Text of the determination
Case No: 275524 Determination Page 1 of 12
Case number: 275524
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim Amount - Water Damage - Scope of Damage and Policy Indemnity
21 December 2012
Background
1. The Applicant held a home building insurance policy with the Financial
Services Provider (FSP) from 29 December 2008. The policy provided
building cover for his property which was rented to tenants.
2. On 20 March 2011, the home was damaged as a result of a leaking pipe
which flooded parts of it. A claim was lodged.
3. The FSP reviewed the claim and agreed to cover the Applicant for $11,500
less the applicable policy excess of $100. The Applicant sought clarification
of this cover and was dissatisfied with the FS P‟s lack of detail on the scope
for the repairs proposed. He obtained his own quotes for damage which far
exceed that offered by the FSP.
4. The Applicant seeks cover for the estimated repairs, engineer fees, loss of
rent and his agent‟s fees total ling nearly $50,000.
Summary of Applicant’s position
5. The Applicant says that the FSP agreed to cover the claim but failed to
provide a detailed scope of works to explain their offer for settlement. The
FSP has now (unfairly) suggested that it has grounds to deny the claim.
6. No allowance has been permitted for the full scope of the work necessary to
complete the repairs or the loss of rent which will be incurred whilst the
repairs are done.
7. The initial settlement cheque for $11,400 has not been received or banked
by the Applicant.
Determination
Case No: 275524 Determination Page 2 of 12
Summary of FSP’s position
8. The FSP says that the payment offered was a „good faith‟ offer only. It has
no obligation to cover the Applicant for his loss.
9. The loss occurred as a result of an indoor water pipe being blocked by a tree
root, which is an excluded event under the policy. The flooring also did not
have an adequate waterproof base.
10. The scope of works was limited to only those areas directly affected by the
flow of water, even though the FSP had no obligation to cover it.
11. Whilst the scope of works will not cover all of the damage, this is not
necessary as the FSP has no obligation to the Applicant for the claim.
12. The FSP relies on the following policy provisions:
Pages 16-21 of the Product Disclosure Statement (PDS)
“ The events we cover
...
Storm
If loss or damage is caused by a storm.
...
Water and oil leaks
If loss or damage is caused by water or oil leaking or escaping from an item
shown in this section.
Covered
water leaking or escaping from: ̵
house gutters, drainpipes or pipes ̵
...
costs to locate the cause of damage (if we agree to pay these costs
before you make any arrangements).
Not Covered
...
costs to repair or replace the item that the water or oil leaked or
escaped from...”
Page 27 of the PDS
“ Loss of rent during repairs
If a listed event causes loss or damage to your rental property and we agree
your tenants cannot live in it and need to move out whilst it is being repaired
or rebuilt.
Covered under Buildings Insurance
the rent you lose during the reasonable it should take to repair or
rebuild your rental property...
Case No: 275524 Determination Page 3 of 12
...
Conditions
you must have a rental agreement that states the: ̵
term of the rental period, and ̵
amount of rent and bond your tenant needs to pay.
Page 34 of the PDS
“ General exclusions
The exclusions shown in this section apply to all cover under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
...
mould
...
atmospheric conditions or extreme temperature
...
tree roots...”
Page 43 of the PDS
“ How we settle certain things
When we pay your claim, we settle certain things in line with the information
shown in this section.
...
Carpet, vinyl or floorboards
...
we only repair or replace the carpet, vinyl or floorboards in the part of
your rental property that was damaged
we don‟t pay for adjoining rooms, or your entire rental property.”
Issues
13. Whether the Applicant was made aware of the conditions and exclusions
under the policy.
14. Whether the FSP is entitled to rely upon same.
15. Whether and to what extent the loss should be covered.
Reasons for decision
16. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Case No: 275524 Determination Page 4 of 12
Reference. This is because of the potential amount of the claim and the
issues to be considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
17. I am satisfied that a full exchange of the relevant information has taken place
between the respective parties and that each party has had the opportunity
of addressing any issues raised.
18. The parties are in disagreement over several issues for this matter, although
I am of the view that principally it rests on whether the Applicant had a loss
to which the policy responds.
19. The loss relates to the leaking of water from a pipe into the home, which the
FSP says was blocked by tree roots (an excluded event under the policy). It
also claims that waterproofing inside and outside the home was inadequate.
20. The Applicant is represented by a solicitor, although for the purposes of this
Determination any reference to the Applicant will include representations
made on his behalf.
Scope of cover under the policy
21. Prior to considering the merits of the loss, the issue of whether the Applicant
was duly informed of the conditions and limitations of the FSP‟s policy must
be addressed. The Applicant suggests that the FSP is obliged to provide
suitable correspondence to inform him of any deviation with the Insurance
Regulations or a prescribed contract of insurance as defined in the
Insurance Contracts Act 1984 (the Act).
22. Such an obligation is typically discharged with provision of a PDS at the time
of inception or (if appropriate) renewal of a policy. The Applicant has not
submitted that this document was not provided and insofar as the PDS
serves to “clearly inform” him of the limitations of the policy, I am satisfied
that it may be relied upon for the claim.
23. There is no dispute that the policy responds to water leaks such as tha t
experienced by the Applicant and I am satisfied that it has a general
exclusion relating to loss or damage arising from tree roots. A more thorough
examination of the implications for this will be undertaken as necessary in
considering the claim.
Representations of cover
24. The FSP suggests that its settlement offer of $11,500 less excess was a
“good faith” proposal to the Applicant and not an admission of liability.
Payment was allegedly made on 4 January 2012. The FSP relies upon
exclusions cited in the policy to avoid responsibility for any further payment.
25. It is the FSP‟s position that the Applicant was (technically) not entitled to
cover under the policy and therefore should not receive any further payment
at all.
Case No: 275524 Determination Page 5 of 12
26. This assertion is rejected by the Applicant, who relies upon the email sent on
30 April 2011 from a representative of the FSP which relevantly provided:
“... builder has indicated no claim as tree roots have blocked sewer pipe,
however we will accept resultant damage as escape of water claim.”
27. Given the representation made by the FSP (which is not denied), I am
satisfied that the intent was to settle the Applicant for the loss directly related
to the release of water from the internal blockage. I am mindful that other
issues were cited with the property by its experts and am satisfied that the
FSP never had intention of providing cover for all of the identified damage. It
also formed the view that aspects of the home needed to be rectified before
the repairs could be attended to and this formed the basis of the FSP
offering a cash settlement.
28. In this respect, I am satisfied that the Applicant should be settled for the
damage directly related to the release of water from the internal pipe. This
amount and the extent of that damage remains open to scrutiny.
29. I am not satisfied that the FSP should be entitled to retrospectively
reconsider its position, whether it would have been entitled to deny the claim
outright or not. It is clear that the FSP communicated its intent to settle and
that this was not a decision made in error but made in full knowledge of its
position on the claim.
30. This issue also leaves aside the lack of direct evidence to implicate the tree
root as a potential cause of the loss, given that t he FSP‟s reliance on this is
based on a comment allegedly made by the Applicant‟s plumber who has
supplied no report for any work done or inspected as part of the claim. Whilst
the other experts retained appear to agree with the assessment, none of
them saw the home prior to the alleged issue being corrected.
31. In consideration of what is fair in all the circumstances, I am of the view that
the FSP should honour its position as expressed to the Applicant, to the
extent of covering the damage which may be attributable to the insured
event of the water leak.
Analysis of the loss
32. The FSP‟s assessor , PN, noted in his email of 10 May 2011 that the tenant
walked downstairs in the property on the date of the loss and discovered
warm water on the floating timber floor. A plumber was called and he:
“... discovered that pipes had become blocked due to tree roots and with both
large volumes of rain and tenants having showers pipe couldn‟t handle
volume thus causing resultant damage.”
33. No report was obtained by either party from the plumber. The FSP
subsequently arranged for two experts to visit the Applicant‟s property. The
first of these, TF, was a timber floor specialist and provided a report dated 18
May 2011. TF noted:
Case No: 275524 Determination Page 6 of 12
the home is situated on a flat block of land with no fall or gradient;
there was evidence of “serious inundation and subsequent swelling”
of the timber flooring;
a blocked internal drainage pipe encased inside one of the family
room‟s plaster columns was the source;
the family room, dining room and kitchen were all affected;
the sunroom suffered “minimal” impact from the event – the distortion
in the floorboards was attributed to the effects of the sun, rather than
the water incident;
high moisture readings were found in the floorboards for the family
room, indicating that moisture was still present;
TF was unable to locate evidence of a “vapour proof membrane”
attached to the slab – he suggested that the concrete floor of the
residence are “probably absorbing free water and remaining damp”;
a vapour proof membrane was located under the plywood used in the
installation of the timber flooring, although this had likely been
compromised by the use of anchors to affix the sub-base to the
concrete;
the existing slab is “potentially wet and absorbing moisture” and
further problems with dampness in the flooring “will remain possible”.
34. On 19 May 2011, a second expert (IT), provided its report into the possible
causes of the damage. IT had attended the property with TF and noted:
he was unable to ascertain if a vapour barrier was placed beneath the
concrete slab, although it was not visible along the side of the slab;
the site of the home was near level, with a 300mm step down to the
rear tennis court;
the home was about 30-35 years old;
the tenant had been in the property since 2009 and had observed no
distortion or other problems with the timber floor at that time;
the leak came from an internal blockage from an enclosed waste
stack, which was cleared by the plumber retained to investigate. No
further leakage has occurred since the plumber attended the site;
the blockage of the sewer involved tree roots from the property, which
was cleared by the plumber;
Case No: 275524 Determination Page 7 of 12
the floorboards displayed signs of “cupping” in the foyer/hallway,
combined kitchen/dining rooms, family room and sunroom. The
damage in the foyer/hallway and the sunroom was considered
unrelated to the subject incident as it was too far removed from the
source of the water entry;
the lifting of the floorboards has also affected the skirting in some
areas and the base areas around the breakfast bar floor;
surface drainage outside of the home was inadequate meaning that
water was likely to pool on the pavers in heavy rain;
the weep holes and the damp proof course in the external brick walls
of the home are too low and therefore vulnerable to surface water
inundation;
the internal flooring in the sunroom, family room and kitchen are
“vulnerable to swelling because of abnormal moisture within the
concrete slab arising from both construction de fects” relating to the
surface drainage and the weep holes;
leakage from the sewer stack is consistent with blockage of the
“earthernware sewer system” by tree roots – given where this system
is situated, “leakage is likely to recur”;
the floorboards in the family room, sunroom, combined kitchen/dining
room area are and will remain vulnerable to cupping as a result of the
construction defects with the house.
35. I note that the tenants informed IT that no problems were present with the
flooring at the time they moved into the property in August 2009. This implies
that the problems with the flooring not related to the pipe discharge may
have been a recent development. Such a prospect was not addressed by the
various experts.
36. Based on the reports received and after consideration of the matter, the FSP
agreed to indemnify the Applicant. It ultimately made an offer to pay $11,500
less the policy excess.
37. The Applicant sought clarification of the offer as to what it actually covered.
As he was dissatisfied with the lack of explanation from the FSP, he retained
a consulting engineer expert, AE, to investigate the cause of the loss and to
consider the expert opinion provided by the FSP‟s experts.
38. AE provided a report dated 4 July 2011. This report noted:
the source of the moisture affecting the flooring timbers was the sewer
stack. A line of boards into the family room, the kitchen and the dining
room were water affected;
Case No: 275524 Determination Page 8 of 12
AE agreed basically with the conclusions reached by IT and TF. AE
disagreed only on the idea that any remedial work should be limited to
certain floorboards. He considered that the entire flooring in the
kitchen and the dining area should be replaced, and possibly the
hallway as well;
the replacement area of boarding was estimated at 50m 2 , as against
the estimate from IT of 28m 2 ;
AE agreed that the sunroom boards were not affected by the water
leak. He further considered that the family room and the sunroom
showed “no obvious evidence” of being adversely affected by an
external water source. He c onceded that the “control of [the] external
moisture remains important” but that the FSP‟s experts had not
supplied evidence of this “adversely affecting the floor boards” .
39. AE‟s conclusions invite consideration that the water damage observed at the
premises was solely related to the leakage event and not to any issue of
drainage or waterproofing as suggested by the FSP.
40. Based on the recommendation of AE, the Applicant obtained several quotes
regarding the cost of rectification to the home. These included AC
($19,584.40 – though this appears to be based on the same limited scope of
works suggested by the FSP), HY ($27,086) and SG ($32,730.50). As all
were well in excess of the settlement offer from the FSP, the Applicant
queried how the FSP reached this amount.
41. The FSP provided no proper explanation for its calculation of the loss. Its
breakdown of the cost of the work provided in its submission to the Service
suggests that the cost of repairs (noting a limit of 28m 2 on the flooring) was
$10,665. No detailed analysis of the damage attributable to the house
drainage problem or any possible contribution from the allegedly absent
vapour proof membrane was obtained. No details of who prepared this quote
or whether the relevant person was prepared to do the work were provided
either.
42. The lack of detail on these issues causes me serious concern. The Internal
Dispute Resolution (IDR) letter confirmed that the offer was “correct” but
provided no explanation of how the offer was calculated or what it was
specifically based upon.
43. The lack of detail for the estimation of this offer cannot simply be explained
by the reduced amount of the flooring included in the estimate. If so, the FSP
could have articulated this more clearly. Better yet, it could (and should)
have provided the actual quote (if it existed).
44. As it stands, the FSP‟s quote is still only about half of that from AC, which
appears to have related to the same general scope of works – not including
the additional flooring that the Applicant seeks cover for.
Case No: 275524 Determination Page 9 of 12
45. On this basis, I am satisfied that the offer made by the FSP was not
satisfactory.
46. With respect to the damage, it is clear that the FSP formed a view that some
of it was caused by the drainage/membrane problems at the property. This
restricted the offer to cover an area of 28m 2 and not 50m 2 as required to
attend to all the flooring. The Applicant‟s expert, AE, pointed out that no clear
evidence of any water ingress (outside of that caused by the insured event)
was actually supplied.
47. Noting that the tenant had occupied the home since 2009 and reported no
problems since the insured event, I consider it likely that any water related
problems prior to the event were likely minimal if they were an issue at all.
The home was described as between 30-35 years old.
48. Given the age of the property and the reported problems with it, I would
expect that any pre-existing damage should be evident and distinguishable
from the water leak. The evidence before me does not lead me to this
conclusion.
49. AE disagreed with IT‟s suggestion th at the water damage to hallway was too
far from the source of the leak and considered that the damage in this area
might have been incident related as “other areas at a similar distance have
been affected”.
50. It is perhaps not unfair to suggest that none of the experts can be definitive
on this issue and all agree that some issues exist with drainage and possibly
the membrane under the flooring. On this basis, I am of the view that a new
scope of works should be prepared to cover the entire repair of the area ,
with the Applicant to contribute 50% for the cost of the flooring outside of the
28m 2 covered and up to the 50m 2 required for replacement. In effect, this
means that the Applicant will need to bear the cost for 50% of 22m 2 of
flooring. The FSP should bear the balance (as it has previously agreed to
do).
51. This proposal reflects the likelihood that some issues with age, lack of
waterproofing and possibly drainage problems might have had an impact or
exacerbated the level of damage observed. I cannot overlook this as the
issues are acknowledged by all of the experts, although I do not accept that
such damage was likely to have been extensive.
Rental loss
52. The Applicant submitted a claim for rental loss which the FSP has only
addressed in a perfunctory way. This presumably is based on the notion that
the policy was not required to respond to the physical loss and therefore that
no loss would be claimable.
53. I accept that the policy responds to the Applicant‟s loss and therefore that it
follows that a rental loss claim should be covered under the policy.
Case No: 275524 Determination Page 10 of 12
54. The Applicant has provided a letter from the property agent to confirm that
the rent had been reduced by $200 per week since 1 June 2011. This was to
accommodate the tenant due to the condition of the property as a result of
the loss. As of 3 October 2012, the accumulated lost rent had been
$14,773.85.
55. I accept that the policy provides cover for the rent lost “during the reasonable
time it should take to repair or rebuild” the property. As the policy limits
payments to 12 months, any payment cannot exceed this period.
56. Should the relevant loss be limited to 12 months (52 weeks), the maximum
claimable amount would be limited to $10,400 based on the reduced rent
amount.
57. There is also a question of whether it was reasonable for the Applicant to
wait this long, given that a repair of the floorboards was an obvious priority
with a tenant remaining in the premises. No explanation has been supplied
for the failure to attend to the work, although it may be that he could not
afford it. The FSP queried whether the Applicant took any reasonable steps
to mitigate the loss.
58. The Applicant states that the FSP took 15 weeks to consider the damage
and make an offer for settlement. He submits that it would have taken that
long again to arrange someone to attend to the work and at least three
weeks for the work to be done. On this basis, he submits that 30 weeks of
reduced rent ($200 per week for $6,000 total) and three weeks of no rent
($1,325 per week for $3,975 total) should be paid.
59. No challenge was entered by the FSP to this calculation. I consider that it is
reasonable for the Applicant to seek 15 weeks in relation to waiting for the
offer for settlement, and it may take five weeks to arrange for the work to be
carried out. The three weeks to complete the job may be accurate but may
also be dependent on who does the work.
60. Ultimately, I am satisfied that there have been delays in this matter due to
the extensive amount of analysis and expert opinion obtained. I do not hold
the FSP solely responsible for this but I concede that the Applicant has
suffered through receiving a lesser income on the property through the
relevant period.
61. I am therefore satisfied that the FSP should pay the 20 weeks, together with
3 weeks to repair the home (if the tenant is required to vacate, or to the
extent that any reduced/lost rent is incurred). I accept that the matter has
been severely delayed and that the FSP must accept responsibility for
payment of the majority of the loss from the water leakage. Accordingly, it
should indemnify the Applicant for the subsequent loss of rent incurred.
Additional costs
62. The Applicant sought additional costs including the fees for AE ($2,244) and
the solicitor acting on his behalf ($4,265).
Case No: 275524 Determination Page 11 of 12
63. I accept that in the absence of a suitable explanation for the calculation of
the loss that it was reasonable for the Applicant to retain an expert to
properly consider the cause and to evaluate a potential scope of works.
64. The report provided by AE established some doubt over the conclusio ns
reached by the FSP‟s experts and these were sufficient to influence (at least
partly) my consideration of the claim. As such, I am satisfied that the amount
of the AE invoice should be paid, subject to provision of same to the FSP.
65. The Service has provision in its Terms of Reference to provide cover for
legal/representative costs in certain circumstances:
“ 9.4 Applicant’s costs in pursuing the matter
FOS may decide that the Financial Services Provider contribute to the legal or
other professional costs or travel costs incurred by the Applicant in the course
of the Dispute. Unless exceptional circumstances apply, FOS will not require
the Financial Services Provider to contribute more than $3,000 to these costs.
66. Any costs allowed in the Applicant‟s favour are subject to this limitation. I
note that no account has been rendered as yet and that the solicitor has
informed the Applicant that he will amend his costs as appropriate to what is
awarded.
67. The Service does not typically award costs simply because an Applicant has
retained a solicitor or agent to act on his or her behalf. Further to this, the
Terms of Reference address that such a consideration will be to a
contribution towards the costs, rather than an outright payment.
68. In this matter, I accept that as the Applicant was overseas and settlement for
his claim was limited without any appropriate explanation, the retention of
someone to look after his affairs was reasonable. I am of the view that some
compensation is appropriate but not to the level claimed.
69. In accordance with what is fair in all the circumstances, I am satisfied that
the FSP should pay up to the sum of $1,250 to the Applicant for the
solicitor ‟s costs , on the basis that an account is specifically rendered to the
Applicant for an equivalent amount or more.
Payment
70. The Applicant has informed the Service that the payment has not been
received as yet. The FSP suggested that payment was made on or about 4
January 2012.
71. Assuming that this payment has not been presented and/or directed to a
wrong person or address, the FSP should cancel the cheque and reissue a
further payment for the relevant settlement amount as directed by the
Applicant or his solicitor.
Case No: 275524 Determination Page 12 of 12
Determination
72. On the basis of the available information, I determine that the FSP should
indemnify the Applicant for:
the damage initially quoted (inclusive of the 28m 2 of flooring) plus half
of the additional damage up to the 50m 2 of flooring quoted by the
Applicant‟s experts;
20 weeks of lost rent (totalling $4,000) plus an additional amount for the
date of re-inspection and quoting and the estimated time of repairs as
determined in a fresh inspection of the property;
$2,244 for the costs of the inspection and expert fees incurred by the
Applicant to assess the damage;
legal fees up to but not exceeding $1,250 subject to provision of an
invoice for at least this amount from the Applicant‟s solicitor. Should the
invoice be for a lesser amount, the FSP is entitled to reduce the
payment as appropriate.
73. The FSP should arrange for a new quote to be compiled at the property,
inclusive of the damage to not be covered, to properly break up the
contribution required by the Applicant to the loss. It will then be at liberty to
either cash settle or attend to the repairs (if the Applicant agrees to
contribute) at its option.
74. The FSP must investigate whether the previously provided payment has
been banked and cancel the cheque if it has not. If the payment has been
banked and cannot be accounted for, I expect that the parties will work
together cooperatively to identify what occurred with the payment and to
ensure that this issue is properly and fairly resolved.
75. Insofar as any further payment is to be made on the claim, the FSP must
include interest calculated at the statutory rate from 5 May 2011 until the
date of settlement.