Building settlement amount - deduction for pre-existing wear and tear after cyclone
Text of the determination
Case No: 274018 Determination Page 1 of 9
Case number: 274018
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
31 October 2012
Background
1. The Applicants hold a household insurance policy with the Financial
Services Provider (FSP) which was current at the date of loss.
2. The policy provided building cover for $391,000, contents cover for $149,000
and specified contents items in the home cover for $7,000. The applicable
policy excess is $300.
3. The Applicants lodged a claim with the FSP for cyclone damage which
occurred at their home on 3 February 2011. The FSP subsequently accepted
the Applicants contents claim and provided settlement for contents
accordingly.
4. After assessments of the building were undertaken by the FSP and
Applicants’ appoin ted builders, a dispute arose regarding items the FSP
deemed to be maintenance/wear and tear issues and not damaged by the
cyclone.
5. The FSP has offered settlement to the Applicants based on building reports
and quotations obtained however this settlement has been rejected by the
Applicants.
Summary of Applicants ’ position
6. The Applicants are represented. For the sake of clarity and brevity, the Panel
will refer hereafter to the Applicants and their representative as “the
Applicants”.
7. The Applicants say the FSP failed to assess the damage caused to their
home by the cyclone in a timely manner. They say the FSP has delayed and
confused the settlement process by treating the damage to the property as
repairable when it is not economically feasible to repair the home building.
8. The Applicants say the proposed settlement offered by the FSP attributes
the loss as 43% due to pre-existing wear and tear/maintenance issues and
only 57% to cyclone damage
Determination
Case No: 274018 Determination Page 2 of 9
9. The Applicants say the FSP has failed and refused to provide details of the
pre-existing wear and tear and maintenance issues sufficient to attribute the
loss in the percentages detailed.
10. The Applicants say the FSP has failed and refused to properly review its
decision.
11. The Applicants seek to have the FSP pay the proposed settlement amount
already offered of $254,276.66, on a without prejudice basis, and pay
immediately a further amount of $35,000 for the demolition, certification and
design costs for the building, as per the quotation provided by the Applicants
from CB. In addition, the Applicants seek to have the FSP source three
quotations for the repairs of the pre-existing damage alleged by the FSP and
then pay the full cost of rebuilding the property, less the average of these
three quotations.
Summary of FSP’s position
12. The FSP says it has accepted the Applicants’ claim for cyclone related
damage, acknowledging the property did suffer cyclone damage, and has
settled the Applicants’ contents claim accordingly. These issues are not in
dispute.
13. The FSP says it appointed builders, engineers, assessors and experts to
inspect the property to provide an opinion on the damage caused and a
scope of works to enable quotations for repairs to be completed. As a result
of the inspections undertaken by these experts, a number of maintenance
items, wear and tear and pre-existing damage were found at the Applicants’
premises.
14. The FSP says it received a quotation for the rebuilding of the property
supplied by the Applicants’ builder ; however this quotation was prepared
prior to the inspection of the property by any engineers or experts to enable
an accurate scope of works to be provided. On receipt of the accurate scope
of works relating to cyclone damage only, this was provided to the
Applicants ’ builder to offer them an opportunity to p rovide a quotation,
however they did not provide a quotation.
15. The FSP says the quotations it received for the scope of works were
assessed and determined to be accurate. The most competitive quotation
was used to calculate settlement. In addition, an allowance for variations in
costs/materials etc was added, as recommended by its experts, of 20% of
the quoted repair cost.
16. The FSP says its offer was based on its experts’ advice on the condition of
the property and accurate quotations provided to it by its nominated builders.
A generous allowance was also provided for variations in costs/materials etc.
Case No: 274018 Determination Page 3 of 9
17. The FSP says it is not required to contribute anything towards maintenance,
wear and tear or pre-existing damage to the property as these items are
excluded from the policy coverage.
18. The FSP relies on the following policy provisions of the applicable Product
Disclosure Statement (PDS):
“ Settling your claim
If your certificate of insurance shows that you have home insurance we will
cover your home for loss or damage as a result of an insured event occurring
during the period of insurance.
We may choose at our option to:
rebuild or repair your home as new; or
pay you the cost to us of rebuilding or repairing your home as new
including any additional costs (relating only to that part of the home that
was damaged) necessary to comply with government or local government
laws existing at the time of the damage occurring, provided that at the
time of the original construction the laws and by-laws prevailing then were
complied with; or
pay you the home sum insured; or
settle, when allowance for wear and tear or lack of maintenance of the
property is to be made, as explained in “Claims settlement other than on
an as new basis” on page 26.”
“ Claims settlement other than on an as new basis
The amount we pay for rebuilding or repairing damage will be reduced from
an as new basis to an amount that would place you in the same position you
were in immediately before the loss or damage occurred with due allowance
for age, wear, tear and where applicable, lack of maintenance of the property
in the following circumstances:
where the home was not in a sound condition or well maintained at the
time of the loss or damage occurring;
...”
19. The Panel notes the letter to the Applicants on 27 October 2011 refers to an
incorrect PDS which was released around January 2011. As the Applicants’
policy had a cover period of 15 February 2010 to 15 February 2011 covering
the time of loss the PDS referred to could not be the applicable document.
Issues
20. Whether the Applicants are entitled to receive from the FSP the full cost of
rebuilding their residence.
21. Whether the Applicants are entitled to receive payments from the FSP for
demolition, certification and design costs for rebuilding their home from the
FSP.
Case No: 274018 Determination Page 4 of 9
22. Whether the FSP is required to provide quotations for the maintenance, wear
and tear and pre-existing items as requested by the Applicants.
Reasons for decision
23. This decision has been made by a Panel consisting of an Ombudsman, an
industry representative and a consumer representative.
24. The Panel is satisfied there has been a full exchange of material between
the parties and that each party has had the opportunity of clarifying the
issues that arise from the material.
25. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
26. The FSP is obliged to indemnify the Applicants for any loss they incur during
the period of insurance, as a result of an insured event, in accordance with
the policy terms and conditions as set out in the FSP’s applicable PDS,
current at the time of the loss.
27. In this case, it has been clearly established that the Applicants held a current
policy of insurance with the FSP at the time of the loss and that the event
giving rise to the reported damage was an insured event (cyclone). The
issues giving rise to this dispute revolve around the settlement being offered
by the FSP and the method of calculating that settlement.
28. The FSP’s position appears to be, on the face of it, quite simple, in that it is
prepared to indemnify the Applicants for their loss as a result of the cyclone
damage their property suffered, but it is not obliged to provide any
contribution towards areas of damage not caused by the cyclone. The FSP
has relied on its experts’ evidence which indicates the Applicants’ property
had a number of areas exhibiting signs of normal wear and tear, pre-existing
damage and an apparent lack of maintenance.
29. The Applicants say that the FSP has not provided detailed information
regarding the maintenance/wear and tear/pre -existing damage to their
property, nor has the FSP provided costs associated with rectification of
these items.
30. The Panel notes that copies of all reports from all of the FSP’s experts have
been provided to the Applicants. This is not denied by the Applicants and
these various reports, quotations and photographs have been referred to by
the Applicants in their correspondence to the FSP and to FOS.
31. The initial inspection of the property was made by the FSP’s internal loss
adjuster on or around 14 February 2011, which is the date of his report. The
adjuster advised the following in his report:
Case No: 274018 Determination Page 5 of 9
“During the cyclone the wind has blown a very large tee on to the roof of our
insureds (sic) home, the impact has badly damaged the roof, veranda and
front wall of the home. A section of the tree has crashed through the roof over
the lounge room, study area and main bedroom, sending debris, timber and
rain into both rooms.
...
Nature/Extent of Damage:
Building:
Refer scope of works from [BC.” (sic)
32. From documents presented by the FSP it appears the FSP appointed a
building consultant, BC, to attend with its internal loss adjuster on or around
14 February 2011. BC’s report of 15 February 2011 provides the following:
“ Overview Of Loss
Damage has been sustained to:
The tree has impacted diagonally across the front right corner of the house
with the top of the trunk going over the middle towards the left rear corner and
as a result of the impact all of the external walls have been forced outwards at
the top and the front wall pushed down through the floor into the subfloor area
and engineer will be required to determine if restoration is viable given the
age of the dwelling.”
33. Attached to this first report from BC are a number of photographs clearly
showing the tree still on top of the Applicants ’ home.
34. Based on the advice provid ed in BC’s report, the FSP appointed a building
engineer to undertake an inspection of the Applicants’ property to comment
on any safety issues and to summarise the main engineering issues. The
engineer attended the property on 26 February 2011 and his report dated 1
March 2011 identified the following safety issues:
“ Safety Issues Identified and Recommended Emergency Make Safe
Sidewalls have come away the top. We recommend that timber struts be
put into place from top of wall to bottom of verandah post.
Props to ceiling joists to timber floor to support collapsed roof. Props to be
placed over floor joist over supporting concrete stump.
Piece of timber hanging by electrical cord at front door to be removed.
...”
The engineer further provided the following summary on the main
engineering issues:
“ General Engineering Observations
A large tree near the house has fallen landing on the font right hand
section of the verandah and house causing significant damage and water
ingress.
At the time of the inspection, tarps had been fitted to prevent further water
ingress.
Case No: 274018 Determination Page 6 of 9
The existing floor appeared dry and minor signs of swelling.
Over 50% of the roof has been extensively damaged and the front
external wall from the door to the right hand side bay window has been
damaged.
Due to the force of the impact and lack of ceiling horizontal tie from left to
right, the sidewalls have been pushed outwards at the top. Apart from this,
all walls and floor framing appeared to be structurally sound.
The existing solar power panels installed on the rear of the roof are
undamaged and are to be removed prior to rectification works. We
understand the owner will undertake this task soon.
The entire existing roof sheeting is to be removed. All roof framing to be
removed, with the existing rafters cut at the external wall so that the
rafters remain over the veranda. Any damaged veranda rafters to be
replaced with salvaged timber from the main section of the roof.
Ceiling joists and VJ ceiling lining to be removed over the main section of
the residence.
Front-pitched veranda over the entry is to be removed and veranda rafters
supported by right hand side front wall to also be removed.
Front wall, including front entry door, to right hand side bay window to be
removed. Supporting bearer to be replaced as necessary if damaged.
Timber stud wall to be reinstated with VJ MDF internal lining wan
weatherboard lining externally. Note that the remaining walls will need to
have studs installed, by removing existing belt rail, and cladding externally
with weatherboards in order to match rectification of front wall as well as
to accommodate tie down rods of wall frame.
Reinstate main section of roof with timber trusses at 900 CRS and
hardwood timber or steel battens. Roof to be colorbond corrugated roof
sheeting and ceiling to be VJ MDF lining painted and sealed both sides.
All remaining VJ walls to sanded and gap sealed and repainted.
Kitchen joinery water damaged to be replaced.
Some existing concrete stumps have cracked and will be replaced. We
noted 3 stumps were cracked at time of inspection, including one stump
under the front right hand side corner of the house.
All works are to be to current Australian Standard Codes and relevant
BCA clauses.” (sic)
35. A scope of works was prepared by BC and the engineer’s report was used
as a basis of what work was required. The FSP says the engineer was not
involved in determining what areas of required repairs related to cyclone
damage and what area of damage related to wear and tear issues. This was
determined by the assessors based on the builder’s advice and observations
regarding wear and tear/maintenance issues.
36. The wear and tear/maintenance issues were identified by all of the builders
who were requested to provide a quotation for repairs and they indicated
they were not prepared to carry out the cyclone related repairs without
attending to the other repairs required at the property. The other repairs
Case No: 274018 Determination Page 7 of 9
related to wear and tear/maintenance items and/or pre -existing damage all
of which did not form part of the cyclone damage.
37. The Applicants’ builder’s quotation and proposed repair work included the
comment under “Note”, that:
“[BC]’s Scope of Works and Engineers report missed several structural issues
which have been included in the overall cost of this provided quote.
Clarification can be provided if required by contacting ...” (sic)
38. The FSP attempted to obtain clarification of the quotation from the
Applicants’ builder, however no response was received. The Panel realises
the Applicants’ builder’s quotation includes items which have been identified
by the FSP and its experts as not having been damaged by cyclone, for
example the concrete subfloor posts (5). The quotation does not specify
rooms requiring repairs or specific measurements or areas referred to.
Accordingly, the Panel cannot distinguish what repairs the Applicants’ builder
has quoted on which relate solely to cyclone damage and what repairs are
related to non-cyclone damage.
39. Whilst the Panel accepts the quotation from the Applicants’ b uilder covers all
repairs required to be completed at the property, the Panel cannot accept
that all repairs quoted are related to cyclone damage in light of the
overwhelming evidence provided by the FSP that there was pre -existing
wear and tear/maintenance issues at the property.
40. Despite the FSP’s efforts to clarify the quotation with the Applicants’ builder
in an effort to resolve the settlement dispute, the information sought was not
forthcoming. The Panel cannot, therefore, accept that quotation is either
accurate or useful for the purposes of determining a fair and reasonable
settlement.
41. Furthermore, the Applicants have not provided any evidence to support their
opinion that the wear and tear/maintenance related issues were not present
prior to the cyclone or were minimal. Photographs provided by the FSP
taken some 11 days after the cyclone event show evidence of the peeling
paint, poor condition of the veranda balustrade and cracks to stumps.
42. The Panel is satisfied that the Applicants’ property did in fact have pre-
existing damage which was not related to cyclone damage, and which would
be considered to be general wear and tear or maintenance related. It is on
this basis that the Panel accepts the FSP’s submission that these items
should be excluded from any settlement.
43. The Panel notes the Applicants’ comments regarding photographs provided
by the FSP being taken a considerable period after the insured event. In
their email to the FSP on 25 January 2011, the Applicants say:
“We note that the photographs reflect significant deterioration of our clients’
home that has occurred in the 12 months since the cyclone. The photographs
also show the original emergency tarpaulin put in place by the SES. Our
clients cannot understand why [the FSP] failed to ensure that the building was
properly protected. We are instructed that [the FSP] instructed [BC] to arrange
Case No: 274018 Determination Page 8 of 9
it when our clients told them the roof was leaking. On that basis all
deterioration since the cyclone is the responsibility of [the FSP].”
44. The Panel has reviewed all photographs provided by the FSP including
original photographs taken on or around 14 February 2011, 11 days after the
cyclone event. The Panel does not accept the Applicants’ opinion that the
property has significantly deteriorated since the cyclone event and there
does not appear to be any further damage to the property as a result of the
FSP’s “make safe” measures.
45. The Applicants also say that CB has indicated the cost to repair the cyclone
related damage at $285,000 and the repair of other items at $120,000. They
say based on this, the FSP is indicating that 43% of the home is in need of
maintenance for non cyclone related damage and only 57% of the damage
relates to the cyclone. They say this is inaccurate and that their home was in
a sound condition and well maintained prior to the cyclone event.
46. The Panel does not accept that the calculations detailed by the Applicants
are correct. The Applicants did not explain how their figure was reached but
appear to have used the following formula:
$120,000 ÷ $285,000 = 0.421 x 100 = 42.1% (approximately)
Instead of adopting the correct formula, which should be:
$120,000 + $285,000 = $405000 (total cost of all repairs/rebuilding cost ex GST)
$120,000 ÷ $405,000 = 0.305 x 100 = 30.5% (approximately)
(Pages 47,44,42)
47. Based on the Panel’s assessment of all information regarding repairs
provided by the FSP’s experts and the Applicants, and using the correct
formula, the Panel is of the opinion that 30.5% of damage attributable to
maintenance, wear and tear and pre-existing damage, is reasonable.
48. The FSP’s PDS is clear and unambiguous in its method of settlement where
wear and tear or maintenance issues are identified, as described above. In
this instance, the FSP is entitled to settle the claim based on the cost to
repair only the cyclone related damage taking into consideration a reduction
for wear and tear. That is, the Applicants are not entitled to receive a
settlement based on “new for old” replacement or repairs.
49. The Panel is satisfied that the repairs as q uoted by the various builders will
be using new products, for example, new paint to cover various areas of the
home which sustained damage as a result of the cyclone. However the paint
in these areas was quite obviously in a poor state of repair prior to the
cyclone and the Applicants will therefore be receiving a benefit of new
products/materials that were not present prior to the cyclone. Accordingly,
the FSP is entitled to make an appropriate deduction from the overall quoted
repair figure to allow for these types of improvements.
Case No: 274018 Determination Page 9 of 9
Determination
50. On the basis of the available information the Panel determines that the
Applicants are not entitled to receive the full cost of rebuilding their residence
from the FSP as it has been clearly determined that the residence has not
been completely destroyed. Whilst the Panel accepts that additional repairs
are required in order for cyclone damage to be effected, these additional
repairs involve pre-existing and non-cyclone related damage, and therefore
could not be considered by the FSP as part of the claim made by the
Applicants.
51. The Panel further determines that the inclusive offer of $254,276.66 made by
the FSP is fair and reasonable in the circumstances. It is based on a fair and
reasonable quotation provided by a qualified builder to effect repairs to the
cyclone related damage only. From that quotation, a deduction has been
made for depreciation, which takes into account the wear and
tear/maintenance related items and any betterment or improvement the
Applicants may receive from the repairs.
52. Finally, the Panel determines that other than identifying the areas of the
residence which have not been damaged by the cyclone event, the FSP is
not required to provide quotations for these items, as requested by the
Applicants.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.