Partial denial of hail storm home claim: timber floor denied as pre-existing, roof offer disputed, and insurer demanded reassessment

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$64,499
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a December 2011 hail storm the insurer accepted part of the home claim, denied the timber floor and most of the roof, and offered $11,680 in cash. AFCA ordered $64,499.20 in total, including the floor, make-safe costs, professional costs and interest, upheld the roof offer, and allowed the insurer to reassess the heating appliance.

Expert evidence that storm moisture damaged the floor outweighed the insurer's assessors, and the insured's make-safe repairs were reasonable under the policy duty to prevent further loss.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 273736 Determination Page 1 of 16 Case number: 273736 General Insurance - Domestic Insurance - Home Building - FSP’s Decision – Partial Denial - Hail Storm - Pre-Existing Damage - Conflicting Expert Reports – Insurer’s Entitlement to Re -Assess 28 November 2012 Background 1. The Applicants hold an Accidental Damage Home Insurance policy with the Financial Services Provider (FSP). 2. On 25 December 2011, a hail storm occurred which damaged the Applicants’ home. 3. The FSP had the property inspected by its assessor, two builders, and a roofing contractor. (the advisory group). 4. Based on the reports from (the advisory group) the FSP partially accepted the claim. It accepted damage to electrical fittings, ceilings and walls of the various parts of the house. 5. However, it denied the entire timber floor claim and only partially accepted the roof claim. It noted pre-existing damage to the timber floor and roof. It also denied damage to the entry porch. It offered a cash settlement of $11,680 (less $250 excess) to the Applicants. 6. The Applicants were not satisfied with the offer and obtained their own expert reports, including reports from a builder, a construction firm, and an accredited Australian Timber Flooring Association Floor Inspector (A’s advisors). The builder estimated repair costs for all the damage to the home in the amount of $75,000, apart from the cost of remedial works carried out during and immediately after the storm on 25 December 2011. 7. After receipt of Applicants’ expert reports, the FSP sought a re -assessment of the property by two more experts (the reviewers). 8. The Applicants initially agreed to the re-assessment but changed their minds after consulting a lawyer. 9. In its Internal Dispute Resolution letter dated 23 July 2012, the FSP wrote: “While you have suppli ed the report from [your building advisor] ], [FSP does] not believe that the request for [the reviewers]] to attend your property is unreasonable. It is a responsibility when you make a claim that “you must (original emphasis) give us any information or assistance we require to Determination Case No: 273736 Determination Page 2 of 16 investigate and process your claim”... [U]ntil [FSP’s] experts have been granted access to your property cash settlement offer of $11,430 stands as [FSP’s] offer of settlement. Summary of Applicants ’ position 10. The Applicants’ lawyer says:  the Applicants allowed numerous persons engaged by the FSP to attend the property. However, each time a person attended, the FSP decided further persons should be engaged;  the Applicants have acted in utmost good faith towards the FSP in accordance with section 13 of the Insurance Contracts Act 1984 by allowing numerous tradesmen to inspect the property on numerous occasions;  it is unreasonable for the FSP to expect the Applicants to continue to allow further inspections when it had ample opportunity for the same. Approximately 6 months had passed since the damage was caused, and the Applicants are no closer to rectifying the serious deficiencies in their home;  given the state of the home, the Applicants were inconvenienced greatly as they were unable to live in their own home;  the Applicants have now gone to the expense of engaging persons to rectify their home to bring it back to a condition where they can comfortably live. Although this means that the FSP may not be able to send further professionals in to consider the state of the premises, they clearly have sufficient reports to consider the extent of the damage; and  the Applicants have also just recently been made aware of an issue with their heating. Given the state of their home, they have not had cause to use the ducted heating and have instead been utilising a heater upstairs. The FSP should also indemnify the Applicants for the repair of the heating. 11. In their Dispute Form, the Applicants say that they “had to get an independent building inspector report as [FSP] would not allow [them] any access to any of the reports their people had come through”. The report from [A’s advisors] cost more than $6,000 and the Applicants had to borrow money to pay that amount. Summary of FSP’s position 12. The FSP says:  it accepts that the insured property suffered damage due to the storm on 25 December 2011; Case No: 273736 Determination Page 3 of 16  however, it does not accept that all repairs claimed by the Applicants arose from that storm;  the exper t reports it tried to obtain from [the reviewers] “were to be used to reach an agreement to the extent of [storm] damage”;  because there is doubt as to the extent of the storm damage, it is necessary for its appointed experts to attend the insured property. 13. The FSP relies on the following policy provisions contained in the Product Disclosure Statement (PDS): “ Your responsibilities when you are making a claim When you make a claim you must meet a number of responsibilities. You must ...  give us any information or assistance we require to investigate and process your claim ... If you do not meet your responsibilities If you do not meet your responsibilities, we may refuse or reduce a claim...” Issues 14. Whether the Applicants have breached the policy condition “You must... give us any information or assistance we require to investigate and process your claim” when they refused a re -assessment of the property by the FSP. 15. Whether the FSP is entitled to a re-assessment of the roof and timber floor in order to determine the extent of storm damage. 16. Whether there is sufficient expert evidence to determine the extent of storm damage to the roof and timber floor. 17. Whether the Applicants have established storm damage to the timber floor. 18. Whether the FSP’s cash offer of $4,100 to settle the roof damage is fair and reasonable. 19. Whether the FSP must indemnify the Applicants for the cost of make – safe and temporary repairs to the roof. 20. Whether the FSP must indemnify the Applicants for the make-safe and temporary repairs to downlights, smoke alarms, power feed and safety switches. 21. Whether the Applicants are entitled to be indemnified for the alleged damage to the heating appliance. Case No: 273736 Determination Page 4 of 16 22. Whether the FSP’s cash offer of $7,580 to settle the undisputed items (ceiling, walls, and electrical fittings) is fair and reasonable. 23. Whether the FSP must indemnify the Applicants for damage to the entry porch area. 24. Whether the FSP must compensate the Applicants for professional costs incurred in relation to this claim. Reasons for decision 25. Due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 26. The Panel is satisfied that there had been an exchange of all relevant information between the parties and that each party has had the opportunity to address all issues raised. Giving information or assistance 27. The evidence before the Panel shows that the FSP’s group of four assessor/experts had access to the insured property on four occasions in January 2012. They inspected and reported on the extent of damage to the home, including the roof and timber flooring, and gave their opinion on what caused the damage. 28. The Panel is satisfied that the FSP had ample opportunity to make a full assessment of the roof and floor, and, in fact, made a decision to partially deny the roof claim and totally deny the floor claim based on the various reports of their assessor/experts. Moreover, the FSP had made an offer of cash settlement based on the full assessment by its experts/assessor. 29. The fact that the Applicants were able to obtain their own expert reports that seriously challenged, if not rebutted, the FSP’s assessor/expert reports did not automatically entitle the FSP to demand a re-assessment of the roof and floor. 30. The Panel is not persuaded that the Applicants’ refusal to agree to a re - assessment of the roof and floor amounts to a breach of the policy condition on giving information or assistance when required by the FSP in investigating the claim. 31. The FSP, by making a decision to partially deny the roof claim and totally deny the floor claim, should be deemed to have already completed its investigation of the roof and floor claim. If it had not yet completed its Case No: 273736 Determination Page 5 of 16 investigation, then it should have not made the denials and offered a cash settlement. Sufficient expert evidence to determine extent of storm damage to roof and floor 32. As will be evident below, each party has submitted several expert reports, some of which are quite detailed and extensive. 33. The Panel has considered all the expert reports submitted by the parties and note in particular the expert reports discussed below. 34. The Panel is satisfied that there is sufficient expert evidence to determine the extent of storm damage to the timber floor and roof. 35. The Panel will now discuss these two items. Timber Floor 36. The timber floor was inspected and assessed by the FSP’s builders and assessor. All three did not attribute storm damage to the floor and noted pre- existing damage to the floor. 37. One of the builders attended the insured property on 3 January 2012 and reported on the timber floor as follows: “ BUILDERS ASSESSMENT OF CAUSE : Inspection of the property shows evidence of water entry to both the downstairs section, and the upstairs section of the house. ... RESULTANT DAMAGE: ... The Insured is also claiming damage to the entire polished timber flooring, which consists of direct fixed solid timber flooring, with a sand and polished finish. The alleged damage consists of cracking along the timber grain through most sections of the floor. The timber flooring is installed through most rooms downstairs. According to the Insured, a significant amount of water flooded the entire downstairs floor, hence the damage to the timber flooring. There is no other evidence of significant water damage, with no visible ..peaking... of the timber, and no skirting board swelling visible. In our opinion the timber floor was cracked before the event, and is the result of timber shrinkage. This is probably due to the timber not being allowed to acclimatize during the construction period. We do not believe the timber damage is due to the claimed event.” 38. The other builder also inspected the timber floor and reported 30 January 2012. The report relevantly reads: Case No: 273736 Determination Page 6 of 16 “We refer to our previous correspondence in relation to the above claim and now supply you upon your request a brief report on our Assessment of the Timber overlay Flooring... ITEMS ASSESSED Overlay Flooring : The Timber overlay Floor laid to the Living/Entrance Room & Hallway was an item that the Insured's Son pointed out to me to assess. Outcome: This Floor had a serious problem which was the splitting down the centre of many Boards which could be attributed to the Floor being "Green Laid'' where the Builder has not allowed the Flooring once delivered on site to Climatically adjust to the surrounding conditions before being laid down or were released from the Mill to early and did not have enough time to cure before being laid. These splits are almost certain to be due to shrinkage. The Insured's Son also pointed out to an area of this Flooring at the entrance Door to the Garage where once the Door was opened inwards it would hit the floor at the halfway opening point and he was sure this did not previously occur before the recent Hail/Rain storm of the 25/12 and claimed water had run down onto the Floor causing it to "swell & lifts. I could not discount his reasoning of this explanation however there was considerable surface damage to the Floor from continual "scraping" where the Door was forcibly opened on more than a few occasions. Maybe this section was lifting due glue delaminating or from an expansion problem. If the Insurer was to accept this Floor damage claim to the entrance to the Garage we would recommend a Cash settlement for this area only as the other issues with this Floor are tot ally unrelated to “storm damage” (original emphasis) 39. The FSP’s assessor inspected and assessed the property on 9 January 2012. With regard to the timber floor he reported]: “Attended property as a result of storm water entry which occurred on the 25 - 12-2011. ... Our is [sic] also claiming damage to the entire polished timber flooring, which consists of direct fixed solid timber flooring, with a sand and polished finish. The alleged damage consists of cracking along the timber grain through most sections of the floor. The timber flooring is installed through most rooms downstairs. According to our insured, a significant amount of water flooded the entire downstairs floor, hence the damage to the timber flooring. There is no other evidence of significant water damage, with no visible peaking of the timber, and no skirting board swelling visible. In my opinion the timber floor was cracked before the event, and is the result of timber shrinkage. This is probably due to the timber not being allowed to acclimatize during the construction period. I do not believe the timber flooring damage is due to the claimed event. ” 40. The Applicants obtained three contrary expert reports. All three concluded that the timber floor was damaged by the storm. Case No: 273736 Determination Page 7 of 16 41. The flooring specialist issued a report on 13 February 2012 stating: “After careful inspection of the timber floor of which moisture tests have also been carried out. It is evident of a higher than usual moisture content ranging between 14 and 20%. There are also extensive amounts of cracks which have occurred over the duration of the drying out period. I would highly recommend removal of the flooring an battens, only because it is unknown of the condition of the subfloor to price a resand only, which would be void of any warranty (sic), and problems may reoccur.” (sic) and quoted $35,939.20 (inclusive of GST) to repair the timber flooring. 42. An accredited Floor Inspector inspected the insured property on 9 March 2012 and issued a “Floor Inspection Report” dated 15 March 2012. The report relevantly reads: “ 6.0 ANALYSIS OF OBSERVATIONS MEASUREMENTS AND TESTING ... The internal environment was reported to be damp, with a musty smell and is still drying out with ongoing storm damage work to be carried out (carpet underlay replacement one item to be addressed). Concerning the measurements taken over 10 boards they indicate that at the time of laying the average board width was close to the nominal manufactured board width of 85 mm. Although a species correction factor could not be applied the moisture meter readings of 10% and 14% were not outside expected parameters for a floor that has now dried. It should be noted that these meters are considered to be accurate to 32% in the range being measured, when applicable corrections have been applied. More accurate moisture content testing can only be achieved by removing samples from the floor and testing them in a laboratory by the oven dry method. The gapping between boards and split boards is considered to be the result of the floor taking up moisture from the wet environment relating to the reported storm. That condition expanded the boards and where expansion could no longer be accommodated the timber fibres were subsequently compressed. When the floor dried out (which appears to be ongoing) the compressed fibres did not (and do not) return to their original state, therefore the board dimensions reduce to less than their initial dimensions, hence this has resulted in shrinkage gapping. Concerning the cause of the wider irregularly spacing of the gaps it is considered likely that although edge bonding would have been present in the floor prior, it was the inherent movement from the wetting and redrying that has resulted in the appearance of an edge bonded irregularly gapped floor. Note that attached is an earlier report by a third party and at the end of the report it states "It is evident of a higher than usual moisture content ranging between14 and 20%". 7.0 FACTORS CONSIDERED TO BE CONTRIBUTING TO THE PROBLEM ARE ... From our observations and testing, it is considered that the gapping and edge bonding in the floor is likely the result of moisture uptake due to the storm. This has presented a floor that is no longer considered to be in an acceptable condition. Case No: 273736 Determination Page 8 of 16 8.0 CONCLUSIONS ... The purpose of this report was primarily to assess the causes of gapping present in the floor. Throughout the installation the gapping was considered to be predominantly caused by pressure effects and crushing through expansion forces from storm moisture uptake that was then followed by shrinkage in the floor as moisture contents returned to more normal levels. The effect of this movement combined with edge bonding effects in the floor have then resulted in the irregular spaced gaps. Though the floor is considered sound, it is commercially unacceptable and remedial work is needed. This may require replacing the entire floor when the home environme nt is dried out and considered to be stable.” 43. The Applicant’s builder inspected the insured property on 5 April 2011 and issued a report dated 25 April 2012. With regard to the timber flooring, he reported: “ Timber Flooring 61 As reported the timber flooring throughout the Ground Floor area exhibits irregular and wide spread gapping throughout. The majority of the gaps between individual boards are 2mm or greater with a large number in the order of 4mm. A considerable degree of splitting within the lengths of individual boards has also occurred. 62 The [FSP] Home Claims letter of 21 st February 2012 with reference to the timber floor states that they appointed [Builder P] to report on the damage and with particular respect to the timber flooring, note that [Builder P] observed: .... 63 I have been provided with a copy of a Floor Inspection Report prepared for [J] and dated 15 th March 2012. I note the following points from that document: ... 64 I have also been provided with a report and quotation from [IFlooring] dated 13 th February 2012. I note the following comment from that document: ... 65 The damage to the timber flooring is extensive and involves quite wide gaps between individual boards and splitting of the actual timber flooring. I disagree with the comments that have been made that this damage existed before this storm event. While drying shrinkage can occur as a result of not acclimatising timber flooring prior to laying, based on my experience this is not the cause of the problem in this building. I agree with the findings of the [J’s] Floor Inspection Report that the widespread movement in the timber flooring is a result of excessive moisture from the water ingress into the house during the storm and subsequent drying out of the timber.” Case No: 273736 Determination Page 9 of 16 44. The Panel i s of the opinion that the Applicants’ expert evidence have rebutted the FSP’s expert evidence. The Panel is satisfied that the timber floor was damaged by the storm. 45. Therefore, the Panel determines that the FSP must indemnify the Applicants for the cost of repairing the timber floor. 46. The Panel notes that the flooring specialist quoted $35,939.20 (inclusive of GST) to repair the timber flooring, while the builder quoted $34,955 (excluding GST). 47. The Panel determines that the FSP indemnify the Applicants based on the lower quote, $35,939.20 plus interest. Roof 48. The parties agree that the roof was damaged by the storm. However, they disagree on the extent of damage. 49. The roof was inspected by two of the FSP’s experts. 50. A builder inspected the roof on 3 January 2012 and gave the following report: “Insured advised water entered the property during the recent hail storm. The insured advised that they had a previous ... water entry claim in the same area in 2007. ACTION FOLLOWING INCIDENT: A makesafe was performed by others to the roof. The Insured however sealed the damaged ceiling in the lounge room, and moved the furniture out of the lounge room themselves. BUILDERS ASSESSMENT OF CAUSE: Inspection of the property shows evidence of water entry to both the downstairs section, and the upstairs section of the house. The downstairs water entry occurred in the lounge and garage respectively. In both these areas, the roof above is a flat deck metal roof with box gutters. There is evidence of ongoing issues with this roof as there is copious amounts of silicone sealant applied liberally in an attempt to seal the roof. There is also evidence of poor construction methods around the base of the windows directly above the deck roof. The insured advised they had previous issues with the deck roof, and the Plumbing commission was involved in getting the repairs completed. In our opinion there is still a construction issue with the deck roof, and may continue to leak due to inadequate overflows, and poor flashing/ sealing. The upstairs roof consists of cement tiles. The roof is in generally good condition, however a close examination was not possible due to the roof being 2 story. There is evidence of temporary repairs to the front ridges, with plastic installed where the tiles were missing.” Case No: 273736 Determination Page 10 of 16 51. The roofing contractor advising the FSP also inspected the roof on 18 January 2012 and gave the following opinion: “ Expert Opinion on Findings Storm damage and roof leaks had occurred at this multi-storey dwelling with a concrete tiled roof. Strong winds had dislodged several capping tiles from the upper roof. Approximately 15 roof tiles were damaged as the capping tiles tumbled down the roof’s surface. Leaks had occurred in the upper rooms as rain water had penetrated through the capping tile gaps and through the cracked roof tiles and diverted into the roof cavity. Others had installed lead flashing over the hip capping tiles and sealed some roof tiles for temporary weather proofing. Leaks had occurred in the Iounge room and were the result of incorrectly applied sealants to the cover flashing and roof sheets intersections (faulty work). The sealants had cracked (maintenance) allowing rain water to penetrate through, become trapped and back flow over the upper ends of the roof sheets and divert into the roof cavity. The general condition of the remainder of the roof is in good order although [S Roof] noted approximately 40-45 roof tiles with broken water courses (maintenance). [Original emphasis] ... Required and/or Recommended Repairs Storm/impact related repairs: Replace approximately 8 capping tiles and 15 broken/cracked roof tiles. Re-bed (where necessary) and re-point all capping tiles on the upper roof and 2 lower rear hips with a combination of Bondcrete and silicone or Flexi-point. Note: Bondcrete is required as this roof is located in a high-wind area. Other required repairs: Remove all of the silicone from the cover flashing and roof sheet intersections on the lower south facing roofs. Replace approximately 45 roof tiles with broken water courses. Re-bed (where necessary) and re-point the capping tiles where these may be disturbed during tile replacement.” 52. The FSP, noting the recommendation of replacing 8 capping tiles and 15 broken/cracked roof tiles, offered to cash settle the roof claim in the amount of $4,100. 53. The Applicants obtained their own expert reports on the extent of storm damage to the roof. 54. One such report dated 13 February 2012 relevantly reads: “This report was condu cted on Wednesday the 8 th of February at approx 5.30 pm. This report confirms that I have personally sighted the property at [address]. [Female Applicant] contact with me and requested a report to be written up due to some disputes she was facing as to what can be covered by insurance and what[FSP] believed was not storm water damage related and need further proof by obtaining Independent reports from professionals. Case No: 273736 Determination Page 11 of 16 On assessment I observed obvious damage when going throughout the two manholes located in the house one upstairs near bathroom and one down stairs in the bathroom of the main bedroom. Upon entering the roof there were obvious cracks and light was coming throughout from above and potentially at risk of another leak if it was too rain again, on using the ladder and on the top of the roof I sighted broken loose tiles and some missing tiles, it also appeared some work was done previously too patch up some areas with metal sheeting and other materials and silicone to keep tiles together, obvious throughout the tiled roof areas toward top front of house above the balcony, both sides of the house also back of house were all affected, some tiles were chipped and cracked there were loose tiles sitting at the edge of roof where owners stated that some tiles have been falling and were very concerned about two young children which are no longer allowed to play in their own back yard due to safety issues. In my opinion I believe that storm water has caused this ruin...” 55. The builder inspected the insured property on 5 April 2011 and issued a report dated 25 April 2012 where he stated: “ Roof Tiling 45 It is obvious that significant damage occurred to the roof tiling on this house during the storm of 25 th December 2011. On the day of the event [a plumber carried out emergency repairs into the night and during the next day. They carried out temporary repairs to the hips and ridges on all of the tiled roof areas and replaced numerous tiles. It was also necessary for [an electrician] to carry out emergency repairs to water damage on downlights, smoke alarms and light fittings as well as damage to the electrical wiring/safety switches. 46 Other contractors also attended on the day of the storm and thereafter to carry out make-safe work which principally involved replacement of tiles. I am instructed by the Owners that a considerable number of tiles that had been left over from the original house construction were used by the various contractors to rectify roof areas damaged by the storm. My inspection confirms that a considerable number of roof tiles have been replaced. 47 At the time of my inspection a number of broken/cracked tiles were identified and it is quite possible that more exist on the two tiled roof areas. I note that the [the FSP’s roofing advisor’s] report issued following their inspection on 18 th January 2012 recommended the replacement of approximately 8 capping tiles and 15 broken/cracked roof tiles. That report also recommends the replacement of approximately 45 roof tiles that had broken water courses which is considered to be maintenance work. However in view of the considerable amount of foot traffic that has been necessary at the time the initial damage occurred and subsequently to minimise the chance of roof leakage it is considered that the replacement of the roof tiles should include this number as that is the likely cause. 48 Considerable damage to the pointing/bedding of hip/ridge tiles has occurred as a result of the storm. Approximately 8 hip capping tiles have been damaged at the time of the inspection and temporary lead coverings were in place in these areas. 49 ... Case No: 273736 Determination Page 12 of 16 Metal Roofing 50 The metal roofed area over the Living Room is approximately 30sq.m. and falls to an adequately sized box gutter, discharging through rainheads at both sides of that area which are connected to separate downpipes. 51 The metal roof over the Garage receives approximately ¼ of the First Floor tiled roof area via a downpipe to the north-east corner and the combined roof areas are approximately 70sq.m. This metal roof also discharges to an adequately sized box gutter with sufficient fall discharging to two rain heads connected to two separate downpipes. 52 I note that the slope on the roof over the Living Room is approximately 1 in 200 and that over the Garage is approximately 1 in 100. These slopes are less than the minimum recommended fall for this particular roofing of 1 in 60. 53 I have carried out calculations in accordance with the requirements of AS/NZS 3500.3:2003 Plumbing and drainage, Part 3 Stormwater drainage which have confirmed that for a return period of 100 years the box gutters, rainheads and downpipes installed are of adequate capacity. While the slope on the roof is less than required, an acceptable flow of water to the discharge points would be expected. 54 I have been provided with a copy of a Plumbing Industry Commission Investigation Report [146] which relates to a complaint made by the Owners as a result of water leakage into the Living area at the front of the dwelling in August 2005. This Report indicates that repair work was carried out at the time to the satisfaction of the Plumbing Industry Commission. As such it can be considered that the apron flashings and roofing in these areas were considered to be of a satisfactory standard prior to the storm event. 55 In order to ensure that water penetration was not occurring at the apron flashings along the north side of the metal roof, the plumber carrying out emergency repair at the time of and immediately after the storm sealed any gaps/holes that may have been allowing water penetration into the building. I am instructed by the Owners that leakage is still occurring at the location of where the ceiling collapsed in the Living area during rain periods. This indicates that the penetration is not occurring from the metal roofs. 56 I am also instructed by the Owners that apart from the problems with leakage into the Living area in 2005, prior to 25 th December 2011 no other rain water entry into the house had been experienced.” 56. The buil der’s “COSTING OF RECTIFICATION WORKS” estimated a $3,695 (excluding GST) repair cost for the concrete roof tile areas. In particular, “Repair concrete tile roof areas. Replace approximately 50 tiles and approximately 8 capping tiles. Re-bed and repoint all ridges/hips. Replace capping to parapet on south side of First Floor roof ”. 57. While the parties appear to disagree on the extent of storm damage (pre- existing damage vs storm damage), the Panel notes that the Applicants’ builder’s estimate of $3,695 to re pair the roof, inclusive of 50 tiles (as opposed to the FSP’s 15 tiles only) is lower than the FSP’s offer of cash settlement of $4,100 to repair the roof. Case No: 273736 Determination Page 13 of 16 58. Subject to the discussion in paragraphs 59-63 below, the Panel therefore determines that the FSP’s o ffer of cash settlement of $4,100 to permanently repair the roof is fair and reasonable. 59. The Panel notes the parties’ submissions with regard to a previous roof claim by the Applicants for storm damage in 2009 which was denied by the FSP due to maintenance issues. It also notes the documents from the Plumbing Industry Commission. However, considering the higher cash offer of $4,100 by the FSP, it is not necessary to discuss these matters. Make-safe and temporary repairs to roof 60. There is no dispute that the Applicants organised make-safe and temporary repairs during and immediately after the storm. 61. A plumber’s tax invoice dated 14 February 2012 shows that make -safe and temporary repairs to the roof were performed on 25-26 December 2011. The cost of repairs was $9,800. 62. The PDS, under the heading “Your responsibilities when you are making a claim”, states that the Applicants “must” “take safe and reasonable steps to prevent any further loss, damage or liability occurring”. 63. The Panel is of the view that the App licants’ act of organising make -safe and temporary repairs was in accordance with the above policy condition. 64. Accordingly, the Panel determines that it is fair and reasonable that the FSP also indemnify the Applicants $9,800 plus interest for the make-safe and temporary repairs to the roof on 25-26 December 2011. Downlights, smoke alarms, etc 65. There is also no dispute that the Applicants organised make-safe and temporary repairs to downlights, smoke alarms, light fittings, power feed, and safety switches on 25 December 2012. 66. The tax invoice from an electrician dated 14 February 2012 [127] shows the cost of repairs was $3,630. 67. For reasons already stated above, the Panel determines that it is fair and reasonable that the FSP indemnify the Applicants $3,630 plus interest for the make-safe and temporary repairs to the downlights, etc on 25 December 2011. Heating Appliance 68. In its submission to FOS dated 3 September 2012, the Applicants have raised for the first time the issue on damage to their heating appliance. 69. As this is a new issue, the Panel is of the view that the FSP is entitled to inspect and assess the heating appliance and then to make a decision on Case No: 273736 Determination Page 14 of 16 whether it accepts or rejects the claim for storm damage to the heating appliance. 70. If the Applicants have already repaired the heating appliance and the FSP is unable to make a proper assessment on whether the damage claimed was caused by the storm on 25 December 2012, it is the Panel’s opinion that the FSP is entitled to deny the claim as the FSP has been prejudiced by the Applicants’ action. Cash offer of $7,580 for undisputed storm damaged items 71. The FSP has offered $7,580 for the following damaged items which are not disputed: “GENERAL -70m2approx. Downstairs/ lounge repair section of damaged plaster ceiling, approx 2m x 1m GENERAL- 70m2 approx Downstairs/lounge Prepare and repaint ceiling to match as near to existing GENERAL - 3.5m x3.S m approx Upstairs bed 2 prepare and repaint 1 wall to match existing GENERAL- upstairs retreat 7m x 5m approx Reattach skirting and paint disturbed areas similar to existing. GENERAL Downstairs laundry and Bathroom 2.4m x 2.4m, 2.2 x 2.5m approx Prepare and paint water stained walls similar to existing. GENERAL- check electrical fittings water affected, replace as required KITCHEN - 7m x 2.7m h prepare and repaint 1 LHS wall above sink where water stained GARAGE - 6m x 6m approx cut out and replace approx 3m x 3m of water affected ceiling. prepare and repaint ceiling to match existing Allow to remove and raft garage motor mechanism to allow repairs to be completed Estimated costs $7580” 72. On the other hand, the Applicants’ builder estimated a total of $7,320 (excluding GST) for the following undisputed items:  internal ceiling/wall repairs – living area, garage, kitchen, laundry, bathroom, family room, bedrooms 1,2, and 3 - $6,870; and  electrical circuits, outlets and switchboard- $450. 73. The Panel accepts that the FSP’s cash offer of $7,580 for the above undisputed items is fair and reasonable. Entry porch area 74. The report dated 30 January 2012 from a builder commissioned by the FSP reads in part: “Cement Wall Render: I was shown a few narrow stress cracks to the wall render in the Garage around the house entrance door area which I assessed Case No: 273736 Determination Page 15 of 16 as being consistent with typical shrinkage & expansion and the other areas of the walls I assessed also fall into this same opinion and this is unrelated to the incident of “storm damage”. 75. On the other hand, the report from the Applicants’ builder noted storm damage to the entry porch area, thus: “Damage in Entry Porch Area 59 Rainwater penetration has occurred into the ceiling of the Entry Porch which is under an area where it is known that leakage from the First Floor tiled roof took place. Some deterioration of the render to the wall of the Entry is also evident and the only apparent reason for this water flowing from the ceiling area. Rectification works are required in both situations. 76. The other builder advising the Applicants dated 13 February 2012 also stated: When doing my assessment there was obvious evidence water has leaked through walls and seeped into the floors as skirting boards downstairs have lifted away from plaster also this is very evident outside of their home looking at the render of the house where excessive water has caught between the brickwork and render where there is clear cracks occurring due to water damage on all fronts of home, the front is observed as taking the brunt of the water due to having a tin roof over lounge and garage areas which had apparently lifted accor ding to [male Applicant’s] statement. The render works is extensively damaged in this area due to having blue board beneath the render. This obviously is at higher risk of cracking due to water exposure. 77. The Panel is persuaded by the reports from the Applicants' advisors and is satisfied that the proximate cause of the damage to the entry porch was the storm. 78. The Applicants’ builder estimated $450 to repair the entry porch. The Panel determines that the FSP must indemnify the Applicants $450 plus GST and interest for the damage to the entry porch. Professional costs 79. The Panel notes the Applicants’ statement: “My floor boards also wore the brunt of the water that is obviously damage and a report from [the flooring expert] ...will confirm this. I also had to get an independent building inspector report as [FSP] would not allow us any access to any of the reports their people had come through so basically both these reports alone was over $6.000 dollars which I did not have and had to borrow...” (sic) 80. The FSP has not directly addressed the Applicant’s allegation of not being allowed by the FSP to access any of the FSP’s expe rt reports. 81. FOS Terms of Reference provides: “ 9.4 Applicant’s costs in pursuing the matter FOS may decided that the Financial Services provider contribute to the legal or other professional costs or travel costs incurred by the Case No: 273736 Determination Page 16 of 16 Applicants in the course of the Dispute. Unless exceptional circumstances apply, FOS will not require the Financial Services Provider to contribute more than $3,000 to these costs.” 82. The Panel notes that the Applicants have submitted J’s tax invoice of $990 for the inspection report he prepared. The Panel determines that the FSP must reimburse the Applicants $990. 83. Subject to proof of payment to Builder B, the Panel also determines that the FSP must compensate the Applicants a further $2,010 for Builder B’s report. Determination 84. On the basis of the available information and the above reasons, the Panel determines: a) timber floor - FSP must indemnify the Applicants $35,939.20 plus interest; b) roof – permanent repairs – FSP must indemnify the Applicants $4,100; c) roof – make-safe/temporary repairs – FSP must indemnify the Applicants $9,800 plus interest; d) downlights, smoke alarms, etc – make-safe/temporary repairs - $3,630 plus interest; e) heating appliance – the FSP is entitled to inspect and assess the alleged storm damage as discussed in paragraphs 71-72 above; f) undisputed storm damage to ceiling, walls and electrical circuits, etc - the FSP must indemnify the Applicants $7,580; g) entry porch area – the FSP must indemnify the Applicants $450 plus GST and interest; h) professional costs – the FSP must compensate the Applicants $990 for the flooring expert’s inspection report. Subject to proof of payment to the builder, the FSP must also compensate the Applicants an additional $2,010. The FSP must also pay interest to the Applicants for these amounts. 85. The interest referred to in a), c), d), g) and h) is to be based on the statutory rate from 23 July 2012 (the date of the issuance of the FSP’s Internal Dispute Resolution letter) to the date of the settlement of this Determination. No interest is due for b) and f) as the FSP had previously offered these amounts to the Applicants.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.