Determination 271832

Delayed and inadequate handling of home and contents water damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,934
Non-financial loss$2,000
Amount claimed$48,272
SourceAFCA PDF

Summary

Homeowner claimed $48,271.80 for water damage and consequential losses after the FSP's claim handling. The panel rejected most consequential losses for lack of proof, ordered $3,934.10 in reimbursements and mileage and $2,000 for non-financial loss.

A consequential loss claim requires proof of the loss and causation by the insurer's breach, while non-financial loss is awarded only for unusual inconvenience caused by claim handling under the FOS Terms of Reference.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 271832 Determination Page 1 of 16 Case number: 271832 General Insurance - Domestic Insurance - Home Building - Service - Delay in claim handling 26 March 2013 Background 1. This is a Determination following the rejection of a Recommendation by the Applicant. 2. A dispute has arisen between the Applicant and the Financial Services Provider (FSP) with whom the Applicant held a Home and Contents Policy. 3. The dispute arises following the claim lodged on 1 November 2011 following water damage to the home and contents caused by a burst water filter system in the kitchen. 4. After many attempts between the parties to resolve the issues, the Applicant referred the matter to this Service. 5. On 14 January 2013, a Case Manager made a Recommendation. As the recommendation was extremely detailed and set out all of the factual matters, I think it preferable that I now set out the Recommendation in full. I shall then make additional comments. “1. The Applicant’s home and contents were insured with the Financial Services Provider (FSP) under a home and contents policy. 2. A claim was lodged on 1 November 2011 for water damage to the home and some contents caused by a burst water filter system in the kitchen. 3. The FSP accepted liability and settled the claim by carrying out some of the repairs and cash settling other aspects of it. 4. The Applicant believes he is entitled to further compensation on the basis the FSP’s carriage of the claim had caused him, his family and pet illness, stress, anxiety and additional costs. Summary of Applicant’s position 5. He is entitled to compensation because: Determination Case No: 271832 Determination Page 2 of 16  The FSP was negligent in dealing with the claim;  There were difficulties contacting the FSP;  Of “the claim resolution system”; and  His family suffered disruption and health issues. 6. The FSP delayed in attending to the claim for first 7 days and was also lax in organising the repairs to his home 7. He seeks the following costs: (a) Overseas telephone calls $85.00 (b) Wasted water (due to burst filtration system) $100.00 (c) Electricity used to dry out wet areas $100.00 (d) Labour costs to remove furniture; clear out kitchen cabinets; dry, clean and disinfect impacted areas $2,500.00 (e) Wages lost on 2 and 7 November 2011 $800.00 (f) Stress and anxiety, disruption to household, dispute with Applicant’s builder, inability to use portions of the home, cancelled Christmas arrangements, and chest infection and illness caused by rotting carpet $12,000 (g) Veterinary expenses as a result of the family dog contracting bacterial infection due to the rotting carpet $373.80 (h) Stress and anxiety as a result of having to make alternative accommodation for an aged parent and visits (52 days at $250.00 a day) $16,250.00 (i) Meals purchased because the kitchen was unfit for use (90 days at $150 a day) $13,500.00 (j) Claims yet to be settled, comprising: i. $575.00 for painting ii. $1,620.00 for damaged furniture iii. $368.00 for damaged kitchen utensils $2,563.00 Total $48,271.80 Summary of FSP’s position 8. FOS can only award a maximum of $3,000 for financial and non-financial loss respectively. 9. Although it was not preferable that it took 6 days to remove the water damaged carpet from the Applicant’s home, the timeframe was not unreasonable. Case No: 271832 Determination Page 3 of 16 10. The only other period of delay was due to additional or non-claim related works being carried out to the property by the Applicant through its authorised repairer. 11. The claim was otherwise processed in a timely manner, consistent with the Code of Practice. 12. Of the sums claimed by the Applicant:  It is agreeable to compensate for item (c).  It has since settled item (j).  Items (a), (b), (d), (e), (f), (g), (h) and (i) are not covered by the policy.  It has not been established that the home was unliveable so as to give rise to an entitlement to temporary accommodation.  The Applicant has not proven these costs were actually incurred . 13. The FSP relies on the following policy provisions: “ What you are insured against? You are insured against the events set out in the following tables. The tables also show what we do not cover. Insured events You can only claim for loss or damage to your home , contents or both, if it is caused by one or more of the 11 insured events as described under “What we cover” below and  your schedule shows that either home and/or contents is insured, and  the insured events occur during the period of insurance, and  for contents , they are at the place of loss or damage (see page 44), and  the loss or damage is not excluded as described under the “What we do not cover” column of this section, and  the loss or damage is not excluded by any of the General Exclusions listed in the policy. ... General exclusions Please note: These general exclusions below apply to all sections of this policy. We do not insure you for:  Any loss or damage that is not directly caused by an insured event (applies to Home or Contents or both).” Issue 14. Whether the Applicant is entitled to a compensation for consequential and/or non-financial losses. Case No: 271832 Determination Page 4 of 16 Reasons for Recommendation 15. I am satisfied there has been a full exchange of material and the parties have had the opportunity to respond to the issues raised. 16. The Applicant initially sought $48,271.80, comprising the items identified in paragraph 7 above. Of these, the FSP has since:  Agreed to reimburse the Applicant for item (c) (electricity usage).  Paid item (j) (outstanding claim amount of $2,563.00). 17. The FSP maintains that it is not responsible for any of the other sums claimed which remain in dispute. Relevant Terms of Reference 18. Clause 9.3 of the FOS Terms of Reference allows FOS (the Service) to make separate awards of up to $3,000 for consequential loss and non-financial loss respectively. 9.3 Other compensation a) Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3c) and paragraph 9.7 FOS may decide that the Financial Services Provider compensate the Applicant for non- financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicants’ expectation of enjoyment or peace of mind has occurred; … The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. 19. The Service considers “Consequential Financial Loss” as an “indirect financial loss or damage” (see clause 20.1 of the Terms of Reference) while clause 9.3(b)(i) of the Terms of Reference describes the type of experiences capable of giving rise to a claim for non-financial loss. 20. Stress and anxiety are not generally recognised as experiences capable of giving rise to a claim for non-financial loss under clause 9.3(b)(i) of the Terms of Reference, so the Applicant’s claims in this regard should be considered in the context of the situations mentioned in clause 9.3(b)(i). 21. The Service must have regard to what is fair in all the circumstances in deciding if compensation should ultimately be allowed. Clause 8.2 of the Terms of Reference states: 8.2 Dispute resolution criteria Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances Case No: 271832 Determination Page 5 of 16 a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these). 22. The Applicant has been made aware of the Service’s monetary limits for non - financial and consequential losses, and I understand that he is agreeable to proceed with the subject to the Service’s limitations. Consequential loss – onus to prove breach and loss 23. A claim for consequential loss in the context of a contractual dispute may arise when a party to a contract has conducted itself in a manner that constitutes a breach of the contract, causing the other contracting party to incur additional losses that would not have otherwise occurred. 24. At law, the onus falls on the party claiming a consequential loss to strictly prove that a breach of contract occurred and that breach caused him/her to suffer the loss claimed. 25. Accordingly, although the Service has the capacity to award for consequential losses (subject to the $3,000 monetary limitation), the Applicant has the onus to firstly establish that:  The FSP was in breach of contract by failing to fulfil an obligation it was obliged to meet; and  Such failure caused the losses claimed. 26. The Applicant says the FSP was slow in processing the claim. This may arguably form a basis for suggesting that the FSP was in breach of contract if the delay was inordinate. 27. However, the main difficulty with the Applicant’s case for consequential loss is that he has not shown that he had actually suffered the losses claimed, let alone demonstrate that it was caused by the alleged breach. 28. He has not proven that he actually incurred:  $85 worth of overseas telephone;  $2,500 in labour costs;  $800 in lost wages;  Medical expenses;  $373.80 worth of veterinary expenses;  $250 worth of daily accommodation and/or travel expenses for 52 days; and  $150 worth of daily meal purchases for 90 days. Case No: 271832 Determination Page 6 of 16 29. He has also not provided any medical or veterinary evidence to support claims that he, his wife and pet actually fell ill and more importantly, that they fell ill as a result of mould. 30. As the Applicant has not persuasively established that he has suffered the losses claimed and that they were in fact due to the FSP’s conduct of the claim, it follows that his claim for consequential losses fails (even if I am inclined to conclude that the FSP’s carriage of the claim was actually in breach of contract). 31. I am mindful that the Applicant actually premises his claim for consequential loss under the law of Negligence. However, the principles applicable are essentially the same in that he must first and foremost demonstrate that he had suffered the losses claimed and that they were due to the FSP’s carriage of the claim (assuming it was negligent). He has not persuasively established his losses or the causative aspects of the same, so his claim fails. Non-financial loss 32. Turning to the Applicant’s claim for compensation for stress, anxiety and inconvenience generally, the Service may award him compensation not exceeding $3,000 if:  The FSP had taken an unusual amount of time to resolve the claim; or  Its carriage of the claim was such that it had subjected to him an unusual degree of physical inconvenience or caused an unusual interference with his expectation of enjoyment or peace of mind. 33. Although the Applicant has raised many issues with respect to the carriage of his claim, his dissatisfaction can generally be categorised into the 5 areas outlined below. Lack of initial claims response and assistance 34. The first relates to a failure to respond to the claim initially. In this respect, the Applicant says that the FSP failed to render his wife any meaningful assistance and took some 7 days to remove a water damaged carpet from the home. 35. The FSP acknowledges that the initial delay in attending to the claim was not preferable, but otherwise believes that it was not unreasonable. 36. On review of its file notes, I note that:  Part of the delay was due to some confusion surrounding the FSP’s nominated contractor’s authority to deal with the carpet.  The FSP had also apologised for the lack of initial response. Delay in kitchen cabinet repairs 37. The second aspect of his dissatisfaction mainly relates to the delay in having his damaged kitchen cabinets replaced, which subsequently occurred in February 2012. Case No: 271832 Determination Page 7 of 16 38. The Applicant’ s belief is that the FSP was generally lax in organising the repairs to his home. 39. An ancillary complaint was that the FSP did not remove the damaged kitchen cabinets until 6 February 2012 although the Applicant had been voicing concern of a foul smell emanating from them since November 2011. 40. According to the material exchanged:  The FSP’s assessor inspected the home on 7 November 2011 and issued her first report on 18 November 2011, advising that she was in the process of sourcing quotes to repair the damag e to the Applicant’s home.  The relevant repair quotes were attached to the assessor’s second report (dated 13 December 2011). The quotes supplied by “C” and “M” provided for the replacement the damaged kitchen cabinets.  The assessor was advised that the kitchen cabinets would be installed in the second week of January 2012, and this was apparently communicated to the Applicant and FSP (see assessor’s 15 December 2011 email).  There was apparently some discussion between the Applicant and the kitchen cabinet installer with respect to the installation of a different bench top sometime between the assessor’s second report and third report (dated 1 February 2012), and the installation of the new kitchen was booked in for the first week of February 2012.  There appears to be some inconsistency as to when the kitchen cabinet repairs were actually completed. The Applicant says it occurred over a period of 3 days (ie. between 6 and 8 February 2012) but the assessor’s fourth report (dated 14 February 2012) suggests that the kitchen cabinet installer was still awaiting delivery of the new bench top; which was anticipated to arrive in 2 weeks. It appears that the home repairs (if not the kitchen cabinets) may not have been completed as 29 February 2012. The assessor’s fift h report (dated 29 February 2012) advised that he was hopeful that repairs would be completed in the “very near future”.  The Applicant had complained of the foul smell from behind the kitchen cabinets since November 2011, and this was directly reported to the FSP through: i. The Applicant’s 30 November 2011 letter to the CEO of the FSP’s parent company (which the FSP received on/about 5 December 2011). ii. The assessor’s 13 December 2011 report (second report). However, there is nothing to suggest that the complaint was ever attended to. Case No: 271832 Determination Page 8 of 16 Delays in paying contents and wall painting claims 41. The Applicant’s third dissatisfaction relates to a failure to promptly settle the claims relating to the painting of the wall and the replacement of damaged contents. On review of the material, I have observed as follows:  Although described as a tax invoice, the quote for the painting of the wall ($575) was issued on 29 November 2011.  The quote for the replacement of a number of electrical appliances ($368) was issued on 13 December 2011.  The quote for the replacement of a wine rack ($1,620) was issued on 7 January 2012.  The above quotes were forwarded to the FSP together with the assessor’s third (dated 1 February 2012) and fourth report (dated 14 February 2012).  It appears that payments for the electrical appliances and the wine rack occurred sometime prior to 15 March 2012 (see Applicant’s 15 March 2012 email).  It is unclear when the payment for the wall painting was actually made. Based on the FSP 17 April 2012 file note, it appears that it likely occurred on or after 17 April 2012. Dispute surrounding skirting 42. The fourth aspect of the Applicant’s dissatisfaction concerns a dispute that arose between him and the FSP’s builder with respect to the replacement of a particular skirting. The dispute was eventually resolved, apparently following discussions with the FSP’s assessor. 43. Whilst I appreciate that the Applicant was no doubt frustrated that a dispute should arise on the matter, the fact is that it was ultimately resolved fairly quickly. In my view, this issue does not constitute a matter which gives rise to an entitlement to compensation under clause 9.3(b)(i) of the Terms of Reference. Temporary accommodation 44. The Applicant’s final dissatisfaction appears to concern temporar y accommodation. 45. The available material suggests that the Applicant and his family had remained at the home during the entire repair process apart from an aged parent. 46. According to the Applicant, he had to make alternative accommodation arrangements for the aged parent however, as previously outlined, I was not satisfied that he has proved a loss was incurred in making this arrangement. 47. In any case, the FSP says that the Applicant was not entitled to the benefit of temporary accommodation because the home was not “unliveable”. It argues that whilst there was disruption to normal living arrangements, the Applicant still had use of the kitchen and bedrooms, and the home was secure. Case No: 271832 Determination Page 9 of 16 48. The Applicant’s response is simply that the kitchen could not be used, so the home was in an unliveable condition. 49. Contrary to the FSP’s assertions, its 7 December 2011 file note as well as the email exchanges between it and its assessor on the same day clearly shows that the assessor had been instructed to arrange temporary accommodation for the Applicant for the repair period. 50. The FSP claims that “[it] was later advised that temporary accommodation was not required”, but I found nothing in the FSP’s “attachment 7” to support such a claim. 51. The available material does not identify who provided and received the alleged advice, nor does it identify the basis upon which it was decided that temporary accommodation was not required. There is also nothing to indicate that the Applicant was ever consulted on the matter. More importantly, the material shows that the assessor was instructed to arrange for temporary accommodation which indicates that a decision was already made that it was actually necessary. 52. It is not unreasonable to say that the FSP was likely to have reduced its claims expenditure by not providing temporary accommodation (although it was approved). 53. I do not consider it fair in all the circumstances (or consistent with an obligation to act with utmost good faith) for an insurer to benefit from a cost saving when such saving was derived from a failure to provide a benefit that was supposed to be provided. Is Applicant entitled to compensation for non-financial loss? 54. The Service has previously determined that compensation under clause 9.3(b)(i) of the Terms of Reference is generally meant to cater for situations where an insurer’s carriage of the claim was so significantly below par that it causes an Applicant an unusual degree of delay or inconvenience. 55. It is meant not to penalise an insurer merely because there were delays, inconveniences, or mistakes made during the claims process. In the main, it is not uncommon that the occurrence of an event resulting in loss as well as an insurance claim would result in some inconvenience, stress and delays. This must ordinarily be allowed for. 56. The Applicant believes that the FSP’s initial response to the claim was unreasonable. Whilst I accept that its initial response may not have been ideal insurance practice, I do not consider the FSP’s initial conduct to be so unreasonable or inordinate as to justify the payment of compensation under clause 9.3(b)(i) of the Terms of Reference; particularly when:  The delay was merely a matter of days;  The FSP took fairly quick action to remove the soaked carpet following the Applicant’s complaint; an d  The FSP had apologised for the incident. Case No: 271832 Determination Page 10 of 16 57. Turning to the delay concerning the kitchen cabinets, I am of the view that a substantial portion of the delay may be attributable to the year-end festivities as well as the wait for the stone bench top. 58. The Service has dealt with many disputes involving claims that occur near to or during the Christmas and New Year period. Based on my observations and experience, it is not unusual for repairers, trade persons and businesses generally to wind down their activities during this period, such that it is often difficult (if not impossible) to engage trade services or obtain parts until late January to early February in the following year. 59. It is unfortunate that the Applicant’s claim occurred fairly close to a long holiday period. Whilst I certainly appreciate his frustration, I do not consider the FSP substantially responsible for the delay in the kitchen repairs. 60. Having said that, I am concerned by the FSP’s lack of response to the Applicant’s complaint of the foul smell coming from the kitchen area. 61. Although raised fairly early into the claims process, there is nothing in the evidence to suggest that the FSP made an attempt to verify the complaint, let alone take immediate steps to address the issue; especially after becoming aware that the kitchen repairs would not occur until late January to early February 2012. 62. I am also concerned of the FSP’s failure to provide temporary accommodation although it approved the same. 63. The FSP’s lack of action on these matters leaves me w ith little choice but to accept that the Applicant’s complaints on the matter and conclude that he and his family were left to cope with a foul smell for some 2 months; until the cabinets were finally removed in early February 2012. 64. In my view, the Applica nt’s complaints were largely avoidable and relatively easy to resolve. For instance, the FSP could have removed the rotting cabinet carcasses pending the replacement, or provide the alternative accommodation it had already authorised. 65. As it did not attend to these matters, I am satisfied that the FSP had unnecessarily and unreasonably subjected the Applicant to additional frustration and inconvenience over and above the already difficult circumstances he and his family were left to cope with. 66. I am also satisfied that there were delays in the payment of the claims for the wall painting, kitchen appliances and the wine rack. The material exchanged shows:  The FSP had received all relevant documentation with respect these claims by mid to late February 2012.  Payments for the contents (wine rack and kitchen appliances) were completed between late February and mid-March 2012, but the payment for the wall painting was unlikely to have occurred until mid to late April 2012.  The delay in paying the wall painting claim appeared to stem from an impasse between the parties. Case No: 271832 Determination Page 11 of 16 The FSP was of the view that the Applicant should pay the painter first and then seek reimbursement for the cost by production of a receipt. On the other hand, the Applicant claims he could not arrange the painter until he has received the cheque. 67. The strict position at law is that an insurer is not generally obliged to meet an expense that has not been incurred, so the FSP was not necessarily incorrect in adopting the strict position it had taken. 68. Having said that, the FSP also has discretion to exercise some flexibility in the matter. I find odd that it chose to be strict with respect to the wall painting claim when:  It had adopted a somewhat more relaxed position in relation to the contents claim; and  Its own assessor had recommended that a cheque be given to the Applicant in the name of the painter so that the Applicant can make immediate payment upon completion of the works. 69. On consideration of the matter, I do not consider it unreasonable to say that the FSP’s inflexibility with respect to the wall painting claim was largely unnecessary, and would no doubt have caused the Applicant unnecessary delay, inconvenience and frustration. 70. Accordingly, having carefully considered the matter, I consider it fair in all the circumstances that the Applicant should be entitled to a sum of $2000 pursuant to clause 9.3(b)(i) of the Terms of Reference. In coming to this conclusion, I am primarily influenced by:  The fact the Applicant and his family were not provided with temporary accommodation (although approved) and were left to cope with a foul smelling kitchen for some 2 months.  The fact that it would not be fair in all the circumstances (and inconsistent with an obligation to act with utmost good faith) for the FSP to benefit from a cost saving when such saving was derived from a failure to provide a benefit that was supposed to be provided.  The inflexible stance taken by the FSP in relation to the wall painting claim, which was generally unnecessary and ultimately delayed the settlement of that claim by nearly 2 months. Recommendation 71. For these reasons, it is my recommendation that: a. The FSP is not required to pay compensation pursuant to clause 9.3(a) of the Terms of Reference. b. The FSP should pay the Applicant $2,000 as compensation pursuant to clause 9.3(b)(i) of the Terms of Reference within seven (7) of the parties’ acceptance of this Recommendation (if accepted)” . Case No: 271832 Determination Page 12 of 16 Additional Comments 6. It will be seen that from the Applicant’s view point, the only positive f eature of the Recommendation was the proposal that the FSP pay the sum of $2,000 pursuant to paragraph 9.3(b)(i) of the Terms of Reference. As to many items, the Case Manager found that the Applicant had not supplied sufficient evidence as to various items of damage which he claimed had been sustained. 7. When rejecting the Recommendation, the Applicant stated that “at no time had I been requested to substantiate these costs”. In saying this, he was referring to items such as the expenses for restaurants during the period in which the Applicant and his wife were unable to use the kitchen. 8. Thereafter, in a detailed submission of 23 January 2013, the Applicant addressed a number of issues. 9. Point no 1 related to the delay in removal of the soiled carpets. 10. I note what the Applicant has said, but this issue is not critical to the Determination which I make. 11. Point no 2 related to the liability for the electricity costs to dry out wet areas, and pointed out that although the FSP had conceded liability for the electricity costs to dry out wet areas, no decision had been made as to whether the FSP was to reimburse these costs. I think that this point is correct and I will address it. 12. Point no 3 related to a claim which the FSP made, that it had paid $575 to settle an invoice for wall painting. The Applicant claimed that he had never received the payment. It has now been confirmed by the FSP that this is correct and therefore I shall take it into consideration in this Determination. 13. Point no 4 related to comments by the Case Manager that the Applicant should have provided documentary evidence to prove the costs incurred. These comments related, in particular, to items such as restaurant expenses during the time that the kitchen was unusable, and expenses for the re- location of an elderly but dependant family member who had to be moved elsewhere as a result of the damage to the kitchen. As to this point, whilst the Applicant wrote at length on the subject, he still didn’t address the issue of providing documentation, except that a set of copies of credit card transactions was made available. 14. In further correspondence with the Applicant, it was suggested that he should itemise the items for which he was seeking re-imbursement and indicate a total sum. He has now done this, and I take these matters into consideration in following the additional information which he has supplied. Incidentally all of these further submissions have been referred to the FSP. 15. At this point, he also referred to an infection caused to the family pet. He produced an invoice from the appropriate veterinary surgeon, but as, in my Case No: 271832 Determination Page 13 of 16 opinion, there is no evidence whatever that the cat suffered infection which was in any way related to the incident with which we are dealing, I do not make any allowance for that item. 16. In point no 5, the Applicant made further complaints about the form of the Recommendation and made the rather absurd comment that “the inclusion of a resolved matter by the FOS into the ambit of my dispute is unfair and unnecessary. Its inclusion app ears only serving to discredit my dispute”. This is an unfortunate comment for the Applicant to make – the Case Manager was doing his best to categorise the matters which he had considered were still in dispute, bearing in mind that the Applicant has submitted a huge volume of material from time to time throughout this matter. 17. The next point, no 6, related to the question of delays and the file handling by the FSP. 18. What must be noted is that the Case Manager had essentially accepted the complaints by the Applicant as to this subject. He had recommended the payment of $2,000 pursuant to paragraph 9.3(b)(i) of the Terms of Reference. Bearing in mind that the maximum sum which may be awarded is $3,000, the recommending that a payment of $2,000 demonstrates the seriousness with which the Case Manager had treated these issues. For the Applicant to write that “this has given me further concern on the objectivity of the FOS in dealing with the dispute” appears to me to be remarkable. 19. I read all of the material on the file before reading the Recommendation. I am satisfied that for the reasons which are set out at length in the Recommendation an award pursuant to 9.3(b)(i) was absolutely justified. I note that the FSP has indeed accepted the Recommendation so that it must be taken to have accepted the Case Manager’s findings as to the delays and inadequate service. 20. The next item, point 7, in my view, amounts to a further elaboration upon the question of delay and inadequate handling of the matter on the part of the Applicant. The Applicant makes the point very ably, that the kitchen cupboards had not been removed for some three months after the water damage, despite the strong and pervasive smell of mould emanating from these cupboards. 21. I accept this point, and it is precisely why an award under paragraph 9.3(b)(i) was recommended. 22. Point no 8 relates to the FSP denying temporary accommodation and refers to the very specific comments made by the Case Manager on this subject. 23. I regard this issue as important, particularly because of the arrangements which needed to be made for the Applicant’s mother -in-law who had to be removed from the house. This is a matter which I take into consideration below. Case No: 271832 Determination Page 14 of 16 24. Point no 9 is, I believe, a further elaboration upon what the Applicant regards as the culpability of the FSP in failing to act more speedily having regard to the condition of the house, the smell etc. 25. As indicated earlier, in subsequent correspondence from the Applicant, he did provide an itemised accounting for the restaurant expenses which had been incurred between 11 November 2011 and 10 February 2012. Overall, the amounts incurred for each visit, are modest. The total sum claimed was $970.10. The Applicant makes the point that the unhygienic conditions from mould and stench made it impossible to use the kitchen and all cooking utensils/crockery had been cleared from the kitchen and packed away shortly after the water burst had occurred. The kitchen was demolished and replaced over the period 6 to 8 February 2012 but because of the smell of glues etc, the kitchen could not be used until after 10 February. 26. The Applicant also makes the point that apart from the meals which were consumed at the restaurants (we are only dealing with some 14 occasions between 11 November 2011 and 10 February 2012) the Applicant and his wife had to purchase such items as readymade sandwiches etc for light meals, from local supermarkets. Not surprisingly he does not have itemised shopping receipts to compare against each supermarket bank transaction. 27. One has to be careful in this area, because had the Applicant not experienced the incident which has given rise to this claim, he would, nevertheless, have been obliged to purchase food for his household use. Nevertheless, I am satisfied that if there was an inability to cook anything as plainly was the case, the Applicant has obviously sustained greater losses than simply for the restaurant meals. Over a period of 12 weeks, I consider that an allowance of $100 per week should be made, in addition to the $970.10 for which records have been supplied by the Applicant. Therefore, under this heading, I allow the sum of $2,170.10. 28. The FSP has now conceded contrary to its earlier submission that the Applicant had not been reimbursed the total sum of $675, being $575 for the painting and $100 for the electricity. I therefore conclude that the FSP shall pay to the Applicant $675 in reimbursement of these items. 29. In the further information supplied by the Applicant, he has provided further elaboration on the need for his mother-in- law to be transferred to his wife’s sister’s home at Busselton. He has pointed out that Busselton is approximately 247kms from Connelly (where the Applicant lives). 30. The Applicant has referred to four return trips. Upon further elaboration he has mentioned that the first trip involved the removal of the mother-in-law and some of her necessary items, to the sister’s home. I have no doubt that this was a reasonable course to follow and that the Applicant should be reimbursed for this. Thereafter there were two further visits to the mother-in- law whilst she was at Busselton. One of them involved taking further items which she needed. It is not surprising that all items needed by the mother-in- law were not taken on the first visit, and I regard the second visit as entirely reasonable and for which the Applicant should be reimbursed. Case No: 271832 Determination Page 15 of 16 31. Thereafter, there was one further visit, before the fourth journey to Busselton in order to collect the mother-in-law and to bring her back to Connelly (subsequently this elderly lady has required full time care). 32. The fourth journey was obviously necessary in order to return this elderly lady to the home in which she normally lived. 33. I therefore consider that the FSP should pay for three of the return visits to Busselton. In correspondence on this subject the FSP has accepted that the appropriate rate is $0.75 cents per kilometre. My calculation is that for three return trips, a total of 1,482kms was travelled and at the rate of $0.75cents, this produces a figure of $1,089. Compensation 34. Under paragraph 9.3(b)(i), whilst I have been convinced at all times that an award under this heading was appropriate, I have given very detailed consideration as to whether the sum of $2,000, or 2/3rds of the maximum sum which may be awarded, was appropriate. 35. Ultimately I have decided that it was. Although, as can be seen above, the FSP will be required to reimburse the Applicant for the mileage which has been expended, this does not amount to compensation for the time and inconvenience of the four trips to Busselton. I am certain that if the matter had been handled expeditiously, at least two of those trips would not have been necessary. 36. The other matter which must be considered is the extent of the inconvenience to the Applicant whilst he was effectively excluded from the kitchen. I should have thought that it would be obvious to the FSP from an early time, that it was necessary to move as quickly as possible in order that the use of the kitchen could be restored. In all of the circumstances, I am satisfied that the amount of $2,000 was absolutely appropriate. 37. In reaching this decision, I’m also mindful of the fact that the FSP does appear to have benefitted from the fact that it did not provide alternative accommodation to the Applicant. I agr ee entirely with the Case Manager’s comments as to this subject. The FSP appears to have relied upon the fact that in the log of claims submitted by the Applicant, and which was dealt with in the FSP’s IDR response, he did not actually claim the cost of al ternative accommodation but of course he was unaware that the FSP’s assessor had recommended to the FSP on 7 December 2011 that alternative accommodation was required, and indeed that the assessor had been instructed to arrange temporary accommodation for the Applicant for the repair period. 38. When these matters are taken into consideration, I am satisfied that the figure of $2,000 is absolutely justified. Case No: 271832 Determination Page 16 of 16 Determination 39. I determine that the FSP should pay to the Applicant the following sum: a) $675 in reimbursement for painting costs and the electricity necessary to dry out the wet areas. b) The sum of $1,089 reimbursement of travel costs incurred by the Applicant for the transport of the Applicant’s mother -in-law to Busselton, one subsequent visit to her at Busselton and for transport of the mother- in- law from Busselton back to the Applicant’s home. c) A sum of $970.10 in reimbursement of expenses incurred by the Applicant at restaurants on 14 occasions between 11 November 2011 and 10 February 2012. d) The sum of $1,200 representing $100 per week for additional expenses for food for the Applicant and his wife for the period 11 November 2011 to 10 February 2012. 40. I further determine that the FSP should pay to the Applicant a sum of $2,000 pursuant to paragraph 9.3(b)(i) of the Terms of Reference of this Service.