Water inundation damage declined as flood, an excluded event
Summary
The insured business claimed storm-related water inundation at its hotel, which the insurer declined as flood damage. AFCA found an initial insured stormwater inundation up to 100mm above floor level occurred before flood water, so the insurer must pay that loss with interest, quantum to be agreed.
Consecutive rather than concurrent inundations by different proximate causes meant Wayne Tank did not bar cover for the earlier insured stormwater inundation.
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 273820 Determination Page 1 of 8
Case number: 273820
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
12 February 2012
Background
1. The Applicant holds a Business Property policy with the Financial Services
Provider (FSP). The policy provides cover for insured events as well as
accidental damage up to a selected sub-limit. The policy covers the building
up to the sum of $1,100,000, subject to an excess of $250.
2. During the severe weather events in Queensland i n January 2011 the
insured property in Forest Hill sustained damage arising from water
inundation.
3. The FSP declined the claim on the basis the inundation arose from flood
which is an excluded event under the policy.
4. The Applicant disputes the declinature o n the basis that the damage arose
from stormwater inundation which is covered by the policy.
Summary of Applicant’s position
5. The Applicant relies on the FSP‟s hydrology report from “W”. The Panel
notes the following from this report:
The hotel was inundated after 10.00am on 11 January 2011.
The hotel was inundated to a depth of 1.2m above floor level which
damaged furniture, fixtures, fittings and stock.
The manager M has provided W with the following version of events:
i. Around 9am M received a telephone call from a national
newspaper asking if water had come through the hotel. M noted
this had not occurred.
ii. Around 10am water appeared to come „out of nowhere‟ rising
quickly to inundate the hotel.
iii. M was airlifted out of Forest Hill at around 2pm.
The floor level of the hotel is about 150mm above the footpath and the
footpath is about 100mm above the street level.
Determination
Case No: 273820 Determination Page 2 of 8
Sandy Creek flows in a north-easterly direction on the western outskirts
of Forest Hill. Sandy Creek is a tributary of Laidley Creek at the
Warrego Highway, located approximately 4km north-east of the
property. The Laidley Creek gauge failed at 1pm on 11 January 2011.
The local rainfall gauge is approximately 6.4km away from the insured
property. The peak rainfall intensity of 42.4mm/hr occ urred at 7am on
11 January 2011 which is approximately a 2-5year ARI. The 6 hour
storm however was a 20year ARI and the 24-72 hour storms were 50-
100year ARI. The 12 hour storm had an ARI greater than a 100 year
event.
W noted the site topography and the size of the local catchment prior to
concluding the peak level of inundation (1.2m above floor level) could
not have been caused by local stormwater runoff.
The peak level of inundation at the subject property was caused by
floodwaters overflowing from Sand y Creek and Laidley Creek.
Floodwater from Sandy Creek would have backed up along the open
stormwater drains located within Forest Hill.
Floodwater from Laidley Creek would have flowed overland through
Forest Hill.
Due to the very flat topography of the area, it is possible that shallow
inundation (<100mm) above floor level occurred just prior to inundation
by floodwaters from Sandy and Laidley Creeks.
6. The Applicant has provided new submissions including a further eye witness
account from M. The Panel notes a separate statement from M was not
provided but the account recorded was as follows:
“That by that (sic) 8.30am on Tuesday, 11 January 2011 the rain became very
heavy. This very heavy rain continued until 2.30pm when the police came to
evacuate myself and my 4 year old son as well as Canadian Chef [name
removed] who worked at the hotel. The police came to the hotel in a
boat....We were saturated in the heavy rain at that time”
7. M also provided the following information:
Shortly before the inundation of the hotel she was advised by people
walking down “W Street” that the back of Forest Hill was flooded. She
says that this happens often in heavy rain. The water that ultimately
inundated the hotel came from that direction.
The hotel is in a dip so the stormwater would naturally collect in that
area.
The railway line near the hotel acted as a barrier for the stormwater.
There was nowhere for the stormwater to escape during the morning of
11 January 2011.
A ribbon of water developed in W Street filling up the g utters. The water
spread across W Street and that after 10 minutes the water was deep
enough for wheelie bins to float down the Street.
Case No: 273820 Determination Page 3 of 8
8. The Applicant notes evidence provided by the Bureau of Meteorology to the
Queensland Flood Commission of Inquiry said that there was heavy rainfall
in the months prior to the inundation. A sequence of thunderstorms caused
intense rainfall over Toowoomba and Lockyer Valley Catchment
commencing 10 January 2011. In particular:
“Forest Hill was reported to have been flooded at around 9:00 to 10:00am on
11 January 2011. This is believed to have been a result of very heavy rainfall
in the immediate area and flows in Laidley and Sandy Creeks”
9. The Applicant has enclosed an extract from the ICA Hydrology Panel Report
dated 20 Februar y 2011. The Applicant notes „surface run - off‟ is the name
given to water before it enters a waterway. The Hydrology Panel says that
overland flow is caused by direct local rainfall in the area producing the
overland flow. The Hydrology Panel goes on to say that overland flow
catchments are generally small in urban areas but can be large and flat in
rural areas.
10. The Applicant submits the hotel was inundated by stormwater from the rain
events of 10-11 January 2011. The FSP suggests it was flood water
however the hydrology report indicates there was initial inundation which
arose from stormwater damage.
11. The Applicant is critical of the FSP‟s submissions noting that it is based on
assumptions and probabilities. The Applicant submits that the FSP is
unfamiliar with the local topography which is flat. The heavy rainfall created a
large volume of rainfall which could not escape.
12. The Applicant seeks indemnity from the FSP for storm damage in the sum of
$300,000 but accepts FOS‟s jurisdiction is up to $280,000.
Summary of FSP’s position
13. The FSP relies on the following policy terms and conditions:
“1. Definition which apply to this section
...
1.3 Flood – the inundation of normally dry land by water escaping from or
released from the normal confines of any natural water course of lake
(whether or not altered or modified) or any dam, reservoir or canal.
...
3.3 Wind and water
Wind and water including water and any other liquid discharged from mains,
pipes, gutters, drains, tanks or fixed apparatus used to hold or carry liquids,
but not loss or damage:
(a) By sea, tidal wave, high water, flood, erosion, subsidence, landslide,
mudslide or settling”
Case No: 273820 Determination Page 4 of 8
14. The FSP has enclosed a report for the loss adjuster “C”. The Panel notes the
following from this report:
a. The assessor was advised by the tenant (manager) that after heavy
rain which fell in the Toowoomba region and subsequently the Lockyer
Valley over 10-11 January 2011, the hotel received water ingress.
b. The tenant advised water suddenly started to progress towards the
hotel in the morning of 11 January 2011. The water rose rapidly,
peaked at 1m and then dropped rapidly.
c. Damage has occurred to refrigeration equipment, front face of the bar,
kitchen flooring and bar areas, walls, doors, tiling in toilets, cool room,
poker machines, carpet to poker machine area and various sundry
minor damages.
d. The assessor set a reserve (exclusive of GST) in the sum of $110,000.
15. The FSP has enclosed an email dated 6 March 2012 from W. The Panel
notes the following from this email:
The direction of water flow described by M is consistent with floodwater
overflow. W Street is located to the West of the subject property, with
Sandy Creek located further to the west beyond W Street. The
floodwater from Sandy Creek would have arrived in Forest Hill by
backing up along the open drains within Forest Hill.
W confirms the property is located within a dip and that the floor level is
250mm above street level.
W confirms that the reported timing of initial inundation and the
elevated floor level of the subject property suggests stormwater alone
could not have inundated the subject property to the maximum depth
observed.
W further maintains it is possible that stormwater run-off could have
inundated the property above floor level immediately prior to the arrival
of Sandy Creek and Laidley Creek floodwaters. The stormwater runoff
would have been unable to drain freely from the vicinity of the subject
property due to the elevated creek water levels. Based on an
assessment of the relative ground and floor levels, the depth of
inundation above floor level by stormwater runoff would have been less
than 100mm.
16. The FSP submits that on the balance of probabilities the damage arose from
flood water inundation.
17. The FSP contends the Applicant has failed to discharge the onus of
demonstrating an insured event occurred.
18. If there was any stormwater inundation, it occurred after floodwater
inundation had already occurred. The FSP submits that the Wayne Tank
principle is applicable given there are two proximate causes of inundation.
Case No: 273820 Determination Page 5 of 8
19. The FSP notes the Applicant‟s submissions regarding the initial stormwater
inundation and responds as follows:
W‟s report states it is „possible‟ that there was shallow inundation by
stormwater around 10am (11 January 2011). Further, W‟s report
establishes that in addition to overland flooding the stormwater drains
would have surcharged which, according to the K Sika Plastics case,
constitutes flooding.
The stormwater runoff would have to reach 250mm above street level
and the rainfall from 4am to 10am was 80mm. Accordingly, the
stormwater inundation was 170mm below the necessary levels
required. In addition to this, the rainfall records indicate the rainfall
decreased after 8am. Therefore if there was any stormwater inundation
of the hotel it occurred after the flood inundation.
M‟s description is that water rose quickly and accordingly there is no
suggestion of storm inundation prior to the flood inundation. The later
statement provided to the Applicant cannot be relied upon. M originally
describes the direction of the water which came down W Street which
also happens to be from the direction of Sandy Creek. Further, the
quick rise of the water would be contrary to a stormwater runoff
scenario.
The ICA Hydrology Panel stated Forest Hill experienced flooding from
Sandy Creek from 2am. The town of Laidley sustained flooding from
the Laidley Creek from 6am. Accordingly flooding from Laidley Creek
would have commenced in Forest Hill shortly after.
The FSP notes that the Bureau of Meteorology evidence indicates
flooding between 9am-10am on 11 January 2011 was due to heavy
rainfall. However, the FSP considers the evidence unspecific in nature
and not site specific to the insured‟s property. The evidence is based
on weather patterns rather than hydrological considerations. The
evidence of W should therefore be preferred.
20. The FSP notes that if FOS determines there was initial stormwater
inundation that FOS should seek further information and submissions
regarding what loss is subject to policy cover as the Applicant has provided
no information on quantum to date.
Issue
21. Whether the FSP was entitled to decline the Applicant‟s cla im for loss and
damage arising from water inundation.
Reasons for decision
22. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
Case No: 273820 Determination Page 6 of 8
23. The Panel has read each party ‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
24. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
25. The Panel notes there is only one site specific hydrology report, from W. The
evidence from W is that the 12 hour storm had an ARI greater than the 100
year event. W reviewed the street level and floor leve l still stated that:
“ Due to the very flat topography of the area, it is possible that shallow
inundation (<100mm) above floor level occurred just prior to inundation by
floodwaters from sandy and Laidley Creeks ”
26. W‟s conclusions are somewhat corroborated by the Bureau of Meteorology
evidence indicates flooding between 9am-10am on 11 January 2011 was
due to heavy rainfall.
27. The Panel places limited weight on the evidence from M as presented by the
parties due to the different accounts being contrary and the lack of any direct
witness statement from M.
28. Similarly, the Panel places limited weight on that part of the FSP‟s
submissions which differ from the W‟s conclusions on the basis that W is an
appropriately qualified expert who has reviewed the site of inundation. In
particular, the Panel is not persuaded by the FSP‟s submission that water
level quickly rising and dissipating is being consistent with riverine flooding.
In the Panel‟s extensive experience in flood matters, this type of inundation
is generally quite consistent with flash flooding caused by rainfall as seen in
Towoomba and Ipswich. Where such assumptions are made by an FSP
without corroboration from a professional hydrologist as to the source of
inundation the Panel cannot rely on such submissions. Given this, the Panel
prefers to rely on the evidence of the hydrologist.
29. The Panel accepts that W has appropriate qualifications and has taken into
account relevant factors prior to concluding that:
a. There was a possible inundation of not less than 100mm prior to the
flood inundation; and
b. That flood inundation was responsible for the inundation up to 1.2m.
30. The Panel notes the FSP has made much of W‟s statement that “it is
possible” that stormwater inundation occurred prior to flood. The Panel
considers that W‟s statement together with the ARI rating assigned to the
rainfall by W and the statements regarding the weather by the Bureau of
Meteorology make it more probable than not that stormwater inundation
occurred. The Panel further notes that the areas o f Toowoomba, Gatton and
Forest Hill are in the Lockyer Valley region which is surrounded by
mountainous ranges. The Panel is aware from multiple claims in this area
that there was in fact extremely heavy rainfall which affected the valley. The
hotel itself sits in a topographical dip within Forest Hill.
Case No: 273820 Determination Page 7 of 8
31. The Panel notes W‟s further email indicates that stormwater runoff would
have been unable to drain freely from the vicinity of the subject property due
to the elevated creek water levels. Presumably this is the basis for the FSP‟s
reliance on the K Sika Plastics case.
32. The K Sika Plastics case held that:
“...In ordinary and natural language, I think that a water course is said to
overflow its normal banks when all the water that would otherwise drain or fall
into it cannot be contained in it because it is full. All the surplus water is then
overflow, no matter whether or not some of it has at one time been within the
banks and then forced out.”
33. The Panel have previously accepted submissions based on this case in
relation to flood disputes. Based on the evidence in this dispute, however,
there is no demonstrated link between the stormwater inundation and the
inability of the stormwater to runoff i nto a watercourse. This is particularly so
given W has stated the inundation was likely due to the flat topography
rather than the water being unable to drain away due to the watercourses
being full. The evidence from W does not support the application of the Sika
Plastics case.
34. The Panel similarly notes Wayne Tank can be applied in circumstances
where there are two simultaneous proximate causes of loss. However, the
Panel must also take into account the case of Elilade Pty Ltd v Nonpareil Pty
Ltd [2002] FCA 909 . In the case of Elilade, the insured company was subject
to two water inundations which caused separate damage. The first
inundation was caused by an insured event and the second inundation was
caused by the excluded event of flood. The Court gave co nsideration to the
issue of Wayne Tank in this matter and held that:
“From that point, that is from the time of the second inundation, I do not
consider that Elilade is entitled to be indemnified under the policy for any
damage to its stock or plant and equipment. There are two means of reaching
that conclusion. The first is to treat the initial inundation and the second
inundation from that point as each operating as effective or proximate causes
of Elilade's losses sustained thereafter. In that event, as one of the proximate
causes was an exempted event under the policy, Elilade would not be entitled
to indemnity: Wayne Tank and Pump Co. ; Countrywide Finance Ltd v State
Insurance Ltd [1993] 3 NZLR 745. The second is to conclude, as I do, that in
a real and practical sense, the proximate or effective cause of any damage
caused after that time was the second inundation. It effectively rendered the
initial inundation of no ongoing significance to the losses sustained after that
time. The quality of the water from the Katherine River, with its high organic
content, was different from that of the initial inundation. It had different and
more adverse consequences, including health considerations, leading to
virtually all the stock and plant and equipment being irrecoverable and being
disposed of. Its height of 1.8 metres was greatly higher than the initial
inundation.”
35. The Panel notes this case is analogous to the current circumstances. The
cause of each inundation in the present case is different. The stormwater
inundation occurred due to flat topography and heavy rainfall. The second
inundation arises separately due to flood which likely caused a higher
Case No: 273820 Determination Page 8 of 8
degree of damage due to the organic material which is common part of
riverine flooding.
36. The Panel considers that the Wayne Tank principle should not be applied
due to the apparent consecutive rather than concurrent nature of these
inundation events operating by different proximate causes.
37. Based on the evidence before it, the Panel accepts on the balance of
probabilities that the initial inundation up to 100mm above floor level of the
insured premises occurred prior to the flood water inundation. Further, that
the initial inundation is an insured event which is separate from the flood
inundation to which the policy responds.
38. The FSP has asserted that FOS should require quantification for the damage
from the Applicant as the Applicant has provided no such evidence to date.
The Panel notes that neither party has provided evidence of quantum
despite the FSP‟s loss adjustor‟s attendance at the property. FOS‟s role is to
determine disputes based on the material before it, as there is currently no
dispute on quantum it would not be appropriate for FOS to perform such a
role.
39. The parties are requested to work cooperatively to determine the extent of
damage which would have been caused by an initial inundation up to
100mm above floor level. For the sake of clarity, the FSP is not required to
indemnify the Applicant for any damage caused by inundation greater than
100mm above floor level.
40. If a dispute later arises on the quantum then the parties can revert to FOS
for either conciliation or a Determination.
Determination
41. On the basis of the available information the Panel determines the FSP was
not entitled to decline the whole of the Applicant‟s claim. The Panel further
determines that the FSP is liable to make payment for loss or damage
caused by inundation up to 100mm only in accordance with the policy terms.
42. The Panel further determines that the FSP is to pay interest in accordance
with Section 57 of the Act from 12 July 2011 (being the date on which the
FSP‟s hydrologist confirmed in its report that a low level inundation above
floor level could have occurred) to date of payment of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.