The applicant's home was inundated in the January 2011 Queensland floods and the FSP denied the claim under the flood exclusion. AFCA found the FSP had clearly informed the applicant of the exclusion and, on the site-specific hydrology evidence, that the damage was caused by river and backwater flood, so the FSP was entitled to deny the claim.

The flood exclusion was clearly disclosed as required by s35(2) of the Insurance Contracts Act 1984, and the evidence showed the inundation was river flooding rather than stormwater runoff.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 271899 Determination Page 1 of 8 Case number: 271899 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim – Flood – Policy Exclusion – Section 35(2) of the Insurance Contract 1984 (the Act). 15 April 2013 Background 1. The Applicant held a home building and contents insurance policy issued by the Financial Services Provider (FSP). 2. The Applicant lodged a claim on the policy after her home in Sherwood was inundated with water in January 2011 following the severe weather events in Queensland. 3. The FSP denied the claim on the basis that the damage was caused by flood, which is specifically excluded under the policy. 4. The Applicant considers the initial water inundation was a result of stormwater runoff and therefore seeks indemnity for the resultant damage caused by the initial inundation. 5. The Applicant is represented; accordingly, references in this Determination to the Applicant will include submissions made on her behalf by her legal representative. Summary of Applicant’s position 6. The FSP has failed to clearly inform her of the flood exclusion in accordance with its obligations set out under Section 35(2) of the Insurance Contracts Act 1984 (the Act). Therefore, it should not be able to rely on this exclusion. 7. The wordings contained within the policy are unclear and confusing. She has great difficulty understanding the extent of coverage this policy offered and as a consequence, standard cover should apply and her claim should be paid. 8. Due to the property being situated at the bottom of a number of hills, rainwater flowed from adjoining higher streets and cascaded towards the property, causing extensive water damage. As the property was inundated by stormwater prior to the arrival of flood water, the resultant damage caused by the stormwater runoff should be covered by the policy. Determination Case No: 271899 Determination Page 2 of 8 9. In the alternative, the Applicant submits that consideration should be given to the loss under the insured event “ 2(h) bursting, leaking and discharging or overflowing of fixed basin, shower bases, or other fi xed apparatus, fixed tanks or fixed pipes used to hold or carry liquid of any kind...” . 10. The Applicant in support of this proposition provided the Brisbane City Council Storm and Stormwater Network map that shows the stormwater infrastructure proximate to the property. 11. The FSP initially relied on hydrology evidence from the Insurance Council of Australia (ICA) to deny the claim. However, this evidence is only general in nature. 12. The FSP’s site specific hydrology report dated 6 May 2011 is not persuasive as it was acquired a significant time after the event. 13. The Applicant maintains she is entitled to indemnity for the resultant damage that was caused by the initial stormwater inundation. Summary of FSP’s position 14. The policy wording is clear and unambiguous regarding the flood exclusion and it clearly informed the Applicant of the relevant exclusion through the provision of a Product Disclosure Statement (PDS). 15. The methodology underpinning the preparation of a site specific hydrology reports is to interpret objectively recorded data from the date of loss – such as rainfall volume, intensity and river levels against features of the local topography. As the recorded data and the local topography have not changed since the date of loss the site-specific report is still of great forensic value. 16. The site specific report points to overbank flow from the Brisbane River/Oxley Creek as the cause of inundation to the Applicant’s home. Therefore, it was entitled to deny liability for the damage resulting from this inundation. 17. The Applicant relied on hydrological data from the Bureau of Meteorology. However, this evidence demonstrates nothing more than that Brisbane was affected by storms on the morning of 11 January 2011. It is therefore insufficient to demonstrate that the property was inundated by stormwater runoff. 18. It rejected the Applicant’s contention that the damage should be covered under insured event 2(h) because the damage covered under this section is of a different type to the damage in dispute. 19. The provisions of section 2(h) are clearly directed to damage caused by the escape of liquid from specific structures (fixed pipe) that carry water to and from the residential areas. As a stormwater drain does not fit within the Case No: 271899 Determination Page 3 of 8 description of a “pipe”, the damage is not covered under this section of the policy. 20. Hydrology evidence established that the rising level of the river resulted in back flow through the stormwater drainage system. Therefore, regardless of whether or not the water which inundated the property came up through the stormwater drain, the proximate cause of the inundation was river flood, which is excluded under the policy. Accordingly, the FSP submits it is entitled to rely on the Wayne Tank principle to deny the claim. 21. The FSP relies on a site specific hydrology report, the reports commissioned by the Insurance Council of Australia (ICA) and the following policy provisions to substantiate its position: “Words that have special meanings Some key words and terms used in this Policy have a special meaning. If words and terms are used in one section of the Policy, we will describe their special meaning in that Section. Whenever the following words or terms are used in the Policy, they mean what is set out below: Word or Expression Meaning Flood the inundation of normally dry land by water from any watercourse, lake, canal, dam or reservoir. ... Section 2: Cover for your Home & Contents – Insured Events You are insured against loss or damage caused directly by the following insured events: (b) Storm (including cyclone or hurricane) and/or rain, which may be accompanied by snow, sleet or hail. But not Loss or damage caused by:  Flood) ” Issues 22. Whether the FSP has complied with the requirements under Section 35 of the Act to rely on the policy exclusion of flood. 23. Whether the Applicant ’s loss was caused by an event insured against under the policy. 24. Whether the FSP was entitled to deny the Applicant’s claim on the basis the damage was caused by the excluded event of flood. Case No: 271899 Determination Page 4 of 8 Reasons for decision 25. Due to the nature of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s (FOS) Terms of Reference. 26. The Panel consists of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 27. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to clarify the issues raised. 28. The Panel considers it appropriate to address each issue under separate headings. Clearly Inform 29. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. 30. There is no dispute that a contract of insurance covering a residential building is a “prescribed contract” and damage due to flood is a “prescribed event”. 31. The onus is therefore on the FSP to establish that it has clearly informed the Applicant prior to the claim that it would not cover damage caused by “flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 32. In this regard, the Applicant has not disputed receiving the policy documents. Instead, she has provided numerous submissions arguing that the terms and conditions in the policy are confusing, complex and unclear. 33. The Panel has considered the wording of the policy relevant to this dispute and noted that it was clearly indexed. It contains a reference to page 15 for information regarding the cover (Section 2: “Cover for your Ho me & Contents – Insured Event”). At page 15, under the insured event 2(b): “Storm”, the policy clearly states that damage caused by flood is not covered. 34. The PDS also contains a reference to page 10 for definitions of words with special meaning including t he definition of the term “Flood”, which the Panel finds to be clear and unambiguous. 35. Having considered the policy, the Panel finds the relevant exclusions and limitations are clear and unambiguous. In the Panel’s view, the Applicant upon reading the policy would have had little difficulty in finding and understanding that flood was excluded under the policy. Case No: 271899 Determination Page 5 of 8 36. The Panel is therefore satisfied in the circumstances the FSP has met its obligation to clearly inform the Applicant of the flood exclusion as required by Section 35(2) of the Act. Cause of damage 37. It is an accepted principle of general insurance that an insured bears the onus to prove, on the face of the facts, that they have suffered a loss caused by an event to which the policy responds. Once so established, the onus shifts to the insurer to prove that an exclusion applies if it seeks to limit or deny the claim. 38. The FSP relied on the ICA hydrology report which noted the following relevant information:  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. As the flood wave moved downstream, backwater flooding occurred along the lower reaches of the Bremer River and its tributaries.  Floodwaters moving down the Brisbane River were made up of dam release floodwaters from Wivenhoe Dam and floodwaters from Lockyer Creek and the Bremer River.  It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reaches of the Brisbane River downstream of the dam and along tributaries through the Ipswich City LGA.  Any areas within the Brisbane City LGA adjacent to the Brisbane River that were inundated would have suffered water flow inundation principally by the dam release flood from Wivenhoe Dam making its way downstream over the period Tuesday to Thursday 11-13 January 2011. 39. The FSP has also relied on a site specific hydrology report for the property, which contains the following relevant information:  The property is situated approximately 100m west of Oxley Creek and 750m south-east of the Brisbane River.  The property grades downwards from the western side of the block to the south-eastern corner and there is approximately 2m difference in elevation.  The ground levels of the property range from 7.7m AHD to 9.7m AHD.  The raised slab level of the property is estimated to be approximately 8.4m AHD.  The property lies upstream of the Oxley Creek Mouth Alert (#540274) water level gauge on Oxley Creek. This gauge peaked at 9.27m AHD at around midnight Wednesday 12 January 2011. Case No: 271899 Determination Page 6 of 8  The gauge level data at Oxley Creek indicates that inundation at the property commenced at approximately 09:00 on Wednesday 12 January 2011 and receded by approximately 14:00 on Thursday 13 January 2011.  Rainfall totals obtained from the Archerfield gauge shows the greatest rainfall intensity was 15mm/hr and occurred in a 30 minute period between 10:00 and 11:00 on Tuesday 11 January 2011. The intensity of rainfall in the days leading up to inundation was very low and less than a 1 year Average Recurrence Interval (ARI). 40. The hydrologist concluded the following:  The localised catchment that had potential to direct stormwater sheet flow towards the fence on the western side of the property is of the order of 2-3 houses blocks in size. It is highly unlikely that a catchment of this size and slope could generate sufficient flow depth and velocities to knock down a fence, especially as the maximum rainfall intensity over the inundation period had a less than 1 year ARI.  The inundation at the property on Wednesday 12 January 2011 was caused by backflow from the Brisbane River and not from any localised stormwater type inundation. 41. The property was occupied by the Applicant’s son and his family. During an interview with the FSP’s hydrologist, the Applicant and her wi tness (daughter) indicated that all occupants evacuated the property at midnight of Tuesday 11 January 2011. Upon their return to the property on the morning of Wednesday 12 January 2011, the inundation was already half way up the driveway and continued to rise until approximately midnight on Wednesday. 42. The Applicant’s son in a Statutory Declaration provided the following information: “On the 12 th January I (name) returned early in the morning to the property to see the state of the water levels. There were misty periodic rain showers. It was noted at this time that the direction of the water was still coming from above the property and from across and below the home. [The Applicant’s daughter] and I returned to the property at around 2pm the same day and found we had to wade through of a neighbouring property, which is situated above [the risk address], to view the home [the risk address]. To our recollection the water that was running down from this neighbour’s property was clearer then the waters coming, from below and across Plumer Street. To the best of our recollections there was water coming from stormwater drains in the property area prior to and during the period up until we could not see some drains, due to water inundation on the late on 12 th and 13 January. To the best of our recollections there was water coming from storm water drains in the properties located nearby to the property prior and during the period up until we could not see the drains, due to water inundation on the late on 12 th and 13 th January”. 43. The Applicant has not provided any hydrology evidence but has relied on hydrological data obtained from the Bureau of Meteorology. Case No: 271899 Determination Page 7 of 8 44. In view of some confusion as to the initial source of inundation and whether it is possible that the property was inundated by stormwater runoff, the Panel Chair Ombudsman conducted a site inspection of the property on 2 April 2013. The Applicant, her son and a representative from the FSP were present. 45. The Applicant confirmed during the site inspection that she was not present at the time of the house flooding. Her son D was. He advised that water came from all directions but in particular, water was running down from neighbouring blocks which are higher than the Applicant’s property, onto a low brick patio area at the back of the property. This area was lower than the immediate surrounding ground and it was in this area that the water pooled. 46. According to D, he saw water coming from stormwater drains. The water was heading towards Oxley Creek and not coming from Oxley Creek. He described the water building from the street opposite which is a low point in the surrounding area. The water gradually rose from that area. 47. D advised that by the time he left the house, the rain had eased. He left the house around 2:00am on the morning of 12 January 2011. At that time there was water pooling at the front of the house. There may have been some water in the patio area but water had not entered the house. He believed the water had risen from the opposite street but he also maintains he observed water coming from stormwater drains when he came back to the property at approximately 9:00am the same day. 48. In relation to the Applicant’s claim that the rushing stormwater had pushed the side fence over, D confirmed that the fence fell approximately two or three days after the floods. 49. After having given a great deal of consideration to the evidence, the Panel is persuaded by the hydrology evidence contained within the site specific report for the following reasons:  It relies on rainfall data recorded from a station proximate to the Applicant’s property which would therefore, on balance, be reflective of the local rainfall characteristics affecting the property.  His reasoning about why the rainfall recorded was not sufficient enough to inundate the property is reasonable on the face of it given the fact the ARI was less than 1 year.  His estimated time of inundation at the property being approximately 09:00 on Wednesday 12 January 2011 is not inconsistent with the Applicant’s witness evidence.  His conclusion that the property was not inundated by stormwater runoff is reasonable given the property was initially inundated at approximately 09:00 on the morning of Wednesday 12 January 2011, which was about 15 hours after the rainfall had ceased. Case No: 271899 Determination Page 8 of 8  His opinion about the elevated waters of the Brisbane River and Oxley Creek is corroborated both by the ICA report and general public knowledge of the events that occurred in the region around that time.  He is appropriately qualified to examine and report on the likely source of inundation. 50. In light of the above, the Panel accepts that the damage to the Applicant’s property was a result of inundation by flooding of the Brisbane River and backwater flooding from the Brisbane River up the Oxley Creek. 51. The Applicant argued that even if this is the case, this water could have escaped from stormwater drains, thus falling within the insured event of “ Bursting, leaking and discharging or overflowing of fixed basin, shower bases, or other fixed apparatus, fixed tanks or fixed pipes used to hold or carry liquid of any kind...” In this regard, she has provided a copy of the Brisbane City Council Storm and Stormwater Network map that shows the stormwater infrastructure proximate to the property. 52. Whilst the Panel does not doubt the Applicant or the witness comments about water escaping from the stormwater drains, there is no evidence available to the Panel to establish that this water would have been stormwater overflow and not backflow from the Oxley Creek and Brisbane River, nor is there evidence available to indicate that such runoff inundated the property prior to the arrival of the flood waters from the Brisbane River and Oxley Creek. 53. The hydrologist’s conclusion is that the property was not inundated by stormwater runoff. The fact that there is stormwater infrastructure in the area and the fact that water may have been observed escaping from the stormwater drains is not of itself sufficient to establis h that the Applicant’s property was inundated by stormwater runoff in accordance with the terms of the policy. Determination 54. On the basis of the available information, the Panel determines the FSP is entitled to deny the claim.