Background
1. The Applicants hold a Landlord Insurance Policy with the Financial Services
Provider (FSP). The relevant period of coverage was 2 October 2010 to 1
October 2011.
2. On 3 February 2011, the Applicants‟ property was damaged by Cyclone
Yasi.
3. On 18 February 2011 the Applicants lodged a claim with the FSP in respect
of the damage to their property.
4. Following an inspection of the property the FSP arranged for sectional
repairs to the Applicants‟ damaged roof and other issues identified as having
been caused by Cyclone Yasi.
5. The Applicants maintain that the repairs undertaken by the FSP were
insufficient. The Applicants seek to be indemnified for the cost of a full
replacement of the roof of their property in accordance with the terms of their
policy.
Summary of Applicants ’ position
6. They are entitled to coverage for the full extent of the damage which
occurred on 3 February 2011, including the cost of a replacement roof,
because:
a. They had purchased the property three years prior to the Cyclone and
there had been no previous issues with water damage or leaks.
b. They have obtained an engineer‟s report and two further builders ‟
quotations confirming that replacement of the roof is required.
c. There are several leaks in the roof of the outdoor entertainment
(skillion) area which the FSP have declined to cover. The Applicants
submit that the FSP‟s agent undertook make safe repairs to this
structure which have weakened the roof.
Determination
Case No: 275258 Determination Page 2 of 9
d. The FSP has only replaced the guttering that was dislodged by the
Cyclone however have refused to indemnify them for repair to guttering
which was dented by debris.
7. They are seeking the difference between the quotation prepared based on
their engineers scope of works of $61,506.00 and the cash settlement
received from the FSP of $27,795.92 (i.e. $33,710.48). They are also
seeking reimbursement for their costs in retaining their own engineer of
$660.
Summary of FSP’s position
8. The FSP submits it has discharged its obligations under the policy by paying
cash settlement to the Applicants of $27,795.52 on 11 October 2011
because the policy only requires the FSP to:
(i) repair the damage caused by the insured event (Cyclone Yasi) ;
and
(ii) to return the Applicants ‟ property to its original condition when
new or last renovated.
9. Accordingly the FSP only partly accepted the Applicants‟ claim as it
determined the some aspects of damage were related to the Cyclone event,
and others were caused by maintenance and rust issues.
10. In asserting it has complied with its obligations above, the FSP states:
a. the roof does not require replacement and sectional repair of the roof
was appropriate as the majority of the roof sheets were in good
condition and there was less than 20% damage caused by the event;
b. no de-lamination of the rafter to batten connection could be identified
within the roof frame;
c. no damage consistent with structural racking of the building was noted;
d. no damage was noted to any internal walls of any room and mould
growth in the kitchen was not consistent with water entry into the ceiling
cavity.
e. damage to the rear skillion roof of the property was pre-existing,
caused by rust and had previously been repaired which the applicants
have acknowledged;
f. replacement of the Applicants‟ roof would amount to an upgrade to their
property;
g. it is not obliged to pay for damage caused by or as a result of the
Applicants failure to fix a fault that existed before the loss or damage
occurred;
h. it denies any damage was caused to the Applicants‟ property by the
make safe repairs;
Case No: 275258 Determination Page 3 of 9
i. it denies it had only agreed to replacement of the fallen guttering and
not the dented guttering. The FSP has identified the relevant sections
of its expert reports wherein provision for replacement of the damaged
guttering is made.
11. The FSP submits that the cash settlement of $27,795.52 paid to the
Applicants on 14 October 2011 was sufficient to cover the cyclone damage
based on the quotation prepared by their builder (GH) of $23,380.95, less
the applicable policy excess of $500.
12. The FSP relies on the following policy provisions:
“ When we may refuse a claim
We may refuse a claim for any of the following reasons.
Your actions or your failure to act
We may refuse to pay a claim or limit the amount payable under this policy if:
you do not at all times take all reasonable care to:
o protect any property you have insured with us against any initial
or further loss or damage
o keep your property and contents in good condition
General exclusions
These general exclusions apply to all sections of the policy.
We also do not insure you under this policy for loss or damage caused by, or
legal liability arising from:
gradual deterioration, wear and tear, lack of maintenance, faulty
workmanship, or fault design, rust, corrosion, mildew, wet or dry rot, rising
damp, or seepage.
What we do cover
We will pay you for loss or damage to your property, contents , or both
caused by:
1. Storm, rain or flood
X What we do not cover
We will not pay you for loss or damage to your property, contents or both
caused by:
X storm , rain or flood to:
retaining walls, or
external paintwork, if that is the only damage done to that
part of the building.
We also will not pay you for loss or damage to your property,
contents or both caused by:
water seeping into or entering your property because of:
Case No: 275258 Determination Page 4 of 9
defects in its structure or design, or defective work
done on it, or
structural alterations, additions, renovations or
repairs.
Repairing or rebuilding your property
Please note: although we will return or pay to return your property to its
original condition when new or last renovated, we will not upgrade your
property if you have over-insured it, nor will we pay extra to return your
property to a better standard, specification or quality than it was when new or
last renovated.
What we will pay
If you have insured your property and loss or damage occurs to the
property we will at our option do one of the following:
Arrange to build, replace or repair your property so that it is
returned, as far as possible, to its condition and extent when new,
or if it has been renovated, to its condition and extent when last
renovated, or
Pay you what it would cost us to rebuild, replace or repair your
property so that it is returned, as far as possible, to its condition
and extent when new or, if it has been renovated, if it has been
renovated, to its condition and extent when last renovated, or
If you decide not to replace, rebuild or repair your property, we
will, if we agree, pay you the market value of the land and property
just before the loss or damage less the market value of the land
and property after the loss or damage occurred, or
If the property is totally destroyed and you want to replace your
property with a smaller property, we will, if we agree, pay what it
would have cost us to rebuild the replacement property plus a
cash settlement. The cash settlement will be limited to the market
value of the land and property just before the loss or damage less
the market value of the land and property after the replacement
property has been built.
What we will not pay
If we agree to pay a claim under this policy, we will not pay you more
than:
The amount of the sum insured applicable to property cover; plus
An amount for “additional protection and benefits”, plus
GST; less
Any excess.
We will not pay for loss or damage caused by, or as a result of, your
failure to:
Case No: 275258 Determination Page 5 of 9
Maintain your property in a good state of repair. If not, we will
apply depreciation to your property before we pay and replacing,
rebuilding or repair costs. Any depreciation we apply is based on
the age and condition of your property, or
Fix a fault that existed before the loss or damage occurred.”
Issues
13. Whether the FSP has discharged its obligations under the policy by cash
settling the Applicants‟ in respect of the damage it has attributed to Cyclone
Yasi.
Reasons for decision
14. Due to the nature of the dispute, the Financial Ombudsman Service (FOS)
has considered it appropriate that it be directly referred to an Ombudsman
for determination in accordance with the Operational Guidelines to the FOS
Terms of Reference (TOR).
15. I am satisfied that a full exchange of information has taken place between
the parties and that each party has had an opportunity to address all issues
raised.
16. The FSP does not dispute that the Applicants‟ property sustained damage as
a result of Cyclone Yasi on 3 February 2011. Therefore, there is no
argument that the Applicants have a claim under the policy.
17. The Applicants‟ house is of t imber frame, wall and roof construction with
metal roof sheeting and timber floor boards. It is approximately 50 years old.
18. The central issue is whether the cash settlement paid by the FSP is sufficient
to discharge its obligations to the Applicants under the policy. To do this, it is
necessary to consider the expert evidence in respect of the damage to the
Applicants‟ property.
FSP’s Expert Evidence
19. The FSP retained an engineer (RP) to inspect the Applicants‟ property and
identify the damage caused by Cyclone Yasi and the repairs that would be
required to return the property to its pre-event condition. In his report dated
19 April 2011, RP indicated:
“% damage to structural elements
Roof less than 20%
Walls & Timber Flooring less than 20%
Sub-floor less than 20%
Notes
Case No: 275258 Determination Page 6 of 9
1. At the time of our inspection, the tenant stated that after Cyclone
Yasi, works were carried out to stop water leaks to the main
building. Roof sheeting nails are used for roof sheet fixing, apart
from the top and bottom rows where screws are used. It was
stated that the roofing nails were lifted and were nailed back into
place. Sections of roof sheeting were also inserted under the
original sheets over a window head on the Western wall of the
building.
Roof
Evidence of structural roofing members Yes
lifting? (ridge capping)
Evidence of major damage to structural roof No
Members? e.g. splitting
General condition of roof sheeting? Good
Ongoing roof leaks? Yes
Notes
1. At the time of our inspection, no structural damage to the main roof
framing was observed from the ceiling cavity which could be
attributed to Cyclone Yasi.
2. At the time of our inspection, evidence of water staining to battens
and rafter suggest some re-fixed roofing nails continue to leak.
3. At the time of our inspection ridge capping was observed to have
partially lifted. We believe that this damage has been caused by
high winds during Cyclone Yasi.
Internal
Water damage to interior Yes
Notes
1. At the time of our inspection, mould growth to the living room
ceiling was observed. We believe that the leak originates from the
ridge capping. We believe that the high winds experienced during
Cyclone Yasi have partially lifted the ridge capping.
2. At the time of our inspection, evidence of water ingress to the
ceiling and internal timber linings was observed underneath the
section of the roof sheeting where temporary repairs were carried
out. We believe that the roof sheeting had lifted in the area during
Cyclone Yasi resulting in water ingress.
Structural Scope of Works
1. Repair replace damaged roof sheeting (including fixtures and
finishings) in accordance with all relevant current Australian
Standards.
Other Structures
Covered patio/deck? Yes
Notes
Case No: 275258 Determination Page 7 of 9
At the time of our inspection, the tenant stated that the rear patio
roof leaked during heavy rain. We believe that this is pre-existing
and not attributed to Cyclone Yasi.”
20. Having considered the report of RP above, the FSP arranged for its builder
GH to prepare a quotation for the scope of works set out by RP. GH
indicated it could repair the Cyclone Yasi damage for $23,380.95.
21. The Applicants however queried the scope of works prepared by RP . A
further engineering expert, (DE) was appointed by the FSP to carry out a
further inspection of the damage of the Applicants‟ property and identify the
damage caused by Cyclone Yasi. The Applicants‟ were in attendance at the
time of this inspection. I appreciate the Applicants‟ suggestion that DE
should not be regarded as independent but I consider this opinion is of
value.
22. In his report dated 20 September 2011, DE set out the following
observations:
a. The building was in good condition at the time of their attendance.
b. Damage to the rear skillion roof of the property was pre-existing,
caused by rust and had previously been repaired with an epoxy
product. This was discussed with the Applicants on site who confirmed
their acceptance of this view. Therefore, repair of the skillion roof
section rests with the insured.
c. The majority of the roof sheets were in good condition with only 6
sheets on the western side requiring replacement;
d. Water staining of the valley and ridge boards was be identified, and
likely to have occurred during the storm due to “wind driven rain”
entering under the ridge and hip flashings.
e. No damage consistent with the structural racking of the building was
observed during their inspection.
f. Damage to the roof does not extend to greater than 20% of the entire
roof and that a sectional repair of the roof was acceptable.
g. The timber cladding was rotten in several places.
h. No damage was noted to the internal walls of any room and that the
mould growth in the kitchen area is not deemed to be consistent with
water entry into the ceiling cavity.
23. GH was thereafter asked to provide a further quotation based on the scope
of works set out by DE. The revised quotation indicated a cost of $28,295.52
for the Cyclone damage. This quotation ultimately formed the basis of the
cash settlement paid to the Applicants (less the policy excess of $500).
Applicants’ Expert Evidence
24. The Applicant obtained a quotations from their own builder (SK) dated 19
March 2011 in the sum of $43,577 inclusive of GST. This quotation notes:
Case No: 275258 Determination Page 8 of 9
“...
- Corrugated iron roof showing signs of damage and fatigue due to impact
of Cyclone Yasi
- Roofing has multiple leaks.
- Fixing to iron have lifted and are loose
- Cyclone washers have been punched through existing iron and worn
through due to excessive strain to perimeter fixings.
- Gutters and down pipes have been removed and/or dinted and scratched
by debris
- Scratching and dinting of iron sheeting, flashings, awnings”
25. The Applicants also retained their own engineer (MA) to also inspect and
report on the damage. MA in its report dated 20 June 2011, states:
“ ... The house would be approximately 50 years old. Water during the cyclone
entered through the roof and eaves. The major issue is the structural integrity
of the roof framing and connections as the house has been subject to two
severe cyclones with wind speeds up to 300km/hr.
...
The major issue is the integrity of the connections between roof sheeting and
battens and roof rafter and walls and the lack of hold down bolts throughout
the house. The laps of the roof sheeting have permanently lifted. These lifted
laps will provide a starting point for the whole roof sheet to be lost during the
next cyclonic event. All roof iron has to be replaced.” (emphasis added).
26. The Applicants have obtained a tender from a building contractor (KGC) for
the replacement of their roof, of $57,288 inclusive of GST.
27. The have obtained further quotations from two further building contractors,
(DCP) for $71,442.09, and (WJS) for $61,506.00.
Conclusion
28. I note that Applicants‟ expert engineer does not indicate the cause of the
varying aspects of the roof damage nor differentiate any aspect of the
damage from that which in a 50 year old house, may reasonably be related
to wear & tear or lack of maintenance. Further, I note MA refers to the
Applicants‟ property having been subject to two cyclone events. Ther efore,
the reasonable assumption is that some of the reported damage was present
prior to Yasi.
29. This assumption is given further weight by the observations of the
Applicants‟ builder SK who refers to signs of „ fatigue ‟ and damage relating to
iron being „ worn through’ which indicates damage resulting over time rather
than from a single event.
30. The report prepared by the FSP‟s engineer RP (with the observations
reinforced by the further report of DE) provides a detailed analysis of the
damage to the Applican ts‟ property, clearly identifying that which can be
Case No: 275258 Determination Page 9 of 9
attributed to Cyclone Yasi. In circumstances in which only 6 new sheets are
required in the opinion of both RP and DE, I am inclined to prefer the FSP‟s
engineers‟ joint position that there is no structural damage to the Applicants‟
roof that would justify a full replacement.
31. Therefore, I accept that the latter GH quotation based on the scope of works
determined by the FSP engineers is fair and reasonable and the appropriate
basis for the calculation of the cash settlement paid to the Applicants.
32. Based on the evidence of DE, evidence of previous repair attempts and the
reported comments of the tenants as to incidences of water leakage, I
accept that the damage to the outdoor entertaining area was pre-existing
and likely to be maintenance related. Accordingly, I consider the FSP has no
obligation to indemnify the Applicants in respect of this damage.
33. Further, in respect of the allegation by the Applicants that the FSP‟s agent
had damaged the structural integrity of this fixture, I note there has been no
evidence adduced by the Applicants to substantiate this. Accordingly, I
consider this allegation to be unfounded and do not intend to give it further
consideration.
Determination
34. On the basis of the available information I determine the FSP has
discharged its obligations under the policy and is entitled to deny the balance
of the Applicants‟ claim.