Quality of repairs and settlement after water leak claim

FirmFinancial Firm (Unknown - Insurer)
Decided2014-02-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$813
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant disputed the quality of repairs after a water leak and the cash settlement, and sought further amounts for carpet, drapes and other items. AFCA ordered $633 for painting and $180 for drapes with interest on the drapes, and found the FSP otherwise had no further obligations.

A cash settlement for defective repairs was accepted as appropriate, with allowances for the likely increased costs; the premium increase and extra private work fell outside jurisdiction.

Issues

Subjects and remedies

pay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 272546 Determination Page 1 of 14 Case number: 272546 General Insurance - Domestic Insurance - Home and Contents Insurance - Service - Service Quality - Repair Problems 6 December 2013 Background 1. The Applicant held a home and contents insurance policy with the Financial Services Provider (FSP). The policy provided building cover for $97,000 and contents cover for $34,728. 2. On or about 6 January 2012, the Applicant lodged a claim with the FSP for water damage in the home, which appeared to originate from a leaking pipe. 3. The FSP accepted the claim and through its agents attended to the repair of the damage. The Applicant is dissatisfied with the repair work done and the handling of the matter by the FSP and its agents. Summary of Applicant’s position 4. The Applicant says that the replaced carpet in the home was an 80/20 wool blend and not 100% wool as was the original. It was not laid properly and is unsightly. She should be entitled to a proper replacement. 5. The quality of the repairs at her home was not acceptable, particularly in relation to the render used, the pipes, the damage to the drapes not properly addressed, the excavation and repair of the brickwork and the painting work. 6. The leaking pipe was not from her unit but from a neighbouring one. No proper leak test has been done in relation to her pipes and the repairer damaged it in the course of the work being completed. 7. The plumber was rude to her and she feels that this warrants an apology. 8. The cash settlement is insufficient to cover the damage and inconvenience she has suffered through the repair process. 9. Guarantees for the work completed were not provided by the FSP’s agents and she believes that she should be entitled to this. 10. The work done in the toilet area was not of a sufficient quality and she is concerned that it may fail. Determination Case No: 272546 Determination Page 2 of 14 11. A compliance certificate was not issued for the electrical work done at the home. 12. As a result of this incident, her premium was increased on the renewal of the insurance cover. Summary of FSP’s position 13. The FSP concedes that some aspects of the original repair were not to an acceptable standard. It arranged for the appointment of an independent contractor to inspect the quality of the work and it subsequently cash settled the Applicant for the value of the extra work required. 14. The carpet was paid for and chosen by the Applicant and should not be an issue for the FSP to consider. The plumber was retained by the Applicant and not the FSP. 15. There is no evidence of continued leakage problems at the property. 16. Its agents have guaranteed the work conducted at the premises, as provided for under the policy. 17. In the circumstances, the FSP is of the view that it has settled the matter appropriately. 18. The FSP relies on the following policy provisions: Page 10 of the Product Disclosure Statement (PDS) “ How we will settle your buildings claim 1. At our option, we will: a. repair or rebuild the damaged part of your building to the same condition as when it was new; or b. pay you the reasonable cost of repairing or rebuilding any damaged part of your building to the same condition as when it was new; or c. pay you up to the amount of the sum insured. If we pay you the reasonable cost of repair or rebuilding, this means the cost of repairing or rebuilding less any discount available to us were we to repair or rebuild. ” Page 16 of the PDS “ How we will settle your contents claim 1. At our option, we will: a. repair or replace your contents; or b. pay you the reasonable cost of repair or replacement; or c. pay you up to the amount of the sum insured. Case No: 272546 Determination Page 3 of 14 If we pay you the reasonable cost of repair or replacement, this means the retail price of the item as if it were new less any discount available to us were we to repair or replace it. We will adjust your claims payment in accordance with the GST provision noted under “Conditions of cover”, “GST Notice” on pages 45 to 46. 2. When it is not possible to repair or replace a damaged item with original materials or an original item, the nearest available equivalent to the original materials or item will be used. We will not pay to repair or replace property which has not been physically damaged. 3. If the claim relates to loss or damage to carpet, loose floor coverings, curtains or internal blinds, repair or replacement is limited to the room, hall or passage in which the loss or damage actually occurred. 4. If any part of a pair, set or collection is lost or damaged, we will not pay more than the value of the part which is lost or damaged. No allowance will be made for any reduction in the value of the remaining part or parts of the pair, set or collection. ” Page 21 of the PDS “ 11. Water or other liquid damage (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage which results directly from the bursting, leaking, discharging or overflowing of: • fixed apparatus, • dishwashers, • washing machines, • fixed tanks, • fixed pipes, • waterbeds, or • aquariums designed to hold more than 20 litres of water. If you have buildings cover and we have agreed to pay a claim for water or other liquid damage, we will also pay the reasonable cost of locating the source of the damage. We will not pay: a. for loss or damage caused as a result of the gradual escape of liquid over a period of time: • where you or a reasonable person in the circumstances could be expected to have been aware of such gradual escape of liquid, • due to lack of maintenance, wear and tear, or neglect, or • from a shower base, shower recess, shower alcove or the walls surrounding the shower; b. for the cost of repair or replacement of the defective part or parts of the fixed apparatus, dishwashers, washing machines, fixed tanks, fixed pipes, waterbeds, aquariums or installations which caused the loss or damage; Case No: 272546 Determination Page 4 of 14 c. for the cost of repair or replacement of any broken main or pipe; or d. for loss or damage caused by rust, corrosion, algae, mould or mildew. ” Issues 19. Whether the FSP has settled the Applicant’s claim appropriately. 20. If not, what further issues should be addressed. Reasons for decision 21. I am satisfied that an exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 22. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the nature and complexity of the matter. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 23. Whilst I have read and considered all of the provided material and there are numerous issues raised by the parties, I will not address all of these issues in the Determination. I have chosen to restrict my commentary to only those issues which I consider relevant to the outcome. 24. The Applicant’ s home was damaged as a result of a water leak, which caused water damage to areas of the home and some contents. 25. Numerous issues have been highlighted by the Applicant and I will attempt to address each of these in turn. Re-assessment 26. From the outset, the Applicant was dissatisfied with the quality of the repairs completed by the FSP’s agents/contractors and wanted a reassessment of the work. 27. The FSP retained an independent expert, “AA”, to inspect the home and to provide commentary on the extent of the repairs undertaken and the quality of those repairs. 28. AA provided a report dated 20 November 2012, after an inspection of the premises. Attending the home with the FSP’s loss adjuster, “CL”, AA noted in this report that:  Damage occurred to the Applicant’s uni t after a water pipe burst and spilt water into the unit, damaging the wall and the carpet in some areas; Case No: 272546 Determination Page 5 of 14  Access to the pipe was gained through the south wall of the second bedroom;  The Applicant was dissatisfied with the finish to the render wall and the overall process. She considered that the replacement skirting in one area had not been bevelled to achieve a match with the original skirting;  AA determined that the quality of the paint finish in the second bedroom was “generally good” , but that there was a visible join that required minor additional work;  An area of one square metre was removed and replaced from the cement render wall linings on the western wall, with a “clearly visible join” apparent. This required minor work to achieve a flat surface an d a seamless repair to the render;  A split in the door face was identified in the door for bedroom two, for which repairer “PI” attended to minor work not originally considered part of the claim. AA was unable to determine if this problem was caused by the repair work. The door now requires replacement;  In the toilet, AA considered the repair to the cement render to be to a “satisfactory standard”, though the replacement skirting was not to standard and required a splay cut end to match the original. The top of the cistern needed a “minor adjustment” in the refitting;  The Applicant alleged that the FSP’s contractors had damaged kitchen tiles and dirtied the grouting during their time in her home. AA found no evidence of this;  A scope of works was devised to account for the additional works suggested by AA and this estimated that the further work would cost an additional $790. 29. The Applicant contends that the scope and breadth of work required could not be achieved with the amount suggested by AA and she has a lso intimated that there is additional work not considered by the FSP which requires attending to. Origin of the leak 30. The Applicant highlights that the damaged pipe which caused the water damage to her home was not from her property but from her neighbour’s property. She considers that this is important for an understanding of the incident. 31. In support of her claim, the Applicant has provided details of water metre readings from her own home and her neighbour’s home to attest to there being no leak on her property. Having considered the evidence presented, I am satisfied that the issue does not influence the outcome of the claim. Case No: 272546 Determination Page 6 of 14 32. It is clear that the Applicant’s home was damaged as a result of the incident and that the FSP accepted the claim and sought to provide coverage for her loss. 33. In conversations with the Case Manager for the Service, the Applicant confirmed that she has not experienced any further leakage problems in the home. 34. However, the Applicant claims that one of the repairers, appointed by the FSP, damaged her pipes in the course of the repair process, though it is not in dispute that this damage has since been repaired. 35. I am satisfied that in this case, the origin of the leak itself is not important from the point of view of coverage for the claim. The policy extends cover for the resultant damage and this would eventuate regardless of whether it originated from the neighbour’s propert y or not. Indeed, the FSP has accepted that it is required to cover the Applicant’s claim. 36. I appreciate that the Applicant says that the neighbours had a significantly higher water bill over a recent period and I acknowledge her belief that this is indicative of a leak from their property. This may be the case, but even if true, it is not relevant to the Applicant or this claim, unless this leak is still causing damage. 37. The lack of ongoing damage issues, the concession from the Applicant and the report from AA, all confirm that this is not the case. As there is no ongoing water ingress into the property, I am satisfied that the FSP is not obliged to perform any further work to look for any possible additional leaks. This is a matter of general maintenance , w hich is the Applicant’s responsibility. Carpet 38. The Applicant’s major concern with the claim is with the replacement carpet provided at her home by “SI”. The Applicant claims that the original carpet was 100% wool based and that the replacement carpet is o nly an 80/20 nylon blend. 39. The Applicant has also claimed that the installation of this replacement carpet was defective. 40. No evidence of defective installation of the carpet has been supplied by the Applicant. The Case Manager for the Service has invited the Applicant to obtain some evidence in support of her claims, although nothing has been provided. 41. I agree that under the terms of the policy, a damaged item should be replaced with an item of commensurate quality. The policy provides that the FSP, when repairing or replacing an item, will: “... repair or rebuild the damaged part of your building to the same condition as when it was new ...” Case No: 272546 Determination Page 7 of 14 42. This should ensure a like-for-like replacement. The FSP submits that it did not instruct SI to attend to the repair, as this was negotiated with the Applicant direct, after the FSP prepared a cash settlement for the Applicant. 43. However, the Applicant says that the FSP chose the repairer and the cheque she received was made payable to SI, which left her with no choice but to let the contractor attend to the job. 44. I accept that if the FSP has made the payment which was sent to the Applicant, payable to SI, then the FSP must accept responsibility for the quality of the repair. 45. When asked about the reported issues with the work, S I confirmed that it was asked by the Applicant to conduct extra work for her at a cost of $300. The Applicant did not want to pay the cost to carpet a full extra room and compromised with a suggestion to re-use some of the undamaged carpet. SI further confirmed that it has not been paid by the Applicant for this additional work and that when it sought payment, the Applicant started her complaints about the quality of the job and her dissatisfaction with the carpet. 46. Insofar as the Applicant has arranged for additional work to be done by SI, that was not within the scope permitted under the claim, this work would not be the responsibility of the FSP and it is not within the jurisdiction of the Service. 47. Whilst the Applicant contends that the previous carpet was 100% wool and that the replacement was only an 80/20 wool blend, she has provided no evidence in support of these claims. The Case Manager invited the Applicant to obtain such evidence to support her claim. No evidence has been provided. 48. SI provided a copy of the relevant purchase documents for the additional private work. The loss adjuster for the FSP, “CL”, also provided a copy of the “Completion Certificate & Payment Authority”, dated 25 February 2013, in which the Applicant signed and agreed in relation to the work by SI that: “All authorised insurance works by the Contractor... relating to my insurance claim have now been completed. I am happy with the quality of the work that has been completed.” 49. The Applicant has not challenged the authenticity of this document. 50. The signed form from the Applicant confirms that she accepted that the work completed by SI (in relation to the claim), was complete and that she was happy with it. In my view, this confirms that the Applicant was satisfied with both the choice of carpet and the quality of the work when it was completed. I am not persuaded that it would be reasonable to revisit the quality of the materials used now, noting that there is no evidence that the installation was defective or that the carpet was not of the same quality as the previous product. Case No: 272546 Determination Page 8 of 14 Guarantee for repairs 51. The Applicant sought a guarantee for the quality of the work attended to at her home. 52. The FSP supplied and exchanged a letter from PI, dated 19 December 2012. This letter noted that PI would: “... honour any rectification works which arise as a result of any faulty/defective claim related workmanship that was undertaken by [PI].” 53. I am satisfied that the abovementioned letter is sufficient to guarantee the work undertaken by PI. Further to this, I am satisfied that should any work shown to be related to the claim incur any problems or be established by the Applicant to be defective in some way or manner, she would be entitled to return to the FSP to have it reviewed. 54. The Applicant also sought a compliance certificate for the electrical work undertaken at her home. The FSP says that no such work was done and there is no need for such a certificate. 55. Whilst the Applicant disagrees with this, there is no evidence that an electrician was required or that electrical work was specifically attended to. On this basis, I will not compel the FSP to provide such a certificate. Toilet 56. Part of the excavation to discover the leak and subsequent repairs conducted to the home, involved the wall in the toilet area and the Applicant is of the view that this structure is not safe. 57. Whilst invited to, the Applicant has not supplied any independent evidence to address this issue or to suggest that the repairs completed were not of an acceptable standard. 58. The report from AA confirmed that there were some minor issues for the FSP to address, including replacing the poorly finished skirting and adjusting the cistern. Importantly, AA found no issue with the cement render or the stability of the structure itself. 59. In the absence of any substantiation of the Applicant’s claims regarding the safety of the work and the structure, I cannot draw any adverse conclusions as to this aspect of the damage. Specific additional items sought by the Applicant 60. The Applicant remains concerned with several other aspects of the repair process, including damage that she alleges was caused by contractors to the drapes, security door and an oak table in her home. Case No: 272546 Determination Page 9 of 14 61. These issues have been considered by the FSP and the loss adjuster in the context of the allegations made by the Applicant. In the interests of resolving the matter, the FSP agreed to cash settle the Applicant for the following:  Additional work suggested by AA $ 790  Oak table $ 385  Security door $ 420  Drapes $ 450  Linen press $ 320  Carpet steam cleaning $ 385  Total cash settlement proposed $2,750 62. Further to the above, the FSP agreed that it would have its repairer PI cover the cost of the damaged door ($150), identified by AA in his report. AA was not sure if this was claim related and the FSP determined that it was not but understood that as PI attended to the work it should indemnify the Applicant for the subsequent problem. The FSP stated that it would have PI settle this aspect of the matter with the Applicant direct. 63. The above amounts and settlement proposal were in addition to prior damaged items that had also been settled by the FSP or its agents. 64. In total, the FSP effectively offered $2,900 to the Applicant for the settlement of the balance of the claim. 65. According to the FSP, PI subsequently paid $150 to the Applicant and the promised payment for $2,750 from the FSP was made on 27 November 2012 and subsequently presented by the Applicant. 66. The Applicant has not challenged that she has been paid in relation to these aspects of the claim. She remains concerned as to the offers made for the various items and suggested that the cost to replace these items has increased since that time. She has provided a number of her own quotes to address this and sought additional payments from the FSP. 67. I have reviewed the supplied quotes from the Applicant in the context of her argument that she would be disadvantaged if the FSP were to limit its settlement in the way which it has done. Painting 68. The FSP agrees that rectification work is required in regard to the painting and within the report from AA has allowed $540 for this work. Case No: 272546 Determination Page 10 of 14 69. The Applicant has obtained a separate quotation for the rectification painting, in the amount of $1,188. The accuracy of this quotation has not been separately challenged by the FSP. 70. After considering all the evidence, I am satisfied that the relationship between the Applicant and the FSP and its various contractors, including PI, has broken down to the point where it would not assist matters by insisting that any particular contractor should return to the Applicant’s home, to complete any rectification. 71. I accept that the policy provides that the FSP is entitled to take advantage of any discount available on repair work. However, I have given consideration to the way events have unfolded in this matter and the Applicant is to be cash settled for her loss and the FSP have not challenged her quotation, albeit that it is a quotation, post the initial cash settlement. In the circumstances, I am satisfied that it would be fair for the FSP to pay the Applicant $633, being the balance of her quotation, after the allowance for painting rectification provided for by AA. Drapes 72. The FSP allowed $450 for the cleaning and refitting of the drapes in its original settlement of the claim, based on a quote from “DD”. 73. The Applicant obtained a second quote from DD dated 16 June 2013, for which it suggested the same work would cost $750. She further obtained a quote from “OG” to attend to the damage located at the base of the drapes (valued at $180), which she attributes to the work of the FSP’s agents at the time of the claim. 74. The Applicant alleges that the drapes were damaged by two of the contractors working for the FSP, when they were unhooked and left dangling on the floor to allow for more light in the room. 75. The FSP has not addressed this aspect of the claim from the Applicant. In the absence of any evidence to the contrary, I accept that the damage quoted was incurred as a result of the work done at the home and that the FSP should be responsible for it. 76. Noting that the Applicant had been settled for $450 previously by the FSP for the cleaning of the drapes, I am satisfied she could have had these cleaned at the time if she saw fit. I am not inclined to pay the extra amount quoted by DD as this would not be relevant if the Applicant had attended to the work at the time. I will allow the $180 quote for the repair of the drapes. Coffee (oak) table 77. The repair of the damage caused to the coffee or oak table was quoted at $385, by “AS” , for the FSP. Case No: 272546 Determination Page 11 of 14 78. The Applicant has since obtained a second quote from “MS” dated 21 October 2013, suggesting that this work will cost $450. 79. There is no explanation for why the Applicant did not attend to the work at the time that the cash settlement was paid by the FSP. There is no evidence that it was insufficient to attend to the issues at the time. In the circumstances, I am not inclined to allow the additional amount. Security door 80. The FSP al lowed $420 for the security door as per a quote from “LS” , around the time of settlement. 81. The Applicant recently obtained a quote from “SS” on 1 November 2013 , for $460 to replace this item. 82. As with the oak coffee table, I consider that the Applicant could have had the matter attended to at the time of the original cash settlement and therefore I will not allow the additional amount. Linen press 83. No quote was ever obtained for the damage allegedly caused to the linen press. The Applicant was asked for a quote by the FSP, but in the absence of same, an offer for $320 was made. 84. The Applicant has still not obtained a quote for this item and in the absence of evidence to the contrary, I am satisfied that the FSP may rely upon the settlement already paid for this item. Carpet clean 85. The FSP offered to and allowed in its settlement an amount for the cleaning of the carpet at the home for $385. This has not been challenged by the Applicant. Premium increase 86. In the wake of this claim being lodged with the FSP, the Applicant contends that she was charged an increased premium upon renewal of the policy with the FSP. She considers this unfair, particularly as she believes that the water pipe responsible for her damage was on her neighbour’s property. 87. In accordance with the Terms of Reference for the Service, I accept that FOS may only consider issues relating to the renewal of an insurance policy where: “... the decision was made indiscriminately, maliciously or on the basis of incorrect information ...” Case No: 272546 Determination Page 12 of 14 88. There is no evidence before me to suggest that the decision to increase the Applicant’s premium was made “ indiscriminately, maliciously or on the basis of incorrect information ”. In the normal course of events, it is not unusual where a claim is made that an insurer will reconsider the risk presented, upon renewal of the policy. 89. I accept that the decision to increase the premium is at the FSP’s discretion and that there is no evidence to suggest that this decision was unreasonable or unfair or that it falls within the jurisdiction of the Service. Suitability of the cash settlement 90. Whilst the FSP conceded, based on the report of AA, that some aspects of the repair needed redressing, it proposed to cash settle the Applicant for these repairs rather than having its agents attend to the work. 91. This is an unusual step and one that the Service is not usually comfortable with. It is normally appropriate that if the quality of the work has not been to an acceptable standard that the FSP should ensure that the work is completed until the relevant standard is reached. 92. It appears that some of the contractors retained to do the work on this matter have been uncomfortable with dealing with the Applicant and she likewise with some of the FSP’s agents. 93. In the circumstances, I am inclined to accept that a cash settlement is appropriate but some concessions have to be made. Specifically, I am of the view that the quoted amounts from AA were likely catering for the existing contractors to finish the work. Given that this may now not occur in relation to the painting, I have allowed for some extra value in the cash settlement payable to the Applicant for this to cater for the likely increased costs she will incur. Further commentary 94. The Case Manager for the Service has discussed the matter on numerous occasions with the Applicant. It is apparent that she was unhappy with the FSP’s handling of the claim and numerous aspects of the repair work. 95. Whilst I concede that the Applicant has some basis for some of her concerns, I am of the view that both parties have contributed to the issues that have arisen. 96. The Applicant remains concerned over the amount of tradesman who visited her property and sought information on this from the FSP. Specifically, she wanted details of every person to visit the property and the dates and times of those attendances. The Case Manager invited but did not compel the FSP to present evidence on this issue. The FSP did not provide the information. 97. I am of the view that the requested information by the Applicant is not necessary to properly analyse the issues in dispute and to reach a Case No: 272546 Determination Page 13 of 14 Determination on the matter. I accept that the work co nducted by the FSP may have taken longer than first thought and (in some instances) was not initially completed to a level equal to what the Applicant was entitled to expect. 98. These issues aside, I am satisfied that the majority of the claim has been addressed and that the balance of the issues outstanding relate to minor aspects of the claim only. These issues are resolvable without the need to obtain the further information. 99. The Applicant was unhappy with the approach of the FSP’s contractors in general, noting the amount of time it took to repair her home, her dissatisfaction with her treatment and with the amount of “foot traffic” through the home and the inconvenience of same. 100. It is normal in the handling of any claim for an insured party to expect a degree of inconvenience. The purpose of an insurance policy is to provide a measure of protection against foreseeable events and to this end the Applicant received appropriate cover under her policy. 101. I accept that there were some difficulties for all the parties concerned and that the Applicant highlighted some genuine issues with the quality of the work done at various stages throughout the claims process. CL noted that the plumber was chosen by the Applicant and I am satisfied that the FSP should not be resp onsible for this person’s conduct. CL further considered that contractors had been denied access to the property at times and that they had found it difficult to satisfy the Applicant. 102. To alleviate the Applicant’s concerns with much of the claims process, the FSP waived her excess on the claim as a matter of courtesy. I am satisfied that this, together with the previously paid cash settlement, was indicative of the FSP’s genuine attempt to resolve the matter to the Applicant’s satisfaction. 103. Clearly there were multiple visits to the property and aspects of the damage that the Applicant still remains dissatisfied with. Whilst ideally, the work would have been completed satisfactorily at the first instance, I accept that the FSP was proactive in attempting to resolve the issues highlighted by the Applicant. 104. In considering this, I am of the view that there is no persuasive evidence to suggest that there are any remaining issues with the property, outside of those highlighted in this Determination. Determination 105. On the basis of the available information, I determine that the FSP must attend to the following:  Pay an additional amount of $633 to finalise the painting rectification. Case No: 272546 Determination Page 14 of 14  Pay an additional $180 for the repair of the drapes as per the Applicant’s quote from OG. 106. Outside of the above listed items, I am satisfied that the Applicant’s home has otherwise suitably been repaired, taking into account the payment already made by the FSP for aspects of the damage that required further attention and that the FSP has no further obligations to the Applicant for the claim (outside of those that normally relate to the policy). 107. In respect to the amount of $180 referred to above, the FSP is to pay interest calculated at the statutory rate from 26 November 2012, until the date of settlement. 108. The FSP is not required to pay interest in regard to the amount of $633, being the balance of the painting rectification.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.