Partial denial of hail storm home claim: timber floor denied as pre-existing, roof offer disputed, and insurer demanded reassessment
Text of the determination
Case No: 273736 Determination Page 1 of 16
Case number: 273736
General Insurance - Domestic Insurance - Home Building - FSP’s Decision –
Partial Denial - Hail Storm - Pre-Existing Damage - Conflicting Expert Reports –
Insurer’s Entitlement to Re -Assess
28 November 2012
Background
1. The Applicants hold an Accidental Damage Home Insurance policy with the
Financial Services Provider (FSP).
2. On 25 December 2011, a hail storm occurred which damaged the
Applicants’ home.
3. The FSP had the property inspected by its assessor, two builders, and a
roofing contractor. (the advisory group).
4. Based on the reports from (the advisory group) the FSP partially accepted
the claim. It accepted damage to electrical fittings, ceilings and walls of the
various parts of the house.
5. However, it denied the entire timber floor claim and only partially accepted
the roof claim. It noted pre-existing damage to the timber floor and roof. It
also denied damage to the entry porch. It offered a cash settlement of
$11,680 (less $250 excess) to the Applicants.
6. The Applicants were not satisfied with the offer and obtained their own
expert reports, including reports from a builder, a construction firm, and an
accredited Australian Timber Flooring Association Floor Inspector (A’s
advisors). The builder estimated repair costs for all the damage to the home
in the amount of $75,000, apart from the cost of remedial works carried out
during and immediately after the storm on 25 December 2011.
7. After receipt of Applicants’ expert reports, the FSP sought a re -assessment
of the property by two more experts (the reviewers).
8. The Applicants initially agreed to the re-assessment but changed their minds
after consulting a lawyer.
9. In its Internal Dispute Resolution letter dated 23 July 2012, the FSP wrote:
“While you have suppli ed the report from [your building advisor] ], [FSP does]
not believe that the request for [the reviewers]] to attend your property is
unreasonable. It is a responsibility when you make a claim that “you must
(original emphasis) give us any information or assistance we require to
Determination
Case No: 273736 Determination Page 2 of 16
investigate and process your claim”... [U]ntil [FSP’s] experts have been
granted access to your property cash settlement offer of $11,430 stands as
[FSP’s] offer of settlement.
Summary of Applicants ’ position
10. The Applicants’ lawyer says:
the Applicants allowed numerous persons engaged by the FSP to
attend the property. However, each time a person attended, the FSP
decided further persons should be engaged;
the Applicants have acted in utmost good faith towards the FSP in
accordance with section 13 of the Insurance Contracts Act 1984 by
allowing numerous tradesmen to inspect the property on numerous
occasions;
it is unreasonable for the FSP to expect the Applicants to continue to
allow further inspections when it had ample opportunity for the same.
Approximately 6 months had passed since the damage was caused,
and the Applicants are no closer to rectifying the serious deficiencies in
their home;
given the state of the home, the Applicants were inconvenienced
greatly as they were unable to live in their own home;
the Applicants have now gone to the expense of engaging persons to
rectify their home to bring it back to a condition where they can
comfortably live. Although this means that the FSP may not be able to
send further professionals in to consider the state of the premises, they
clearly have sufficient reports to consider the extent of the damage; and
the Applicants have also just recently been made aware of an issue
with their heating. Given the state of their home, they have not had
cause to use the ducted heating and have instead been utilising a
heater upstairs. The FSP should also indemnify the Applicants for the
repair of the heating.
11. In their Dispute Form, the Applicants say that they “had to get an
independent building inspector report as [FSP] would not allow [them] any
access to any of the reports their people had come through”. The report from
[A’s advisors] cost more than $6,000 and the Applicants had to borrow
money to pay that amount.
Summary of FSP’s position
12. The FSP says:
it accepts that the insured property suffered damage due to the storm
on 25 December 2011;
Case No: 273736 Determination Page 3 of 16
however, it does not accept that all repairs claimed by the Applicants
arose from that storm;
the exper t reports it tried to obtain from [the reviewers] “were to be
used to reach an agreement to the extent of [storm] damage”;
because there is doubt as to the extent of the storm damage, it is
necessary for its appointed experts to attend the insured property.
13. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement (PDS):
“ Your responsibilities when you are making a claim
When you make a claim you must meet a number of responsibilities.
You must
...
give us any information or assistance we require to investigate and process
your claim
...
If you do not meet your responsibilities
If you do not meet your responsibilities, we may refuse or reduce a claim...”
Issues
14. Whether the Applicants have breached the policy condition “You must... give
us any information or assistance we require to investigate and process your
claim” when they refused a re -assessment of the property by the FSP.
15. Whether the FSP is entitled to a re-assessment of the roof and timber floor in
order to determine the extent of storm damage.
16. Whether there is sufficient expert evidence to determine the extent of storm
damage to the roof and timber floor.
17. Whether the Applicants have established storm damage to the timber floor.
18. Whether the FSP’s cash offer of $4,100 to settle the roof damage is fair and
reasonable.
19. Whether the FSP must indemnify the Applicants for the cost of make – safe
and temporary repairs to the roof.
20. Whether the FSP must indemnify the Applicants for the make-safe and
temporary repairs to downlights, smoke alarms, power feed and safety
switches.
21. Whether the Applicants are entitled to be indemnified for the alleged damage
to the heating appliance.
Case No: 273736 Determination Page 4 of 16
22. Whether the FSP’s cash offer of $7,580 to settle the undisputed items
(ceiling, walls, and electrical fittings) is fair and reasonable.
23. Whether the FSP must indemnify the Applicants for damage to the entry
porch area.
24. Whether the FSP must compensate the Applicants for professional costs
incurred in relation to this claim.
Reasons for decision
25. Due to the nature of the dispute, the Financial Ombudsman Service (FOS)
has considered it appropriate to expedite the dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference. Thus, this dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination. The parties have been previously advised that a
Determination will be issued in this case.
26. The Panel is satisfied that there had been an exchange of all relevant
information between the parties and that each party has had the opportunity
to address all issues raised.
Giving information or assistance
27. The evidence before the Panel shows that the FSP’s group of four
assessor/experts had access to the insured property on four occasions in
January 2012. They inspected and reported on the extent of damage to the
home, including the roof and timber flooring, and gave their opinion on what
caused the damage.
28. The Panel is satisfied that the FSP had ample opportunity to make a full
assessment of the roof and floor, and, in fact, made a decision to partially
deny the roof claim and totally deny the floor claim based on the various
reports of their assessor/experts. Moreover, the FSP had made an offer of
cash settlement based on the full assessment by its experts/assessor.
29. The fact that the Applicants were able to obtain their own expert reports that
seriously challenged, if not rebutted, the FSP’s assessor/expert reports did
not automatically entitle the FSP to demand a re-assessment of the roof and
floor.
30. The Panel is not persuaded that the Applicants’ refusal to agree to a re -
assessment of the roof and floor amounts to a breach of the policy condition
on giving information or assistance when required by the FSP in
investigating the claim.
31. The FSP, by making a decision to partially deny the roof claim and totally
deny the floor claim, should be deemed to have already completed its
investigation of the roof and floor claim. If it had not yet completed its
Case No: 273736 Determination Page 5 of 16
investigation, then it should have not made the denials and offered a cash
settlement.
Sufficient expert evidence to determine extent of storm damage to roof and
floor
32. As will be evident below, each party has submitted several expert reports,
some of which are quite detailed and extensive.
33. The Panel has considered all the expert reports submitted by the parties and
note in particular the expert reports discussed below.
34. The Panel is satisfied that there is sufficient expert evidence to determine
the extent of storm damage to the timber floor and roof.
35. The Panel will now discuss these two items.
Timber Floor
36. The timber floor was inspected and assessed by the FSP’s builders and
assessor. All three did not attribute storm damage to the floor and noted pre-
existing damage to the floor.
37. One of the builders attended the insured property on 3 January 2012 and
reported on the timber floor as follows:
“ BUILDERS ASSESSMENT OF CAUSE :
Inspection of the property shows evidence of water entry to both the
downstairs section, and the upstairs section of the house.
...
RESULTANT DAMAGE:
...
The Insured is also claiming damage to the entire polished timber flooring, which
consists of direct fixed solid timber flooring, with a sand and polished finish.
The alleged damage consists of cracking along the timber grain through most
sections of the floor. The timber flooring is installed through most rooms
downstairs.
According to the Insured, a significant amount of water flooded the entire
downstairs floor, hence the damage to the timber flooring.
There is no other evidence of significant water damage, with no visible
..peaking... of the timber, and no skirting board swelling visible.
In our opinion the timber floor was cracked before the event, and is the result of
timber shrinkage. This is probably due to the timber not being allowed to
acclimatize during the construction period. We do not believe the timber damage
is due to the claimed event.”
38. The other builder also inspected the timber floor and reported 30 January
2012. The report relevantly reads:
Case No: 273736 Determination Page 6 of 16
“We refer to our previous correspondence in relation to the above claim and
now supply you upon your request a brief report on our Assessment of the
Timber overlay Flooring...
ITEMS ASSESSED
Overlay Flooring : The Timber overlay Floor laid to the Living/Entrance Room
& Hallway was an item that the Insured's Son pointed out to me to assess.
Outcome: This Floor had a serious problem which was the splitting
down the centre of many Boards which could be attributed to the Floor
being "Green Laid'' where the Builder has not allowed the Flooring once
delivered on site to Climatically adjust to the surrounding conditions
before being laid down or were released from the Mill to early and did
not have enough time to cure before being laid. These splits are almost
certain to be due to shrinkage.
The Insured's Son also pointed out to an area of this Flooring at the
entrance Door to the Garage where once the Door was opened inwards
it would hit the floor at the halfway opening point and he was sure this
did not previously occur before the recent Hail/Rain storm of the 25/12
and claimed water had run down onto the Floor causing it to "swell &
lifts. I could not discount his reasoning of this explanation however
there was considerable surface damage to the Floor from continual
"scraping" where the Door was forcibly opened on more than a few
occasions. Maybe this section was lifting due glue delaminating or from
an expansion problem. If the Insurer was to accept this Floor damage
claim to the entrance to the Garage we would recommend a Cash
settlement for this area only as the other issues with this Floor are
tot ally unrelated to “storm damage” (original emphasis)
39. The FSP’s assessor inspected and assessed the property on 9 January
2012. With regard to the timber floor he reported]:
“Attended property as a result of storm water entry which occurred on the 25 -
12-2011.
...
Our is [sic] also claiming damage to the entire polished timber flooring, which
consists of direct fixed solid timber flooring, with a sand and polished finish.
The alleged damage consists of cracking along the timber grain through most
sections of the floor. The timber flooring is installed through most rooms
downstairs.
According to our insured, a significant amount of water flooded the entire
downstairs floor, hence the damage to the timber flooring.
There is no other evidence of significant water damage, with no visible
peaking of the timber, and no skirting board swelling visible.
In my opinion the timber floor was cracked before the event, and is the result
of timber shrinkage. This is probably due to the timber not being allowed to
acclimatize during the construction period. I do not believe the timber flooring
damage is due to the claimed event. ”
40. The Applicants obtained three contrary expert reports. All three concluded
that the timber floor was damaged by the storm.
Case No: 273736 Determination Page 7 of 16
41. The flooring specialist issued a report on 13 February 2012 stating:
“After careful inspection of the timber floor of which moisture tests have also
been carried out. It is evident of a higher than usual moisture content ranging
between 14 and 20%. There are also extensive amounts of cracks which have
occurred over the duration of the drying out period. I would highly recommend
removal of the flooring an battens, only because it is unknown of the condition
of the subfloor to price a resand only, which would be void of any warranty
(sic), and problems may reoccur.” (sic)
and quoted $35,939.20 (inclusive of GST) to repair the timber flooring.
42. An accredited Floor Inspector inspected the insured property on 9 March
2012 and issued a “Floor Inspection Report” dated 15 March 2012. The
report relevantly reads:
“ 6.0 ANALYSIS OF OBSERVATIONS MEASUREMENTS AND TESTING
...
The internal environment was reported to be damp, with a musty smell and is
still drying out with ongoing storm damage work to be carried out (carpet
underlay replacement one item to be addressed).
Concerning the measurements taken over 10 boards they indicate that at the
time of laying the average board width was close to the nominal manufactured
board width of 85 mm.
Although a species correction factor could not be applied the moisture meter
readings of 10% and 14% were not outside expected parameters for a floor
that has now dried. It should be noted that these meters are considered to be
accurate to 32% in the range being measured, when applicable corrections have
been applied. More accurate moisture content testing can only be achieved by
removing samples from the floor and testing them in a laboratory by the oven dry
method.
The gapping between boards and split boards is considered to be the result of
the floor taking up moisture from the wet environment relating to the reported
storm. That condition expanded the boards and where expansion could no longer
be accommodated the timber fibres were subsequently compressed. When the
floor dried out (which appears to be ongoing) the compressed fibres did not (and
do not) return to their original state, therefore the board dimensions reduce to
less than their initial dimensions, hence this has resulted in shrinkage gapping.
Concerning the cause of the wider irregularly spacing of the gaps it is considered
likely that although edge bonding would have been present in the floor prior, it
was the inherent movement from the wetting and redrying that has resulted in the
appearance of an edge bonded irregularly gapped floor. Note that attached is an
earlier report by a third party and at the end of the report it states "It is evident of
a higher than usual moisture content ranging between14 and 20%".
7.0 FACTORS CONSIDERED TO BE CONTRIBUTING TO THE
PROBLEM ARE
...
From our observations and testing, it is considered that the gapping and edge
bonding in the floor is likely the result of moisture uptake due to the storm. This
has presented a floor that is no longer considered to be in an acceptable
condition.
Case No: 273736 Determination Page 8 of 16
8.0 CONCLUSIONS
...
The purpose of this report was primarily to assess the causes of gapping present
in the floor.
Throughout the installation the gapping was considered to be predominantly
caused by pressure effects and crushing through expansion forces from storm
moisture uptake that was then followed by shrinkage in the floor as moisture
contents returned to more normal levels. The effect of this movement combined
with edge bonding effects in the floor have then resulted in the irregular spaced
gaps.
Though the floor is considered sound, it is commercially unacceptable and
remedial work is needed. This may require replacing the entire floor when the
home environme nt is dried out and considered to be stable.”
43. The Applicant’s builder inspected the insured property on 5 April 2011 and
issued a report dated 25 April 2012. With regard to the timber flooring, he
reported:
“ Timber Flooring
61 As reported the timber flooring throughout the Ground Floor area exhibits
irregular and wide spread gapping throughout. The majority of the gaps
between individual boards are 2mm or greater with a large number in the
order of 4mm. A considerable degree of splitting within the lengths of
individual boards has also occurred.
62 The [FSP] Home Claims letter of 21 st February 2012 with reference to the
timber floor states that they appointed [Builder P] to report on the damage
and with particular respect to the timber flooring, note that [Builder P]
observed:
....
63 I have been provided with a copy of a Floor Inspection Report prepared for
[J] and dated 15 th March 2012. I note the following points from that
document:
...
64 I have also been provided with a report and quotation from [IFlooring]
dated 13 th February 2012. I note the following comment from that
document:
...
65 The damage to the timber flooring is extensive and involves quite wide
gaps between individual boards and splitting of the actual timber flooring. I
disagree with the comments that have been made that this damage existed
before this storm event. While drying shrinkage can occur as a result of not
acclimatising timber flooring prior to laying, based on my experience this is
not the cause of the problem in this building. I agree with the findings of the
[J’s] Floor Inspection Report that the widespread movement in the timber
flooring is a result of excessive moisture from the water ingress into the
house during the storm and subsequent drying out of the timber.”
Case No: 273736 Determination Page 9 of 16
44. The Panel i s of the opinion that the Applicants’ expert evidence have
rebutted the FSP’s expert evidence. The Panel is satisfied that the timber
floor was damaged by the storm.
45. Therefore, the Panel determines that the FSP must indemnify the Applicants
for the cost of repairing the timber floor.
46. The Panel notes that the flooring specialist quoted $35,939.20 (inclusive of
GST) to repair the timber flooring, while the builder quoted $34,955
(excluding GST).
47. The Panel determines that the FSP indemnify the Applicants based on the
lower quote, $35,939.20 plus interest.
Roof
48. The parties agree that the roof was damaged by the storm. However, they
disagree on the extent of damage.
49. The roof was inspected by two of the FSP’s experts.
50. A builder inspected the roof on 3 January 2012 and gave the following
report:
“Insured advised water entered the property during the recent hail storm.
The insured advised that they had a previous ... water entry claim in the same
area in 2007.
ACTION FOLLOWING INCIDENT:
A makesafe was performed by others to the roof. The Insured however sealed
the damaged ceiling in the lounge room, and moved the furniture out of the
lounge room themselves.
BUILDERS ASSESSMENT OF CAUSE:
Inspection of the property shows evidence of water entry to both the
downstairs section, and the upstairs section of the house.
The downstairs water entry occurred in the lounge and garage respectively. In
both these areas, the roof above is a flat deck metal roof with box gutters.
There is evidence of ongoing issues with this roof as there is copious amounts
of silicone sealant applied liberally in an attempt to seal the roof. There is also
evidence of poor construction methods around the base of the windows
directly above the deck roof. The insured advised they had previous issues
with the deck roof, and the Plumbing commission was involved in getting the
repairs completed. In our opinion there is still a construction issue with the
deck roof, and may continue to leak due to inadequate overflows, and poor
flashing/ sealing.
The upstairs roof consists of cement tiles. The roof is in generally good
condition, however a close examination was not possible due to the roof being
2 story. There is evidence of temporary repairs to the front ridges, with plastic
installed where the tiles were missing.”
Case No: 273736 Determination Page 10 of 16
51. The roofing contractor advising the FSP also inspected the roof on 18
January 2012 and gave the following opinion:
“ Expert Opinion on Findings
Storm damage and roof leaks had occurred at this multi-storey dwelling with
a concrete tiled roof.
Strong winds had dislodged several capping tiles from the upper roof.
Approximately 15 roof tiles were damaged as the capping tiles tumbled down
the roof’s surface.
Leaks had occurred in the upper rooms as rain water had penetrated through
the capping tile gaps and through the cracked roof tiles and diverted into the
roof cavity.
Others had installed lead flashing over the hip capping tiles and sealed some
roof tiles for temporary weather proofing.
Leaks had occurred in the Iounge room and were the result of incorrectly
applied sealants to the cover flashing and roof sheets intersections (faulty
work). The sealants had cracked (maintenance) allowing rain water to penetrate
through, become trapped and back flow over the upper ends of the roof sheets
and divert into the roof cavity.
The general condition of the remainder of the roof is in good order although [S
Roof] noted approximately 40-45 roof tiles with broken water courses
(maintenance). [Original emphasis]
...
Required and/or Recommended Repairs
Storm/impact related repairs: Replace approximately 8 capping tiles and 15
broken/cracked roof tiles. Re-bed (where necessary) and re-point all capping
tiles on the upper roof and 2 lower rear hips with a combination of Bondcrete
and silicone or Flexi-point. Note: Bondcrete is required as this roof is located
in a high-wind area.
Other required repairs: Remove all of the silicone from the cover flashing
and roof sheet intersections on the lower south facing roofs. Replace
approximately 45 roof tiles with broken water courses. Re-bed (where
necessary) and re-point the capping tiles where these may be disturbed
during tile replacement.”
52. The FSP, noting the recommendation of replacing 8 capping tiles and 15
broken/cracked roof tiles, offered to cash settle the roof claim in the amount
of $4,100.
53. The Applicants obtained their own expert reports on the extent of storm
damage to the roof.
54. One such report dated 13 February 2012 relevantly reads:
“This report was condu cted on Wednesday the 8 th of February at approx 5.30
pm. This report confirms that I have personally sighted the property at
[address]. [Female Applicant] contact with me and requested a report to be
written up due to some disputes she was facing as to what can be covered by
insurance and what[FSP] believed was not storm water damage related and
need further proof by obtaining Independent reports from professionals.
Case No: 273736 Determination Page 11 of 16
On assessment I observed obvious damage when going throughout the two
manholes located in the house one upstairs near bathroom and one down
stairs in the bathroom of the main bedroom. Upon entering the roof there were
obvious cracks and light was coming throughout from above and potentially at
risk of another leak if it was too rain again, on using the ladder and on the top
of the roof I sighted broken loose tiles and some missing tiles, it also appeared
some work was done previously too patch up some areas with metal sheeting
and other materials and silicone to keep tiles together, obvious throughout the
tiled roof areas toward top front of house above the balcony, both sides of the
house also back of house were all affected, some tiles were chipped and
cracked there were loose tiles sitting at the edge of roof where owners stated
that some tiles have been falling and were very concerned about two young
children which are no longer allowed to play in their own back yard due to
safety issues.
In my opinion I believe that storm water has caused this ruin...”
55. The builder inspected the insured property on 5 April 2011 and issued a
report dated 25 April 2012 where he stated:
“ Roof Tiling
45 It is obvious that significant damage occurred to the roof tiling on this
house during the storm of 25 th December 2011. On the day of the event [a
plumber carried out emergency repairs into the night and during the next
day. They carried out temporary repairs to the hips and ridges on all of the
tiled roof areas and replaced numerous tiles. It was also necessary for [an
electrician] to carry out emergency repairs to water damage on downlights,
smoke alarms and light fittings as well as damage to the electrical
wiring/safety switches.
46 Other contractors also attended on the day of the storm and thereafter to
carry out make-safe work which principally involved replacement of tiles. I
am instructed by the Owners that a considerable number of tiles that had
been left over from the original house construction were used by the
various contractors to rectify roof areas damaged by the storm. My
inspection confirms that a considerable number of roof tiles have been
replaced.
47 At the time of my inspection a number of broken/cracked tiles were
identified and it is quite possible that more exist on the two tiled roof areas.
I note that the [the FSP’s roofing advisor’s] report issued following their
inspection on 18 th January 2012 recommended the replacement of
approximately 8 capping tiles and 15 broken/cracked roof tiles. That report
also recommends the replacement of approximately 45 roof tiles that had
broken water courses which is considered to be maintenance work.
However in view of the considerable amount of foot traffic that has been
necessary at the time the initial damage occurred and subsequently to
minimise the chance of roof leakage it is considered that the replacement
of the roof tiles should include this number as that is the likely cause.
48 Considerable damage to the pointing/bedding of hip/ridge tiles has
occurred as a result of the storm. Approximately 8 hip capping tiles have
been damaged at the time of the inspection and temporary lead coverings
were in place in these areas.
49 ...
Case No: 273736 Determination Page 12 of 16
Metal Roofing
50 The metal roofed area over the Living Room is approximately 30sq.m. and
falls to an adequately sized box gutter, discharging through rainheads at
both sides of that area which are connected to separate downpipes.
51 The metal roof over the Garage receives approximately ¼ of the First Floor
tiled roof area via a downpipe to the north-east corner and the combined
roof areas are approximately 70sq.m. This metal roof also discharges to an
adequately sized box gutter with sufficient fall discharging to two rain
heads connected to two separate downpipes.
52 I note that the slope on the roof over the Living Room is approximately 1 in
200 and that over the Garage is approximately 1 in 100. These slopes are
less than the minimum recommended fall for this particular roofing of 1 in
60.
53 I have carried out calculations in accordance with the requirements of
AS/NZS 3500.3:2003 Plumbing and drainage, Part 3 Stormwater drainage
which have confirmed that for a return period of 100 years the box gutters,
rainheads and downpipes installed are of adequate capacity. While the
slope on the roof is less than required, an acceptable flow of water to the
discharge points would be expected.
54 I have been provided with a copy of a Plumbing Industry Commission
Investigation Report [146] which relates to a complaint made by the
Owners as a result of water leakage into the Living area at the front of the
dwelling in August 2005. This Report indicates that repair work was carried
out at the time to the satisfaction of the Plumbing Industry Commission. As
such it can be considered that the apron flashings and roofing in these
areas were considered to be of a satisfactory standard prior to the storm
event.
55 In order to ensure that water penetration was not occurring at the apron
flashings along the north side of the metal roof, the plumber carrying out
emergency repair at the time of and immediately after the storm sealed any
gaps/holes that may have been allowing water penetration into the
building. I am instructed by the Owners that leakage is still occurring at the
location of where the ceiling collapsed in the Living area during rain
periods. This indicates that the penetration is not occurring from the metal
roofs.
56 I am also instructed by the Owners that apart from the problems with
leakage into the Living area in 2005, prior to 25 th December 2011 no other
rain water entry into the house had been experienced.”
56. The buil der’s “COSTING OF RECTIFICATION WORKS” estimated a $3,695
(excluding GST) repair cost for the concrete roof tile areas. In particular,
“Repair concrete tile roof areas. Replace approximately 50 tiles and
approximately 8 capping tiles. Re-bed and repoint all ridges/hips. Replace
capping to parapet on south side of First Floor roof ”.
57. While the parties appear to disagree on the extent of storm damage (pre-
existing damage vs storm damage), the Panel notes that the Applicants’
builder’s estimate of $3,695 to re pair the roof, inclusive of 50 tiles (as
opposed to the FSP’s 15 tiles only) is lower than the FSP’s offer of cash
settlement of $4,100 to repair the roof.
Case No: 273736 Determination Page 13 of 16
58. Subject to the discussion in paragraphs 59-63 below, the Panel therefore
determines that the FSP’s o ffer of cash settlement of $4,100 to permanently
repair the roof is fair and reasonable.
59. The Panel notes the parties’ submissions with regard to a previous roof
claim by the Applicants for storm damage in 2009 which was denied by the
FSP due to maintenance issues. It also notes the documents from the
Plumbing Industry Commission. However, considering the higher cash offer
of $4,100 by the FSP, it is not necessary to discuss these matters.
Make-safe and temporary repairs to roof
60. There is no dispute that the Applicants organised make-safe and temporary
repairs during and immediately after the storm.
61. A plumber’s tax invoice dated 14 February 2012 shows that make -safe and
temporary repairs to the roof were performed on 25-26 December 2011. The
cost of repairs was $9,800.
62. The PDS, under the heading “Your responsibilities when you are making a
claim”, states that the Applicants “must” “take safe and reasonable steps to
prevent any further loss, damage or liability occurring”.
63. The Panel is of the view that the App licants’ act of organising make -safe and
temporary repairs was in accordance with the above policy condition.
64. Accordingly, the Panel determines that it is fair and reasonable that the FSP
also indemnify the Applicants $9,800 plus interest for the make-safe and
temporary repairs to the roof on 25-26 December 2011.
Downlights, smoke alarms, etc
65. There is also no dispute that the Applicants organised make-safe and
temporary repairs to downlights, smoke alarms, light fittings, power feed, and
safety switches on 25 December 2012.
66. The tax invoice from an electrician dated 14 February 2012 [127] shows the
cost of repairs was $3,630.
67. For reasons already stated above, the Panel determines that it is fair and
reasonable that the FSP indemnify the Applicants $3,630 plus interest for the
make-safe and temporary repairs to the downlights, etc on 25 December
2011.
Heating Appliance
68. In its submission to FOS dated 3 September 2012, the Applicants have
raised for the first time the issue on damage to their heating appliance.
69. As this is a new issue, the Panel is of the view that the FSP is entitled to
inspect and assess the heating appliance and then to make a decision on
Case No: 273736 Determination Page 14 of 16
whether it accepts or rejects the claim for storm damage to the heating
appliance.
70. If the Applicants have already repaired the heating appliance and the FSP is
unable to make a proper assessment on whether the damage claimed was
caused by the storm on 25 December 2012, it is the Panel’s opinion that the
FSP is entitled to deny the claim as the FSP has been prejudiced by the
Applicants’ action.
Cash offer of $7,580 for undisputed storm damaged items
71. The FSP has offered $7,580 for the following damaged items which are not
disputed:
“GENERAL -70m2approx. Downstairs/ lounge repair section of damaged
plaster ceiling, approx 2m x 1m
GENERAL- 70m2 approx Downstairs/lounge Prepare and repaint ceiling to
match as near to existing
GENERAL - 3.5m x3.S m approx Upstairs bed 2 prepare and repaint 1 wall to
match existing
GENERAL- upstairs retreat 7m x 5m approx Reattach skirting and paint
disturbed areas similar to existing.
GENERAL Downstairs laundry and Bathroom 2.4m x 2.4m, 2.2 x 2.5m approx
Prepare and paint water stained walls similar to existing.
GENERAL- check electrical fittings water affected, replace as required
KITCHEN - 7m x 2.7m h prepare and repaint 1 LHS wall above sink where
water stained
GARAGE - 6m x 6m approx cut out and replace approx 3m x 3m of water
affected ceiling. prepare and repaint ceiling to match existing
Allow to remove and raft garage motor mechanism to allow repairs to be
completed
Estimated costs $7580”
72. On the other hand, the Applicants’ builder estimated a total of $7,320
(excluding GST) for the following undisputed items:
internal ceiling/wall repairs – living area, garage, kitchen, laundry,
bathroom, family room, bedrooms 1,2, and 3 - $6,870; and
electrical circuits, outlets and switchboard- $450.
73. The Panel accepts that the FSP’s cash offer of $7,580 for the above
undisputed items is fair and reasonable.
Entry porch area
74. The report dated 30 January 2012 from a builder commissioned by the FSP
reads in part:
“Cement Wall Render: I was shown a few narrow stress cracks to the wall
render in the Garage around the house entrance door area which I assessed
Case No: 273736 Determination Page 15 of 16
as being consistent with typical shrinkage & expansion and the other areas of
the walls I assessed also fall into this same opinion and this is unrelated to the
incident of “storm damage”.
75. On the other hand, the report from the Applicants’ builder noted storm
damage to the entry porch area, thus:
“Damage in Entry Porch Area
59 Rainwater penetration has occurred into the ceiling of the Entry Porch
which is under an area where it is known that leakage from the First Floor tiled
roof took place. Some deterioration of the render to the wall of the Entry is
also evident and the only apparent reason for this water flowing from the
ceiling area. Rectification works are required in both situations.
76. The other builder advising the Applicants dated 13 February 2012 also
stated:
When doing my assessment there was obvious evidence water has leaked
through walls and seeped into the floors as skirting boards downstairs have
lifted away from plaster also this is very evident outside of their home looking
at the render of the house where excessive water has caught between the
brickwork and render where there is clear cracks occurring due to water
damage on all fronts of home, the front is observed as taking the brunt of the
water due to having a tin roof over lounge and garage areas which had
apparently lifted accor ding to [male Applicant’s] statement. The render works
is extensively damaged in this area due to having blue board beneath the
render. This obviously is at higher risk of cracking due to water exposure.
77. The Panel is persuaded by the reports from the Applicants' advisors and is
satisfied that the proximate cause of the damage to the entry porch was the
storm.
78. The Applicants’ builder estimated $450 to repair the entry porch. The Panel
determines that the FSP must indemnify the Applicants $450 plus GST and
interest for the damage to the entry porch.
Professional costs
79. The Panel notes the Applicants’ statement:
“My floor boards also wore the brunt of the water that is obviously damage
and a report from [the flooring expert] ...will confirm this. I also had to get an
independent building inspector report as [FSP] would not allow us any access
to any of the reports their people had come through so basically both these
reports alone was over $6.000 dollars which I did not have and had to
borrow...” (sic)
80. The FSP has not directly addressed the Applicant’s allegation of not being
allowed by the FSP to access any of the FSP’s expe rt reports.
81. FOS Terms of Reference provides:
“ 9.4 Applicant’s costs in pursuing the matter
FOS may decided that the Financial Services provider contribute to
the legal or other professional costs or travel costs incurred by the
Case No: 273736 Determination Page 16 of 16
Applicants in the course of the Dispute. Unless exceptional
circumstances apply, FOS will not require the Financial Services
Provider to contribute more than $3,000 to these costs.”
82. The Panel notes that the Applicants have submitted J’s tax invoice of $990
for the inspection report he prepared. The Panel determines that the FSP
must reimburse the Applicants $990.
83. Subject to proof of payment to Builder B, the Panel also determines that the
FSP must compensate the Applicants a further $2,010 for Builder B’s report.
Determination
84. On the basis of the available information and the above reasons, the Panel
determines:
a) timber floor - FSP must indemnify the Applicants $35,939.20 plus
interest;
b) roof – permanent repairs – FSP must indemnify the Applicants $4,100;
c) roof – make-safe/temporary repairs – FSP must indemnify the
Applicants $9,800 plus interest;
d) downlights, smoke alarms, etc – make-safe/temporary repairs - $3,630
plus interest;
e) heating appliance – the FSP is entitled to inspect and assess the
alleged storm damage as discussed in paragraphs 71-72 above;
f) undisputed storm damage to ceiling, walls and electrical circuits, etc -
the FSP must indemnify the Applicants $7,580;
g) entry porch area – the FSP must indemnify the Applicants $450 plus
GST and interest;
h) professional costs – the FSP must compensate the Applicants $990 for
the flooring expert’s inspection report. Subject to proof of payment to
the builder, the FSP must also compensate the Applicants an additional
$2,010. The FSP must also pay interest to the Applicants for these
amounts.
85. The interest referred to in a), c), d), g) and h) is to be based on the statutory
rate from 23 July 2012 (the date of the issuance of the FSP’s Internal
Dispute Resolution letter) to the date of the settlement of this Determination.
No interest is due for b) and f) as the FSP had previously offered these
amounts to the Applicants.