Text of the determination
Case No: 273687 Determination Page 1 of 15
Case number: 273687
General Insurance - Domestic Insurance - Home Building and Contents - FSP
Decision - Denial of claim
30 October 2012
Background
1. The Applicants insured their home and contents in Fairfield with the
Financial Services Provider (FSP). The relevant period of insurance
operated for twelve months beginning from 25 September 2010. During this
period, the building was insured up to a sum of $290,000 and the contents
for $46,000, with $2,100 cover for selected personal items away from the
home.
2. On 25 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation following the severe weather events in
Queensland.
3. The FSP denied the claim on the basis the damage was due to ―flood‖. The
Applicants have disputed this.
4. Both the Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicants ’ position
5. The Applicants are represented; for convenience reference to the Applicants
will also include reference to their representative.
6. The Applicants submits the following as alternative arguments in response to
the FSP’s decision:
a. The FSP told them at policy inception that they were not covered for
flood but did not explain the meaning of that term.
b. The FSP’s policy failed to clearly inform them that ―flood‖ was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
c. The FSP breached its duty of utmost good faith by failing to ensure the
policy the Applicants had taken out was suitable to their needs.
Determination
Case No: 273687 Determination Page 2 of 15
d. Just prior to the loss event, the FSP represented that they were
covered for ―flash flood and storm water runoff‖ but did not mention the
caps on any benefit payable under this event.
e. The damage was due to ―flash flood and stormwater run - off‖, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4.00am on 11 January 2011 which resulted in the
Wivenhoe Dam operators elevating their strategy to W4. This decision
resulted in massive discharges of water into the Brisbane River that
ultimately inundated their property.
7. The Applicants seek to be indemnified for their claim.
Summary of FSP’s position
8. In response to the Applicants’ arguments, the FSP submits the following:
a. It denies any of its telephone consultants misrepresented to the
Applicants in the days prior to the loss event the extent of cover
afforded under the ―flash flood and stormwater runoff‖ insured event.
b. There is no dispute that the Applicants received the Product Disclosure
Statement (PDS) for the policy
c. The policy structure and layout in conjunction with its Certificate of
Insurance (COI) enables it to rely on the exclusion clause of ―flood‖
pursuant to Section 35(2) of the Act.
d. The duty of utmost good faith does not extend to an obligation to
ensure a poli cy is suitable to the Applicants’ needs.
9. The FSP relies on a number of hydrology reports authored by ―DC‖ and ―SC‖
and the following policy provisions to deny the Applicants’ claim :
Page 4 of the Certificate of Insurance (COI)
― What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...‖
Pages 10-12 of the PDS
― Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Case No: 273687 Determination Page 3 of 15
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...‖
Pages 17-18 of the PDS
― Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...‖
Page 27 of the PDS
― Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...‖
Page 32 of the PDS
― Your contents
The most we will pay you for contents claims
What is covered What is not covered
Case No: 273687 Determination Page 4 of 15
... ...
Flash flood and stormwater run - off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...‖
Issues
10. Whether the Applicants were ―clearly informed‖ about what the policy did and
did not cover.
11. Whether the FSP misrepresented to the Applicants prior to the claim that
they were covered for all damage caused by flash flood and stormwater run-
off with no limits applicable.
12. Whether the FSP breached its duty of utmost good faith in allowing the
Applicants to incept this type of policy.
13. Whether the cause of the Applicants’ loss was covered under the policy.
Reasons for decision
14. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS’s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
15. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
16. It is appropriate to consider the issues under the various headings.
Consideration of "Flood" Definition in PDS
17. The Applicants have argued that the policy fails to clearly inform as to the
derogation from flood cover and/or the limitations on the extent of cover for
flash flood.
18. There is no dispute that the Applicants had received the policy
documentation, including the PDS.
Case No: 273687 Determination Page 5 of 15
19. It is established law that in order to satisfy the requirement to clearly inform,
the language of Section 35 (2) of the Act allows for a proposed insured to be
clearly informed by providing the rele vant documentation in writing and that
the relevant exclusions and/or limitations are clear and unambiguous and
presented in a manner which a person of average intelligence and education
is likely to have little difficulty in finding and understanding if that person
reads the policy.
20. The Panel has reviewed the FSP’s policy on a number of occasions. The
policy is indexed with relevant sections covering the insured events. The
policy sets out the definitions of storm and flash flood and stormwater runoff.
The policy clearly identifies that flood and storm surge is an optional cover
but otherwise flood is excluded from cover. The COI also clearly identifies
that with respect to the Applicants ’ policy flood and storm surge is not
covered.
21. Having considered the Applicants ’ submissions and the FSP’s policy
documents, the Panel is satisfied that the FSP has met its obligations to
clearly inform the Applicants of the extent of the exclusions and limitations in
accordance with the requirements of the Act.
Utmost Good Faith
22. The Applicants have alleged the FSP breached its duty of utmost good faith
by failing to ensure the policy provided adequate coverage or was suitable to
their needs.
23. The Panel considers the Applican ts’ arguments regarding the duty of utmost
good faith are misconceived. There is no legal principle that supports the
Applicants’ argument that an insurer’s duty of utmost good faith extends to
enquiring and ensuring its policy is appropriate to the insured’s needs. Such
a duty is generally associated with insurance brokers or authorised financial
advisers where case law makes it clear these individuals have a duty to
ensure the policy they procure is suitable to their client’s needs.
24. Further the FSP’s policy, which the Panel has found the Applicants recei ved
before the policy commenced:
Is a standard home insurance policy that appears to be available to the
general public as opposed to being tailored to the Applicants ’ needs,
and
Had a 21 day cooling off period which provided the Applicants ample
opportunity to review the contract and obtain advice on it to ensure it
was suitable to their needs.
25. Given this, the Panel does not accept the FSP breached its duty of utmost
good faith with respect to offering its standard home insurance policy to the
Applicants.
Case No: 273687 Determination Page 6 of 15
Representations by FSP about extent of cover
26. The Applicants say that when they took out the policy they specifically asked
about flood cover and were told by the FSP that they were not covered for
flood but with no discussion as to the meaning of this term.
27. The female Applicant also says that she called the FSP on 10 January 2011
after the flood in Toowoomba and was told that they were covered for flash
flood and stormwater runoff which was explained as ―stormwater drains that
were full because of less than 24 hours of rain‖. She says the re was no
mention of capping of the benefit provided under this insured event. She also
says she was told they would not be covered for ―storm surge or flood, and
not for water from a rising river‖.
28. The FSP says that it does not accept that the statements alleged to have
been made to the Applicants at the time of policy inception, were in fact
made and even if they were, the Applicants could not have reasonably relied
upon them.
29. The FSP has provided a transcript of the telephone conversation it had with
the female Applicant on 10 January 2011 and says that the statements made
by its representative during that call were correct, and in line with the FSP’s
insurance policy. According to the FSP, the statements it made during the 10
January 2011 conversation were not misleading.
30. As previously outlined in this Determination, the Panel accepts that the PDS
provides definitions for the various terms used throughout the policy,
including ―flood‖, ―storm‖ and ―flash flood and stormwater runoff‖.
31. The policy was incepted in 2003 (although at this time the policy covered a
different house) and there is no dispute that the Applicants received the
relevant PDS for the policy. Accordingly the Panel is satisfied that the
Applicants would have had ample opportunity prior to the loss event to read
the policy documents and understand the meanings of the various terms
used throughout. Had they done so, the Panel is of the opinion that they
would have readily understood the meaning of flood, and that it was not
covered under their policy.
32. The Panel has reviewed the transcript of the 10 January 2011 telephone
conversation between the FSP.
33. The FSP advised the Applicants that the ―storm surge and flood‖ optional
cover was not included on their policy, and that although they could apply to
have that option added, it could not be applied to their policy until the next
renewal in September 2011.
34. When asked by the female Applicant ―What is stormwater runoff?‖ during this
call, the FSP’s representative replied:
―Stormwater runoff – I me an, my, I suppose, a layman’s way of saying that is
if the stormwater drains are full – you know, if it’s been raining and they’re just
too full – like, say there is a high tide and so, therefore, the stormwater drains
Case No: 273687 Determination Page 7 of 15
are full and they’ve got nowhere to run to, they can’t run away. So, therefore,
all the rain that’s falling just bubbles over and ends up coming into your
house. Once again, if it’s less than 24 hours of rain, that’s automatically
covered.‖
35. The explanation of ―stormwater runoff‖ provided by the FSP’s representative
did not conflict with the treatment of such an event under the policy. The
Panel notes that the FSP’s representative stated that she was providing a
―layman’s way‖ of describing the phenomenon of stormwater runoff, and
although her description is not included in the policy wording, in the Panel’s
view in considering the entirety of the discussion such statement could not
be characterised as misleading.
36. As outlined previously in this Determination the policy was incepted in 2003,
the Applicants were provided with a copy of the PDS and had ample
opportunity to review the terms and conditions of the policy, including the
limits applicable to the benefits payable under the ―Flash flood and
stormwater runoff‖ insured event.
Water Inundation
37. The Panel accepts that the FSP’s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). It extends cover to damage from sudden flood
events ―caused by heavy rain that fell no more than 24 hours prior‖ to the
flash flood.
38. The Applicants say that water came from the stormwater drains and that as
the river was rising — but before it broke its banks — the stormwater drains
were overflowing.
39. In their initial submission to the Service, they say they were told to evacuate
on the afternoon of Tuesday 11 January 2011. This is confirmed in a
Statutory Declaration dated 30 August 2012, in which they also state that the
evacuation took place on Tuesday night.
40. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicants’ property.
The report estimated that there was about $50,000 worth of building damage
and $10,000 of contents damage. Amongst the factual information, the
assessor from MY indicated that the Applicants’ home was on stilts with the
distance from the ground to the floor level being 2m.
41. The assessor from MY noted the following:
―Brisbane R iver located 300 metres away burst its banks and flooded area to
a depth of 3 metres‖ (sic) .
42. He reported that the Applicants and family members were present at the
time of the loss and that water started to enter the property at 7.00am on 12
Case No: 273687 Determination Page 8 of 15
January 2011. He considered that the type of loss was flood, caused by
―torrential rains combined with tidal surge‖.
43. The FSP subsequently engaged hydrology firm ―WT‖ to provide a report as
to the damage.
44. The FSP has submitted a statement dated 13 July 2012 from hydrologist
DC, which provides an evaluation of the cause of the loss in the region
surrounding and specifically affecting the Applicants’ home. DC found that:
the terrain data for the Applicants’ home does not suggest that it was
particularly vulnerable to stormwater or other local runoff during the
rainfall intensities experiences during the January 2011 event;
inundation from stormwater run- off requires ―intense levels of rain‖ which
is sufficient to overcome the stormwater drainage system. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall;
a review of the data from the rainwater gauge at Toowong, approximately
5.1km from and — in DC’s opinion — representative of the rain
experienced at the Applicants’ property, r evealed that 82 mm of rain fell
over 9 and 10 January 2011, with a further 74 mm falling on 11 January
2011. The most intense rainfall on 11 January 2011 fell between 10am
and 11am when approximately 19 mm of rain fell;
the overall intensity of the rainfall was very low and unlikely to result in
run-off or stormwater inundation to the property;
the property is approximately 200 m east of the Brisbane River. The
level of the banks of the Brisbane River immediately adjacent to the
Applicants’ property is between 7m AHD and 8m AHD. The terrain level
falls gradually from the high point of these banks to the Applicants’
property.
the Brisbane City Council (BCC) Floodwise report for the property shows
its ground level varies from 5.1m AHD to 5.9m AHD;
the Brisbane River reached a level of 5.1m AHD at approximately
12.45am on 12 January 2011, which would have been sufficient to
inundate the minimum level of the Applicants’ property.
the lowest level of the structure of the Applicants’ ho use (the ―Benchmark
L evel‖) is 5.4m AHD;
the Brisbane River reached a level sufficient to inundate the Benchmark
Level at 1.49am on 12 January 2011;
the Brisbane River peaked at approximately 2.57am on 13 January 2011
at a level of 7.8m AHD, sufficient to inundate the Applicants’ home by
approximately 2.4 metres.
Case No: 273687 Determination Page 9 of 15
the Applicants’ property was inundated by the rising water from the
Brisbane River and not stormwater run-off or other local runoff associated
with rainfall.
Releases from Wivenhoe Dam & Proximate Cause
45. The central issue for Determination in this dispute is whether the inundation
of the Applicants’ home on 11 January 2011 was due to flash flood as
defined within the terms of the policy, that is whether rain that fell no more
than 24 hours prior to the inundatio n of the Applicants’ property was the
proximate cause of the inundation.
46. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
47. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
48. In view of this, the FSP provided a detailed submission to FOS on 17 July
2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter from the FSP’s hydrologist attaching a key information sheet for
the Applicants’ property;
Hydrologist report ―Investigations of January 2011 inundation event –
Brisbane‖ dated March 2011;
Key Conclusions statement from hydrologist ―SC‖ dated 7 June 2012.
49. Further statements were provided by DC dated 13 July 2012 and SC dated
18 September 2012. Amended Reference documents were also provided the
latest dated 28 August 2012.
50. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, was the rain that commenced falling from
9 January 2011(or earlier) and not simply the rain that occurred from 4.00am
on 11 January 2011. The FSP maintains that on any reasonable view, the
damage sustained to the downstream properties was the combined effect of
all of the rainfall and not just the rain that had fallen from 4.00am on 11
Case No: 273687 Determination Page 10 of 15
January 2011 leading to the implementation of the W4 strategy from 8.00am
that day.
51. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011.
52. The FSP’s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wive nhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
53. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
54. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
55. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel’s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam i nfluenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
56. The ICA hydrology and the information provided by the FSP’s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
57. The question arises as to what was the proximate cause of this inundation.
In determining the proximate cause of the inundation it is necessary to look
Case No: 273687 Determination Page 11 of 15
at the effective or dominant cause of the inundation. The Panel agrees with
the FSP’s general submission that the proximate cause is a cause
determined by common sense evaluation of the relevant facts. In the event
that there are two or more proximate causes, one within the policy and the
other excluded, the policy does not respond. The proximate cause is not
determined by identifying the last event or final trigger but by determining
what is the dominant, effective, direct or efficient cause of the loss.
58. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
59. With respect to the FSP’s argum ent the Panel disagrees. Whilst the Panel
accepts there has been a significant impact on the levels of the Wivenhoe
Dam by the rainfall that commenced falling on or about 9 January 2011 or
earlier, the Panel is satisfied having regard to the information that has been
exchanged and the relevant legal principles, that the heavy rain that
commenced falling on or about 4.00am on 11 January 2011 was the
proximate or effective cause of the adoption of the W4 strategy.
60. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicants’ Inundation
61. SC’s sta tement indicates the effect of the W4 releases first reached the
vicinity of the Applicants ’ property at 2.58pm on 11 January 2011. He
estimated that the property was first inundated by the Brisbane River at
12.51am on 12 January 2011 and by 4am on 12 January 2011, the property
was inundated up to 0.6 m above the Benchmark Level.
62. According to SC, the Benchmark Level of the Applicants’ home was ―Elevated
(possible storage areas)‖. He es timates its height as being 5.2m AHD, which is
slightly lower than the estimate of DC.
63. The Panel notes that the ultimate inundation of the property was 2.4 m
above the Benchmark Level. SC estimated this peak inundation occurred at
approximately 2.57am on 13 January 2011.
64. There are various errors and inconsistencies in the hydrology reports and
statements provided by SC:
In a revised statement dated 18 September 2012, SC attempts to
confirm the Benchmark Level of the Applicants’ property. Although SC
makes reference to the Key Conclusions Statement (forming
Attachment A of his 7 June 2012 statement), in his latter statement he
Case No: 273687 Determination Page 12 of 15
incorrectly states that he had estimated the Benchmark Level as 5.4m
AHD, rather than 5.2m AHD which is the estimate that appears in his 7
June 2012 statement
In the revised statement, SC also contends that Attachment A of his 7
June 2012 statement shows that ―the Benchmark level of the Subject
Property was inundated at approximately 1.45am on Wednesday 12
January 2011‖. However, Attachment A of his 7 June 2012 state ment
estimates the inundation of the Benchmark Level as being 12.51am on
12 January 2011.
The reports provided by the FSP’s hydrologists (DC and SC) included
aerial photographs attached to each report of the vicinity around the
Applicants’ property. These aerial photographs purport to identify the
Applicants’ home within its surrounds and in the case of one of the
reports from SC, include a mark showing the position on the property
used to calculate the ―Benchmark Level‖ of the house.
A comparison of the aerial photographs in the reports by DC and
SC reveals that they identify different houses as being Applicants’
home.
The 13 July 2012 report by DC clearly marks a house with a
green roof, while the report from SC identifies a house with a
grey/silver roof to the east of the house identified by DC.
Based on information available on Google Maps Street View, it
appears that the report by SC incorrectly identifies a house which
has a driveway and street frontage on Fenton Street (which is the
cross street immed iately to the south of the Applicants’ property).
However, in his revised 18 September 2012 statement, SC
includes a topographic map of the vicinity of the Applicants’ home
and on this map he correctly identifies the Applicants’ property.
65. The Panel is concerned that these errors by SC cast doubt on the accuracy
of his estimation of the relevant Benchmark Level, and on the validity of the
statements about the property.
66. However, the street level photographs of the Applicants’ home are the same
in both DC’s report and SC’s report and both reports reference the same
BCC Floodwise Report (which is the correct report for the Applicants’
property.)
67. The Panel recognises that the Benchmark Level for the Applicants’ home
must be between the minimum and maximum ground levels for their property
(shown as 5.1m AHD and 5.9m AHD respectively on the relevant BCC
Floodwise Report), so despite SC’s error in relation to the location of the
Applicants’ house, the Panel is satisfied that his estimate of 5.2m AHD as
the Benchmark Level is correct, given this is almost at the lowest point of the
land.
68. Despite the errors contained in the FSP’s hydrology reports, it is not disputed
that the level of inundation at 4.00am on 12 January 2011 would have been
Case No: 273687 Determination Page 13 of 15
at approximately 5.8m AHD. Ha ving noted the levels of the Applicants’
property and the various images of the home, it is clear that inundation at
5.8m AHD would have covered most of the land area and part of the
structure of the house
69. To this extent, the Panel is satisfied that the inundation of the Applicants ’
property to the level of 0.6 metres above Benchmark Level was caused by
flood that occurred within 24 hours of the heavy rainfall.
Quantum
70. The Renewal COI for the relevant period provides a sum insured of
$290,000 for the home with contents of $46,000 and $2,100 of specified
personal items. T he policy cap for the insured event of ―Flash flood and
stormwater runoff‖, limits the FSP ’ s liability to a maximum of 50% of the sum
insured for building and contents.
71. The Panel notes that cover for specified personal items under the policy is
for accidental damage or loss. Accordingly, subject to the provision of
evidence that items specified on the COI suffered damage or were lost, the
FSP is also liable for that damage or loss up to the maximum amount listed
on the COI for each item.
72. According to the assessment report by MY, the Applicants’ house is on stilts
or stumps, with the first level of the house is approximately 2 metres above
the ground level, the latter of which is equivalent to the Benchmark Level.
73. In his 18 September 2011 statement, SC estimates that the first floor of the
house is approximately 1.5 metres above ground level.
74. In any event, it is clear that inundation of 0.6 metres above Benchmark Level
would therefore not reach the first floor of the house.
75. The photographs attached to assessment report by MY show that the lower
level of the house (which would have been affected by the initial 0.6 metres
of inundation) had a shower room and other items such as a washing
machine and dryer. It is not clear as to whether other rooms were also
located downstairs, or whether the Applicants stored contents items at that
level.
76. The Applicants and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained to the ground level of the property
and to reach an agreement as to cost of repairs of the ground level and
replacement of the various contents lost subject to the limitations contained
within the policy. If the Parties are unable to reach agreement the y make
further submissions to the Panel and the Panel will determine the loss.
77. The Panel has also considered the issue of interest.
78. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
Case No: 273687 Determination Page 14 of 15
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
79. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP’s fault.
80. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes ―unreasonable for the insurer to have withheld payment‖. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
81. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
82. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
83. In the Panel ’s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicants had withheld information from the FSP that
would have led to an alteration of its decision.
84. Accordingly, the Panel determines that it is appropriate that the FSP in this
dispute pay interest from the day upon which the FSP determined to deny
liability of the Applicants ’ claim, until payment of the claim.
85. Insofar as the FSP may have made payment of a compassionate sum to the
Applicants, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
payment was made, may be entitled to deduct this payment from any
settlement sum.
Determination
86. On the basis of the available information the Panel determines that:
The FSP clearly informed the Applicants of the flood exclusion of the
policy;
Case No: 273687 Determination Page 15 of 15
There is no evidence that the FSP misrepresented the extent or scope
of cover to the Applicants during telephone conversations at policy
inception or on 10 January 2011;
The cause of the inundation to the Applicants’ home up to 0.6 metres
above ground level (Benchmark Level) was flash flood, which is
covered under the policy insured event of ―Flash flood and stormwater
runoff‖;
The FSP is liable for damage to the lower level of the Applicants’ home
building and loss of any contents stored on the lower level of the
Applicants’ home subject to the policy limitations.
The FSP is liable for the loss or damage to items listed on the COI as
specified personal items, up to the amounts listed against those items,
subject to the provision of evidence of loss or damage of those items.
87. The Panel also determines that where the FSP cash settles any part of this
claim, pursuant to Section 57 of the Act, the FSP is required to pay statutory
interest on those amounts calculated from 24 March 2011, being the date at
the FSP wrote to the Applicants formally denying the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.