Text of the determination
Case No: 275358 Determination Page 1 of 11
Case number: 275358
General Insurance - Small Business/Farm Insurance - Home Building - FSP
Decision - Claim Amount - Settlement Offer - Rectification Repairs
11 October 2013
Background
1. The Applicants hold a farm insurance policy with the Financial Services
Provider (FSP) covering their home building and farm property. The policy
was current at the time of the loss.
2. On 10 January 2011, the property was damaged by a fire and the Applicants
subsequently lodged a claim with the FSP. The FSP accepted the claim and
authorised builders „C‟ , to undertake the necessary repairs.
3. The Applicants are unhappy with the quality of repairs undertaken by C and
has since refused them access to the property to undertake the rectification
to the repairs. A number of items remain outstanding, some of which they
have paid themselves to remedy and others which they are seeking a cash
settlement, in lieu of repairs from the FSP.
4. The Applicants are seeking a review of the FSP‟s decision , to decline a cash
settlement of the outstanding items.
Summary of Applicants ’ position
5. The Applicants say C conducted poor quality repairs on their home, which
had to be rectified on many occasions. After a serious safety incident at the
premises, they declined to have C back on the property to complete any
further repairs.
6. The Applicants engaged their own plumber „W‟ , to undertake the remainder
of the works required, as well as rectify the poor quality works undertaken by
C. They are seeking the FSP reimburse the amount of $4,608.01 they have
paid to W. The FSP has only offered to cover 50% of this, which the
Applicants do not accept.
7. The Applicants say the FSP has agreed to cover the costs to replace the
roof, due to the poor quality works undertaken by C. However, the FSP is
insistent on authorising a contractor of their choice to complete the work.
The Applicants seek a cash settlement in lieu of repairs so that they are able
to engage a contractor of their choice. The Applicants are willing to pay any
Determination
Case No: 275358 Determination Page 2 of 11
extra amounts payable in engaging their own repairer, but would prefer to
deal with someone they trust, after the poor experience with C.
8. The Applicants say there are other items outstanding which the FSP has not
yet settled. These are the balustrade and stirrups for the balcony, as well as
loose timber building materials for the balcony. The Applicants seek
settlement of these items under the policy.
9. The Applicants say the FSP has not managed their claim in a timely manner
and did not proactively respond to concerns raised a bout C‟s conduct. The
Applicants say before the fire they were in the process of renovating the
property and it is now in a worse condition due to C‟s substandard works.
10. The Applicants are disappointed the FSP also declined to renew their policy
after this claim was submitted, although they are not seeking a review of this
decision.
Summary of FSP’s position
11. The FSP says it has agreed the works from C require rectification and has
sourced a new quote from „P‟ to replace the roof. However , it is not willing to
cash settle the claim and will undertake repairs. The FSP has offered to get
a quote from another contractor and allow the Applicants to choose which
one they prefer. However, the Applicants have refused to allow any other
contractors on site to quote and therefore the FSP has been unable to
resolve this aspect of the dispute.
12. The FSP says upon being made aware of the substandard works from C, it
arranged an independent building consultant „JB‟ , to inspect the Applicants
home. However, when JB attended, most of the items the Applicants raised
concerns over had already been rectified by W. Accordingly, the FSP says it
has been prejudiced by the Applicants‟ actions of arranging their own
repairs, before the FSP had the opportunity to inspect.
13. Further, the FSP believes it would have been able to source more
competitive quotes than W‟s. On this basis, it is prepared to reimburse the
Applicants 50% of W‟s invoiced repair costs.
14. The FSP says the quote the Applicants have provided for the balustrade
replacement is excessive, being nearly twice the amount quoted by C. The
FSP says it intends to obtain a second quotation for the balustrade before it
will be in a position to finalise its settlement for this item. However, the
Applicants have again refused to allow access for an alternative quotation to
be supplied and therefore this aspect of the dispute has been unable to be
resolved.
15. The FSP says the Applicants are claiming for stored timber building
materials which were damaged in the fire. The FSP believes the amount
being claimed by the Applicants is excessive and made enquiries with the
Case No: 275358 Determination Page 3 of 11
previous owner to ascertain the timber quantity and lengths etc. The
previous owner was unable to assist due to the time lapse.
16. The FSP says the stirrups were replaced by the Applicants without its
authorisation. It believes the amount being sought is excessive and there
was no justification for the Applicants to replace those without its authority,
especially since these were included on C‟s scope of works (SOW). The
FSP is not prepared to consider this aspect of the claim until the Applicants
provide further details.
17. The FSP relies on the following policy provisions, which the Applicants do
not dispute receiving :
“ What you are insured for
We will pay for loss or damage caused by the Occurrences listed under
Defined Events Cover or Accidental Damage Cover to your Building or
Contents depending on the cover type you have selected. The Schedule
shows if you have insured your Building(s) and/or Contents and the cover
type selected by you.
Defined Events Cover
We will pay for loss or damage at the Address caused by the following
Defined Events:
4. Fire, lightning or explosion.
...
Methods of settlement
Building
Indemnity value
We will at our option either:
1. Pay you the Indemnity Value of the damaged part of the Building;
or
2. Repair or replace the damage part of the Building.
...
General policy conditions
Claims – What you must do after a loss, damage or an accident
...
Where possible preserve and retain any damaged property that may assist us
with investigating or defending your claim and make it available for inspection.
...
Provide us with all information, proof and assistance reasonably required and
co-operate fully in the investigation, negotiation, defence or settlement of any
claim. This may include providing us with a Statutory Declaration verifying the
truth of your claim and any matters connected to it.
What you must not do after a loss, damage or an accident
...
Case No: 275358 Determination Page 4 of 11
For all other types of losses, you must not incur any costs or expenses or
authorise repairs, including legal costs, without our agreement, and we will not
pay for such costs, expenses or repairs unless you can show that they were
necessary and unavoidable in the prevailing circumstances. ”
Issues
18. Whether the FSP has fulfilled its obligations pursuant to the terms of the
policy.
19. Whether the Applicants are entitled to compensation for the manner in which
the FSP handled their claim.
Reasons for decision
20. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is due to the circumstances of the dispute. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
21. I am satisfied a full exchange of information has taken place between each
party and each party has had the opportunity to address any issues raised.
22. I consider the FOS Terms of Reference relevant to this dispute are:
“ 8.2 Dispute resolution criteria
Subject to paragraph 8.1, when deciding a Dispute and whether a remedy
should be provided in accordance with paragraph 9, FOS will do what in its
opinion is fair in all the circumstances, having regard to each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme (although
FOS will not be bound by these).
...
9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for
consequential financial loss or damage up to a maximum amount of
$3,000 per claim made in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for non-
financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with the
Case No: 275358 Determination Page 5 of 11
Applicant‟s expectation of enjoyment or peace of mind has
occurred; or
(ii) in the case of a Dispute pertaining to an individual‟s privacy
rights - injury has occurred to the Applicant‟s feelings or
humiliation has been suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide
compensation for:
(i) consequential financial loss; or
(ii) non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance
Policy that expressly excludes such liability.
d) The cap on liability in paragraph 9.3 a) does not in any way restrict
FOS‟s ability to make an interest award under paragraph 9.5.”
23. It is not disputed between the parties the Applicants suffered a loss from a
risk insured against or that the FSP accepted the Applicants‟ claim and
arranged for the home to be repaired. However, a dispute has now arisen
between the parties regarding the method and amount of settlement of the
outstanding claimed items. I note that this matter has been on foot with this
Service for some time and during that course, several aspects of the
concerns initially raised have since been resolved. Accordingly, I will limit my
review to the issues remaining in dispute and I propose to deal with each
item separately below.
Roof Replacement
24. It is not disputed between the parties the works undertaken by C to the roof
were not up to standard and the roof now requires replacement. It is further
not disputed between the parties that C is not required to undertake those
works on behalf of the FSP.
25. The Applicants are seeking a cash settlement in relation to the replacement
roof, whereas the FSP says it wishes to authorise repairs to another
contractor. It has sought one quotation from P although due to the amount
involved, wishes to seek a second one , however, the Applicants have
refused to allow access to the property for anyone else to provide the
second quote. The FSP says it is prepared to give the Applicants the choice
as to which contractor undertakes the work once it has obtained the second
quote.
26. Having considered the terms of the policy, I accept the policy clearly states it
is at the FSP‟s option to either authorise repairs or provide a cash settlement
in lieu of undertaking the work, which I accept would encompass any
rectification required. Accordingly, the FSP is acting in accordance with the
terms of the policy in authorising the replacement roof works to be
undertaken by an alternative contractor. I consider the FSP‟s offer to allow
the Applicants the ultimate authority to choose the contractor who
Case No: 275358 Determination Page 6 of 11
undertakes the works, to be reasonable in the circumstances. I further note
that by accepting a cash settlement for the replacement roof, the Applicants
will effectively forfeit their entitlement to any guarantee on those repairs from
the FSP, a factor which the Applicants may not be aware of.
27. However, I am mindful of the protracted nature of this claim. It is clear that
the relationship between the parties has deteriorated throughout the life of
the claim and neither party is prepared to review or change their respective
positions which in my view, has not assisted in resolving the dispute. FOS
would encourage the parties to work together to resolve any issues which
have arisen over the lifespan of the claim.
28. Accordingly, in the interests of resolving this long standing matter and after
considering what is fair in all the circumstances, I consider it is appropriate to
determine the FSP is to arrange to cash settle the Applicants in lieu of
completing the roof replacement, based on the quotation supplied by P. I
note P‟s quotation was only valid until 8 February 2013, so an updated quote
from P must be sourced to enable a current price to be determined.
29. As the quote from P is to be updated to accurately reflect today‟s cost to
replace the roof, it is not appropriate in the circumstances to consider an
award of interest. The FSP is to arrange settlement within 14 days of the
date of acceptance of this Determination.
Invoices and work undertaken by W
30. The Applicants arranged for their own plumber W, to undertake rectification
to a number of the repairs originally undertaken by C. In doing so, the
Applicants incurred costs of $4,608.01 and are seeking reimbursement of
that amount.
31. The FSP says the Applicants have prejudiced it by authorising their own
rectification repairs without the FSP‟s authority. The FSP is now unable to
determine if those repairs were required as a result of the quality of C‟s work
and if it were to be accepted those repairs were required. The FSP also
asserts that it may have been able to source a more competitive quote than
that charged by W. On this basis, the FSP has offered to reimburse 50% of
W‟s invoice amount.
32. I note the policy clearly states an insured must not authorise repairs without
the FSP‟s authority unless it can be demonstrated the repairs were
unavoidable in the prevailing circumstances. Accordingly, it is incumbent on
the Applicants to demonstrate it was unavoidable that W undertake the
works completed. The FSP says it has contacted W to discuss the repairs,
but has not had any response.
33. Upon review of the file, it is clear that the Applicants raised concerns
regarding the quality of C‟s work , with the FSP‟s assessor „CL‟ as early as 25
August 2011, although I am unable to determine from the material supplied,
exactly what those concerns were, or what action was taken by CL or the
FSP in response. CL‟s report of the same date merely comments “ ...there
Case No: 275358 Determination Page 7 of 11
are nevertheless issues with rust spots noted on the roof and materials. We
are seeking to have the contractors clarify or resolve these matters”. CL‟s
later reports of 27 September 2011 and 18 October 2011, do not specifically
outline the concerns and refer to them as “...minor issues raised which are
being addressed with the majority of work already undertaken”.
34. It is clear the Applicants provided a „punch list‟ to the FS P, at some point,
which outlined their concerns with C‟s work. However, I am unable to
ascertain from the material supplied, when this was first supplied to the FSP.
35. Certainly, the evidence on file confirms the Applicants made C aware of their
concerns in regard to the quality of work undertaken and provided C with
their „punch list‟ on or around 15 February 2012, however , what is not clear
is if the Applicants raised their concerns directly with the FSP. The
Applicants‟ email to C of 15 February 2012 , states, in part:
“Thanks for the speedy response to the attached issues. [C] has had their
chance to repair my place on several occasions and haven‟t completed many
of the attached list.
...
The first lot of guys took several months any many different men with a huge
mess left behind (see attached). They were kicked off my property once, then
you told me I had to have them back to rectify the issues that are attached.
They came again did very little to what is on the punch list. Feel through the
roof, every gutter join still leaks. I still have burnt battens... the list goes on. My
confidence in [C]‟s ability to manage and direct their chosen employees is nil.
Thanks but no thanks with the roof guy. I don‟t want any more of your guys
looking at anything at my place.
I have had [W] come to complete the attached list. He will be sending me the
bill in which I will forward to [C] to pay. As for the roof, I will be getting 3 or
more tradesman to come and give me their professional opinion of the issue
of rusty roof. ” (sic)
36. The above email sets out that the Applicants had already had W complete
the works before they informed C they would not allow them a chance to
rectify and/or finish the outstanding items. Further, it would seem clear the
Applicants had previously been advised by C they would need to allow
access to tradesmen in order to address any concerns they had. C provided
the above email to CL, who in turn passed it to the FSP. CL also wrote to the
Applicants to advise them they must provide access to C‟s cont ractors to
address the concerns raised.
37. The Applicants also lodged a dispute with this Service which prompted the
FSP to initiate an internal dispute resolution review (IDR) of the Applicants‟
concerns. As a result of the IDR review, the FSP arranged for JB to inspect
the concerns raised by the Applicants, however, the majority of these works
had already been completed by W.
38. I have undertaken a review of the Applicants‟ punch list. The list is extensive ,
comprising of 28 items and raises concerns regarding general clean ups of
the site, repairs to the gutters, repairs to the roof, flue, roof of shed and
Case No: 275358 Determination Page 8 of 11
carport and barge boards for the house and sheds. Whilst I accept these
items required rectification, I am not persuaded these items were so urgent
as to be unavoidable for the Applicants to authorise their own repairs and
furthermore to do so without bringing their concerns to the FSP‟s attention.
39. The policy terms are clear in that an insured is not to authorise their own
works unless such action is necessary and unavoidable, in the
circumstances. In my view, this would encompass situations such as
emergency securing of a premises immediately after an event or to prevent
further damage occurring such as in the case of a water leak. I do not
consider the sc enario before me constitutes „necessary and unavoidable‟ for
the purposes of the policy. Certainly no evidence has been presented by the
Applicants to suggest why these repairs were so urgent and the FSP‟s
attempts to confirm with W, were unsuccessful.
40. In my view, the FSP has been prejudiced by the Applicants‟ actions of
authorising their own repairs. The FSP was not given an opportunity to
inspect the quality of work in order to definitively determine whether remedial
works were required and if it were accepted rectification was required, to
source alternative costing for such works to be undertaken.
41. Accordingly, after careful consideration, I accept the FSP‟s offer to reimburse
the Applicants the sum of $2,357.24, representing the total cost of
rectification to a number of repairs originally undertaken by C, as reasonable
in the circumstances.
Settlement for balustrade
42. C originally quoted to replace the balustrade at a cost of $3,549.71. These
works were not undertaken by C, although it is unclear why. The Applicants
have provided their own quotation from “S” for the manufacture of the
balustrade at a cost of $7,698.64 and it is this amount the Applicants are
seeking in settlement of their claim.
43. However, I note that P also included a component for the balustrade in their
quotation, which was quoted at an amount of $5,236.
44. After considering what is reasonable in all the circumstances, it is my view,
that the amount quoted by P represents a fair middle ground settlement in
respect of the balustrade. It is not clear if these costs include installation,
however, if not, then the FSP is to include an allowance for fitting.
Accordingly, the FSP is to obtain an updated cost from P for the balustrade
at today‟s prices and arrange settlement t o the Applicants for this amount,
within 14 days of the date of acceptance of this Determination.
Settlement for timber
45. The Applicants are seeking settlement of loose timber items which were
stored at the premises in preparation of building a decking area. It would
appear these items were purchased by the previous owner of the property.
Case No: 275358 Determination Page 9 of 11
The FSP has made enquiries with the prior owner who advised she was
unable to recall precise lengths or measurements due to the time lapse since
she sold the property.
46. I note the FSP originally declined to cover these items on the basis they
were not considered content items although as a result of the IDR review
these items were accepted. It would appear the items were possibly
disposed of in the meantime and therefore the FSP was not able to assess
the items once a decision was made to cover these. The FSP says the
Applicants have now refused to allow access to a contractor to provide an
alternative quotation.
47. The Applicants have provided a quotation for the replacement timber in the
amount of $13,156. This comprises of 40m² of jarrah decking, 50m of top rail
and eight stair treads.
48. I note there is no longer any dispute the FSP is covering these items under
the claim. Rather, the only outstanding issue in dispute remains over the
settlement amount. In my view, the quotation presented by the Applicants
represents a significant amount of timber and furthermore, timber of quite
high quality. Given the amount in dispute, I do not consider it unreasonable
for a second quotation for the timber to be sought.
49. Accordingly, I determine the FSP is to arrange a quotation for the
replacement timber within 14 days of this Determination being accepted.
Were it the case access needs to be granted to the premises in order for the
quotation to be obtained, the Applicants are to allow such access to the
FSP‟s contractor. Once the quotations are received, the FSP is to assess its
liability under the terms of the policy and provide either an offer of settlement
or arrange replacement to the Applicants. In the event a further dispute
arises over quantum, then either party is at liberty to seek a further
Determination over this issue.
Settlement for stirrups
50. The final matter for consideration is the metal stirrups for the decking. The
FSP has requested the Applicants confirm why the purchase of these were
„necessary and unavoidable‟ , so as to be covered by the terms of the policy.
51. I have reviewed the documentation supplied and note the Applicants have
supplied a quotation only for the replacement stirrups, at a cost of $1520.20.
Therefore, it does not appear these have been purchased to date. I note the
quotation supplied is from the Applicants‟ employer and the quotation
supplied is only valid for 30 days.
52. I note a component for the stirrups was included in C‟s SOW and was
reflective only of sanding and galvanising one stirrup, at a cost of $115.70.
Therefore, there is a significant discrepancy between what was on the SOW
and what is being sought by the Applicants.
Case No: 275358 Determination Page 10 of 11
53. Accordingly, after considering what is fair in all the circumstances, I consider
the FSP is entitled to re-assess this aspect of the claim. In the event the
stirrups require replacement, the Applicants are to arrange an updated
quotation for the stirrups to be supplied to the FSP. The FSP is also to
arrange their own quotation for them and again, if access to the property is
required to undertake this then the Applicants must grant access. This is to
be completed within 14 days of the date of acceptance of this Determination.
54. Once the quotations are received, the FSP is to assess its liability under the
terms of the policy and provide either an offer of settlement or arrange
replacement to the Applicants. In the event a further dispute arises over
quantum, then either party is at liberty to seek a further Determination over
this issue.
Are the Applicants entitled to compensation as a result of the FSP’s handling
of the claim?
55. Whilst I accept that generally speaking, the FSP has fulfilled its obligations to
the Applicants pursuant to the terms of the policy, this does not preclude me
from considering whether the Applicants are entitled to compensation
pursuant to the FOS Terms of Reference 9.3b.
56. I accept that to some degree, all insurance claims are stressful and
inconvenient. In order to invoke an order of compensation under 9.3b, I must
be satisfied that some action of the FSP caused the Applicants an unusual
degree of inconvenience or time taken to resolve the situation.
57. I have undertaken a careful review of the FSP‟s carriage of the claim. In my
view, both parties have contributed to the delays experienced in bringing this
matter to a timely conclusion.
58. From my review of the file, it would appear the repairs to the property were
commenced in June 2011, after disagreements between the parties as to the
SOW required, with the bulk of repairs being completed by late August 2011,
and the Applicants re-occupying the property as of 12 September 2011. In
my view, this timeframe for such extensive repairs is not excessive and I
note the FSP paid for temporary accommodation throughout.
59. Whilst I accept there was rectification required, it would appear that C and
CL were liaising with the Applicants to achieve a satisfactory outcome until
such point as the relationship between the parties broke down irrevocably.
60. In order to consider if an award of compensation for either consequential
financial or non-financial loss under the FOS TOR 9.3b, I must be satisfied
some action of the FSP has caused an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with the
Applicants ‟ expectation of enjoyment or peace of mind.
61. I do not consider the simple passage of time to be a sufficient trigger for an
award of compensation. Whilst I agree the FSP‟s conduct of the claim could
certainly have been handled better in some instances and there certainly
Case No: 275358 Determination Page 11 of 11
appears to have been a breakdown in communications between C, CL and
the FSP, I am not persuaded they so mishandled the claim as to justify an
award of compensation pursuant to 9.3b of the TOR.
62. Accordingly, whilst I empathise with the Applicants‟ position and appreciate
the circumstances they found themselves in were difficult, I accep t the FSP‟s
handling of the claim was reasonable in the circumstances and therefore, an
award of compensation is not appropriate.
Determination
63. On the basis of the available information I determine:
The FSP is to arrange a cash settlement for the roof replacement
based on the updated quotation from P;
The FSP‟s offer of $2,357.24 in respect of W‟s invoice is fair in the
circumstances;
The FSP is to settle the claim for the balustrade based on the amount
quoted by P in their updated quotation;
The FSP is entitled to seek a second quotation in respect of the timber
and stirrups in order to assess their liability under the terms of the
policy and the Applicants must allow access to the property for this to
occur if necessary; and
The Applicants are not entitled to compensation for the manner in
which the FSP managed their claim.