Text of the determination
Case No: 271832 Determination Page 1 of 16
Case number: 271832
General Insurance - Domestic Insurance - Home Building - Service - Delay in
claim handling
26 March 2013
Background
1. This is a Determination following the rejection of a Recommendation by the
Applicant.
2. A dispute has arisen between the Applicant and the Financial Services
Provider (FSP) with whom the Applicant held a Home and Contents Policy.
3. The dispute arises following the claim lodged on 1 November 2011 following
water damage to the home and contents caused by a burst water filter
system in the kitchen.
4. After many attempts between the parties to resolve the issues, the Applicant
referred the matter to this Service.
5. On 14 January 2013, a Case Manager made a Recommendation. As the
recommendation was extremely detailed and set out all of the factual
matters, I think it preferable that I now set out the Recommendation in full. I
shall then make additional comments.
“1. The Applicant’s home and contents were insured with the Financial Services
Provider (FSP) under a home and contents policy.
2. A claim was lodged on 1 November 2011 for water damage to the home and
some contents caused by a burst water filter system in the kitchen.
3. The FSP accepted liability and settled the claim by carrying out some of the
repairs and cash settling other aspects of it.
4. The Applicant believes he is entitled to further compensation on the basis the
FSP’s carriage of the claim had caused him, his family and pet illness, stress,
anxiety and additional costs.
Summary of Applicant’s position
5. He is entitled to compensation because:
Determination
Case No: 271832 Determination Page 2 of 16
The FSP was negligent in dealing with the claim;
There were difficulties contacting the FSP;
Of “the claim resolution system”; and
His family suffered disruption and health issues.
6. The FSP delayed in attending to the claim for first 7 days and was also lax in
organising the repairs to his home
7. He seeks the following costs:
(a) Overseas telephone calls $85.00
(b) Wasted water (due to burst filtration system) $100.00
(c) Electricity used to dry out wet areas $100.00
(d) Labour costs to remove furniture; clear out kitchen
cabinets; dry, clean and disinfect impacted areas
$2,500.00
(e) Wages lost on 2 and 7 November 2011 $800.00
(f) Stress and anxiety, disruption to household, dispute
with Applicant’s builder, inability to use portions of the
home, cancelled Christmas arrangements, and chest
infection and illness caused by rotting carpet
$12,000
(g) Veterinary expenses as a result of the family dog
contracting bacterial infection due to the rotting carpet
$373.80
(h) Stress and anxiety as a result of having to make
alternative accommodation for an aged parent and
visits (52 days at $250.00 a day)
$16,250.00
(i) Meals purchased because the kitchen was unfit for use
(90 days at $150 a day)
$13,500.00
(j) Claims yet to be settled, comprising:
i. $575.00 for painting
ii. $1,620.00 for damaged furniture
iii. $368.00 for damaged kitchen utensils
$2,563.00
Total $48,271.80
Summary of FSP’s position
8. FOS can only award a maximum of $3,000 for financial and non-financial loss
respectively.
9. Although it was not preferable that it took 6 days to remove the water
damaged carpet from the Applicant’s home, the timeframe was not
unreasonable.
Case No: 271832 Determination Page 3 of 16
10. The only other period of delay was due to additional or non-claim related
works being carried out to the property by the Applicant through its authorised
repairer.
11. The claim was otherwise processed in a timely manner, consistent with the
Code of Practice.
12. Of the sums claimed by the Applicant:
It is agreeable to compensate for item (c).
It has since settled item (j).
Items (a), (b), (d), (e), (f), (g), (h) and (i) are not covered by the policy.
It has not been established that the home was unliveable so as to give
rise to an entitlement to temporary accommodation.
The Applicant has not proven these costs were actually incurred .
13. The FSP relies on the following policy provisions:
“ What you are insured against?
You are insured against the events set out in the following tables. The
tables also show what we do not cover.
Insured events
You can only claim for loss or damage to your home , contents or
both, if it is caused by one or more of the 11 insured events as
described under “What we cover” below and
your schedule shows that either home and/or contents is
insured, and
the insured events occur during the period of insurance, and
for contents , they are at the place of loss or damage (see
page 44), and
the loss or damage is not excluded as described under the
“What we do not cover” column of this section, and
the loss or damage is not excluded by any of the General
Exclusions listed in the policy.
...
General exclusions
Please note: These general exclusions below apply to all sections of
this policy.
We do not insure you for:
Any loss or damage that is not directly caused by an insured
event (applies to Home or Contents or both).”
Issue
14. Whether the Applicant is entitled to a compensation for consequential and/or
non-financial losses.
Case No: 271832 Determination Page 4 of 16
Reasons for Recommendation
15. I am satisfied there has been a full exchange of material and the parties have
had the opportunity to respond to the issues raised.
16. The Applicant initially sought $48,271.80, comprising the items identified in
paragraph 7 above. Of these, the FSP has since:
Agreed to reimburse the Applicant for item (c) (electricity usage).
Paid item (j) (outstanding claim amount of $2,563.00).
17. The FSP maintains that it is not responsible for any of the other sums claimed
which remain in dispute.
Relevant Terms of Reference
18. Clause 9.3 of the FOS Terms of Reference allows FOS (the Service) to make
separate awards of up to $3,000 for consequential loss and non-financial loss
respectively.
9.3 Other compensation
a) Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for
consequential financial loss or damage up to a maximum amount of
$3,000 per claim made in the Dispute.
b) Subject to paragraph 9.3c) and paragraph 9.7 FOS may decide that
the Financial Services Provider compensate the Applicant for non-
financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicants’ expectation of
enjoyment or peace of mind has occurred;
…
The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute.
19. The Service considers “Consequential Financial Loss” as an “indirect financial
loss or damage” (see clause 20.1 of the Terms of Reference) while clause
9.3(b)(i) of the Terms of Reference describes the type of experiences capable
of giving rise to a claim for non-financial loss.
20. Stress and anxiety are not generally recognised as experiences capable of
giving rise to a claim for non-financial loss under clause 9.3(b)(i) of the Terms
of Reference, so the Applicant’s claims in this regard should be considered in
the context of the situations mentioned in clause 9.3(b)(i).
21. The Service must have regard to what is fair in all the circumstances in
deciding if compensation should ultimately be allowed. Clause 8.2 of the
Terms of Reference states:
8.2 Dispute resolution criteria
Subject to paragraph 8.1, when deciding a Dispute and whether a
remedy should be provided in accordance with paragraph 9, FOS will
do what in its opinion is fair in all the circumstances
Case No: 271832 Determination Page 5 of 16
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme
(although FOS will not be bound by these).
22. The Applicant has been made aware of the Service’s monetary limits for non -
financial and consequential losses, and I understand that he is agreeable to
proceed with the subject to the Service’s limitations.
Consequential loss – onus to prove breach and loss
23. A claim for consequential loss in the context of a contractual dispute may
arise when a party to a contract has conducted itself in a manner that
constitutes a breach of the contract, causing the other contracting party to
incur additional losses that would not have otherwise occurred.
24. At law, the onus falls on the party claiming a consequential loss to strictly
prove that a breach of contract occurred and that breach caused him/her to
suffer the loss claimed.
25. Accordingly, although the Service has the capacity to award for consequential
losses (subject to the $3,000 monetary limitation), the Applicant has the onus
to firstly establish that:
The FSP was in breach of contract by failing to fulfil an obligation it
was obliged to meet; and
Such failure caused the losses claimed.
26. The Applicant says the FSP was slow in processing the claim. This may
arguably form a basis for suggesting that the FSP was in breach of contract if
the delay was inordinate.
27. However, the main difficulty with the Applicant’s case for consequential loss is
that he has not shown that he had actually suffered the losses claimed, let
alone demonstrate that it was caused by the alleged breach.
28. He has not proven that he actually incurred:
$85 worth of overseas telephone;
$2,500 in labour costs;
$800 in lost wages;
Medical expenses;
$373.80 worth of veterinary expenses;
$250 worth of daily accommodation and/or travel expenses for 52
days; and
$150 worth of daily meal purchases for 90 days.
Case No: 271832 Determination Page 6 of 16
29. He has also not provided any medical or veterinary evidence to support
claims that he, his wife and pet actually fell ill and more importantly, that they
fell ill as a result of mould.
30. As the Applicant has not persuasively established that he has suffered the
losses claimed and that they were in fact due to the FSP’s conduct of the
claim, it follows that his claim for consequential losses fails (even if I am
inclined to conclude that the FSP’s carriage of the claim was actually in
breach of contract).
31. I am mindful that the Applicant actually premises his claim for consequential
loss under the law of Negligence. However, the principles applicable are
essentially the same in that he must first and foremost demonstrate that he
had suffered the losses claimed and that they were due to the FSP’s carriage
of the claim (assuming it was negligent). He has not persuasively established
his losses or the causative aspects of the same, so his claim fails.
Non-financial loss
32. Turning to the Applicant’s claim for compensation for stress, anxiety and
inconvenience generally, the Service may award him compensation not
exceeding $3,000 if:
The FSP had taken an unusual amount of time to resolve the claim; or
Its carriage of the claim was such that it had subjected to him an
unusual degree of physical inconvenience or caused an unusual
interference with his expectation of enjoyment or peace of mind.
33. Although the Applicant has raised many issues with respect to the carriage of
his claim, his dissatisfaction can generally be categorised into the 5 areas
outlined below.
Lack of initial claims response and assistance
34. The first relates to a failure to respond to the claim initially. In this respect, the
Applicant says that the FSP failed to render his wife any meaningful
assistance and took some 7 days to remove a water damaged carpet from the
home.
35. The FSP acknowledges that the initial delay in attending to the claim was not
preferable, but otherwise believes that it was not unreasonable.
36. On review of its file notes, I note that:
Part of the delay was due to some confusion surrounding the FSP’s
nominated contractor’s authority to deal with the carpet.
The FSP had also apologised for the lack of initial response.
Delay in kitchen cabinet repairs
37. The second aspect of his dissatisfaction mainly relates to the delay in having
his damaged kitchen cabinets replaced, which subsequently occurred in
February 2012.
Case No: 271832 Determination Page 7 of 16
38. The Applicant’ s belief is that the FSP was generally lax in organising the
repairs to his home.
39. An ancillary complaint was that the FSP did not remove the damaged kitchen
cabinets until 6 February 2012 although the Applicant had been voicing
concern of a foul smell emanating from them since November 2011.
40. According to the material exchanged:
The FSP’s assessor inspected the home on 7 November 2011 and
issued her first report on 18 November 2011, advising that she was in
the process of sourcing quotes to repair the damag e to the Applicant’s
home.
The relevant repair quotes were attached to the assessor’s second
report (dated 13 December 2011). The quotes supplied by “C” and “M”
provided for the replacement the damaged kitchen cabinets.
The assessor was advised that the kitchen cabinets would be installed
in the second week of January 2012, and this was apparently
communicated to the Applicant and FSP (see assessor’s 15 December
2011 email).
There was apparently some discussion between the Applicant and the
kitchen cabinet installer with respect to the installation of a different
bench top sometime between the assessor’s second report and third
report (dated 1 February 2012), and the installation of the new kitchen
was booked in for the first week of February 2012.
There appears to be some inconsistency as to when the kitchen
cabinet repairs were actually completed.
The Applicant says it occurred over a period of 3 days (ie. between 6
and 8 February 2012) but the assessor’s fourth report (dated 14
February 2012) suggests that the kitchen cabinet installer was still
awaiting delivery of the new bench top; which was anticipated to arrive
in 2 weeks.
It appears that the home repairs (if not the kitchen cabinets) may not
have been completed as 29 February 2012. The assessor’s fift h report
(dated 29 February 2012) advised that he was hopeful that repairs
would be completed in the “very near future”.
The Applicant had complained of the foul smell from behind the
kitchen cabinets since November 2011, and this was directly reported
to the FSP through:
i. The Applicant’s 30 November 2011 letter to the CEO of the
FSP’s parent company (which the FSP received on/about 5
December 2011).
ii. The assessor’s 13 December 2011 report (second report).
However, there is nothing to suggest that the complaint was ever
attended to.
Case No: 271832 Determination Page 8 of 16
Delays in paying contents and wall painting claims
41. The Applicant’s third dissatisfaction relates to a failure to promptly settle the
claims relating to the painting of the wall and the replacement of damaged
contents. On review of the material, I have observed as follows:
Although described as a tax invoice, the quote for the painting of the
wall ($575) was issued on 29 November 2011.
The quote for the replacement of a number of electrical appliances
($368) was issued on 13 December 2011.
The quote for the replacement of a wine rack ($1,620) was issued on 7
January 2012.
The above quotes were forwarded to the FSP together with the
assessor’s third (dated 1 February 2012) and fourth report (dated 14
February 2012).
It appears that payments for the electrical appliances and the wine
rack occurred sometime prior to 15 March 2012 (see Applicant’s 15
March 2012 email).
It is unclear when the payment for the wall painting was actually made.
Based on the FSP 17 April 2012 file note, it appears that it likely
occurred on or after 17 April 2012.
Dispute surrounding skirting
42. The fourth aspect of the Applicant’s dissatisfaction concerns a dispute that
arose between him and the FSP’s builder with respect to the replacement of a
particular skirting. The dispute was eventually resolved, apparently following
discussions with the FSP’s assessor.
43. Whilst I appreciate that the Applicant was no doubt frustrated that a dispute
should arise on the matter, the fact is that it was ultimately resolved fairly
quickly. In my view, this issue does not constitute a matter which gives rise to
an entitlement to compensation under clause 9.3(b)(i) of the Terms of
Reference.
Temporary accommodation
44. The Applicant’s final dissatisfaction appears to concern temporar y
accommodation.
45. The available material suggests that the Applicant and his family had
remained at the home during the entire repair process apart from an aged
parent.
46. According to the Applicant, he had to make alternative accommodation
arrangements for the aged parent however, as previously outlined, I was not
satisfied that he has proved a loss was incurred in making this arrangement.
47. In any case, the FSP says that the Applicant was not entitled to the benefit of
temporary accommodation because the home was not “unliveable”. It argues
that whilst there was disruption to normal living arrangements, the Applicant
still had use of the kitchen and bedrooms, and the home was secure.
Case No: 271832 Determination Page 9 of 16
48. The Applicant’s response is simply that the kitchen could not be used, so the
home was in an unliveable condition.
49. Contrary to the FSP’s assertions, its 7 December 2011 file note as well as the
email exchanges between it and its assessor on the same day clearly shows
that the assessor had been instructed to arrange temporary accommodation
for the Applicant for the repair period.
50. The FSP claims that “[it] was later advised that temporary accommodation
was not required”, but I found nothing in the FSP’s “attachment 7” to support
such a claim.
51. The available material does not identify who provided and received the
alleged advice, nor does it identify the basis upon which it was decided that
temporary accommodation was not required. There is also nothing to indicate
that the Applicant was ever consulted on the matter. More importantly, the
material shows that the assessor was instructed to arrange for temporary
accommodation which indicates that a decision was already made that it was
actually necessary.
52. It is not unreasonable to say that the FSP was likely to have reduced its
claims expenditure by not providing temporary accommodation (although it
was approved).
53. I do not consider it fair in all the circumstances (or consistent with an
obligation to act with utmost good faith) for an insurer to benefit from a cost
saving when such saving was derived from a failure to provide a benefit that
was supposed to be provided.
Is Applicant entitled to compensation for non-financial loss?
54. The Service has previously determined that compensation under clause
9.3(b)(i) of the Terms of Reference is generally meant to cater for situations
where an insurer’s carriage of the claim was so significantly below par that it
causes an Applicant an unusual degree of delay or inconvenience.
55. It is meant not to penalise an insurer merely because there were delays,
inconveniences, or mistakes made during the claims process. In the main, it is
not uncommon that the occurrence of an event resulting in loss as well as an
insurance claim would result in some inconvenience, stress and delays. This
must ordinarily be allowed for.
56. The Applicant believes that the FSP’s initial response to the claim was
unreasonable. Whilst I accept that its initial response may not have been ideal
insurance practice, I do not consider the FSP’s initial conduct to be so
unreasonable or inordinate as to justify the payment of compensation under
clause 9.3(b)(i) of the Terms of Reference; particularly when:
The delay was merely a matter of days;
The FSP took fairly quick action to remove the soaked carpet following
the Applicant’s complaint; an d
The FSP had apologised for the incident.
Case No: 271832 Determination Page 10 of 16
57. Turning to the delay concerning the kitchen cabinets, I am of the view that a
substantial portion of the delay may be attributable to the year-end festivities
as well as the wait for the stone bench top.
58. The Service has dealt with many disputes involving claims that occur near to
or during the Christmas and New Year period. Based on my observations and
experience, it is not unusual for repairers, trade persons and businesses
generally to wind down their activities during this period, such that it is often
difficult (if not impossible) to engage trade services or obtain parts until late
January to early February in the following year.
59. It is unfortunate that the Applicant’s claim occurred fairly close to a long
holiday period. Whilst I certainly appreciate his frustration, I do not consider
the FSP substantially responsible for the delay in the kitchen repairs.
60. Having said that, I am concerned by the FSP’s lack of response to the
Applicant’s complaint of the foul smell coming from the kitchen area.
61. Although raised fairly early into the claims process, there is nothing in the
evidence to suggest that the FSP made an attempt to verify the complaint, let
alone take immediate steps to address the issue; especially after becoming
aware that the kitchen repairs would not occur until late January to early
February 2012.
62. I am also concerned of the FSP’s failure to provide temporary accommodation
although it approved the same.
63. The FSP’s lack of action on these matters leaves me w ith little choice but to
accept that the Applicant’s complaints on the matter and conclude that he and
his family were left to cope with a foul smell for some 2 months; until the
cabinets were finally removed in early February 2012.
64. In my view, the Applica nt’s complaints were largely avoidable and relatively
easy to resolve. For instance, the FSP could have removed the rotting cabinet
carcasses pending the replacement, or provide the alternative
accommodation it had already authorised.
65. As it did not attend to these matters, I am satisfied that the FSP had
unnecessarily and unreasonably subjected the Applicant to additional
frustration and inconvenience over and above the already difficult
circumstances he and his family were left to cope with.
66. I am also satisfied that there were delays in the payment of the claims for the
wall painting, kitchen appliances and the wine rack. The material exchanged
shows:
The FSP had received all relevant documentation with respect these
claims by mid to late February 2012.
Payments for the contents (wine rack and kitchen appliances) were
completed between late February and mid-March 2012, but the
payment for the wall painting was unlikely to have occurred until mid to
late April 2012.
The delay in paying the wall painting claim appeared to stem from an
impasse between the parties.
Case No: 271832 Determination Page 11 of 16
The FSP was of the view that the Applicant should pay the painter first
and then seek reimbursement for the cost by production of a receipt.
On the other hand, the Applicant claims he could not arrange the
painter until he has received the cheque.
67. The strict position at law is that an insurer is not generally obliged to meet an
expense that has not been incurred, so the FSP was not necessarily incorrect
in adopting the strict position it had taken.
68. Having said that, the FSP also has discretion to exercise some flexibility in the
matter. I find odd that it chose to be strict with respect to the wall painting
claim when:
It had adopted a somewhat more relaxed position in relation to the
contents claim; and
Its own assessor had recommended that a cheque be given to the
Applicant in the name of the painter so that the Applicant can make
immediate payment upon completion of the works.
69. On consideration of the matter, I do not consider it unreasonable to say that
the FSP’s inflexibility with respect to the wall painting claim was largely
unnecessary, and would no doubt have caused the Applicant unnecessary
delay, inconvenience and frustration.
70. Accordingly, having carefully considered the matter, I consider it fair in all the
circumstances that the Applicant should be entitled to a sum of $2000
pursuant to clause 9.3(b)(i) of the Terms of Reference. In coming to this
conclusion, I am primarily influenced by:
The fact the Applicant and his family were not provided with temporary
accommodation (although approved) and were left to cope with a foul
smelling kitchen for some 2 months.
The fact that it would not be fair in all the circumstances (and
inconsistent with an obligation to act with utmost good faith) for the
FSP to benefit from a cost saving when such saving was derived from
a failure to provide a benefit that was supposed to be provided.
The inflexible stance taken by the FSP in relation to the wall painting
claim, which was generally unnecessary and ultimately delayed the
settlement of that claim by nearly 2 months.
Recommendation
71. For these reasons, it is my recommendation that:
a. The FSP is not required to pay compensation pursuant to clause
9.3(a) of the Terms of Reference.
b. The FSP should pay the Applicant $2,000 as compensation pursuant
to clause 9.3(b)(i) of the Terms of Reference within seven (7) of the
parties’ acceptance of this Recommendation (if accepted)” .
Case No: 271832 Determination Page 12 of 16
Additional Comments
6. It will be seen that from the Applicant’s view point, the only positive f eature of
the Recommendation was the proposal that the FSP pay the sum of $2,000
pursuant to paragraph 9.3(b)(i) of the Terms of Reference. As to many items,
the Case Manager found that the Applicant had not supplied sufficient
evidence as to various items of damage which he claimed had been
sustained.
7. When rejecting the Recommendation, the Applicant stated that “at no time
had I been requested to substantiate these costs”. In saying this, he was
referring to items such as the expenses for restaurants during the period in
which the Applicant and his wife were unable to use the kitchen.
8. Thereafter, in a detailed submission of 23 January 2013, the Applicant
addressed a number of issues.
9. Point no 1 related to the delay in removal of the soiled carpets.
10. I note what the Applicant has said, but this issue is not critical to the
Determination which I make.
11. Point no 2 related to the liability for the electricity costs to dry out wet areas,
and pointed out that although the FSP had conceded liability for the
electricity costs to dry out wet areas, no decision had been made as to
whether the FSP was to reimburse these costs. I think that this point is
correct and I will address it.
12. Point no 3 related to a claim which the FSP made, that it had paid $575 to
settle an invoice for wall painting. The Applicant claimed that he had never
received the payment. It has now been confirmed by the FSP that this is
correct and therefore I shall take it into consideration in this Determination.
13. Point no 4 related to comments by the Case Manager that the Applicant
should have provided documentary evidence to prove the costs incurred.
These comments related, in particular, to items such as restaurant expenses
during the time that the kitchen was unusable, and expenses for the re-
location of an elderly but dependant family member who had to be moved
elsewhere as a result of the damage to the kitchen. As to this point, whilst
the Applicant wrote at length on the subject, he still didn’t address the issue
of providing documentation, except that a set of copies of credit card
transactions was made available.
14. In further correspondence with the Applicant, it was suggested that he
should itemise the items for which he was seeking re-imbursement and
indicate a total sum. He has now done this, and I take these matters into
consideration in following the additional information which he has supplied.
Incidentally all of these further submissions have been referred to the FSP.
15. At this point, he also referred to an infection caused to the family pet. He
produced an invoice from the appropriate veterinary surgeon, but as, in my
Case No: 271832 Determination Page 13 of 16
opinion, there is no evidence whatever that the cat suffered infection which
was in any way related to the incident with which we are dealing, I do not
make any allowance for that item.
16. In point no 5, the Applicant made further complaints about the form of the
Recommendation and made the rather absurd comment that “the inclusion
of a resolved matter by the FOS into the ambit of my dispute is unfair and
unnecessary. Its inclusion app ears only serving to discredit my dispute”. This
is an unfortunate comment for the Applicant to make – the Case Manager
was doing his best to categorise the matters which he had considered were
still in dispute, bearing in mind that the Applicant has submitted a huge
volume of material from time to time throughout this matter.
17. The next point, no 6, related to the question of delays and the file handling
by the FSP.
18. What must be noted is that the Case Manager had essentially accepted the
complaints by the Applicant as to this subject. He had recommended the
payment of $2,000 pursuant to paragraph 9.3(b)(i) of the Terms of
Reference. Bearing in mind that the maximum sum which may be awarded is
$3,000, the recommending that a payment of $2,000 demonstrates the
seriousness with which the Case Manager had treated these issues. For the
Applicant to write that “this has given me further concern on the objectivity of
the FOS in dealing with the dispute” appears to me to be remarkable.
19. I read all of the material on the file before reading the Recommendation. I
am satisfied that for the reasons which are set out at length in the
Recommendation an award pursuant to 9.3(b)(i) was absolutely justified. I
note that the FSP has indeed accepted the Recommendation so that it must
be taken to have accepted the Case Manager’s findings as to the delays and
inadequate service.
20. The next item, point 7, in my view, amounts to a further elaboration upon the
question of delay and inadequate handling of the matter on the part of the
Applicant. The Applicant makes the point very ably, that the kitchen
cupboards had not been removed for some three months after the water
damage, despite the strong and pervasive smell of mould emanating from
these cupboards.
21. I accept this point, and it is precisely why an award under paragraph 9.3(b)(i)
was recommended.
22. Point no 8 relates to the FSP denying temporary accommodation and refers
to the very specific comments made by the Case Manager on this subject.
23. I regard this issue as important, particularly because of the arrangements
which needed to be made for the Applicant’s mother -in-law who had to be
removed from the house. This is a matter which I take into consideration
below.
Case No: 271832 Determination Page 14 of 16
24. Point no 9 is, I believe, a further elaboration upon what the Applicant regards
as the culpability of the FSP in failing to act more speedily having regard to
the condition of the house, the smell etc.
25. As indicated earlier, in subsequent correspondence from the Applicant, he
did provide an itemised accounting for the restaurant expenses which had
been incurred between 11 November 2011 and 10 February 2012. Overall,
the amounts incurred for each visit, are modest. The total sum claimed was
$970.10. The Applicant makes the point that the unhygienic conditions from
mould and stench made it impossible to use the kitchen and all cooking
utensils/crockery had been cleared from the kitchen and packed away
shortly after the water burst had occurred. The kitchen was demolished and
replaced over the period 6 to 8 February 2012 but because of the smell of
glues etc, the kitchen could not be used until after 10 February.
26. The Applicant also makes the point that apart from the meals which were
consumed at the restaurants (we are only dealing with some 14 occasions
between 11 November 2011 and 10 February 2012) the Applicant and his
wife had to purchase such items as readymade sandwiches etc for light
meals, from local supermarkets. Not surprisingly he does not have itemised
shopping receipts to compare against each supermarket bank transaction.
27. One has to be careful in this area, because had the Applicant not
experienced the incident which has given rise to this claim, he would,
nevertheless, have been obliged to purchase food for his household use.
Nevertheless, I am satisfied that if there was an inability to cook anything as
plainly was the case, the Applicant has obviously sustained greater losses
than simply for the restaurant meals. Over a period of 12 weeks, I consider
that an allowance of $100 per week should be made, in addition to the
$970.10 for which records have been supplied by the Applicant. Therefore,
under this heading, I allow the sum of $2,170.10.
28. The FSP has now conceded contrary to its earlier submission that the
Applicant had not been reimbursed the total sum of $675, being $575 for the
painting and $100 for the electricity. I therefore conclude that the FSP shall
pay to the Applicant $675 in reimbursement of these items.
29. In the further information supplied by the Applicant, he has provided further
elaboration on the need for his mother-in- law to be transferred to his wife’s
sister’s home at Busselton. He has pointed out that Busselton is
approximately 247kms from Connelly (where the Applicant lives).
30. The Applicant has referred to four return trips. Upon further elaboration he
has mentioned that the first trip involved the removal of the mother-in-law
and some of her necessary items, to the sister’s home. I have no doubt that
this was a reasonable course to follow and that the Applicant should be
reimbursed for this. Thereafter there were two further visits to the mother-in-
law whilst she was at Busselton. One of them involved taking further items
which she needed. It is not surprising that all items needed by the mother-in-
law were not taken on the first visit, and I regard the second visit as entirely
reasonable and for which the Applicant should be reimbursed.
Case No: 271832 Determination Page 15 of 16
31. Thereafter, there was one further visit, before the fourth journey to Busselton
in order to collect the mother-in-law and to bring her back to Connelly
(subsequently this elderly lady has required full time care).
32. The fourth journey was obviously necessary in order to return this elderly
lady to the home in which she normally lived.
33. I therefore consider that the FSP should pay for three of the return visits to
Busselton. In correspondence on this subject the FSP has accepted that the
appropriate rate is $0.75 cents per kilometre. My calculation is that for three
return trips, a total of 1,482kms was travelled and at the rate of $0.75cents,
this produces a figure of $1,089.
Compensation
34. Under paragraph 9.3(b)(i), whilst I have been convinced at all times that an
award under this heading was appropriate, I have given very detailed
consideration as to whether the sum of $2,000, or 2/3rds of the maximum
sum which may be awarded, was appropriate.
35. Ultimately I have decided that it was. Although, as can be seen above, the
FSP will be required to reimburse the Applicant for the mileage which has
been expended, this does not amount to compensation for the time and
inconvenience of the four trips to Busselton. I am certain that if the matter
had been handled expeditiously, at least two of those trips would not have
been necessary.
36. The other matter which must be considered is the extent of the
inconvenience to the Applicant whilst he was effectively excluded from the
kitchen. I should have thought that it would be obvious to the FSP from an
early time, that it was necessary to move as quickly as possible in order that
the use of the kitchen could be restored. In all of the circumstances, I am
satisfied that the amount of $2,000 was absolutely appropriate.
37. In reaching this decision, I’m also mindful of the fact that the FSP does
appear to have benefitted from the fact that it did not provide alternative
accommodation to the Applicant. I agr ee entirely with the Case Manager’s
comments as to this subject. The FSP appears to have relied upon the fact
that in the log of claims submitted by the Applicant, and which was dealt with
in the FSP’s IDR response, he did not actually claim the cost of al ternative
accommodation but of course he was unaware that the FSP’s assessor had
recommended to the FSP on 7 December 2011 that alternative
accommodation was required, and indeed that the assessor had been
instructed to arrange temporary accommodation for the Applicant for the
repair period.
38. When these matters are taken into consideration, I am satisfied that the
figure of $2,000 is absolutely justified.
Case No: 271832 Determination Page 16 of 16
Determination
39. I determine that the FSP should pay to the Applicant the following sum:
a) $675 in reimbursement for painting costs and the electricity necessary to
dry out the wet areas.
b) The sum of $1,089 reimbursement of travel costs incurred by the
Applicant for the transport of the Applicant’s mother -in-law to Busselton,
one subsequent visit to her at Busselton and for transport of the mother-
in- law from Busselton back to the Applicant’s home.
c) A sum of $970.10 in reimbursement of expenses incurred by the
Applicant at restaurants on 14 occasions between 11 November 2011
and 10 February 2012.
d) The sum of $1,200 representing $100 per week for additional expenses
for food for the Applicant and his wife for the period 11 November 2011 to
10 February 2012.
40. I further determine that the FSP should pay to the Applicant a sum of $2,000
pursuant to paragraph 9.3(b)(i) of the Terms of Reference of this Service.