Text of the determination
Case No: 276045 Determination Page 1 of 8
Case number: 276045
General Insurance – Domestic Insurance – Home Building Insurance Policy –
Storm damage – Policy exclusions – inherent defects, wear and tear,
depreciation, deterioration
11 November 2012
Background
1. The Applicant insured her home building against loss or damage caused by
insured events under a Home Cover Insurance Policy for $759,000 with a $250
policy excess. The policy incepted on 8 August 2007 and was renewed
annually to 8 August 2012.
2. On 6 February 2012, the Applicant lodged a claim for storm damage to arches,
columns and balcony of her home building that occurred during January 2012.
The Applicant noticed damage to the joints between the rendered columns and
arches which resulted from heavy rain.
3. The Financial Services provider (FSP) accepted liability for damage to the
arches and columns which it agreed was caused by storm rainwater. However,
it denied liability for the costs involved in repairing the rear balcony and its
waterproofing which it considered had been subject to the policy exclusions of
wear and tear and deterioration over a long period of time
4. The FSP paid the Applicant $8,195 for the cost of repairs to the arches and
$858 for the cost of repairs to exploratory holes made in the underside of the
balcony.
5. The Applicant submits that the storm caused damage to her home where the
total cost of repairs will be $30,441.64.The FSP has paid the Applicant the
amount of $8,195 leaving the amount in dispute, $22,246.64.
Summary of Applicant’s Position
6. Approximately one month after the heavy rains in January 2012, the Applicant
noticed a few cracks in the render over the arches and columns under the
balcony.
7. When she reported the damage to the FSP it appointed a civil engineer, ‘M’, to
inspect and report on the cause of the damage and what has to be done to
rectify the problem.
Determination
Case No: 276045 Determination Page 2 of 8
8. After M had assessed the damage he explained that, in his opinion, all of the
damage to her house was caused by the torrential rain and the damage to the
arches, columns and balcony should be viewed as one problem.
9. The FSP has treated the damage to the arches and columns as being separate
to the damage to the balcony. M informed the Applicant that the torrential rain
could easily have damaged the water proof membrane of the balcony.
10. The FSP appointed builder. ‘H’, to assess the damage and provide a quote for
repairs. H provided a quote of $8,195 which did not include the cost of re -
building the columns.
11. The FSP sent H to further inspect the arches and open holes in them to assess
whether water proofing issues existed. H could not establish whether or not
there was a water proofing issue but there was an issue of condensation and a
few rotten timber sections.
12. The Applicant received a further quote from H for $30,441.64 to repair the
damage to her house. The quote included the demolition and re -building of the
solidly built columns which is unnecessary. H also reported that he had found
that the balcony drip point system is defective and did not meet the current
building recommended specifications.
13. H reported that the defective drip point system allowed cascading rainwater to
penetrate through the blue board sheeting causing swelling and movement to
the timber arch framing and blue board joints.
14. H also reported that the damage had been occurring over a number of years as
evidenced by the extent of timber rot found to the timber joists, framing of the
arches and laminated bearer.
15. However, the recommended specifications applied from 2006 whereas her
house was built in 1998 when different specifications applied.
16. The Applicant contends that civil engineer M clearly states that all of the
damages have occurred because of the extremely heavy rain and not because
of a maintenance issue.
17. M also considers that the damage to the arches, columns and balcony are one
and the same issue.
18. The Applicant submits that the FSP should indemnify her for the cost of all of
the necessary repairs to her house.
Summary of FSP’s Position
19. Following the report of the damage to the Applicant’s home building, the FSP’s
loss assessor appointed a civil engineer, M, to attend the property and provide
a technical report on the cause of the damage.
Case No: 276045 Determination Page 3 of 8
20. In its report dated 11 February 2012, M suggested that the cause of the
damage was due to:
Extreme rainfall stormwater runoff from the balcony which cascaded
down and permeated through microscopic cracks in the joints causing
saturation of the inside timber framing.
Saturation of the timber framing then caused it to swell and displace the
panels of the decorative arches between the columns allowing more
water to enter the cracks opened up.
Pooled water caused saturation of the columns and permeated down
causing the rendering to delaminate and trap water.
21. The FSP organised for two quotations to be provided from builders, I and H, for
rep airs to the Applicant’s house. Builder I quoted $16,401 and H $8,195 both
including GST.
22. The Applicant also provided a quotation from builder B for the amount of
$15,664 including GST. However, the Applicant’s quote included repairs to the
balcony for the amount of $6,541.70 including GST which was not in the scope
of works as it was a maintenance issue and did not result from an insured
event. The quote for the repairs to arches and columns was $9,122.30
including GST.
23. The FSP noted that all three builders engaged to provide quotes disagreed with
civil engineer M. The builders opined that the cause of the property damage
may be due to the failure of the waterproofing in the balcony above the arches
and columns.
24. Based on the findings of M’s report, the FSP accepted the scope of works
submitted by builder H in relation to the damage caused by rainwater to the
rendered columns and arches with a quotation of $8,195 including GST.
25. However, the FSP refused cover in respect to any waterproofing works, (if it
was found to have failed) on the grounds that it did not result from an insured
event.
26. The FSP informed the Applicant that future claims for rainwater damage would
be affected if the Applicant chose to not carry out waterproofing repairs if they
were found to be required.
27. Builder H engaged a builder and licensed plumber, HB, to carry out an invasive
inspection of the balcony. HB’s report confirmed that the balcony drip point
system was defective and allowed water to penetrate through the blue board
sheeting causing swelling and movement to the timber arch framing. HB also
reported that the severity of the timber rot was evidence that the problem had
been occurring for a number of years.
Case No: 276045 Determination Page 4 of 8
28. A quotation was provided for the amount of $30,441.64 including GST for the
reparation of the defect which involved the full demolition and replacement of
the tiled balcony, joist, laminated bearer, brick columns and arches.
29. Based on the evidence, including the invasive investigation report from HB, the
builders’ quotes and informa tion provided by civil engineer M, any damage to
the Applicant’s balcony waterproofing would be as a result of maintenance
issues and age.
30. Therefore, the FSP submits that it is not liable for the costs in replacing or
rectifying the balcony waterproofing as inherent defects and wear and tear is
expressly excluded by the policy.
31. The FSP relies on the following policy/contract provisions:
‘Definitions (The meaning of some words)
Wear and tear
damage or a reduction in value through age, ordinary use or lack of maintenance.
...
What you are covered for
Your [name] policy insured you up to the amount of the sum insured for loss or
damage to your building and/or contents caused by an insured event listed below.
...
Insured event
...
Storm, rain or flash flood
We will cover:
√ damage to your building and/or your contents caused by storm, rain or flash flood.
We will not cover:
× water damage to your building caused by storm or rain seeping or otherwise entering
your building unless the water entered through an opening in the wall or roof that had
been made directly by the storm or rain or as a direct result of it;
× damage caused by water penetrating or entering your building because it has not
been properly maintained or as a result of a design fault, structural defect or because
of defective workmanship;
...
When you are not insured
Case No: 276045 Determination Page 5 of 8
You are not insured under any section of this policy if the incident arises from or
is connected with:
× ...
× wear and tear, depreciation, deterioration;
× damage caused by atmospheric conditions, mould, mildew, insects, vermin, action of
light, rot or inherent defect;
...
How we settle your claim
Your building
...
We will not pay:
× ...
× to modify your building to rectify a fault that is causing loss or damage to your
building under this policy.’
Issues
32. Whether the severe rainwater event caused damage to the balcony of the
Applicant’s home building.
Reasons for Decision
33. The onus of proof is on the Applicant to establish, on the balance of
probabilities, that he has suffered a loss caused by a risk insured against. Once
the Applicant has established that the loss was prima facie caused by a risk
insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
34. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material other than when
relevant.
35. The Applicant submits that the storm damage to the arches, columns and
balcony of her home arose from the one storm event.
36. The Applicant engaged a builder to prepare a quotation to repair the damage to
her home. In his quote dated 9 April 2012 builder ARL stated:
‘ Repairs to rear patio and arches at the above address.
Case No: 276045 Determination Page 6 of 8
It appears that after heavy rain water has penetrated through cracks at the junction
between the harditex cladded arches and the brick columns causing rotting to the arch
timbers and joists that support the Patio floor.
The complete patio will have to be demolished. Except the brick columns.’
37. The FSP engaged a civil engineer, M, and builder to inspect and report on the
damage to the Applicant’s home.
38. In his report dated 11 February 2012, M stated, in part:
‘ Conclusion
In my opinion the cause of the cracks in the rendering (plus delamination of rendering,
plus opening up of joints between the HardiTex and the masonry columns) is that
extreme rainfall stormwater run-off from the balcony has cascaded down and has
permeated through microscopic cracks in the joints and has pooled inside the void
between the HardiTex panels and the masonry columns, saturating the inside.
In my opinion that pooled water has saturated the timber framing, causing it to swell
and to displace the HardiTex panels allowing more water to enter as the microscopic
cracks opened up.
In my opinion that pooled water has saturated the masonry columns, then permeated
down, causing the Granosite rendering to delaminate (or bubble out) and trap water as
it gravitated down behind the Granosite and cement rendering.’
39. M did not offer any comment on the balcony other than run-off water would
have flowed down over the east face of the columns. He also stated in a note to
a photograph of the underside of the balcony that there was no leakage
apparent through the balcony.
40. In referring to M’s report the Applicant also stated that M explained that in his
opinion all water damage to her house was a direct result of the torrential rains
and should be looked at as one problem. She also stated that in M’s opinion the
torrential rains could have penetrated the waterproof membrane.
41. However, in a letter dated 6 June 2012, civil engineer M stated that water
flowing off the balcony would not have been sufficient to cause a fissure in the
waterproofing. He stated that the water would not have been under pressure
and could not possibly cause a mechanical failure in the waterproofing.
42. M also stated that he would not have told the Applicant that the rainwater could
have caused a mechanical failure of the waterproofing.
43. However, in a report dated 23 March 2012, builder HB stated:
‘...An invasive inspection wa s carried out to the arches and balcony joist to identify
points of water ingress to the arches timber framing and balcony joist.
...
The invasive inspection revealed large amounts of moisture to the underside of the
balcony’s compressed cement sheeting jo ist and to the timber framing arches.
Case No: 276045 Determination Page 7 of 8
The timber joist to the arches and laminated bearer all showed various stages of water
affected rot.
The most severe case of timber rot was found to the balcony joist behind the centre
brick pillar.
A leak test was carried out to the balcony above to identify points of water ingress.
A very slow leak was found at the back of the centre column indicating failure to the
waterproofing...
In conclusion, it has been found that the existing drip-point system has failed to
prevent balcony water run-off from cascading down the blue board arches. The current
drip point system is deemed defective as it is not built in conjunction with the
manufacturers (sic) James Hardie/Hardie panel compressed sheet decking technical
specifications.
In my professional opinion, over the years this defective balcony drip point system has
allowed cascading water to penetrate through the blue board sheeting, causing
swelling and movement to the timber arch framing and blue board joints. This problem
has only worsened over the years to the point where we now have large volumes of
rain water entering through the wide openings in the blue board joints. Due to large
amounts of moisture building up in these arches the Laminated bearer and balcony
joist have also swelled causing minor water proofing issues at the back of the centre
brick column and a structural crack in the corner brick column.
The severity of the timber rot is evidence that this problem has been occurring for a
number of years.
Full demolition and replacement of tiles balcony, joist, laminated bearer, brick
columns (to ground level) and arches is recommended....’
44. The Applicant has questioned builder HB’s expertise because she considers
that he did not take into account the year her ho use was built, 1998, and the
building recommended specifications at that time.
45. However, notwithstanding any variations in building specifications, I find that
the evidence submitted, including photographs, indicates that water damage to
the timbers of the balcony has resulted in severe wood rot. Builder HB reported
that the most severe rot was found to the balcony joist behind the centre pillar
which indicated failure to the waterproofing.
46. The Applicant submits that the damage to the balcony should be treated as
resulting from the severe rainfall in late January 2012 as was the damage to the
arches and columns.
47. However, the Applicant’s own builder reported that ‘ heavy rain water has
penetrated through cracks at the junction between the harditex cladded arches
and brick columns causing rotting to the arch timbers and joists that support the
Patio floor. (my emphasis)
48. The builder’s report suggests that rotting to th e mentioned timbers has been
caused over a period of time.
Case No: 276045 Determination Page 8 of 8
49. On 15 November 2012, the Applicant wrote to FOS advising that she was
reducing the quantum of her claim from $30,441.64 to $25,053.00 with the aim
of the FSP agreeing to settle her claim. This offer was forwarded to the FSP.
50. The FSP accepted liability for the water damage to the arches and columns but
rejected the claim for the cost of repairs to the balcony on the grounds that the
damage has been occurring over a long period of time.
51. However, on 21 November 2012, FOS was informed by the FSP that it would
not accept the Applicant’s offer and maintained its decision to deny liability for
the damage to the balcony.
52. On the evidence submitted, I find that the FSP has met the onus on it to
establish that the damage to the balcony was caused by wear and tear or rot.
Having regard to the age of the dwelling I would not conclude that there was an
inherent defect.
53. I sympathise with the Applicant who, with good reason, feels that the original
opinion of M should be decisive. But all of the subsequent experts have
reached a clear conclusion, contrary to that of M.
Determination
54. Accordingly, I determine that the FSP is entitled to deny indemnity for the cost
of repairs to the balcony of the Applicant’s house.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.