The complainant's in-ground pool collapsed after storm and flood water in January 2011 and the FSP partly declined the $38,120.90 repair claim under the seepage exclusion. AFCA accepted that water seepage and hydrostatic pressure, combined with faulty backfill, caused the collapse and held the exclusion applied.
Where damage results from concurrent covered and excluded causes, the exclusion prevails, so the insurer is entitled to deny the claim under the seepage of water through the earth exclusion.
Issues
- Claim denial primary · not upheld
“the policy does not extend to cover the loss suffered in the circumstances of this claim and the FSP is entitled to deny the Applicant's claim”
- Poor communication secondary · unclear
“The FSP admits that it initially quoted provisions from an incorrect PDS, in initially denying the claim”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 271917 Determination Page 1 of 7
Case number: 271917
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
7 September 2012
Background
1. The Applicant’s home and contents were insured with the Financial Services
Provider (FSP) under a home and contents policy that commenced on 8
January 2007, and renewed annually.
2. On 17 January 2011 the Applicant’s h ome and contents were damaged in a
storm.
3. The FSP partially accepted the Applicant’s claim. It declined the claim in
respect of damage to the A pplicant’s pool on the basis the damage is
expressly excluded by the policy.
4. The Applicant maintains he is entitled to indemnity for the pool.
Summary of Applicant’s position
5. The Applicant is entitled to indemnity in respect of the pool damage
because:
a. The swimming pool was inundated by flood waters.
b. He refers to the damage as being a “implosion of the walls of a n in-
ground swimming pool located on the property.”
c. He believes the reason for denial of the claim is incompatible with the
conclusion reached by the FSP’s own engineer as to the cause of the
pool collapse.
d. The property was purchased in good faith in November 2006, with the
pool in situ. The pool was well maintained and operated without
problem until the inundation in early 2011.
e. He could not reasonably be expected to be aware of any deficiencies in
the original installation of the pool.
f. The FSP has relied upon the incorrect Product Disclosure Statement
(PDS) in making its decision.
Determination
Case No: 271917 Determination Page 2 of 7
6. The Applicant is seeking cash settlement of his claim in the sum of
$38,120.90 being the cost to repair the damage to the poo l.
Summary of FSP’s position
7. The FSP has partially declined the claim on the basis that:
a. The Applicant has not established that the damage to the pool and
surrounds resulted from an insured event as defined by the policy.
b. Their building expert has reported that the swimming pool excavation
hole was excessive for the size of the swimming pool and had been
back filled with a blue stone road base material rather than stabilised
sand.
c. Further, their engineering expert has reported that the damage was
caused by storm water run-off entering the pool enclosure causing the
collapse of the pool.
d. The policy does not provide cover for loss or damage caused by
seepage of water through the earth or water down the sides or
underneath swimming pools.
8. The FSP admits that it initially quoted provisions from an incorrect PDS, in
initially denying the claim. It however has apologised for any confusion and
relies on the following policy provisions in its Notice of Response:
“ What we cover as your home
Your home means your residential building at the insured address including
its structural improvements, fixtures, fittings and domestic outbuildings.
Home also includes:
....
fixed swimming pools and spas and their accessories
What you are covered for
Insured events 1 to 12
1. Storm and flood
We cover
Loss and damage caused by storm and flood e.g. rain, wind, hail,
storm and damage caused by flooding from rivers, streets and canals.
We do not cover
...
damage to swimming pools and their parts or underground tanks
caused by water leaking down the sides, against the sides, or
getting underneath them.
What is not covered under any part of your policy
Case No: 271917 Determination Page 3 of 7
This section details what is not covered under any part of your policy.
We do not cover loss or damage:
...
Seepage of water through the earth
Caused by water seeping or running:
through the earth (sometimes called hydrostatic water seepage)
through or down the sides of earth or earth fill that is up against
your home
down the sides or underneath swimming pools or spas causing
them to move, change shape or lift or leaking through their
hydrostatic valves”
Issue
9. Whether the Applicant is entitled to indemnity for the damage to his pool,
and if so, to what extent.
Reasons for decision
10. As informed to the parties, due to the nature of this dispute, the matter has
been referred to an Ombudsman for Determination in line with the
Operational Guidelines to the Service’s Terms of Reference.
11. This matter has not been the subject of a Case Manager’ s
Recommendation.
12. I am satisfied that the material has been exchanged and the parties have
had the opportunity to respond to the issues raised.
13. The policy is a listed events policy and the onus is on the Applicant to
establish, on the balance of probabilities, that the claim falls within the terms
of the policy. I have read the policy provisions carefully and note the relevant
listed event with respect to this claim is storm and flood. Therefore the onus
is on the Applicant to establish on the balance of probabilities that the
damage to the pool was due to storm or flood.
14. The FSP does not appear to dispute that there was storm activity and heavy
rainfall (prior to the claimed event) in the area surrounding the Applicant’s
premises. Further it has indemnified the Applicant for other losses arising
from the same weather event. Therefore, I am satisfied the Applicant has
established he has a prima facie claim under the policy.
15. Accordingly, the onus shifts to the FSP to establish that the damage suffered
by the Applicant falls within a scope of a relevant policy exclusion.
Case No: 271917 Determination Page 4 of 7
FSP’s Building Report
16. The FSP retained a suitably qualified builder to inspect and report on the
damage to the Applicant’s home and contents. In respect of the damage to
the pool, the following comments were made:
“ CAUSE OF DAMAGE
Heavy rain event, flooding creek, and runoff water from surrounding paddocks
that slope towards pool.
MAINTENANCE/DEFECT ISSUES
The in ground pool is manufactured as an above ground pool. The ground
surrounding the pool has collapsed at approx a 45 degree angle which has
not only caused the pool liner to collapse but has also caused the collapse of
surrounding pool paving. Issues with the pool installation appears to be the
excessive excavation fit to the pool. Pool walls appear to be dub out at 45
degrees and back filled with a blue stone road base material which has no self
holding ability. There was no evidence of stabilised sand that is used in pool
installations as a packing material. The top of the pool surround is at ground
level and my pool installer adviser has informed by that above ground pools, if
they are installed below ground, must be 150 to 200mm above ground so that
the side walls can be sealed to prevent water entry between pool sides and
supporting stabilized sand. Poor workmanship has contributed to pool
collapse. ...”
17. I must say that I would not find in favour of the FSP on a “poor workmanship”
exemption. The pool has been in place for some time. No previous problem
had occurred. The Applicant could not have been aware of any design or
manufacturing fault without drilling into the fill surrounding the pool thus
causing damage.
FSP’s Engineering Report
18. Upon the abo ve builder’s recommendation, the FSP subsequently appoint ed
an Engineer to inspect and report on the damage to the Applicant’s pool.
19. In the Engineers report, dated 30 March 2011, he stated:
“Our findings are as follows;
1. An existing in-ground plastic lined pool has collapsed together with
surrounding paving. It appears that during a recent heavy rain
event, storm water run-off has entered the pool enclosure causing
collapse of the pool.
2. In general, typical installation of these pool types require
backfilling of a sand-cement mix (3:1) to provide a retaining
structure behind the pool wall. In this case, this had not been
done. The pool has been backfilled with crushed rock only, with no
cement stabilisation.
We recommend that the pool be excavated at least 600mm all around.
A new pool shall be installed per manufacturer’s requirements. Th is
pool must be filled with water to at least 150mm high than backfilling
height. The backfilling with the (3:1) sand/cement mix shall follow.
Case No: 271917 Determination Page 5 of 7
Light watering of the mix is required to harden the mix. The
surrounding pavers may be replaced to match original conditions once
the mix has hardened, generally 2- 3 days after watering the mix. ...”
20. It is the Applicant’s position that neither of these expert reports establish the
storm and flood exclusion relied upon by the FSP namely, “damage to
swimming pools and their parts or underground tanks caused by water
leaking down the sides, against the si des, or getting underneath them”.
21. The FSP submits its expert builder alludes to this exclusion via its reference
in the scope of rectification works to sealing the side walls to “prevent water
entry between pool sides and supporting stabilized sand”.
22. I also note the PDS also provides the following (and perhaps more relevant)
exclusion:
What is not covered under any part of your policy
This section details what is not covered under any part of your policy.
We do not cover loss or damage:
...
Defect, structural fault or design fault
Caused by a defect, structural fault or design fault that you knew about (or
should reasonably have known about) and did not fix before the loss or
damage occurred...”
23. The inadequate backfilling in the course of the installation of the pool as
detailed by the FSP’s experts perhaps more properly falls within the
structural/design fault exclusion above. In this regard, the Applicant asserts
that as the pool was in situ when he purchased the property in 2006, he
could not have reasonably known about any defect in the installation. As I
have said earlier I would not uphold the FSP’s right to rely upon this
exemption.
24. It is not however necessary to go into a detailed analysis of the application of
either of the above exclusions as what I find most persuasive in this matter is
the expert report obtained by the Applicant himself.
Applicant’s Expert Report
25. The Applicant has obtained an independent report and assessment in
respect of the pool from a pool supply and installation expert which provides:
“In my professional opinion the rain runoff has entered between the
excavation of the pool wall causing an external water pressure greater than
the internal water pressure which resulted in the walls of the in-ground pool
collapsing.
In m y opinion the pool is damaged beyond repair.”
Case No: 271917 Determination Page 6 of 7
26. Further, the Applicant in his letter to the Service dated 30 January 2012
states:
“I pointed out that the engineering reports (the FSP) commissioned had ...
concluded ... that the soil had become saturated and therefore unstable
causing the pool walls to collapse due to a combination of hydrostatic
pressure against the sides of the pool, the composition and nature of the
backfill employed in the construction of the pool, and some perceived
installation difficulties.”
27. Unfortunately, this submission by the Applicant would appear to be to his
own detriment. In this regard I note his apparent acceptance of the general
exclusion relied upon by the FSP:
“ What is not covered under any part of your policy
This section details what is not covered under any part of your policy.
We do not cover loss or damage:
...
Seepage of water through the earth
Caused by water seeping or running:
through the earth (sometimes called hydrostatic water seepage) ”
Conclusion
28. I note the Applicant has reported the swimming pool area was inundated by
flood waters and the area was covered by a foot of water. Accordingly, and
having considered the parties’ expert reports I accept that this has resulted
in water seeping down the sides of the swimming pool resulting in
hydrostatic pressure which has caused the collapse.
29. I am satisfied that the evidence of the experts read together establishes that
the damage was most likely due to a combination of factors including faulty
design and water seepage. It is a well established principle of insurance law
that where damage is effectively caused by two concurrent causes one
which is covered under the policy (e.g. faulty workmanship which the insured
could not have reasonably been aware of) and the other which is excluded
(e.g. water seepage), that the FSP is entitled to deny liability. In such cases
the exclusion clause prevails.
30. Having considered the evidence as a whole whilst I am extremely
sympathetic to the position of the Applicant I am satisfied that the policy
does not extend to cover the loss suffered in the circumstances of this claim.
Case No: 271917 Determination Page 7 of 7
Determination
31. Accordingly, on the basis of the available information I determine the FSP is
entitled to deny the Applicant’s claim.