Text of the determination
Case No: 274549 Determination Page 1 of 8
Case number: 274549
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Claim Amount
27 September 2012
Background
1. The Applicants hold a Business Property Smart Choice Insurance Policy with
the Financial Services Provider (FSP) covering their tenanted business
premises in Innisfail, Queensland. The policy commenced on 22 March 2010
and was current at the time of the reported loss.
2. The building has a sum insured of $761,000 and an applicable policy excess
of $500.
3. On 2 February 2011, the property was damaged when Cyclone Yasi hit the
area. A claim was lodged by the Applicants on 4 March 2011, with the FSP.
4. The FSP requested quotations for repairs from the Applicants and on
receiving these, the FSP appointed its own builder and engineer to attend to
inspect the property.
5. Based on the FSP’s appointed engineer, some maintenance and pre -
existing damage to the property was identified and subsequently excluded
from the settlement offer made to the Applicants.
6. The Applicants say the amount offered will not repair the cyclone related
damage and they do not understand what areas require maintenance. The
FSP has maintained its decision to provide only settlement on those aspects
of damage it believes are related to cyclone damage.
Summary of Applicants ’ position
7. The Applicants say that when taking out the insurance with the FSP they
were not aware of some of the maintenance issues the FSP is now claiming
existed.
8. The FSP had a building survey completed at the time the policy commenced
and at this time none of the maintenance issues now being claimed by the
FSP regarding the roof were advised to them.
Determination
Case No: 274549 Determination Page 2 of 8
9. The FSP is denying the roof damage caused by the cyclone but their builder
has identified areas in the roof and the roof sheeting which they believe are
cyclone dama ge related. Further, the FSP’s appointed builder never viewed
the area as the roof was under tarpaulins at the time of the inspection.
10. The FSP has not adequately informed them of what constitutes maintenance
or pre-existing damage to enable them to attend to those repairs.
11. They accept the roof guttering at the premise was a pre -existing problem
and accept they must attend to its repairs.
12. The Applicants say they want another inspection of the premises to take
place in order to properly identify all of the cyclone related damage.
Summary of FSP’s position
13. It has admitted the claim under the relevant insurance policy and has
accepted some of the claimed damage as being cyclone related.
14. Its engineer has assessed the building and identified those areas which have
been damaged by cyclone. The engineer has also identified areas of
maintenance or pre-existing problems at the property.
15. It has provided all relevant scope of works and quotations it obtained in
assessing the Applicants’ damaged building and will not be a ppointing
anyone further to provide any further assessment.
16. The Applicants are responsible for attending to the maintenance and pre-
existing damage at their own cost and it will not be responsible for any
further damage and/or claims which may result, should this damage not be
attended to.
17. It on the following policy provisions of its Product Disclosure Statement
(PDS):
“ Section 1: Fire and Defined Events/Accidental Damage
This Section insures You for loss or damage to the building, arising from a
defined event during Your Period of Insurance. If You lease out Your building,
Your landlord’s fixtures and fittings, including floor coverings are insured as
part of Your building.
Defined events
Defined events include happenings such as fire, lightning, storm, impact and
malicious damage. Please refer to Part C, pages 24 to 27, for details of what
is covered and what is not covered under each defined event. Defined events
are number 1 to 8 for easy reference. ”
(Page 9)
“ 9. Precautions and Inspection
You must:
Case No: 274549 Determination Page 3 of 8
(a) take all necessary steps to ensure that the Insured Property is kept in a
good state of repair and maintenance and free of waste material and
rubbish;
(b) take all necessary steps to ensure that only competent employees and
contractors are engaged by You;
(c) take all reasonable precautions and action to enforce observances by all
appropriate persons of all proper safeguards to prevent, avoid or minimise
any loss, destruction, damage, Personal Injury or liability;
(d) ensure compliance with all Statutes relating to safety of persons or
property or the operation, inspection or maintenance of any property; and
(e) allow Our representative to inspect or examine:
(i) the Insured Property;
(ii) the buildings or structures in which the Insured Property is contained;
and
(iii) Your operations.”
(Page 18)
“ 8. Storm and/or Tempest, Water and Other Liquid
Storm and/or Tempest, Water and Other liquid as defined in (a), (b), (c), (d)
and (e) below.
(a) Rainwater
Rainwater – Water in the form of rain falling from the sky on to the Premises
or the building in which the Premises is situated until such time as it reaches
the ground.
(b) Run-off
Run-off – Rainwater that has accumulated directly on and flowed across
normally dry ground. Run-off includes Rainwater that has overflowed from the
following:-
(i) public roadside gutters, channels and drains that are normally dry.
(ii) Swimming pools, spars or saunas.
Run-off does not include Flood or Water from the Sea.
...
(d) Storm and/or Tempest
Storm and/or Tempest – a violent atmospheric disturbance accompanied by
high wind, rain, snow or hail, but does not mean persistent bad weather,
heavy rain or persistent rain by itself.”
(Pages 25 and 26)
“ Exclusions Applicable to Defined Event 8
1. We will not be liable for destruction or damage caused by:
(d) erosion, collapse, subsidence, landslide or mudslide or any other
earth movement;
...
Case No: 274549 Determination Page 4 of 8
(h) Water entering the Premises as a result of:
(i) structural defects;
(ii) faulty design;
(iii) faulty workmanship; or
(iv) lack of maintenance by You.
2. We will not be liable for destruction of or damage to:
...
(b) Insured Property whilst in the open air unless it comprises or forms part of
a permanent structure designed to function without the protection of walls
or roofs;”
(Pages 26 and 27)
Issues
18. Whether the FSP has adequately assessed the damage claimed b y the
Applicants.
19. Whether the Applicants are entitled to any further settlement towards
cyclone related damage as part of their claim.
Reasons for decision
20. This decision has been made by a Panel consisting of an Ombudsman, an
industry representative and a consumer representative.
21. The Panel is satisfied there has been a full exchange of material between
the parties and that each party has had the opportunity of clarifying the
issues that arise from the material.
22. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
Experts
23. The Panel has considered the opinions of the FSP’s appointed experts,
including an engineer (R), and the opinions expressed by the Applicants’
appointed builders.
24. R has provided a clear indication of cyclone damage he could view at the
Applicants’ premises. R has not identified t he specific causes or rectification
work required for the maintenance and pre-existing damage identified by him
at the Applicants’ premises. This is based on the instructions he received
from the FSP which was simply to identify all cyclone related damage.
Case No: 274549 Determination Page 5 of 8
25. As such R has provided his report on what he considered to be maintenance
related or pre-existing damage but he has not advised as to why he believed
this to be the case. The Panel is of the opinion this has caused some
confusion for the Applicants.
Building Surveyor’s report
26. After taking out the policy of insurance with the FSP, the Applicants, in
accordance with the terms and conditions of their policy, permitted an
inspection of the premises, , by building surveyor (I), appointed by the FSP.
27. I inspected the premises in April 2010, and provided a report on the property.
The report provides details of I’s inspection and noted its concerns with risk
at the premise from an insurance perspective.
28. Based on the information provided by I, the FSP issued a letter to the
Applicants advising of items they must attend to within 60 days. This letter
was sent via email to the Applicants representative, S, on 20 April 2010.
29. The letter requested the Applicants to not only attend to the items within 60
days, but to also to advise the FSP once the items had been attended to.
The items included having the rear stairs inspected by an engineer or council
inspector and the obtaining of a certificate of compliance for safety. It also
identified that repairs to columns in the sub-floor area needed to be attended
to. There is no reference to any roof related issues and no mention of any
damage to those sub-floor columns/posts which had already been subject to
repairs.
30. The Panel notes that although the FSP requested the Applicants to attend to
a variety of matters within 60 days, it did not advised the Applicants of any
possible ramifications if the items were not completed within 60 days, i.e.:
limitation or cancellation of cover etc. However, the Panel notes the relevant
policy wording does clearly identify circumstances where claims will not be
paid.
Roof damage
31. The Panel has reviewed R’s report and notes that there seems to be no
consideration or comment regarding the fact that the Applicants’ premise
had previously been subject to a cyclone event in 2006. This is something
that was confirmed by the building surveyor appointed by the FSP at the
time the policy was taken out.
32. The surveyor inspected the property in April 2010 and did not notice or
report on any pre-existing damage to the roof or guttering. Indeed, the
surveyor, under the heading “Condition of Property“, reported “Roof and
Guttering - Acceptable and new”.
33. The Panel finds it difficult to understand why
Case No: 274549 Determination Page 6 of 8
34. R in its report stated there was no evidence of structural roofing members
being damaged or lifting and the condition of the sheeting was reported as
being good. Accordingly, the Panel is at a loss to understand what R is
inferring by its comment “Evidence of prior repair attempts were also noted.
We believe that this is a pre-existing condition and not attributed to cyclone
Yasi.”
35. R fails to explain what “prior repair attempts” were noted and it does not
appear to have asked the Applicants or anyone else when these alleged
previous repairs were done. The only explanation by way of support for the
comment is “Refer to Photos 3 & 4”. The Panel has examined the
photographs and notes they show ceiling damage caused by water and in
the foreground of photo four there is a spray can which appears to read “leak
sealer”.
36. The Panel concludes that to make any assumptions based on the paucity of
comment from R and the supplied photographs tendered as providing proof
of these previous repairs, would be speculative.
37. Moreover, the Panel notes that R did not inspect the property until July 2011,
some five months after the cyclone event.
38. In the event that the roof pre-existing damage and repair comments made by
R relate solely to its comments on the roof’s box guttering t hey are (as far as
repair or replacement is concerned) of no relevance to this determination as
the Applicants accept that there were pre-existing issues with the guttering
and state that they will be responsible for the costs associated therewith.
39. It follows therefore that the FSP is not liable in relation to damage caused by
water entering the building resulting from the poor condition of the guttering.
40. The Panel notes in regard to the roof flashing R has reported it was
damaged by the cyclone and therefore forms part of the claim.
41. In contrast to R’s report the Applicants builder (J) has provided a series of
photographs depicting roof bearers/beams/battens which appear to be split
or lifted. It is his opinion that this is as a result of the cyclone event.
42. Based on their builder’s report, the Applicants believe the damage to the roof
as claimed was damage caused by the cyclone.
43. The Panel has considered the reports and photographs made available in
relation to the roof and it prefers the report of the Appli cant’s builder which
asserts cyclone damage and is supported by numerous photographs
depicting splitting, lifting and separation of trusses/rafters/battens, evidence
which has not been refuted by the FSP.
44. In its NOR the “[The FSP] notes from the ISA repor t that the roof had been
replaced approximately between March to August 2008 and had been
subject to a cyclone in 2006. Whilst the quoted comment does not accord
fully with the ISA report which describes the roof as “Acceptable and new” it
Case No: 274549 Determination Page 7 of 8
does lend substance to the contention that the roof was not in a damaged
condition prior to the cyclone.
Rear stairs
45. The Applicants say the stairs at the rear of the property were in a sound
condition prior to Cyclone Yasi and only required some minor repairs.
46. The Panel note R’s report and the surveyor’s report completed when the
policy was taken out. Both reports refer to the poor condition of the stairs.
Both reports indicate the stairs required remedial action and pose a safety
hazard.
47. The Panel is of the opinion this damage was pre-existing and that the
Applicants were aware of the condition of the stairs prior to Cyclone Yasi.
Floor structure
48. In his report, R has identified columns within the sub-floor which have been
subjected to previous repairs to combat “concrete cancer”. It is his opinion
these previous repairs may have been sub-standard as he could not see any
reinforcement in the concrete repairs, through a crack in the repaired area
which is now present. He has therefore determined the two columns on
which the repairs have cracked to be pre-existing and maintenance related
issues.
49. The Panel notes the surveyor’s report which was completed on behalf of the
FSP at the time the policy was taken out. This report also identifies the
column repairs as having been done to combat “concrete cancer”. However,
the surveyor makes no mention of there being any inadequacies in the
repairs, or any cracks evident to suggest the repairs were sub-standard or
not doing what they were intending to do. In fact, the surveyor commented:
“On some of the concrete columns, the concrete has been exposed and the
steel rod reinforcing has rusted away but generally most of the columns
appear to be sound enough to carry this very heavy 3 storey complex.”
And, as a comment on a photograph provided by I of the column referred to
by R in his report, he says:
“The concrete post of the left has been heavily repaired to rectify the cancer.”
(sic)
50. Considering I’s report was done in April 2010 and the cyclone occurred in
February 2011, the Panel is not convinced that this cracking to the two
columns has not occurred as a result of Cyclone Yasi.
Carpet
51. The FSP’s NOR states that the female Applicant advised the FSP of various
areas of damage including carpet. The FSP says it advised the female
Case No: 274549 Determination Page 8 of 8
Applicant that carpets were not covered as the Applicants only had building
insurance.
52. This appears to be contradictory to the policy coverage under Section 1 of
the policy, as detailed above (Page 9 of the PDS), which reads:
“If you lease out Your building, Your landlord’s fixtures and fittings, including
floor coverings are insured as part of Your building.”
53. The Panel is aware the property is leased out and as such, carpets, which
are clearly a floor covering, would be covered, providing the carpets have
been damaged by a defined event. In this instance, it must be established
that the carpets were damaged by Cyclone Yasi and if this is the case,
unless the water emanated from the defective guttering, or an effective
exclusion applies, the claim for carpet must be accepted.
Determination
54. On the basis of the available information the Panel is of the opinion the FSP
has not proven the exclusions on which it relies upon to deny the Applicants’
claim. Therefore, the Panel determines that the FSP must accept the
App licants’ claim for cyclone damage to the roof, its flashing and the two
sub-floor columns and must settle the claim in accordance with its PDS.
55. The Panel is of the opinion the damage claimed to the rear stairs and
guttering has been proven to be pre-existing and is therefore excluded under
the policy of insurance. The costs to rectify this damage must be met by the
Applicants.
56. The Panel also determines that in the event the FSP is liable for carpet
damage in response to 56 above the Applicants must provide documentation
for the cost to replace or repair the damaged carpet and the FSP must settle
this aspect of the claim in accordance with the PDS.