Home / Financial Firm (Unknown - Insurer) / Determination 274981

Determination 274981

Swimming pool storm and stormwater damage denied under policy exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Owners of a home with an in-ground pool claimed for pool floor damage after heavy December 2010 rain. The insurer denied the claim under exclusions, and AFCA found the pool damage fell within the flash flood and stormwater run-off exclusion for swimming pools.

Expert evidence showed the damage was caused by torrential rain and stormwater run-off with ground saturation, which falls within the policy exclusion for swimming pools.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 274981 Determination Page 1 of 6 Case Number: 274981 General Insurance – Domestic Insurance – Home Building – Storm – Flash flood and stormwater runoff – Policy exclusions 15 August 2012 Background 1. The Applicants insured their home building under a Household Insurance Policy against loss or damage caused by insured events for $300,000 with a policy excess of $500. The Applicants‟ property is located at Burleigh Waters in South East Queensland. 2. On the 25 January 2011, the Applicants reported that their in-ground fibreglass swimming pool (pool) sustained damage after heavy rain and storms that occurred in December 2010. 3. The pool has been deemed to be a total loss and two quotations to replace the pool have been obtained by the Applicants for $41,800 and $46,870 respectively. 4. The Financial Services Provider (FSP) denied liability on the grounds that the damage to the pool was caused by excluded events earth movement, seepage of water, storm rainwater after it has reached the ground, and rain causing damage happening over an extended period of time. 5. The Applicants dispute the FSP‟s decision and submit that the damage was caused by the insured event stormwater runoff. Summary of Applicants ’ Position 6. The Applicants‟ contend that over the December 2010 period their locality received record rainfall. The continual saturation of the ground caused backfill (compacted sand) to slurry and provided no support to the pool floor. This caused a bulge in the pool floor. 7. The Applicants submitted a claim on the FSP providing a quotation for the cost of repairs. The FSP denied their claim stating that they were not covered for „hydrostatic pressure‟. However, they had only submitted a „Specialist Report‟ to the FSP which did not make any mention of „hydrostatic pressure‟. Determination Case No: 274981 Determination Page 2 of 6 8. The letter from the FSP also referred to a „building consultant” attending their property to make a report on their pool. The Applicants were not aware of a building consultant visiting their property and they wrote to the FSP informing it to make an appointment if it required a building consultant to attend. 9. Although the building consultant referred to „hydrostatic pressure‟, it had been confirmed that the damage to the pool was not due to hydrostatic pressure. The release valve in their pool would have released and let underlyi ng water into the pool if that had been the case. There was no evidence of water leaking into the pool. 10. The Applicants obtained two reports from swimming pool experts which they passed onto the FSP for its consideration. However, the FSP continued to deny their claim. 11. A report dated 21 July 2011 from pool specialist FP stated: “ After inspecting fibreglass pool at [address] and determining that the existing pool is beyond repair due to the effects of torrential rain and ground saturation”. 12. In a report dated 25 July 2011, pool specialist BP stated: “ With consistent heavy rain the excavated pool area has been saturated and moisture unable to escape has caused the under laying compacted sand to „slurry‟ and give absolutely no support to the pool floor.” 13. The Applicants raised the issue of an engineer inspecting their pool. The FSP appointed a structural engineer to inspect and report on their pool. However, the FSP continued to deny their claim. Summary of FSP’s Position 14. The FSP relies on the following reports in support of its denial of the Applicants‟ claim:  The Applicants‟ pool specialist, FP, report dated 31 Ja nuary 2011 where is was stated: “ Swimming pool has been affected by excessive amounts of rain water. This rain has saturated the ground surrounding the pool. This has caused the floor to lift approx 200mm. This lifting of the floor has displaced the walls which disallows the floor to settle back down to it‟s (sic) original position. If pool is not repaired may cause the floor to split in a work weakened area which may cause the pool to lift at the coping level , rendering the pool destroyed.” FP‟s conclusion is quite clear in that the cause of the damage is excessive amounts of rainwater that has saturated the ground surrounding the pool causing the floor to lift and displace the walls.  The FSP submits that during its lifetime, the pool would have been subjected to many and varied weather conditions. The extraordinary quantity of rain experienced from October to December 2010 may have Case No: 274981 Determination Page 3 of 6 finally changed the previous subterranean conditions resulting in the pool finally giving way to the movement of the fill around it.  Applicants‟ pool specialist, FP, report dated 21 July 2011 where it was stated: “ ...pool is beyond repair due to the effects of torrential rain and ground saturation.”  Applicants‟ pool specialist, BP, report dated 25 July 2011 where it was stated: “ With consistent heavy rain the excavated pool area has been saturated and moisture unable to escape has caused the under laying compacted sand to „slurry‟ and give absolutely no support to the pool floor.” 15. Both FP‟s and BP‟s reports indicate that excessive rainfall has been causative of the damage. Both reports confirm movement of the earth either around and/or under the base of the pool. 16. Based on these reports the FSP submits that it is entitled to rely on policy exclusions operating to limit its liability for damage to nil. 17. The FSP also engaged a structural engineer (engineer) to inspect and report on the cause and nature of the damage to the pool and its surrounds. In its report dated 29 August 2011 it stated, in part: “ For swimming pools of this type, the backfilling material (such as sand) has a high degree of permeability. When stormwater enters this surrounding „blanket‟ of backfill material, settlement and/or „slumping‟ of the backfill can occur. When such a situation develops the backfill becomes „fluidised‟ and can flow under the pool where damage of the nature currently evident in the base of the pool can occur. ... We consider that the damage to this pool has occurred as the result of the stormwater flows around the pool and the consequent failure of the backfilling materials in the manner described above.” 18. The FSP also engaged a building consultant to inspect and report on the damage to the pool. In its report dated 6 September 2011 it confirmed the e ngineer‟s findings and also stated that the excessive rainfall had been the causative of the damage. Both the engineer and building consultant confirm movement of the earth either around and/or under the base of the pool. 19. The building consultant noted that the PDS excludes hydrostatic pressure building below or behind any part of the home or structure including a swimming pool their covers, liners and the like. 20. The FSP states that the policy excludes:  Earth movement no matter how caused. Case No: 274981 Determination Page 4 of 6  Loss or damage caused by rain following a storm event after it has reached the ground.  With respect to swimming pools, rain causing damage happening over an extended period of time. 21. Therefore the FSP submits that it is entitled to deny liability for the Applicants‟ claim. 22. The FSP relies on the following policy/contract provisions: ‘How this policy works ... This policy does not cover you for everything. For further details of the cover and the amounts we will pay for any claim, please read this Product Disclosure Statement (PDS) ... Words/terms with special meanings ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run-off. ... Insured events you are covered for Damage caused by weather... What is covered Storm What is not covered Loss or damage: × caused by rain, hail or snow after it has reached the ground; ... What is covered Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run-off What is not covered Loss or damage caused: × ... to swimming pools or spas and their covers, liners and the like; × to the water in swimming pools or spas; ... When you are not covered – general exclusions These general exclusions apply to all sections of your policy. We will not pay for loss or damage or the incurring of a legal liability caused by: ... Case No: 274981 Determination Page 5 of 6 erosion, landslide × erosion, landslide, subsidence, earth movement (except for earthquake), earth shrinkage or expansion no matter how caused. ... seepage, pollution × seepage, pollution or contamination by any substance no matter how caused. ...‟ Issues 23. Whether the damage to the Applicants‟ swimming pool is covered under the terms and conditions of their policy. Reasons for Decision 24. The onus of proof is on the Applicants to establish, on the balance of probabilities, that they have suffered a loss caused by a risk insured against. Once the Applicants have established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. 25. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence it is not necessary to go into all of this material other than when relevant. 26. During the month of December 2010, the Bureau of Meteorology reported that there was 490.4mm of rainfall. Of that total 246mm fell between 24 and 28 December 2010 inclusive. 27. Two swimming pool specialists and a structural engineer reported that stormwater from the severe rainfalls entered the excavated pool area and caused the damage to the floor of the pool. 28. On the evidence submitted by the pool experts I find that the swimming pool was damaged by the affects of stormwater run-off. The FSP has not addressed whether or not the 24 hour time limit applied or not. 29. However, under the insured event flash flood and stormwater run-off, loss or damage caused to swimming pools or spas or to the water in swimming pools is excluded. The experts agree that the damage was caused by torrential rain and storm water run-off with resultant ground saturation. The exclusion in respect of swimming pools and spas applies. Determination Case No: 274981 Determination Page 6 of 6 30. Therefore, I find that the FSP has met the onus on it to establish that, on the balance of probabilities, the loss or damage to the swimming pool was caused by an excluded event of the policy 31. Accordingly I determine that the FSP is entitled to deny liability for the Applicants‟ claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.