Summary

Investor landlords disputed the FSP's cash settlement offer for storm and tree damage to outbuildings at their rental property and its refusal of loss of rent. AFCA set the damage settlement at $70,901.25, ordered loss of rent to be paid on documents, and ordered statutory interest in certain cases.

The PDS defines home to include domestic outbuildings, so damage to outbuildings that made the property uninhabitable triggers loss of rent cover even though the main homestead was undamaged.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 272913 Determination Page 1 of 9 Case number: 272913 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition 27 September 2012 Background 1. The Applicants held an Investor Home and Contents Insurance policy with the Financial Services Provider (FSP), providing cover for their tenanted property, located in the Blue Mountains. The building sum insured was $486,000 and was subject to a $500 policy excess. The insurance policy started on 12 April 2010 and was current at the time of the loss, the subject of this dispute. 2. On 6 July 2011, the FSP received a telephone call from the Applicants‟ tenants advising them of a tree which had fallen at the property causing damage. On assessment of the property it was determined extensive damage had occurred to several outbuildings and services due to the tree impact and associated cyclonic winds. 3. The FSP arrange for relevant “make safe” works at the property which included removal of the tree(s) and relevant debris. After assessment by builders etc, the damaged buildings were essentially demolished and removed from the site. 4. The FSP and the Applicants provided two quotations each for the repairs to the property. The dispute has arisen over the settlement offered by the FSP as being fair and reasonable. 5. In addition, the Applicants say their tenants had to vacate the property due to it being uninhabitable and have claimed loss of rent accordingly. The FSP has denied this aspect of the claim as the main home was not damaged by the tree impact or cyclonic winds/storm. Summary of Applicants ’ position 6. The Applicants say they accept the FSP‟s decision to exclude the replacement of the slab/flooring within the garage. They say they are only concerned with having the concrete slab replaced to the laundry/toilet block, as per the scope of works and quotations provided. Determination Case No: 272913 Determination Page 2 of 9 7. The Applicants say the quotation provided to the FSP by its preferred builder is not adequate to complete the required repairs to their property, based on two separate quotations they received from local builders. They accept that an amount had been included in the quotations their builders supplied for the replacement of a slab to the garage, and accept that these amounts need to be deducted. 8. The Applicants say that during the FSP‟s contractor‟s attendance at their property to remove debris etc, the front facade of their garage was demolished and removed. They had been under the impression this item was to remain in-situ to be re-used when the building works were undertaken. They say this necessitated them going back to the builders that had provided quotations to them to have them revise their quotations accordingly. 9. The Applicants say that in addition to the damage, their tenants vacated the property in November 2011, as they believed the property was uninhabitable because of the unrepaired storm damage at the property. 10. The Applicants seek to be properly reimbursed for the storm damage to their property and seek acceptance of their loss of rent claim. Summary of FSP’s position 11. The FSP has accepted the claim under the terms and conditions of the policy of insurance. It says it has denied the loss of rent aspect of the claim only. 12. The FSP says its builders have provided an adequate quotation covering all necessary repairs and as such, it has accepted the most economical of the quotations provided and based its settlement on this. 13. The FSP says there is no cover for loss of rent under the insurance policy, as the main homestead at the property did not sustain damage. As such, it believes the „home‟ was still habitable and therefore, there is no claim for loss of rent available to the Applicants. 14. The FSP relies on the following policy provisions of its Product Disclosure Statement (PDS): “ What you are covered for Insured events 1 to 12 When covered under this policy, the home and contents are insured for loss or damage at the insured address by any of the 12 insured events, if they happen in the period of insurance. ” (Page 13) “ How we settle your claim We choose how your claim is settled Case No: 272913 Determination Page 3 of 9 If we agree to pay a claim for loss, theft or damage to the home, unit or contents we will decided if we will:  repair damage new for old or  replace home or contents new for old or  pay you what it would cost us to repair or replace the home or contents new for old. The meaning of new for old is defined below. We will not:  pay extra to replace the home or contents to a better standard, specification or quality than it was before the loss or damage occurred except as stated in „new for old‟ on the next page  fix a fault that existed before the loss or damage occurred. ” (Page 46) “ Home claims How we settle home claims If we agree to pay a claim for loss, theft or damage to the home, we will decided if we will:  repair damage new for old or  rebuild the home new for old or  pay you what it would cost us to repair or rebuilding the home new for old.” (Page 49) “ Dealing with defects ... If undamaged defective parts of the home will not support repairs If undamaged defective parts of the home will not support repairing damage by an insured incident, we will only pay what it would have cost us to repair the dam age had the home not been defective.” (Page 52) “ 1a. Loss of rent caused by an insured incident We cover When you have home cover If an insured incident damages the home to the extent it cannot be lived in, we will pay the rent you lose for the reasonable time it should take to repair or replace the home so it can be lived in again.” (Page 20) Issues 15. Whether the FSP has provided an adequate settlement offer to the Applicants. Case No: 272913 Determination Page 4 of 9 16. Whether the FSP is entitled to deny the Applicants claim for loss of rent. Reasons for decision 17. This decision has been made by a Panel consisting of an Ombudsman, an industry representative and a consumer representative. 18. The Panel is satisfied there has been a full exchange of material between the parties and that each party has had the opportunity of clarifying the issues that arise from the material. 19. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 20. There is no dispute over the cause or extent of damage in this instance. The FSP has accepted the claim under the terms and conditions of the policy and the dispute has arisen over the settlement being offered in relation to building repairs required, and the declinature of the Applicants‟ claim for loss of rent. Building Repairs 21. The FSP says it has the right to cash settle building claims in accordance with its PDS, as detailed above. In this instance it says its builders cannot guarantee work completed due to pre -existing defects and items not meeting current building codes, existing at the Applicants‟ property. The Applicants do not dispute this. 22. The FSP‟s Assessor provided a scope of works to the FSP and this was used as the basis for all quotations provided by builders appointed by both the FSP and the Applicants. There appears to be no dispute over the scope of works provided by the assessor, however, following demolition of the standing portion of the garage it became necessary to quote the garage as a full replacement in lieu of a repair. 23. The FSP obtained quotations for the repairs from builders B and A it has accepted for settlement the most economical quotation, that being the quote from B. 24. The Applicants say they are not satisfied with the offer of settlement made by the FSP as they believe the amount offered will not adequately pay for the extent of repairs required. The Applicants have provided quotations, for the necessary repairs from builders L and S, both quotes have been rejected by the FSP. 25. The Panel has reviewed the quotations provided by the FSP and the Applicants in relation to effecting repairs at the property and it notes there are significant discrepancies between the amounts quoted. Case No: 272913 Determination Page 5 of 9 26. Moreover, the Panel is concerned regarding the accuracy of the quotations provided by all of the quoting builders. 27. B has provided the FSP with two quotations. The first quotation for the amount of $52,430 states it is prepared in accordance with the scope of works provided. Thus it does not include the full garage replacement. 28. The second quotation B provided, following the demolition of the garage, is for the amount of $57,415. It was based on a scope of works which included the garage replacement, the laundry, fire shed roof, other, and the water tank. It is on this quotation the FSP has based its settlement. 29. The Panel notes that in its second quotation B has reduced its builder‟s margin to 10% whereas the original quotation (as per the quotation provided by the FSP‟s builder A) has a builder‟s margin of 20%. The Panel is bemused as to the reason for the margin decrease.. 30. The quotation from the FSP‟s builder A is $56,357. The quote shows a breakdown of its costing but fails to include any labour cost to repair the laundry. Moreover, A‟s quote makes no mention of the wood shed or the septic tank being included. 31. A further concern in relation to the quotes of A and B is that both builders appear to b e city based builders whereas the Applicants‟ appointed builders are local. 32. The reason for the concern is, that having reviewed the Applicants‟ location, the Panel is of the opinion that there may be applicable regional costs which are not reflected in A and B‟s quotes. Moreover, they being prepared on a cash settlement basis as was detailed in the scope of works document of 25 July 2011, in lieu of a replacement at the site basis which would otherwise be required for a rebuild. 33. When reviewing the quotati ons provided by the Applicant‟s builders L and S, the Panel noted that S‟s quote of $62,387.50 was provided an “all up” basis. It is based on the scope of works and a site visit but contains a qualification that it does not include: “any damage that [I] c ould not see due to the amount of damaged materials still on & around the work area.” (sic). 34. The quote by L of $92,030 does not take into account septic tank repairs, the water tank or landscape items. 35. Further, the Panel is advised that both S‟s second quote and L‟s quote include the cost of a concrete slab for the replacement garage. As there was no damage caused to the garage slab the charge (not quantified) for its replacement is not allowable. 36. Whilst the Panel appreciates the difficulty involved in pro viding an accurate quotation in circumstances where the damage is extensive, it considers in this instance, all quotations provided are lacking in one way or another. The Case No: 272913 Determination Page 6 of 9 Panel is of the opinion that none of the quotations provided appear to adequately cover the scope of works and its garage replacement revision, which seems to have been agreed to by both the FSP and the Applicant. 37. Notwithstanding, in view of the time delay in obtaining resolution of this matter (well in excess of a year), and as the Panel believes that the required work is well known and seemingly agreed between the parties any further delay in confirming the scope of works and seeking re-quoting is not in the best interests of the parties. 38. Accordingly the Panel will proceed towards arriving at an outcome that is fair in the circumstances to both parties with the most relevant of the imperfect quotes. 39. The FSP‟s offer of settlement at $ 57,415 is based on the quote of BMC which as indicated by the Panel may be defective in not including the normal builder‟s profit margin or an allowance for the regional location of the site . Further, the quote is based on a cash settlement basis that is on a basis that the work will not have to be actually undertaken by the quoting party. 40. The initial quote the applicant‟s builder S provided makes it clear that S quoted on “the building assessment/scope of works and have visited the site and with you have prepared the quote based on the information supplied in the scope of works and from what I have viewed o n visual inspections.” Thus all of the work required to be performed was quoted in S‟s $62,387.50 quote with the exception of the portion of the garage which was standing but was later removed and the complete demolition of the garage seems to have removed the qualification regarding damage unseen due to materials on site. 41. By allowing an additional $22,000 (i.e.66% of B‟s quote for full garage replacement) to S‟s quote to provide for full replacement of the garage rather than the reinstatement of the damag ed portion raises S‟s quote to $84,387.50. 42. The quote provided by B of $57,415 and S‟s adjusted figure of $84,387.50 total $141,802.50 an average of $70,901.25 an arbitrary figure for settlement which the Panel considers fair in the circumstances of the case and the best interest of the disputing parties. 43. The Panel draws some comfort in the fairness of its arbitrary decision in that reinstatement of B‟s normal builder‟s margin of 20% as per its former quote together with the application of a Blue Mountains location regional allowance of 5% raises the FSP‟s offer figure to $65,765.70, without giving further consideration to the quote being calculated on a cash settlement basis as distinct from an actual replacement requirement. Loss of Rent 44. The Panel has con sidered the Applicants‟ submission regarding loss of rent on the basis of the property being uninhabitable due to the extent of damage caused by the insured event of storm. Case No: 272913 Determination Page 7 of 9 45. The Applicants say their tenants moved out of the property due to the property being uninhabitable and they have provided a letter from their then tenants to support this, which reads: “Due to storm damage at the property I believe the premise‟s has become unfit for rental for the following reasons.  With significant damage to the wood shed and garage there is nowhere for dry storage of firewood, which is the primary form of heating  Damage to the septic system has resulted in pooling of septic at surface level which poses a serious health risk and unpleasant living environment  The destruction of the laundry building has resulted in us needing to pay for regular laundry services  Damage to the gate and fence line has left the property boundary unsecure  Due to the damage to the garage there is no longer secure covered parking for our vehicles as per the property lease and required by our insurance provider” (sic) 46. The Panel considers the points raised by the tenants are valid, certainly the lack of laundry facilities, adequate storage for wood stated as being the primary source of heating and especially the pooling of septic system contents at ground level, would make the property prima facie uninhabitable. 47. The Panel notes the FSP does not deny the cause of damage nor does it deny the damage has been caused by an insured event. It has remained silent on whether or not the property is uninhabitable, other than its reliance on the damage not being to the „main homestead‟. 48. The FSP says cover for loss of rent is limited to when the home cannot be lived in, as per its PDS, which reads: “ 1a. Loss of rent caused by an insured incident We cover When you have home cover If an insured incident damages the home to the extent it cannot be lived in, we will pay the rent you lose for the reasonable time it should take to repair or replace the home so it can be lived in again.” 49. The Panel considers the FSP is correct and the Applicants do not dispute, that the main homestead was not damaged as a result of the storm event. However, the Panel has reviewed the FSP‟s PDS wording which provides the following definition for home: “ Terms Explained [page 58] ... Home [page 59] The home shown as insured on page 8. For „at the home or at the insured address‟ see page 58.” at the home or at the insured address [page 58] Case No: 272913 Determination Page 8 of 9 For at the home, it means within the home‟s domesti c land boundaries located at the address shown on your certificate of insurance.” “ About your cover [page 8] What we cover as the home The home means your residential building at the insured address including its structural improvements, fixtures, fittings and domestic outbuildings. Home also includes:  ...  Service pipes or cables you own or are legally responsible for” 50. The Panel is of the opinion that the FSP is unable to deny the Applicants‟ loss of rent claim based purely on the fact the main homestead has not been damaged. It is evident the outbuildings at the property have been damaged, along with the septic system/pipes etc. One of these outbuildings house the laundry which was clearly in use by the tenants, prior to the storm event. Another outbuilding was being used as a dry storage area for wood which is stated to be the primary source of heating for the home. 51. In addition, as repairs have not been effected to the property due to the dispute regarding settlement of the rebuilding aspect of the claim, it appears the septic system is still damaged and remains leaking at the property which the Panel accepts, could pose a serious health risk. 52. On the basis of the evidence before it the Panel concludes the FSP has failed to refute the Applicants‟ claim to loss of rent payments due to the home being uninhabitable. Settlement Offered 53. The FSP offered a settlement to the Applicants which was rejected. Further, a settlement cheque was sent to the Applicant it was returned to the FSP without being presented. 54. On reviewing the documents, the Panel is of the opinion the settlement cheque was sent to the Applicant without any qualification that should its decision be overturned at any stage, it would make an additional payment. The Panel consider the Applicants, had they retained the cheque and started the repair process, may have prejudiced themselves, or at least believed they would have prejudiced themselves, with their dispute action and as such, correctly returned the cheque. Determination 55. The Panel determines in accordance with the foregoing (point 42) the FSP is to pay the Applicant the sum of $70,901.25 in full and final settlement of the damage portion of the claim. Case No: 272913 Determination Page 9 of 9 56. The Panel further determines the FSP will, on provision of documents from the Applicants to support their loss of rent claim (including but not limited to ownership of the property, copies of lease agreements, rent ledgers confirming payment of rent etc), pay to the Applicants loss of rent from the 5th November 2011, being the first day after the tenants vacated the property, until the date of settlement of this claim. 57. Further, in the event the FSP is not required to pay the Applicants loss of rent for any period between the period the 15 November and the payment of the aforesaid $70,901.25 the FSP will pay the Applicants interest on the $70,901.25 at the Statutory Rate for such period.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.