Determination 273447

Home inundation claim refused under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowner's home was inundated in the 2011 Brisbane flood and the FSP denied the claim under the flood exclusion without appointing an assessor or hydrologist. The panel found the FSP entitled to refuse payment, though criticised its failure to investigate.

The insured must establish on the balance of probabilities that the interior was initially inundated by storm or stormwater, and the panel was not satisfied that it was.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 273447 Determination Page 1 of 7 Case number: 273447 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Exclusion 8 April 2013 Background 1. The Applicant held a home building insurance policy with the Financial Services Provider (FSP). The policy provided defined event coverage over his home building in Westlake, Queensland, and was current at the time of the loss. 2. After his home was inundated on 12 January 2011, the Applicant lodged a claim with the FSP for the damage caused. 3. The FSP denied his claim on the basis that the damage was caused by flood, which is excluded under the policy. 4. The Applicant disagrees with the decision and wants the FSP to pay his claim. Summary of Applicant’s position 5. The Applicant is represented and for convenience and simplicity, throughout the remainder of this Determination the Applicant and his representative will be referred to collectively as “the Applicant”. 6. The Applicant says he does not recall receiving a copy of the Product Disclosure Statement (PDS) for the policy. As a result, the FSP has failed to clearly inform him of the flood exclusion of the policy and should not be able to rely on it to deny his claim. 7. The Applicant says that the FSP did not appoint an assessor to inspect the damage to his home, nor was a hydrologist engaged to establish the cause of the inundation. 8. The FSP instead relied on the proximity of his home to the Brisbane River and some aerial photography to decide that it would deny his claim. 9. He says there is a stormwater drain nearby and there is a possibility that the initial inundation of his home was stormwater, which is covered by the policy. Determination Case No: 273447 Determination Page 2 of 7 Further, the Brisbane City Council (BCC) Floodwise Report confirms that his property is in an overland flow path. 10. The Applicant says that the FSP has relied on assumptions and generalities in an attempt to justify its decision. However, it has not discharged its obligation to prove the damage to his property was caused by flood and it should therefore pay his claim. Summary of FSP’s position 11. The FSP says that when the Applicant took out the policy, it sent him an email containing a copy of the PDS and the policy schedule. It also sent a copy of these same documents to him at his residential address by post. 12. It says that the hydrological evidence obtained by the Insurance Council of Australia (ICA) concludes that while there were many factors contributing to the flooding of the Brisbane River, it is clear that the water release from Wivenhoe Dam led to the flooding of the Brisbane local government area (LGA). 13. The FSP says that it reviewed rainfall reports from the Bureau of Meteorology which showed a lack of rainfall on the day of the inundation. It also considered the fact that the Applicant‟s property backs onto a lak e and is very close to the Brisbane River. 14. It has defended its decision to not appoint an assessor or a hydrologist to inspect the Applicant‟s property, saying that there was clear and unequivocal evidence that inundation of his home was caused by flooding of the Brisbane River. 15. The FSP relies on the following policy: “ 7 Storm What is Covered? We will pay for loss or damage caused by storm and stormwater overflow from gutters or from the area around the premises. What is not covered? … We will not pay for any loss, damage or legal liability caused by: … flood (please refer to the definition for flood in the Product Disclosure Statement). … Home Cover Exclusions We will not pay for: … Case No: 273447 Determination Page 3 of 7 13 loss or damage caused by flood .. What do these words mean? ... Flood Means usually dry land being covered by water escaping or overflowing from a natural or manmade waterway, stream, river, canal, reservoir, dam, lake, channel, storm water drain or water catchment system.” Issues 16. Whether the FSP clearly informed the Applicant of the flood exclusion of the policy. 17. Whether the damage to the Applicant‟s property was caused by flood. Reasons for decision 18. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operationa l Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 19. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 20. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. Clearly Informed 21. The Applicant says that when he received a quote for insura nce in June 2010, he received an email containing various hyperlinks but was not aware that those hyperlinks pointed to the PDS for the product he was considering purchasing. 22. He eventually purchased the home insurance policy in July 2010, but cannot recall having received a copy of the PDS from the FSP. 23. The FSP says that when the Applicant completed the purchase of the home building insurance policy, it sent him an email to which was attached a PDF copy of the PDS and the policy schedule. 24. In addition, it says that it sent a hardcopy of the policy schedule and the PDS to the Applicant‟s home address, and has provided documents which Case No: 273447 Determination Page 4 of 7 demonstrate that it followed its normal business process for dispatching policy documentation. 25. The Panel has considered the submissions from both parties in this regard, and has reviewed the policy wording in the PDS. It is satisfied that the PDS clearly outlines that flood is not covered. The exclusion is noted under „Storm‟, and also refers the reader to review the definition of flood. The exclusion is also outlined under the General Exclusions. 26. Furthermore, after reviewing the documentation regarding the process followed by the FSP, the Panel is satisfied that on the balance of probabilities, the Applicant received a copy of the PDS. 27. Accordingly, the Panel finds that the FSP clearly informed the Applicant of the flood exclusion of the policy and it is entitled to rely on that exclusion to deny the claim, should it apply in the circumstances. Was the damage caused by flood? 28. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the face of the facts, that they have suffered a loss to which their policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove that an exclusion applies if it seeks to deny or limit its liability for the claim. 29. The Applicant says that the BCC Floodwise report indicates that his property is in an overland flow path. 30. He says that there is a stormwater drain located four houses down from his home and that in the past, stormwater runoff has flowed via his neighbour‟s elevated property (located to the south) onto his own property. 31. He also says that by not appointing an assessor or hydrologist to inspect his property and relying instead upon the ICA hydrology reports, the FSP has not obtained any information relevant to his specific property or his circumstances. 32. The FSP says that the BCC Floodwise report states that the highest source of flooding affecting the Applicant‟s property originates from the river. It notes that the Applicant‟s property is adjacent to Westlake and within 1km of the Brisbane River. 33. It says that the ICA appointed independent hydrologists to provide technical reports and the hydrological evidence notes that a number of factors contributed to the Brisbane River overflow. These factors include intense rainfall in the catchment areas and large releases from Wivenhoe Dam, which occurred between 6.00am on 11 January 2011 and 3.00am on 12 January 2011. However, it is clear the water release from Wivenhoe Dam led to the flooding in the Brisbane LGA. Case No: 273447 Determination Page 5 of 7 34. The FSP says that data sourced from the Bureau of Meteorology (BoM) shows that 248.8mm of rain was recorded in the Wivenhoe area the day prior to the inundation. By contrast, there was less that 45mm of rain recorded for the Westlake area on the date of the loss. 35. Further, it says that predictive flood mapping sourced from the ICA and BoM are consistent with evidence that the event has been caused by flood, which was the result of water rising from Westlake and the Brisbane River and inundating the Applicant‟s property. 36. The FSP says that the presence of a stormwater drain, even in close proximity of the Applicant‟ s property, does not provide substantial evidence that stormwater runoff caused the inundation event. While the BCC Floodwise report states that the Applicant‟s property is in an overland flow path, there has been no anecdotal or technical reports presented which indicate that overland flow affected his property on the day of the inundation. It also states that the lack of rainfall in the local area at the actual time of the inundation event would more than rule out the possibility of this occurrence. 37. In support of its case, the FSP has presented a chart sourced from BoM, which shows daily rainfall amounts recorded at the Carole Park Alert (040785) and the Panel notes that against the date of 12 January 2011, the report shows that 41mm was recorded and no rain at all was recorded on the successive six days. 38. The Panel is aware that the daily rainfall gauge alerts take readings at 9.00am each day, so the 41mm recorded against 12 January 2011 was for the 24 hours from 9.00am on 11 January 2011 until 9.00am on 12 January 2011. 39. However, the Panel also notes that the Carole Park Alert is situated a considerable distance (several suburbs) from the Applicant‟s property and notes that the report for this rainfall gauge alert may not be representative of the rain which fell in the Westlake area. 40. The FSP has provided a copy of a BCC Flood Map for part of the Westlake suburb and the Panel notes that according to this map the Applicant‟s property is within the extent of the peak flooding for the Brisbane River. 41. Although the FSP has provided an extract from the ICA area hydrology reports for the Brisbane LGA (indicating that water releases from Wivenhoe Dam caused flooding in the LGA), it has not made reference to information, such as rainfall data or river water level data, contained in these reports, to support its case. 42. The FSP has also provided a copy of the BCC Floodwise report for the Applicant‟s property. The Panel notes that according to this report, the minimum and maximum ground levels of the property are shown as 7.9m and 13.9m respectively, while the defined flood level (1 in 100 year event) is shown as 11.9m. Further, the report clearly states that the highest flooding source is „River‟. Case No: 273447 Determination Page 6 of 7 43. However, the report does not show the floor level of the Applicant‟s home relative to the minimum and maximum ground levels, so it is possible that the house floor level is situated higher than the 11.9m defined flood level. 44. The Applicant has pointed out that although the BCC Floodwise report indicates that the river is the highest source of flooding, it is irrelevant to the cause of initial inundation of his home. 45. The Panel is of the view that had the FSP taken the opportunity to arrange for an assessor or a hydrologist to inspect the property, it may have been able to provide i nformation about the floor level of the Applicant‟s home. Without the benefit of any such site-specific inspection report, or any data about the floor level of the Applicant‟s home, the Panel is left to guess at where the floor level might sit relative to the defined flood level. 46. The Applicant is critical of the FSP‟s statement that it appointed hydrologists to inspect other inundated properties, but only in circumstances where it was warranted (eg total loss). He says that based on limited evidence, the FSP rejected his claim and made an incorrect assumption that his claim was less deserving of investigation because there was relatively minor inundation. 47. The Panel understands that FSPs prioritise the use of resources in situations where many claims are received and the availability and cost of resources — particularly hydrologists at the time of a flood event — are limited. 48. However, the Panel also notes that the FSP had several opportunities to arrange for an inspection of the property and on each occasion chose not to do so, relying instead on what it termed “clear and unequivocal evidence” that the cause of the inundation of the Applicant‟s property was flood. Failure to have at least appointed an assessor to attend the Applicant‟s property an d obtain stat ements, has in the Panel‟s opinion, caused considerable distress for the Applicant and has not allowed the Applicant to properly discuss the issues with the FSP. 49. In view of these issues, the Panel Chair Ombudsman conducted a site inspection of the Applican t‟s property on 2 April 2013. The Applicant was present together with a representative of the FSP. The Applicant‟s property is at the end of a street that slopes down towards a lake at the rear. The Applicant‟s home itself is below the road level. The lowe r level of the Applicant‟s property leads out to a rear patio which leads down a number of steps in the direction of the lake at the rear. 50. Whilst the Applicant was not present at the time, he describes the heavy rain that fell in the area on the day prior to the inundation. 51. The Applicant‟s wife was spoken to via the telephone, during the site visit and she described having left the property at approximately midday on 12 January 2011 with the water lapping on the patio at the back of the house. This water was water rising from the lake area. It was unclear whether at that time water had commenced to flow through the house or was flowing to the Case No: 273447 Determination Page 7 of 7 lake area via the stormwater drains. The Applicant‟s wife advised that no water was inside the house at that time. 52. The Applicant‟s property was inundated to a maximum level of approximately one foot. The inundation caused damage to cupboards, carpets, stairs, walls and electricity. 53. As the policy is a listed events policy, the Applicant bears the onus to establish on the balance of probabilities that there was inundation of the property due to stormwater runoff. Whilst the Panel finds that the submissions in this respect, in particular from the FSP are inadequate, the Panel is not convinced that the evidence presented by either party is sufficient to support a proposition that the property was initially inundated by stormwater runoff to a level that would have caused any damage to the interior of the property. 54. Whilst the Panel finds it is likely that water from the Brisbane River ultimately inundated the property, it is not convinced that the evidence presented by the FSP in support of the position that it was only flood water, is quite as clear or unequivocal as the FSP might believe. The FSP‟s failure in this regard, to obtain further information and in particular an assessor‟s report, has in the Panel‟s view caused additional anxiety and inconvenience to the Applicant which may have been avoided if proper investigation of the dispute had been conducted. 55. The Panel however, accepts having considered all of the information now available that based on the terms of the policy, the FSP is entitled to deny the claim on the grounds that the Applicant has not established that the interior of the property was initially inundated b y storm or stormwater overflow from gutters or from the area around the premises. The Panel is persuaded that most likely the whole of the interior inundation of the Applicant‟s property occurred as a result of flood. Determination 56. Accordingly, the Panel determines that the FSP is entitled to refuse payment of the claim pursuant to the terms of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.