Home / Financial Firm (Unknown - Insurer) / Determination 276101
Determination 276101
Denial of claim - exclusion/condition (erosion, subsidence, wear and tear, pre-existing damage)
Summary
The applicants claimed for flood damage to their home, and the FSP denied the concrete stumps and stairs as pre-existing or excluded. AFCA determined the FSP must indemnify $15,284.50 for timber stumps, concrete stumps and stairs plus statutory interest, but refused the cost of fill and any compensation for a missed government grant.
The FSP did not establish on the balance of probabilities that the concrete stump damage was pre-existing, relying on a single internet photograph, while the fill was not part of the building under the policy.
Issues
- Claim denial primary · upheld
“I am not satisfied that the FSP has established that ... the damage sustained to the concrete stumps was pre-existing and not related to the flood.”
- Inadequate claim investigation secondary · upheld
“I am not satisfied with C's findings which are based on a single photograph obtained from the internet”
- Delay secondary · not upheld
“I am satisfied the FSP is not required to pay any compensation to the Applicants in this regard.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 276101 Determination Page 1 of 7
Case number: 276101
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition
9 April 2013
Background
1. The Applicants held a home building and contents insurance policy with the
Financial Services Provider (FSP) from 6 August 2008 and the policy was
current at the time of the loss.
2. On 18 January 2011, the Applicants lodged a claim with the FSP for damage
sustained to their property as a result of a flood event on 10 January 2011.
3. The FSP accepted some parts of the claim and denied the remaining parts
of the claim on the grounds that the damage sustained to the property was a
result of erosion and subsidence, defect, structural fault or design fault wear,
tear rust or mould which are all excluded under the policy and also that some
of the damage was pre-existing.
4. The Applicants expect the FSP to honour the full claim.
Summary of Applicants ’ position
5. The Applicants say the damage to the property was caused by the flood
events between December 2010 and January 2011.
6. An expert S appointed by the Applicants says the damage to the property
was caused by the flood.
7. The gravel under the house was washed away with the flood.
8. The Applicants expect the FSP to reimburse the following expenses:
Cost of replacing and straightening the wooden and concrete stumps;
30 cubic meters of gravel to fill the holes under the house; and
Cost of adjustment to stairs.
9. The Applicants say the FSP’s delayed finalisation of the claim has caused
them to miss out on a Government grant.
Determination
Case No: 276101 Determination Page 2 of 7
Summary of FSP’s position
10. The FSP initially denied liability for the damage sustained to the timber
stumps. However, upon further discussions with M (Applicants’ builder) who
attended to the repairs, it has now decided to accept this part of the claim.
11. The FSP relies on its expert ’s findings and denies liability for the damage
sustained to the concrete stumps on the grounds that it was pre-existing and
not related to the flood.
12. The damage sustained to the stumps was also a result of inadequate
drainage and presence of tall trees in close proximity to the property.
13. The condition of the timber stairs deteriorated due to age and being exposed
to the environment and was a result of flood.
14. The FSP maintains denial of the claim and relies on its expert's findings and
says the damage sustained to the remaining parts of the property was not
caused by the flood event.
15. The FSP relies on the following policy provisions:
“ We cover
Loss and damage caused by storm and flood e.g. rain, wind, hail, storm and
damage caused by flooding from rivers, streets and canals.
...
What you are not covered for
This section details what is not covered under any part of your policy.
We do not cover loss or damage:
...
Erosion or subsidence
Caused by or as a result of erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement, but we will cover
subsidence damage to your home if it is caused by:
...
these insured events if the damage occurs within 72 hours of the event
happening:
- insured event 1 (storm and flood)
...
Defect, structural fault or design fault
Caused by a defect, structural fault or design fault that you knew about (or
should reasonably have known about) and did not fix before the loss or
damage occurred (e.g. if there are signs that a defect previously caused
damage, we will not pay a later claim for further damage from this defect).
Failing to take care of the home or contents
Caused by, or as a result of, your failure to:
Case No: 276101 Determination Page 3 of 7
– take reasonable care of your home and contents
– keep the home and contents in good condition and well maintained
– fix faults and defects as soon as you become aware of them.
...
Wear, tear, rust or mould
Loss or damage caused by wear, tear, rust, fading, gradual deterioration,
mould, rising damp, mildew, action of light, atmospheric or climatic conditions,
corrosion or rot unless this is covered under:
– insured event 1 (storm and flood) ”
Issues
16. Whether the FSP is entitled to deny the Applicants’ claim for concrete
stumps, stairs and fill.
17. Whether the Applicants are entitled to receive compensation.
Reasons for decision
18. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
19. I am satisfied that a full exchange of information has taken place between
the parties and that each party has had the opportunity to address any
issues raised.
20. The onus of proof rests on the Applicants to establish that, on the balance of
probabilities, they have suffered a loss caused by an insured risk. Once the
Applicants have established that the loss was caused by a risk insured under
their policy, the onus then shifts to the FSP to show that, on the balance of
probabilities, the loss falls within an exclusion clause in the policy.
21. The Applicants have not raised an issue in regard to receipt of policy
documents and in the circumstances, I am satisfied the FSP has fulfilled its
obligation in informing them of the terms and conditions of the policy.
22. Subsequent to the lodgement of the claim, the FSP appointed a loss
assessor to investigate the circumstances surrounding the loss and to
assess the claim.
23. The loss assessor in turn appointed an engineer (C) to report on the
movement of the stumps and he says:
The wooden stumps had returned to their original position over the
period;
Case No: 276101 Determination Page 4 of 7
The concrete stumps had suffered from movement prior to the flood
event (evidenced by a google photograph which was taken in March
2010);
The damage to stumps was also cause by differential movement
caused by seasonal factors, inadequate drainage and presence of
trees in close proximity.
The condition of the stairs had deteriorated due its age and exposure to
the environment and effects of the flood was minimal.
24. The property was initially inspected by a flood relief officer Q who noted that
the house may have been impacted by a log. He also found that the wooden
and concrete stumps required re-levelling. He indicated the back stair may
have been moved by impact and required realignment.
25. The Applicants indicate that C witnessed the works which were carried out
by their builder M and when C was questioned about this, he responded that
he did not witness or notice any works that had been completed on the
stumps during his visit to the property on 20 December 2011.
26. It is interesting to note that C did not note the works completed on the
stumps during his visit in December 2011 (against his findings in August
2011) and also believed that the wooden stumps had returned to their
original position on their own within this period.
27. The Applicants have since then provided invoices confirming the works
completed and the FSP then contacted M who confirmed the following:
“I quoted this job in early 2011 after the [Applicants] had an inspection done
by a [Q] Flood Relief Officer. Q recommended replacing 7 concrete stumps at
the back of the house and 1 at the front. He also stated that the 3 sets of
stairs would need adjustment and the timber stumps would need levelling
because of the flood waters. He also noted the large amount of soil that had
been washed out under the house due to the flood waters and the effect this
would have had on the existing timber and concrete stumps. Q recommended
that under the house be refilled with soil to prevent water pooling around the
stumps in the future. I quoted on levelling the timber stumps under the main
house and removing and replacing 7 concrete stumps under the rear of the
house and 1 concrete stump at the front of the house. As well as the stumps
we carted in 30m3 of clean fill to put under the house to prevent ponding. We
also repaired 3 sets of stairs. I believe the flow of flood water had a major
effect on the condition of the stumps at the [Applicants] house as well as the
water ponding underneath the house after the silt had been washed away. We
worked on this job for 12 days during December 2011 and 8 days during
January 2012.” (sic)
“ We started work on this job on the 7/12/11. I believe we spent the first few
days levelling but I can’t recall an exact amount of days.”
28. The Applicants appointed an expert S who holds a graduate diploma in
quality management to review C’s reports along with its comments and he
says:
Case No: 276101 Determination Page 5 of 7
“In my opinion, the timber/concrete movement and the damage to the stairs
were caused by a combination of the effects as listed below:
Continuous force exerted on all of the piers of the building by the rapid
flooding as shown n the video taken on the date 10 Janaury,2011
Erosion to the soils under the house caused by the rapid flooding
Sudden force exerted on the bearer by a large object during the flood
as reported by the insured and acknowledged in the 2 n d report
Differential movement of the foundation soils caused by the sudden
and prolonged submersion under water”
29. Based on the above and the discussions with M, the FSP accepted the claim
for the repair expenses relating to the wooden stumps but maintained denial
of the claim for the concrete stumps and stairs.
30. The FSP’s referred S’s report to C and its final response is below:
Timber Stumps in Southern Elevation
As discussed in our Engineer’s Report dated 25 th January 2012 and the
picture shown in page 3 of this report, the movement of the timber stumps in
this area of the subfloor is minor in nature and is typical over the duration of
time of the subfloor area. While the movement might have been exacerbated
by the flood event in January 2011, the shrink / swell cycle during the flood
and drying out process throughout the past months have allowed the stumps
to return to their original position and status prior to the flood event. We
therefore do not believe that any repairs are necessary to the timber stumps
in this area of the subfloor structure.
Concrete Stumps in Northern Elevation
Regarding the damage to the concrete stumps that we have observed on site,
we have reproduced an enlarged image of the residence from Google Street
View. The picture was taken in March 2010 which was 7 months prior to the
flood event in 2011.
It is clearly indicated from the above-picture that the concrete stumps have
already been misaligned at least 7 months prior to the flood event. We believe
that the damage is due to the inadequate drainage surrounding the sub-floor
area and the presence of tress at close proximity to the dwelling. This photo
was included on our Engineer’s Report dated 25 January 2012 but [S] simply
ignored this and did not make any response on our findings on the pre-
existing movement.
If the Google street view map photos did not show any signs of misalignment
to the concrete stumps in the northern elevation of the residence, we would
then believe that the damages we observed on site are as a result of the flood
event. However, the damage shown in the picture above has clearly shown
that the movement has occurred long before the event and did not occur
unexpectedly from the flood event in January 2011.
Stairs
Wet rot fungi usually occurred in “persistently damp conditions” leaving
optimum moisture content of 50% - 60%. That is, the timber must be exposed
to a highly moisturised environment for a prolonged period of time with
continuous supply of water sources in order to allow wood rot to occur. It is
Case No: 276101 Determination Page 6 of 7
highly unlikely that one flood event could have caused the damage to the
timber stairs.
We believe that the deterioration of the timber stairs is due to the prolonged
exposure to the external environment. The effects of flood water would make
no difference to the effects of weather or storm events throughout the duration
of life of the structure. The timber type chosen for the stairs is not able to
resist rotting and deterioration by the environment.”
31. I have carefully reviewed the evidence before me including the video footage
of the flood which depicts the immense force with which it travelled.
32. I am not satisfied with C’s findings which are based on a single photograph
obtained from the internet that shows one concrete beam which is slightly
moved.
33. The FSP appears to be making a broad assumption that all the concrete
stumps under the house were in the same condition.
34. C clearly indicates that if not for the photograph from the internet, he would
have been satisfied that the damage sustained to the concrete stumps was
caused by the flood.
35. The Applicants accept that the front stump may have been slightly moved.
However, they dispute C’s findings that the remaining concrete stumps were
moved as well.
36. It is interesting to note that the same photograph also shows another
concrete stump which does not show any movement.
37. Based on the above, I am not satisfied that the FSP has established that on
the balance of probabilities, the damage sustained to the concrete stumps
was pre-existing and not related to the flood.
38. Therefore, the FSP should reimburse the Applicants the replacement cost of
the remaining seven concrete stumps (excluding the one that had moved
prior to the floods) amounting to $6,814.50.
39. In regard to the damage d stairs, I note C’s findings. However, the claim
relates only to the adjustment cost and not the replacement cost of the
stairs. Considering Q's and M's comments in this regard, I am satisfied this
damage is probably related to floods.
40. In my opinion, the FSP should pay for the cost of adjusting the stairs.
41. The Applicants have indicated to the Service’s Case Manager that the FSP
had not still made the payment for the part of the claim for the wooden
stumps which was accepted in January 2013.
42. The FSP should also pay for the damaged bearer (if not already paid for) as
it accepted liability for this damage on 22 February 2011.
Case No: 276101 Determination Page 7 of 7
43. It appears the FSP has not addressed the Applicants’ claim for the
replacement cost of 30 cubic metres of fill.
44. The policy states:
“ What we do not cover as your home
Home does not include:
...
– loose or compacted soil, lawn, artificial grass, gravel, pebbles, rocks or
granular rubber; ”
45. I am satisfied that fill does not form part of the building under the policy and
therefore, the FSP is not required to reimburse this expense.
Compensation
46. The Applicants have indicated that they had missed out on a government
grant due to the delays caused by the FSP in finalising the claim.
47. The FSP sought clarification from them regarding the details of this grant
and the Applicants have not provided any further evidence to substantiate
this part of the claim.
48. I am satisfied the FSP is not required to pay any compensation to the
Applicants in this regard.
Determination
49. On the basis of the available information, I determine the FSP is required to
indemnify the Applicants for the damage sustained to the 52 timber stumps,
7 concrete stumps and stairs amounting to $15,284.50.
50. The FSP should pay for the repair cost of the bearer if not already paid.
51. The FSP should also pay interest at the statutory rate from the date this
payment was made to M until settlement.
52. The FSP is not required to reimburse the Applicants for the cost of fill.
53. The FSP is also not required to pay any compensation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.