities that govern their
contractual relations. What matters is what each party by words and
conduct would have led a reasonable person in the position of the other
party to believe. References to the common intention of the parties to a
contract are to be understood as referring to what a reasonable person would
understand by the language in which the parties have expressed their
agreement. The meaning of the terms of a contractual document is to be
determined by what a reasonable person would have understood them to
mean. That, normally, requires consideration not only of the text, but also of
the surrounding circumstances known to the parties, and the purpose and
object of the transaction .” (Panel emphasis)
38. Having regard to this principle, the Panel now refers to the policy definition of
“flood”, in particular the following terms:
“The inundation of normally dry land by water escaping … from the normal
confines of any natural water course or lake …” (Panel emphasis)
39. The word “escaping” is, in the Panel‟s opinion, determinative of this issue.
The term “escaping” is defined by the Macquarie dictionary as:
“To slip or get away, as from confinement or restraint; gain or regain liberty.”
40. In the Panel‟s view, the fact the Applicant did not anticipate the potential
application of this term to the current circumstances is not, of itse lf, sufficient
to argue the principle of contra proferentum . Instead, the relevant
consideration is whether a reasonable person, having read this definition and
the exclusion clause, would readily construe the phenomenon of water from
the Brisbane River surcharging through drains to inundate normally dry land
and causing damage as circumstances associated with the natural and
ordinary meaning of the words used.
Case No: 276658 Determination Page 10 of 11
41. The Panel considers such a person would so construe for the following
reasons:
The normal confines of the Brisbane River are associated with its
defined banks. This is clear and uncontroversial.
Due to the elevated waters in the Brisbane River, water that is normally
contained within such banks has “escaped” into the stormwater
drainage system that, in ordinary circumstances, drains water into.
This water has continued to back up through the system before finding
an outlet at which point, it began to inundate normally dry land and then
caused damage.
42. As a result, any damage caused by this water would be readily associated
with the ordinary and natural terms used in defining “flood”.
43. The Panel acknowledges the Applicant‟s argument that exclusion clauses
are construed strictly against the insurer. However, this does not mean that a
strained interpretation will be adopted ( Lumley General Insurance (NZ) Ltd &
Anor v Body Corporate No 205963 & Ors (2010) 16 ANZ Ins Cases 61-853).
In this regard, the Panel considers the language and phrases used are clear
and their application to the circumstances can be readily associated by a
reasonable person.
Direct Cause
44. The Applicant has alternatively argued that the direct cause of the loss was
the inability of the Brisbane City Council stormwater system to withstand and
contain the surcharge/backflow of water, not “flood”. As the words “caused
by” require a direct link, then the flood exclusion cannot apply as it was not a
direct cause.
45. The Panel does not accept this argument.
46. The Panel notes that it is an accepted principle that the phrase “caused by”
is generally interpreted as proximate cause. Proximate cause is determined
by identifying the dominant or effective cause/s of the loss. This is a question
of fact determined by the circumstances and is not answered by reference to
the last event in time ( Leyland Shipping Co Ltd v Norwich Union Fire
Insurance Society Ltd (1918) AC 350).
47. In this regard, the Panel accepts that it is clear that the dominant and
effective cause of the loss was the significant volume of water escaping from
the Brisbane River into the stormwater drain network. This then surcharged
through the outlets to cause damage to the properties.
48. The fact the drainage network could not cope with this volume of water is a
consequence of the “flood” and not a proximate cause. The reason being is
that it is clear the drainage network was clearly not intended to cope with
such significant volumes of water. As such, this corroborates the finding that
the dominant and effective cause of the loss was “flood”.
Case No: 276658 Determination Page 11 of 11
49. Accordingly, the Panel is satisfied the Applicant‟ s loss was proximately
caused by “flood”.
Determination
50. On the basis of the available information the Panel determines the FSP is
entitled to deny liability for the Applicant‟s claims on the basis they were
proximately caused by “flood” as defined by the p olicy.