Home / Financial Firm (Unknown - Insurer) / Determination 271863

Determination 271863

Rental property carpet replacement and engineer report costs after rain ingress; FSP valuation of carpet settlement disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$450
Non-financial loss—
Amount claimed$3,485
SourceAFCA PDF

Summary

The landlord's insurer accepted a rain ingress claim for rental property carpets but offered $967.03 for carpet replacement and $176 for an inspection report, against claimed costs of $3,485. AFCA found the carpet should have been considered for drying and ordered $450 towards the engineer's report fee, with the carpet settlement set at $967.03.

The carpet replacement amount was limited to the insurer's own replacement cost because drying was not properly considered, and the report fee was reasonably allowed at $450 under the policy's claim-cost provisions.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 271863 Determination Page 1 of 8 Case number: 271863 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Claim Amount - Carpet Replacement - Expert Report 29 August 2012 Background 1. The Applicant holds an Investor Home and Contents Insurance policy with the Financial Services Provider (FSP). The policy covered the Applicant’s rental property. 2. On 22 March 2011, the Applicant lodged a claim with the FSP who recorded the following claim description: “Insd advd that during heavy rain water has come through ceiling and damaged carpet in 2 x bedrooms”. (sic) 3. On 23 March 2011, the Applicant contacted the FSP and advised that no one has attended the rental property. He expressed concern as children resided in the rental property and they slept in the bedroom with a wet carpet. 4. On 24 March 2011, the FSP’s representative, N, attended the insured property. N determined that the “(c)arpet is not restorable” because of “contaminated water”. N removed the carp et and recommended the replacement of the carpet to the FSP. 5. On the same day, the Applicant contacted the FSP who recorded the following claim notes: “RCVD call from [Applicant] ACTION: - insd wanting to know when we will be replacing carpet on this cla im… - on this claim we have not yet recieved [N’s] report so don’t no if carpet needs to be replaced - advd insrd that we actually need to get a builder to confirm the water entry point – he advd me that it has come through the balcony … advd insrd that i still need a builder to attend and give us report before we can confirm if covered – insrd not happy with this as he states that he is a builder and he knows where it has come from… - advd without a report we cant do anything as we need to determine coverage – he advd because he is a builder he’l submit a report – advd insrd it can’t come from himself and needs to be another builder he doens ’ t no – insrd advd that he is going ahead and replce carpet anyway because … there is children in it - advd if that what he wants to do then thats fine but we can’t guare ntee we can reimburse the full cost if any until COD confirmed – insrd will still submit builders report though – insrd did also say he wasn’t happy [N] cut out his Determination Case No: 271863 Determination Page 2 of 8 carpet – he advd it was fairly new and he didn’t ask for it to be taken out”. (sic) 6. The Applicant organised the replacement of the carpet by P. He also obtained a “Building Inspection Report” from B Consulting Engineers which concluded as follows: “From my investigation of the property, perus al of the documentation and experience I have formed the following opinions: The damaged were caused by: In my opinion due to severe and unexpected very heavy storm, sudden built up of storm water and penetrated to the bedrooms. The water went through the frame of the sliding glass panel door to the room.” (sic) 7. The Applicant then sought payment of the following from the FSP:  $2,000 - cost of replacing the carpet; and  $1,485 - cost of obtaining a builder’s report. 8. The FSP responded that it is liable only for the following amounts:  $967.03 – which is the amount it would have cost the FSP to replace the carpet; and  $176 – which is the amount it would have cost the FSP to obtain a builder’s report. The FSP noted that the report submitted by the Applicant was prepared by a structural engineer and not a builder. 9. When the matter was referred to this Service it was the subject of a Recommendation. On 27 March 2012, having carefully considered the voluminous material on these files, the Case Manager recommended that the FSP was not obliged to reimburse the Applicant $1,950 for the replacement carpet, but instead the FSP was entitled to settle the carpet damage in the amount of $967.03 and that the FSP was not obliged to reimburse the Applicant $1,485 for the building inspection report. She recommended that it was fair and reasonable that the FSP reimburse the Applicant $371.25, being 25% of the cost for obtaining the report. 10. The Applicant has not accepted the Recommendation. When rejecting the Recommendation a detailed submission has been made on his behalf by a lawyer acting pro-bono. I have been greatly assisted by the lawyer’s submission. Summary of Applicant’s position 11. With regard to the removal of the carpet, the Applicant says:  the FSP’s representative “wanted to cut the carpet” and he “strongly opposed” the cutting of the carpet; Case No: 271863 Determination Page 3 of 8  he informed the FSP’s representative that “rain water from the first floor balcony has made the carpet wet, just dry them and I am happy with that”; and  he was told “water is contam inated and carpet is damaged, and this is our policy we have to cut it”. 12. With regard to the replacement of the carpet, he says:  the FSP informed him it will take two to three weeks to install the new carpet;  that was not acceptable to him because there were two small children in the rental property;  he asked the FSP to install the carpet within three to four days, but this was rejected by the FSP; and  he had no other choice but to organise the replacement of the carpet. 13. With regard to the cost of obtaining the report, the Applicant says the FSP wanted him to get a builder to make a report and so he did, but the FSP now refuses to pay in full the builder’s fee for the report. 14. In the later submission filed by his lawyer, the Applicant strongly makes the point that he contested the decision to replace the carpet, stating that it was new carpet and that if it were dried this would be adequate. 15. It was also submitted that the time proposed by the FSP during which it would obtain a report to permit it to decide the question of liability, and would then replace the carpet, was excessive having regard to the fact that the Applicant had informed the FSP of his very reasonable desire for the carpet situation to be resolved immediately having regard to the fact that there were children (tenants) sleeping in a room without floors. 16. As to the FSP’s contention that they had sought a report from a builder, a nd not an engineer (who would charge a higher fee) the submission has suggested that “it is standard practice to obtain a report from an engineer when questions arise as to how water ingressed into a property. 17. The submission also referred to a paragraph within the Recommendation in which the Case Manager commented that she had invited the Applicant to submit details of the carpet that had been replaced in order that confirmation could be received that, as the Applicant claims, the carpet was still perfectly suitable for use once it had been dried out. The Case Manager commented that despite giving the Applicant considerable time to obtain such a report, no such report had been received. The submission from the Applicant’s solicitor suggested that it was unreasonable for the Applicant to incur still further costs to obtain such a report and that after a period of time it was likely that no useful result could be obtained. (I accept this but if the Applicant had decided not to obtain a report, the Applicant should have advised the Case Manager of his change of mind). Case No: 271863 Determination Page 4 of 8 18. The further submission also pointed out that there is no evidence provided by the FSP of contamination of the carpet. Summary of FSP’s position 19. With regard to the replacement of the carpet, the FSP says that it obtained a carpet replacement quote from C in the amount of only $967.03. It contends that its liability “is the amount it would incur in the replacement of any item lost or damage as a result of an insurable event”. The Applicant was advised on 24 March 2011 that if he replaced the carpet he may not be reimbursed in full. It notes that the invoices submitted by the Applicant shows that the carpet was replaced on or around 23 March 2011. Thus, the FSP “was never provided with the option of organising the replacement of carpet”. 20. With regard to the cost of obtaining the report, the FSP says that the Applicant did not supply a builder’s report as requested. Instead, he submitted an engineer’s report. It asserts that a builder’s report would have been sufficient and it is fair and reasonable that it incur a cost of what a builder would have charged to inspect and report on the property. 21. The FSP relies on the following policy provisions contained in the Product Disclosure Statement (PDS): “ Making a claim … What you must not do …  do not carry out or authorise repairs without our consent unless you contact us and the repairs are necessary to protect your home or contents from further loss or damage ...  do not negotiate, pay or settle a claim with anyone else unless we agree. … How to establish your loss … Things you must do …  provide us with a quote for repair or replacement if we ask for this. If you choose to use our recommended repairers (when available), there is no need to obtain your own quotes  consult an expert if we ask for this and provide any information the expert requests. Case No: 271863 Determination Page 5 of 8 … How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to the home, unit or contents we will decide if we will:  repair damage new for old or  replace home or contents new for old or  pay you what it would cost us to repair or replace the home or contents new for old. … Contents claims How contents claims are settled If we agree to pay a claim for loss, theft or damage to your contents, we will decide if we will:  repair damage new for old or  replace home or contents new for old or  pay you what it would cost us to repair or replace your contents new for old.” Issues 22. Whether the carpet was restorable and did not have to be removed. 23. Whether the FSP must reimburse the Applicant $2,000 for the amount he paid to replace the carpet. 24. Whether the FSP must pay the Applicant $1,485 for the cost of obtaining the “Building Inspection Report” from B. Reasons for Decision 25. In this matter there has been an adequate exchange of material between the parties and each has had the opportunity to address the submissions of the other. 26. The onus is upon the Applicant to establish that the costs for which he seeks reimbursement are reimbursable pursuant to the policy. 27. The Case Manager has set out the matter in considerable details and as will be seen I have adopted many paragraphs from her Recommendation. 28. Two matters are in dispute. The Applicant is aggrieved by reason of the failure of the FSP to reimburse him for the full cost of the two engineer’s reports which he obtained, setting out the cause of the damage to the Case No: 271863 Determination Page 6 of 8 properties. The reports which were provided by “B” Consulting Engineers are largely identical, although they do have different photos and the few lines of “findings” which are set out are different i n each case. 29. I must say that having read the reports, I agree with comments made by the FSP’s officers, that the reports barely provide an adequate explanation as to how the ingress of rain has occurred. Nevertheless the FSP did accept them. 30. The FSP has claimed that it should be liable only for the sum of $176 for each claim (a combined figure of $352). It states that this is the fee that it could have expected to pay for a report by a builder. 31. Having read the file carefully, I do agree that in its discussions with the Applicant, the FSP has referred to a report from a builder. Nevertheless I am unable to agree that $352 for two reports represents a reasonable estimate of the costs likely to have been incurred had the reports been prepared by a builder. Both parts of the property had to be inspected, the damage within the properties had to be assessed and in all the circumstances I think a reasonable allowance for two reports (bearing in mind that only one inspection of the properties was required) would be $900 or $450 per report. 32. I appreciate this will leave the Applicant out of pocket for a considerable sum. He should take up the matter with the engineers, as I am surprised at the fee charged. Replacement of the Carpets 33. This is by far the mo st contentious matter. There is good sense in the FSP’s proposition that it should only be obliged to pay the sum that it would have expended, had it authorised and paid for the carpets from one of its suppliers. 34. But this presupposes that the FSP was entitled to rely upon its assessor “NR” who attended the property on 24 March 2011 and who, on the same day, commenced the removal of the carpet after it was cut. 35. It is plain that this was occurring despite the objection of the Applicant, who maintained that there was no need for the carpet to be replaced. It was new, and in his view (and he has experience as a builder including in the outfitting and refurbishing of domestic premises) once the carpet had been dried, it could have been adequately restored and co ntinued to be used. 36. I must say that it is an unusual state of affairs when an Applicant is challenging a decision to replace carpets! 37. Nevertheless, in the particular circumstances of the Applicant which, no doubt were adequately expressed both to “NR” and to the FSP, his request that the carpets be dried and re-laid was one which I consider should have been very seriously considered. Case No: 271863 Determination Page 7 of 8 38. Apparently “NR” advised the FSP that in their view the carpets would be “contaminated”. Having regard to the method by which the water entered the property, the Applicant strongly disputes this. 39. I must say that I have struggled to find any evidence of “contamination” and I have also struggled to understand why a decision had to be made so quickly that the carpets needed to be replaced. 40. No doubt, the matters troubling the Applicant, notably the tenant’s children sleeping in a room with wet carpet, was a very major concern for him. 41. From the absence of any evidence that the carpets were actually contaminated, I am of the view that the option of drying the carpets and restoring them to their place in the properties should have been considered and put to the Applicant. 42. As it stands at present, the Applicant is heavily out of pocket by reason of the FSP’s decision to offer some $96 7.03 per property, as opposed to the sum of $1,950 for one property, and $2,000 for the other property, which are the sums actually paid by the Applicant. 43. There is one further comment which I should make in relation to the carpets. I consider that if the possibility of drying and restoring the carpets to their previous positions was not one which found favour with the FSP, the Applicant should have been given the opportunity of considering his position, and deciding whether he wished to proceed with the claim in respect to the carpets. 44. Having said all of this, I am concerned by the fact that it is plain that indeed the Applicant had ordered replacement carpets as early as 23 March 2011. Whilst recognising that English is not apparently his first language, I should have thought that it would be possible for him to have the quotations for the new carpets submitted by email or fax to the FSP, so that it could give some indication as to the acceptability of the quotes, or the differential between the sum which the Applicant was contemplating paying, and the sum which the FSP was likely to reimburse. In any event, I consider that the purchase on 23 March 2011 was too hasty. 45. I appreciate that by reason of his family circumstances the Applicant was under considerable pressure at this time, but to some extent I think that he has proceeded in a high-handed manner. Had he followed normal and accepted procedures, he would have been aware that, if he proceeded with the carpet purchase, he would be considerably out of pocket. Determination 46. On the basis of the available information and the above reasons, I determine that: Case No: 271863 Determination Page 8 of 8  the FSP is not obliged to reimburse the Applicant $2,000 for the replacement carpet. The FSP is entitled to settle the carpet damage in the amount of $967.03.  the FSP is not obliged to reimburse the Applicant $1,485 for the Building Inspection Report. It is fair and reasonable that the FSP reimburse the Applicant $450.00 of the fee paid for the report.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.