Determination 275478

Claim amount

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-26
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$23,849
Non-financial loss—
Amount claimed$115,731
SourceAFCA PDF

Summary

Following Cyclone Yasi, the farm owners disputed the insurer's $23,849.23 cash settlement for building B and sought a total loss settlement. AFCA found the offer reflected only damage caused by Cyclone Yasi, not pre-existing defects, and confirmed the settlement as appropriate.

Pre-existing structural defects and poor prior repairs after Cyclone Larry were not caused by Cyclone Yasi, so the insurer need only pay for the Yasi-attributable damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 275478 Determination Page 1 of 7 Case number: 275478 General Insurance - Domestic Insurance - Home Building – FSP’s Decision – Claim amount 25 October 2012 Background 1. The Applicants, husband and wife, are insured with the Financial Services Provider (FSP) under a combined farm insurance policy. The policy covered three dwellings at three separate addresses, specified farm property and two motor vehicles. The dwellings were covered for accidental damage. The relevant period of insurance is 29 April 2010 to 29 April 2011. 2. A claim was lodged under the policy as a result of damage caused to insured property by Cyclone Yasi which occurred on 2-3 February 2011. 3. The FSP appointed a loss adjuster to inspect the damage. The FSP accepted the claim. However a dispute arose in regard to two dwellings. For the purpose of this determination they will be referred as „A‟ and „B‟. 4. The Applicants sought cash settlement of repairs for property „A‟. The FSP advised it would not cash settle for the quoted amount of repairs of $121,245.3 9 but would authorise its repair by the Applicants‟ preferred builder. 5. In regard to property „B‟ the Applicants did not agree with the FSP‟s offer of cash settlement of $23,849.23 as the cost to repair it had been quoted for the amount of $123,145.32. However, the FSP advised that this quote incorporated repair of pre-existing damage not related to Cyclone Yasi but to Cyclone Larry. 6. The FSP advised that it paid the Applicants $81,739.21 for damage caused to „B‟ to undertake repairs as a result of damaged caused to it by Cyclone Larry. Accordingly it says it was not obliged to pay for repairs it had already paid for and had not been attended to. 7. The Applicants also raised issues with settlement amounts for damaged irrigation equipment as well as for three s heds on the property which were identified by the loss adjuster as:  A packing shed – sum insured $100,000  A machinery shed – sum insured $100,000  A workshop – sum insured $70,000 Determination Case No: 275478 Determination Page 2 of 7 8. The FSP advised it would settle any invoices provided by the Applicants for irrigation equipment up to the sum insured of $20,000. 9. The FSP settled the packing shed and workshop as total losses and paid the Applicants for this. A quote to repair the machinery shed was obtained for $78,702.05 which the FSP was prepared to authorise the repair of. 10. The Applicants advised the machinery shed should have been insured for $70,000 and the workshop shed for $70,000. Summary of Applicants ’ position 11. In a letter to the Service dated 14 May 2012 the Applicants advised in respect of: Property ‘A’ 12. Although they hoped for a cash settlement they have agreed to allow repairs to commence. Accordingly there is no longer a dispute about „A‟. Irrigation equipment 13. The Applicants advised they have provided the FSP with further invoices and are awaiting payment. Sheds 14. The Applicants say the FSP has accepted their proposition for the sum insured for the machinery shed and workshop accordingly both have been deemed total losses. As they have now received payment for the sheds there is no longer a dispute. Prope rty ‘B’ 15. The Applicants say this is the only issue that is still in dispute. They say the FSP has not been consistent with its settlement of the various insured property. This is so particularly with the way the FSP managed the claim following Cyclone Larry to what it is advising now. 16. They reject the FSP‟s offer of cash settlement for $23,849.23 and seek settlement of the building as a total loss as the cost to repair it exceeds the sum insured. 17. The Applicants say the damage to property „B‟ is consistent wit h Cyclone Yasi damage to the other properties. They do not accept that repairs following Cyclone Larry in 2006 impacted on the damage caused by Cyclone Yasi. 18. The Applicants say they have now been advised the building must be repaired in accordance with th e engineer‟s report and council specifications. Case No: 275478 Determination Page 3 of 7 19. The Applicants say they do not have the means to undertake all of the repairs that are now required. 20. The Applicants say they spent $81,739.21 plus more in the repair of the building following Cyclone Larry. They say the FSP did not provide them with an engineer‟s report or instructions to repair the property following Cyclone Larry. 21. The Applicants say the FSP did not tell them that an authorised builder needed to undertake repairs following Cyclone Larry. Sum mary of FSP’s position 22. The FSP says it is not satisfied that the total loss settlement paid to the Applicants following Cyclone Larry was utilised properly to repair the property. 23. The FSP accepts some repairs were undertaken but the repairs were not in accordance with the claimed repair cost nor were external repairs done to a standard of work required under the building code at that time. 24. The FSP says that by failing to repair the property to an appropriate standard of repair and to undertake the quoted repairs required the Applicants assumed the risk of further damage occurring. 25. The FSP says an engineer‟s report was commissioned on which it relies upon. It says the property was riddled with pre-existing structural issues, unsatisfactory installations and general non-compliance with the Building Code prior to Cyclone Yasi. 26. The FSP says the policy does not cover loss or damage that occurs as a result of structural defect, faulty design or faulty workmanship. 27. The FSP says the failure to carry out adequate repairs to the building after Cyclone Larry constitutes structural defects and faulty workmanship. 28. The FSP says that when the Applicants‟ loss has two or more effective causes, one of which is excluded from cover under the policy, it is not required to cover the loss. This is known as the Wayne Tank principle. It therefore submits that the proximate cause of the damage was pre-existing structural defects, faulty design or faulty workmanship; causes which are excluded by the policy. 29. The FSP agrees that the policy responds to accept Cyclone Yasi damage. It is satisfied the offer of $23,849.23 is a true reflection of damage attributable to Cyclone Yasi. 30. The FSP relies on the following policy provisions: “ Methods of settlement Building Case No: 275478 Determination Page 4 of 7 Reinstatement or replacement value We will pay the reasonable cost to rebuild or repair any damage part of your Building to the same condition as when it was new. ... We will not pay more than the Sum Insured shown in the Schedule (plus any applicable GST), unless we have stated otherwise elsewhere in Section A – Home Cover. ... Defined Events Cover We will pay for loss or damage at the Address caused by the following defined events: ... 8. Storm or rainwater, but we will not pay for loss of or damage: ... d. that occurs as a result of a structural defect, faulty design or workmanship. Issue 31. Whether the FSP‟s offer of settlement of $23,849.23 fulfils its obligations under the policy for repairs to property „B‟. Reasons for decision 32. Due to the nature of the dispute, this matter has been referred to the Panel for a Determination in line with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 33. The Panel consists of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 34. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 35. The Panel does not intend to recite details of the information in this Determination except where considered relevant. 36. The Applicants ‟ policy provides accidental loss cover to the building. The term “accident” has been judicially defined as meaning “an unforeseen event or mishap”. However , the policy does not cover all accidental loss to the building, as the cover is subject to the exclusions included in the policy. Case No: 275478 Determination Page 5 of 7 37. The Panel notes the FSP‟s reference to exclusions in the Applicants‟ policy in its letter dated 5 June 2012. The policy refers to defined events cover and its limitations. Whereas the applicable exclusions in the policy are: “What you are not insured for Under Section A – Home cover, we will not pay for: 1. ... 2. Loss of or damage to your property caused by ... e. faulty materials, faulty workmanship, wrong or incorrect design, plan or specification or failure of design; 38. When the Applicants referred their dispute to the Service it entailed several issues regarding various insured property. In a letter dated 12 May 2012 it advised that many of the issues had been resolved and that the only outstanding issue to be considered by the Service was concerned property „B‟. 39. The Applicants are seeking settlement of property „B‟ in accordance with the policy terms. The building is insured for the sum of $115,731. A quote to repair the building is in the amount of $123,145.32 and accordingly they seek settlement as a total loss. The Applicants say they do not have the means to repair all the damage. 40. The FSP has offered cash settlement of $23,849.23 which it says covers repairs attributable to Cyclone Yasi. It relies on an engineer‟s report that the majority of the damage appeared to be pre-existing and that had the building repaired properly following Cyclone Larry then the extent of damage may not have been as great as a result of Cyclone Yasi. 41. The Panel notes that the building sustained damage as a result of Cyclone Larry which occurred in 2006 which was insured with the FSP at that time. Following Cyclone Larry the FSP settled the claim as a total loss as the cost of repairs exceeded the sum insured of $81,739.21. 42. The Panel accepts that once the FSP has paid the sum insured it does not have any involvement with the repair of the property and any repairs are the Applicants responsibility. 43. Property „B‟ remained insured under the policy. The Panel notes the policy at that time did not contain any cancellation clause when a claim was settled on the sum insured. 44. The Applicants indicate they were not provide d with a copy of the FSP‟s engineer‟s report following Cyclone Larry as to what reinstatements works were required. The FSP has stated it was under no obligations to provide the report to the Applicants. Whilst the Panel accepts the FSP was not under any obligation to provide the report it would have been more helpful had it done so. Case No: 275478 Determination Page 6 of 7 45. In any case the Applicants were responsible for the repair of the building and arranged for its repair. They indicated the expenditure was in excess of the sum insured paid to them by the FSP. 46. Nonetheless, the crux of this dispute is the FSP‟s settlement of repairs attributed to damage caused by Cyclone Yasi. The FSP says it relies on the engineer‟s report. 47. The Panel notes the Applicants‟ builder initially quoted the amount of $23,849 for the following works:  Remove and replace damaged roof sheting (sic), fsacia (sic) and gutter as per scope of works.  Painting as per scope of works  Vinyl floor as per scope of works  Garden shed  BSA Insurance. 48. The Panel does not have the benefit of knowing the scope of works referred to in this quote. 49. However the Applicants‟ builder submitted a quote dated 20 September 2011 for the total amount of $123,145.32 based on the FSP‟s engineer‟s report. 50. The Panel notes the FSP‟s reliance on the engineer‟ s report. The FSP says the building was riddled with pre-existing structural issues, unsatisfactory installation and general non-compliance with the Australian Building Code. 51. The FSP also referred to the Wayne Tank principle and its application to the circumstances of this matter. The FSP says the policy will not provide for loss or damage that occurs as a result of structural defect, faulty design or faulty workmanship arising from storm or rainwater. As the loss has been caused by an excluded event the policy does not respond. 52. The relevant policy exclusion applicable in this matter states that the policy does not cover loss of or damage to your property caused by..... faulty materials, faulty workmanship, wrong or incorrect design, plan or specification or failure of design; 53. Therefore if the FSP wishes to rely upon an exclusion it needs to show that the damage was caused by the excluded event. 54. The Panel has considered the engineer‟s report which represents the engineer‟s findings of the structural damage in spection on the rural dwellings and adjacent shed structures at the relevant addresses. 55. The Panel notes that the engineer reported that the houses and shed structures sustained a varying degree of structural and aesthetic damage Case No: 275478 Determination Page 7 of 7 due to destructive winds and rain associated with Tropical Cyclone Yasi on 2 and 3 February 2011. 56. The Panel has examined the engineer‟s report and identifies cyclone related damage as follows: “ Tree fall impact to the south western corner of the dwelling where the "roof supporting structure and immediate cladding had been compromised. Gutter failure also may have been caused by the cyclone”. 57. The Panel considers that the cyclone did not cause the inadequate fixing of the cladding or the non-compliant fitting of the ridge and flashi ng. It notes that the pitched rafters were observed to be in sound structural condition except for localised area of tree impact . Determination 58. On the basis of the available information the Panel determines that the settlement proposed by the FSP is appropriate.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.