Home / Financial Firm (Unknown - Insurer) / Determination 272998
Determination 272998
Claim for retaining wall declined under exclusions for storm erosion, earth movement and upgrades
Summary
The applicants claimed $8,580 for a retaining wall after storm-related soil erosion affected their home. The FSP denied the claim and AFCA agreed the works were an upgrade and excluded for storm erosion and earth movement.
The policy covers repair or replacement to prior condition rather than improvements, and expressly excludes storm damage in the nature of erosion or earth movement.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 272998 Determination Page 1 of 6
Case number: 272998
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/condition
29 April 2013
Background
1. This is a review of a Recommendation by the Service’s Case Manager dated
25 February 2013. The Applicants have rejected the Recommendation and
in accordance with the requirements of the Terms of Reference, the matter
has been referred to me for Determination.
2. The relevant background, summaries of the parties’ position and issue to be
determined are set out in paragraphs 1 to 8 of the Recommendation and I
will restate same.
“1. The Applicants hold a home insurance policy with the Financial Services
Provider (FSP) for their residential property. The policy was incepted on 29
May 2007.
2. On 14 June 2011, the Applicants lodged a claim under the policy for damage
caused by storm, citing the date of the loss as being on or around 20 May
2011. The damage was predominantly due to soil eroding and scouring at or
around the north eastern side of the property. This claim related to a previous
claim lodged by the Applicants which was subsequently withdrawn.
3. The FSP denied the claim on a number of bases, namely that there was no
loss or damage sustained due to an insured event or alternatively, that the
claim falls within a policy exclusion.
4. The Applicants have disputed this.
Summary of Applicants’ position
5. The Applicants submit the following in substantiating their position:
a. The damage resulted from a massive storm that impacted the Gap in
May 2008. As their property is built on a hillside, a massive amount of
rainwater runoff cascaded to their home which resulted in significant
soil being deposited against the wall of their downstairs bedroom and
two stumps holding their laundry area being badly exposed.
b. They have experienced continuing problems since then with future soil
erosion from stormwater runoff. In particular, the bottom bedroom has
a build up of soil erosion plus an added problem of white ant
infestation. This has been exacerbated by the severe weather events
experienced in Brisbane in 2011.
Determination
Case No: 272998 Determination Page 2 of 6
c. Prior to the severe storm in 2008, the existing plumbing and drainage
of the site dealt with the relevant runoff. However, this has now been
compromised as a result of the severe storm in 2008.
6. Based on these series of events, the Applicants are seeking reimbursement
for the costs involved in the supply and installation of a retaining wall. A
quotation has been provided in this regard totalling $8,580.
Summary of FSP’s position
7. The FSP relies on an engineer’s report (NJA), a builder’s report (MK) and the
following policy provisions to substantiate its position:
“ Exclusions …
We do not insure you for any loss or damage that is caused by or arises
from:
…
wear and tear, gradual deterioration, or fading
…
settling, expansion, shrinkage or any earth movement other than
earthquake.
…
We will insure your building and contents at the site against loss or
damage caused by the following events if they occur during your period
of insurance. …
Storm …
We won’t cover
loss or damage to:
- retaining walls, paths, driveways or landscaping
…
loss or damage caused by or resulting from:
- landslide, subsidence, erosion or any earth movement (other
than earthquake).”
Issue
8. Whether the FSP is entitled to deny the A pplicants’ claim.”
Reasons for Decision
3. There has been a full exchange of information and each party has had the
opportunity to address the issues that have been raised.
Case No: 272998 Determination Page 3 of 6
4. I have read all of the exchanged material and I have considered the parties’
submissions including the Applicants further submission dated 11 March
2013.
5. In making his Recommendation, the Service’s Case Manager set out his
reasons in paragraphs 10 to 23 and I will restate same.
“10. I note that according to the policy terms and conditions, the FSP is obliged to
do the following when a claimable loss has occurred:
“We may choose to repair:
the reasonable cost of repair, or
the reasonable costs of replacement to new condition with property of
the same size and specification or with items as near to original as is
currently possible, or
a cash amount. If we agree to pay cash, we will pay the amount it
would reasonably cost to repair or replace the property. Where a
building is not being replaced, the amount we will pay will be less a
reasonable deduction for depreciation due to wear and tear and age of
the property.”
11. Accordingly, when you consider this provision in conjunction with the
description of what events the policy covers, it is evident that the intention of
the contract is to repair or replace a damaged item to the condition it was in
prior to the loss. It is not intended to pay for the costs involved in improving or
enhancing any area of the property that suffered loss or damage, even if such
costs are reasonable and necessary.
12. In light of this, I will now consider the available expert evidence and the
Applicants’ claim in further detail. In relation to the latter, I note the Applicants’
claim is limited to the cost of installing a retaining wall, which includes the
installation of an agricultural pipe.
Consideration of the available evidence
13. Both parties have provided an engineer’s report (the Applicants provided one
by SCE) and the FSP has also provided a report from builder MK. The latter
was involved in the Applicants’ withdr awn claim.
14. NJA provided the following relevant comments:
“ General outline of damage
Significant scour had occurred around the perimeters of two of the three
concrete footings to the steel support posts along at the top of the
embankment on the northern side of the sub- floor area. …
Discussions and conclusions
The surface water drainage provisions outside the line of the top of the
sub-floor embankment have clearly proved grossly inadequate to prevent
surface water entry into the sub-floor area in the course of heavy rainfall
events. The paved area outside the northern wall of the house is
relatively flat, and there is no kerb installed to prevent the overflow of
surface water onto the top of the embankment.
Case No: 272998 Determination Page 4 of 6
Given the susceptibility of the earth bank in the sub-floor area to scour,
and the location of the house footings along the top of the embankment,
we believe that the paved area outside the northern side of the house
should have been formed in such a manner as to direct surface water
away from the house and beyond the north-eastern corner of the house
without entering the sub-floor area.
The scour-affected pier footings do not appear to have suffered any
movement to date, however their lateral stability will have been reduced
to some extent by the scouring. The depths of the footings are unknown,
however they are founded on materials which have remained stable to
date.
Given the nature of the house construction and the poor external
drainage conditions there is clearly the potential of ongoing scour of the
embankment, and we consider that the construction of the proposed
retaining wall appears to be a wise precaution.
…
It does not appear at this stage that the house has been structurally
damaged by the effects of the surface water ingress, however the
balance of the unretained bank remains susceptible to scouring damage
and therefore to possible resultant footing instability.”
15. SCE’s report was dated 12 October 2012 and contained the following of
relevance:
“ Observations
The nature of the slope is significant and towards the parklands located to
the rear right hand (South-East) corner of the site.
The drainage on site is adequate to the right and poor to the left.
At the time of the inspection a section of the boulder retaining wall had
failed resulting in debris and boulders in close proximity to the external
face of the dwelling.
The primary water source appears to be from the rear left property.
Substantial erosion and scouring of the earth bank material around the
chain wire fence along the rear boundary. An overland flow open drain or
similar was in place on the adjoining property above this fence line at the
time of the inspection.
…
Conclusion
The failure of the retaining wall and resultant water damage to the
dwelling is likely to a combination of factors which include:
Numerous storm events over years effecting the left face of the
dwelling.
The overland stormwater which has been directed to the dwelling and
scoured the earth batter over the retaining walls.
The channel on the adjoining property directing excess stormwater into
the site.
Inadequate retaining wall design and installation.
Case No: 272998 Determination Page 5 of 6
The statement was made by [W] insurance that the erosion has been the
result of “deterioration, expansion and earth movement which are
exclusions under the Policy” rather than an “insurable storm event”. It
should be verified within the insurance policy as o these condition being
an implied or explicit condition of the policy.”(sic)
16. MK’s report was dated 25 August 2009 and contained the following of
relevance:
“Upon our inspection we have noted that the soil surrounding the footings
to this elevation is eroding away from the footings and collapsing into the
lower level exterior wall of the dwelling.
This is due to the defective design and construction of the dwelling as the
soil has been cut to accommodate for the dwelling to be constructed into
the land as it is a very steep block however no means of retaining the soil
or making a rainwater run off course has been put in place to divert
rainwater away from the subflo or area or footings.”
17. Upon reviewing all of the available expert evidence, it is clear they are
consistent in a number of relevant factors. In particular, they all acknowledge
that there was inadequate drainage to this area of the property. Although the
Applicants have submitted that the volume of rainfall in May 2008 was such
that no amount of drainage or retaining wall would have been able to cope,
this is not corroborated by any of the experts.
18. For instance, none of the experts state that the drainage measures installed
on the property previously were adequate and/or compromised as a result of
the storm in May 2008. Instead, they all expressly acknowledge there is
inadequate drainage to this area of the property which requires to be
redressed. In particul ar, according to the Applicants’ own engineer (SCE), one
of the factors he accepted as causing the failure of the previous retaining wall
was “inadequate retaining wall design and installation”.
19. In addition, the costs sought by the Applicants regarding the construction of
the retaining wall, which includes an agricultural pipe, is consistent with the
experts’ recommendation that this is a necessary measure to protect the
property from potential structural damage.
20. Accordingly, based on the available evidence , I accept the FSP’s position that
the costs being sought by the Applicants is with respect to a modification to
the site that constitutes an upgrade. This in particular is corroborated by the
fact that the costs being sought by the Applicants are not to repair or replace
any existing structure.
21. Although I accept that these works appear to be both necessary and
reasonable, it is not a loss covered by the policy. This is mainly due to the fact
that the basis for constructing the structure is to rectify inadequate drainage
measures that existed at the property throughout the Applicants’ ownership as
opposed to repairing or replacing a structure that suffered loss or damage as
a result of an insured event.
22. Further and in the alternative, even if I accept the costs were necessary to
replace the previous retaining wall that failed, the claim would still not be
payable as damage to a retaining wall caused by storm is specifically not
covered by the policy.
Case No: 272998 Determination Page 6 of 6
23. As a result, I am not satisfied the Applicants’ claim is payable under the terms
and conditions of the policy. ”
6. I agree with the Case Manager’ s reasons and with his recommended
outcome.
7. I note that the Case Manager set out in detail the essence of the Applicants ’
expert report and in particular, I refer to the report by “ SCE ” quoted in
paragraph 15 of the Case Manager’s reasons.
8. In deciding this matter, I am particularly influenced by the aetiology of the
storm events referred to in support of the application. The first of those
events occurred in May 2008 with subsequent future soil erosion events
caused by later storms.
9. In their further submission dated 11 March 2013, the Applicants state that
the claim is confined to damages to their property, apparently including the
retaining wall, and not for a new levee retaining wall.
10. I note that the Applicants ’ expert (SCE) accepted the failure of the original
retaining wall was caused by “inadequate retaining wall design and
insulation”.
11. I agree with the Case Manager’s reasoning and with his recommended
outcome. I particularly note that the costs that were necessary to replace the
original retaining wall are excluded under the policy because damage to a
retaining wall caused by a storm is excluded by the policy.
12. Further, and significantly, the policy excludes “storm dama ge in the nature of
erosion or any earth movement”.
13. Whilst I empathise with the Applicants in their predicament, I am satisfied
that the Applicants’ claim is not covered under the terms and conditions of
the policy.
Determination
14. The FSP is entitled to deny the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.