Determination 271292
Denial of claim for flood inundation damage
Summary
The applicants' home was inundated during the January 2011 Queensland floods and the FSP denied the home and contents claims under the flood exclusion. AFCA found the inundation was caused by flood, that the PDS clearly informed of the exclusion, and that the FSP was entitled to deny the claim.
Under the Insurance Contracts Act s 35 the insurer must clearly inform of exclusions, and the PDS definition of flood, read with the hydrology evidence, establishes that the inundation was flood which is excluded.
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 271292 Determination Page 1 of 7
Case number: 271292
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation - Flood or Stormwater Damage - Receipt of PDS
23 January 2013
Background
1. The Applicants held separate home and contents insurance policies with the
Financial Services Provider (FSP), with the relevant period of cover for the
home building policy operating from 22 August 2010, providing cover for up
to $401,068 and the relevant period of the home contents policy operating
from 29 November 2010, providing cover for up to $207,873. Both policies
were incepted in 2002.
2. On or about 11 January 2011, the Applicants ‟ home in Fig Tree Pocket was
inundated with water as a result of the storms and flooding that affected
much of the Queensland area at that time.
3. The FSP investigated the cause of the loss and determined that the
inundation of the home was due to flood. It denied the Applicants ‟ claims on
the basis that the policy did not cover such losses.
4. The Applicants dispute this outcome and seek cover under the policies.
Summary of Applicants’ position
5. The Applicants say that the damage to their home was caused by the storms
that hit the area and the effects of Tropical Cyclone (TC) Tasha.
6. The view that the damage is storm including stormwater runoff is supported
by the severe weather warnings issued by the BOM shortly before 9.00am
11 January 2011.
7. The FSP‟s hydrology fails to take into ac count the effects of the localised
heavy rainfall.
8. They do not recall receipt of the FSP‟s Product Disclosure Statement (PDS)
and it did not serve to “clearly inform” them of the limits of the policies or the
flood exclusion.
Determination
Case No: 271292 Determination Page 2 of 7
Summary of FSP’s position
9. The FSP says that the cause of the loss was flooding and the policy
excludes all damage resulting from flood.
10. The Applicants were provided with copies of the relevant PDS documents,
which were the same for each policy, and the FSP is therefore entitled to rely
upon the limitations of cover cited in the document.
11. The FSP relies on the following policy provisions:
Page 15 of the PDS
“WHAT YOU ARE COVERED FOR
Storm
If your home or contents suffer loss or damage caused by
a violent wind, cyclone or tornado
thunderstorm or hail which may be accompanied by rain or snow,
or
a sudden, excessive runoff of water as a direct result of a storm
in your local area
We will under contents insurance
replace or repair your damaged contents
We will under buildings insurance
rebuild or repair that part of your home that was damaged
...
However
...
we will NOT cover loss or damage caused by flood...”
Page 35 of the PDS
“ What you are not covered for – general exclusions
we will NOT cover
...
loss, damage, injury or death that occurs as a result of
flood...”
Pages 70-71 of the PDS
“ GLOSSARY
...
flood
is the covering of normally dry land by water escaping or released from the
natural confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam. Flood is not covered by this Policy.
Case No: 271292 Determination Page 3 of 7
...
storm
is a violent wind, cyclone, tornado, thunderstorm or hail which may be
accompanied by rain or snow, or a sudden, excessive run-off of water as a
direct result of a storm in your local area. It does not include persistent rain by
itself.”
Issues
12. Whether the Applicants were supplied with copies of the PDS and if so,
whether provision of these PDS documents was sufficient to discharge the
FSP‟s obligation to clearly inform the Applicant s of the flood exclusion.
13. Whether the damage caused to the Applicants ‟ property can be attributed to
an insured event.
14. If so, whether the FSP is entitled to rely upon exclusion(s) in the policy to
decline indemnity under both policies.
Reasons for decision
15. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to a Panel in accordance with the Operational Guidelines to
the FOS Terms of Reference. This is because of the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
16. The Panel is satisfied that a full exchange of the relevant information has
taken place between the respective parties and that each party has had the
opportunity of addressing any issues raised.
17. The Applicants are represented by a solicitor. For ease of reference,
submissions made on their behalf will appear as „the Applicants ‟.
Provision of the PDS documents and the onus to clearly inform
18. Since the lodgement of the claim, the male Applicant has passed away.
Whilst there was initially no dispute as to the receipt of the PDS on either
policy, the female Applicant has since informed the Service that she cannot
recall ever receiving these documents.
19. The Panel is of the view that a failure of one of the Applicants to recollect
receipt of the PDS documents is not a suggestion that it was never provided.
Nevertheless, the FSP has provided lengthy evidence in support of its
contention that the relevant documents were issued. The evidence
establishes a relevant system for the despatch of documentation. The
evidence establishes that most likely the PDS documents and other
documents were despatched as required by the Act
Case No: 271292 Determination Page 4 of 7
20. Without labouring the evidence, and noting that the PDS for each of the
policies was the same, the Panel is satisfied that most likely the Applicants
were supplied with copies of the PDS documents. The most recent
document issued was on or about 23 October 2004 and that this is the
document relied upon by the FSP.
21. A secondary consideration is whether the PDS served to adequately inform
the Applicants of the flood exclusion. Section 35 of the Insurance Contracts
Act requires that an insurer clearly inform a consumer of any derogation from
standard cover in a prescribed contract. As the Applicants policy is a
prescribed contract then the onus is on the FSP to establish it has clearly
informed the applicants of the relevant limitations and exclusions. The
question of what it means to “clearly inform” was considered by the Northern
Territory Court of Appeal in the matter of Marsh v CGU Insurance Ltd t/as
Commercial Union Insurance [2004] NTCA 1 (the Marsh case). Mildren J
wrote in relation to an insurer‟s obligations under Section 35(2) of the Act
that:
“... a fair reading of sec 35(2) [does] not warrant the co nclusion that the result
needed to go further than providing for the relevant exclusion in the policy
wording in clear and unambiguous language and in a manner which a person
of average intelligence and education was likely to have little difficulty in
fin ding and understanding if that person read the policy in question.”
22. The PDS provides a general list of relevant items for the policy under the title
of “Choose what you would like to do” on page 1. This includes, “Check what
this policy covers” on pages 4 -5, where a separate index regarding the
claimable and excluded items are listed and “Use the Glossary” on page 69,
which provides definitions of relevant terms, including “flood”. The glossary
definition for “flood” stipulates that it is not covered under the policy.
23. From pages 4- 5 under “What this policy covers” the policyholder is directed
to relevant sections for “What you are covered for” (pages 6-39) and
“General Exclusions” on page 35 . First amongst the listed general exclusions
is “flood”.
24. Page 15 details the circumstances under which a claim for storm damage
may be made. It also specifies that cover will not be provided for a flood.
25. The Panel considers that the definition of flood in the PDS clearly informs
that the policy does not cover events where water escapes or is released
from a watercourse or lake over dry land. It further specifies that flood does
not include water escaping from certain water bodies, including a reservoir,
channel, canal or dam. The definition specifically states in italics that losses
due to flooding are not covered.
26. The PDS is written in plain English and in the Panels view if the Applicants
had read the policy they would have had little difficulty in finding and
understanding the relevant limitations and exclusions.
Case No: 271292 Determination Page 5 of 7
27. Accordingly, the Panel is satisfied the FSP has met its obligations under
Section 35 of the Act and in the circumstances; the Panel is satisfied the
FSP may rely upon the flood exclusion where appropriate.
Cause of the loss and whether the FSP is entitled to exclude the event
28. There is an onus on an insured to establish on the balance of probabilities
that a claim fits the definition of an insured event. This is known as a prima
facie claim. Should this onus be discharged, it is then the responsibility of the
insurer to establish the application of any exclusion on which it relies to deny
the claim.
29. To be entitled to cover from the FSP, the onus therefore rests with the
Applicants to establish that their loss fits within the scope of what is covered
by the FS P‟s policy.
30. The policy provides cover for a series of defined events as outlined in the
PDS. It does not provide blanket cover for all types of loss.
31. It is the Applicants‟ contention that the property was damaged by the heavy
storms which affected the area at the time. There is no dispute that the area
was subject to heavy rain in the days preceding the inundation of the
property.
32. After the initial report of the loss, the FSP retained an internal assessor, GS,
to inspect the property on 22 January 2011. He reported that:
the water entered the property at about 3.00-4.00am on 13 January
2011 and the home was inundated to a depth of about 500mm;
the home was inundated for about two hours;
the water emanated from river located at the eastern side of the home
and from the lake across the road;
the Applicants were forced to evacuate and left the home at about
12.00pm on 12 January 2011; and
the Applicants believed the loss to be due to stormwater run-off,
although GS believed it to be flooding.
33. After the Applicants challenged the denial of the claim, the FSP retained a
hydrologist (WP) to provide a site specific report. WP visited the site
(however, no appointment was made with the Applicants and consequently
the site visit was conducted externally) on 7 February 2012 (more than a
year after the event) and provided a report which noted:
the Applicants‟ home was situated about 9km from the centre of
Brisbane and about 330m from the nearest bank of the Brisbane River;
the home is a two storey dwelling situated between about 9.2m AHD
(Australian Height Datum) and 10.9m AHD. The Applicants‟ street is
situated between about 9.5m AHD and 11m AHD. An adjacent main
road is situated at around 8.7m AHD;
Case No: 271292 Determination Page 6 of 7
contact was not made with the Applicants and the hydrologist relied
upon her report to the FSP which only mentioned that the female
Applicant noticed a build up of water out the western side of the home
in the back paddock on 11 January 2011.
WP noted that the approximate peak inundation in the vicinity of the
Applicants‟ prop erty was 11.3m AHD and the home was within the
extent of flooded areas identified after the event;
rainfall data was considered from the local gauge at Archerfield (about
5.4km southeast of the home). The Archerfield gauge showed that
moderate intensity continuous rain fell from 9.00am on 9 January 2011,
delivering about 70mm in 24 hours. Little rain fell the next day and a
further 30mm fell on 11 January 2011 between 9.30am and 3.30pm.
the “low intensity” of the overall rainfall suggested that run -off
inu ndation of the property was “unlikely”;
the large open park area in the vicinity of the home, situated at 5-6m
AHD, would have served to accommodate the rainfall during this
period, making rainwater run-off issues for the Applicants unrealistic;
the interpolation of the river gauges suggests that the peak level of the
inundation of the Applicants‟ home was about 11.4m AHD at 8.30pm on
12 January 2011. This compares favourably with the known inundation
level of the property;
any rainfall likely to cause stormwater inundation ceased as of around
3.00pm on 11 January 2011. The peak inundation of the home was
recorded in the area around 29 hours later;
the cause of the inundation was attributed to the overflow of the
Brisbane River, backing up the unnamed tributary and the local
stormwater system before entering the home.
34. The conclusions of WP suggest that the inundation of the home likely took
place on 12 January 2011 and not 13 January 2011 as first reported. This is
likely explained by the absence of the Applicants from their home.
35. It is a generally accepted principle of hydrology that stormwater run-off
usually occurs contemporaneously with, or shortly after, peak level rainfall.
Noting that there was no report of inundation at the time the Applicants left
and that this was after the rain had effectively ceased, the Panel accepts on
the balance of probabilities it is unlikely that stormwater run-off would have
played a part in the inundation.
36. The FSP also relied upon the area reports from the Insurance Council of
Australia (ICA), which compiled reports into the flooding disasters in
Queensland from this period. The reports detailed information about the
rainfall and affect on the various areas.
37. The Applicants‟ property was located within the bounds of the Brisbane area,
situated about 8-10km south of the town centre. The ICA report noted that
Case No: 271292 Determination Page 7 of 7
rainfall in the Brisbane city area was heaviest through the 6 .00am to 4.00pm
period on 11 January 2011. Page 41 of Volume 2 of the report notes:
“Rain ceased over the Brisbane City area around 1800 hours on Tuesday 11
January, some 24-30 hours before flood levels in the Brisbane River peaked.
Thus, when the Brisbane River peaked, there is no evidence that there was
any „normal‟ flow of significance from the catchment areas of tributary creeks
draining the Brisbane LGA [Local Government Area]. As the flood wave
passed downstream along the Brisbane River, backwater flooding occurred
up the tributary creeks. The peak flood level and time of peak along the
tributary peaks are expected to be the same as those in the Brisbane River at
the mouth of the creeks. Flooding along the mainstream of the Brisbane River
and along the lower tributaries was principally caused by releases from
Wivenhoe Dam (dam release flooding).”
38. This report suggests that rainfall had ceased in the local area the day before
the Applicants ‟ evacuation of the scene and two days prior to the inundation.
It notes that “backwater flooding” occurred through the Brisbane River area
and this flooding was caused by the release of water from the Wivenhoe
Dam. Volume 2 of the ICA report notes that:
“Given that rainfall across the Brisbane City [local area] had ceased by 1800
hours on Tuesday 11 January, any flooding after this time will have been
caused by water flow inundation from the Brisbane River and its tributary
creeks, it being noted that inundation along the tributaries was associated with
backwater flooding from the Brisbane River (which in turn was principally
caused by the dam release flood from Wivenhoe Dam).”
39. The weight of the information exchanged and in particular the hydrology
reports establish that most likely the inundation of the Applicants property
after the completion of the heaviest rainfall on 11 January was almost
certainly due to flooding and not stormwater run-off. Given that the
inundation of the Applicants‟ home was not until at least 12 January 2011,
the Panel is satisfied that the cause of the inundation was flood, which is
excluded from cover under the FSP‟s policy.
Determination
40. On the basis of the available information the Panel determines that the FSP
was entitled to deny the Applicants‟ claim.