Water inundation contents claim declined as flood under policy exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-01-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured couple's home contents were damaged by water inundation in January 2011 and the FSP declined the claim as flood. AFCA found the property was inundated by Brisbane River overflow, the flood exclusion applied, and there was no misrepresentation or s35 breach.

Hydrology evidence shows riverine overflow after the evacuation, so the flood exclusion applies and the PDS and certificate of insurance clearly informed the insureds of it.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 271273 Determination Page 1 of 11 Case number: 271273 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim 24 January 2013 Background 1. The Applicants hold a listed event Home Contents Insurance Policy with the Financial Services Provider (FSP) which covers contents up to $120,000 subject to a $300 excess. The policy provides cover for damage arising from stormwater run-off but not flood. 2. On 11 January 2011, the Applicants‟ residence was inundated with water during severe weather events experienced in the region causing damage to contents. 3. The Applicants lodged a claim for damage arising from the inundation. 4. The FSP has declined the claim on the basis the damage arose from flood which is an excluded cause of loss under the policy. 5. The Applicants dispute the FSP‟s declinature on the basis that the damage arose from storm, the policy was misrepresented at the point of sale, the FSP did not comply with Section 35 of the Insurance Contracts Act 1984 (“the Act”) and the policy terms were unclear. Summary of Applicants ’ position 6. The Applicants rely on a statement by the male Applicant from which the Panel notes the following:  The Applicants held a policy with the FSP for 3 years prior to moving to Queensland.  After moving to Queensland the Applicants investigated insurance cover with other providers. The Applicants were informed by one insurer that they would not insure the property as it was on a flood plain. As a result the female Applicant checked with the FSP to ensure that they would still insure the property. The male Applicant understands there were no issues as the policy covered the new location.  The male Applicant states he does not recall receiving a PDS after this call or previously whilst in Sydney. Determination Case No: 271273 Determination Page 2 of 11  The male Applicant does not specifically recall his discussion with the female Applicant when the policy was first incepted, however, he does recall his discussion with her about getting insurance in Brisbane and this was that they were covered for all contingencies and that they had full comprehensive insurance. However, they did not take out any burn out cover.  Two weeks prior to the incident the Applicants had a blocked PVC drain pipe 100-150mm in diameter. They were drains for the backyard and had grates on the top. These exited out the front of the house and into the gutter on the road. There was a drain right out the front of the house, and a number of others located around the edges of their property. The drains had been blocked over a week or two leading up to the floods. Although this was reported to the Real Estate Agent, the drains were not unblocked. The drains overflowed with stormwater and caused the initial damage to the property.  On Monday 10 January 2011, the male Applicant started to notice things were „a bit off‟. On Tuesday 11 January 2011, the male Applicant spoke with neighbours at The Corso and they said they were moving as water was coming. The Applicants then went back and moved things to the top story – and in the end the water did not flood upstairs. We were able to move product from his business and also key assets such as couches.  The Applicants left late Tuesday 11 January 2011 and at this stage there was no water in the house. The male Applicant went back to the house Wednesday morning at approximately 9am and observed the house from about 150m distance. He judges the peak inundation at about 1 meter. 7. The Applicants also rely on a Statutory Declaration by the female Applicant from which the Panel notes the following:  When the Applicants changed over their policy to the new Queensland address the female Applicant asked if the FSP covered their location because other insurers did not. The female Applicant did not specifically mention that the insured property location was in a flood plain, as she presumed that if the event of flooding prevented an offer of cover then the FSP would have stated so. The FSP confirmed it would cover a property in that particular location.  The female Applicant believed they were transferring the policy from Sydney to Brisbane. Further that the FSP would have advised of any special conditions, particularly in regard to flood. If the female Applicant had known flood was not covered or only available at extra cost, then she would have obtained the extra level of coverage or obtained alternative insurance.  The female Applicant notes the direct debit continued but the monthly amount changed from $94 to $128. The female Applicant notes part of this was due to the increased allowance for furniture. Case No: 271273 Determination Page 3 of 11 8. The Applicants have enclosed copy of stormwater network maps which indicate two stormwater gully pits at the front of the insured property. Further mapping identifies stormwater maintenance holes surrounding the property. 9. The Applicants contend that the FSP failed to adequately inform and draw their attention to the shortcomings of the policy or the unsuitability of the product to their needs. Further, the FSP and its banking agent had a duty to alert them to the absolute inadequacy of the policy for their needs. The Applicants submit this was a breach of the FSP‟s duty of good faith under section 13 of the Act. 10. The Applicants state that the employee at the bank which sold the policy misrepresented the policy and that they relied on the misrepresentation to their detriment. This detriment suffered is that the Applicants would not have been induced to change insurers by the agent‟s misrepresentation and the property would have been covered for the January 2011 event. The fact that the Applicants may have received a PDS after this misrepresentation about the nature of the cover was made, cannot cure the misrepresentation. 11. The Applicants never received a PDS and accordingly have not been notified of the flood exclusion under section 35 of the Act. Accordingly, the policy should revert to the standard prescribed cover which provides indemnity for flood. The Applicants contend their recollection should be preferred over that of the FSP‟s mail-house evidence. The female Applicant further sought specific information regarding coverage at the new insured location and the FSP failed to inform her of the exclusion for flood. 12. Even had the PDS been received, the provision of the PDS would be insufficient as the PDS is not worded in a manner which would properly inform. In particular the policy would not inform a consumer what constitutes covered events of rain and stormwater damage as opposed to flood damage. Further, the Applicants submit that the terms regarding water damage constitute „unusual terms‟ and the FSP should reconsider the declinature given the derogation of terms. 13. The Applicant notes that in certain circumstances, merely providing the policy document may not be enough to clearly inform a consumer of the relevant provisions, such as where there is inadequate attention drawn to certain provisions. An insurer may be required to do more than merely provide the policy document to discharge its obligations under section 35 of the Act:  If the document provisions are complex and confusing; or  Where the language is unclear and ambiguous and the document is set out in a manner which a person of average intelligence and educations is likely to have difficulty finding and understanding. 14. Alternatively, the Applicants submit the PDS provides cover for bursting, leaking, discharging or overflowing from a fixed pipe. 15. Fixed pipes are not defined in the policy which means the ordinary and plain English meaning should be applied in the context of a residential insurance policy. The Applicant submits that this would mean: Case No: 271273 Determination Page 4 of 11 a. The pipes and drains which take waste water away from a residential property and a residential suburb; b. The pipes and drains which take sewerage and other waste away from a residential property or residential area or suburb; or c. The pipes and drains which take stormwater, rainwater and its run-off away from a residential property or residential area or suburb. 16. The Applicant contends that a stormwater drain is a fixed pipe which takes stormwater, rainwater or run-off away from the area where the insured property is located. The property was likely damaged by the stormwater discharging from this drain. 17. The Applicants‟ property had blocked drains in the backyard in the week leading up to the inundation. It is the Applicants‟ submission that the water coming out of these fixed pipes caused damage to the property before any water from the Brisbane River affected it. Summary of FSP’s position 18. The FSP relies on the following policy terms and conditions: “Words with special meanings ... Flood means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. Note: this policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents. ... Rainwater means rain falling naturally from the sky onto the buildings and/or ground. ... Run-off means rainwater that has collected or has flowed across normally dry ground or has overflowed from swimming pools or spas. ... Storm means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. ... Insured events we will pay ... 9. Storm, rainwater, run-off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. Case No: 271273 Determination Page 5 of 11 ... We will not pay for loss or damage: a. caused by: - flood; or - flood water combined with run-off and/or rainwater. ... When we will not pay a claim under your policy ... 2. Unless we state differently in your policy, we will not pay for: a. flood as defined on page 5; b. any loss or damage which is not caused directly by one of the insured events.” 19. The FSP has enclosed its claim record of the incident which states the following: “Stor m – water entered lower level of home” 20. The FSP relies on its assessor‟s report dated 21 January 2011 from which the Panel notes the following:  The property is a two storey dwelling on concrete stumps.  The habitable floor level is 300mm above ground and the ground level of the house is higher than street level.  The date and time of the heaviest rainfall is unknown due to the evacuation of the property.  The date and time of the inundation or direction the water came from is unknown.  The peak of the water inside the house was 2.5m whilst the peak of the water in the yard was 3m. The water inside the property was dirty. 21. The FSP relies on its policy documentation and mail house records from which the Panel notes the following:  The dates on the policy indicate the policy commenced in 2008 and was renewed annually. There appears to also be additional communication sent to the Applicant around 22-23 November 2010.  The FSP has reproduced the original policy schedule together with the later renewals it states were sent by the mail house. Each schedule has been attached to a document indicating the data stream in which it was sent.  The data streams indicate that the original policy was sent with a new business pack only on 20 July 2008. There were no exceptions reported with this particular mail out. Case No: 271273 Determination Page 6 of 11  The 2009 and 2010 renewals are sent but no PDS is forwarded. The data streams indicate no mail exceptions for this policy number occurs.  The Panel notes the last forwarded document to the Queensland address amending the policy to cover the new address. This document is forwarded on 23 November 2010 and is effective from 22 October 2010. The data indicates that no exceptions were listed for this policy number and no PDS was sent with this endorsement of the policy. 22. Additional documentation provided suggests the policy was first incepted by way of telephone call. No telephone recordings were made until 2009. 23. The mapping provided by the FSP indicates the Applicants‟ property would be within the flood extent of the Brisbane River. 24. The FSP relies on a hydrology report dated 4 July 2011 from “W”. The Panel notes the following from this report:  The peak rainfall intensity of 18.5mm/hr was recorded at 10.30am on Tuesday 11 January 2011. The peak stormwater runoff from the surrounding catchment area would have occurred within 1 hour of peak rainfall. No rainfall was recorded after 11.30pm on Tuesday 11 January 2011. The recorded rainfalls are not particularly severe for short durations.  The property is located 220m from the Brisbane River. The Brisbane City Council Floodwise report (enclosed) states the ground levels at the property range from 4.4mAHD to 5.8mAHD with a 100 year ARI flood level of 6.7mAHD. The peak level during the January event at the property was estimated to be 7.8mAHD.  Ground contours in the vicinity of the property indicate that the floor level of the house is approximately 4.8mAHD. The interpolated river level hydrograph indicates that river levels would have first inundated the ground floor level of the subject property at about 12.00am on Wednesday 12 January 2011.  The subject property was not inundated above floor level when the Applicants left the premises at 5.30pm on 11 January. Accordingly local stormwater runoff could not have inundated the property above floor level.  The inundation of the property above floor level was caused by floodwaters from the Brisbane River. 25. The FSP has reviewed all available material and submits it discharged its obligations under section 69 & 77 of the Act by forwarding the PDS to the Applicants‟ relevant postal address in 2008. The FSP further notes the mail house data confirms the documentation was sent and lodged with Australia Post on 23 July 2008. The Applicants‟ policy does not feature on the exception report which means that it was successfully lodged, printed and mailed to the notified address at the time of the 2008 policy inception. 26. The renewal notices were also duly forwarded to the Applicants‟ notified address and the schedule notifies the Applicants they could request a PDS if required. Case No: 271273 Determination Page 7 of 11 27. The policy was amended on 22 November 2010 due to a change of address. There was no change of cover during this transaction and the terms and conditions of the policy remained the same as what they were prior to the endorsement. 28. The Applicants had the onus of ensuring the policy was suitable for their needs. The new business packs and policy schedules encourage the Applicants to read the PDS. 29. The PDS definition of flood is clear and confirms the policy does not cover this event. The flood definition together with the flood exclusions listed at pages 19 & 44 of the PDS confirm that flood is excluded. 30. In addition the FSP submits that each of its Certificates of Insurance which are sent to the Applicants at each renewal contains the statement “Please Note: Flood is not covered by this policy”. 31. The FSP contends that the hydrological evidence conclusively establishes that the Applicants‟ property was inundated by flood which is an excluded event under its policy. The FSP was entitled to decli ne the claim. Issues 32. Whether the FSP misrepresented the policy at inception. 33. Whether the FSP breached its duty of good faith. 34. Whether the FSP has met its obligations under Section 35 of the Act. 35. Whether the FSP was entitled to decline the Applicant‟s clai m for damage arising from water inundation. Reasons for decision 36. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 37. There has been a full exchange of material between the parties and each party has had the opportunity to respond to the issues raised in the material. 38. There are four discrete issues (outlined above) which will be dealt with separately below. Case No: 271273 Determination Page 8 of 11 Whether the FSP misrepresented the policy at inception 39. The Applicants have alleged misrepresentation on the basis the FSP represented that it would cover the Applicants “for the same type of things” as their old policy. Further, that the Applicants were not informed when they changed the policy over that the home would not be covered for flood even though other insurers had declined cover on the basis the home was in a flood plain. 40. The Applicants have not pointed to a specific representation of cover that is in fact a misrepresentation of cover. The Panel is familiar with policies referred to and notes that in a general sense the policies do provide the same type of covers in that they are general domestic property policies readily available in the market and provide similar type covers for a similar range of customers. However each policy contains some differences in their terms and exclusions. 41. The Panel has reviewed the facts as provided and does not consider that such a general statement is reasonably capable of inducing the Applicants to adopt a specific expectation that flood would be covered. The statement is not properly categorised as a misrepresentation that the policy would cover flood, but could be reasonably considered as a statement that the policies were broadly similar. 42. Similarly, when enquiring whether the policy would cover the new address the Applicants did not specifically raise the event of flood or make specific enquiry regarding this type of coverage. The Applicants solely asked whether the property could be covered at that location and the FSP confirmed it was. There is no suggestion that the policy would not respond to insured events at this address other than where specifically excluded. Accordingly the Panel does not consider such a statement a misrepresentation. The Applicants made a general enquiry and received a general response. Whether the FSP breached its duty of good faith 43. The Applicants have alleged the FSP breached its duty of utmost good faith by failing to ensure the policy provided adequate coverage or was suitable to their needs. 44. There is no legal principle that supports the Applicants‟ argument that an insurer‟s duty of utmost good faith extends to enquiring and ensuring its policy is appropriate to the insured‟s needs. Such a duty is generally associated with insurance brokers or other authorised parties where case law makes it clear these professionals have a duty to ensure the policy they procure is suitable to their client‟s needs. 45. Further the FSP‟s policy:  Is a standard home insurance policy that appears to be available to the general public as opposed to being tailored to the Appli cants‟ needs, and Case No: 271273 Determination Page 9 of 11  Had a 21 day cooling off period which provided the Applicants ample opportunity to review the contract and obtain advice on it to ensure it was suitable to their needs. 46. Given this, the Panel does not accept the FSP breached its duty of utmost good faith with respect to offering its standard home insurance policy to the Applicants. Whether the FSP has met its obligations under Section 35 of the Act 47. There are two claimed breaches of Section 35 of the Act, being the failure to provide a PDS and the PDS fails to clearly inform of the flood exclusion. The Panel will deal with each in turn. Whether provision of a PDS occurred 48. First, the Panel have reviewed the Applicants‟ statements together with the mail house data. 49. The evidence from the male Applicant is that he “does not recall receiving a PDS”. The female Applicant does not actually state that the PDS was not received. Further, she makes reference to the renewals being „packed‟ which suggests receipt of some insurance material. The female Ap plicant‟s statement however lacks specificity in relation to the original policy inception and PDS. 50. In contrast the FSP has provided mail house data demonstrating the original policy schedule, PDS and „welcome pack‟ were forwarded to the notified postal address. Further, the Applicants have not denied receiving the Certificates of Insurance (COI) at renewal, which also noted that flood was not covered. 51. Based on the evidence before it, the Panel accepts the FSP forwarded the policy documentation in the postal mail in accordance with sections 69 & 77 of the Act. Whether the PDS clearly informed of the flood exclusion 52. The Panel has examined the FSP‟s PDS and Policy document. The document is lengthy containing 59 pages. A “Table of Contents” is found on page 1 . Set out below the heading “Table of Contents” are a number of emboldened subheadings each with a sequence of headings relevant to that subheading. A similar index is found for the cover provided such as “if you have contents cover”. One such subheading is titled “Insured events we will pay” followed by a range of specified events. Included in the range of specified events is the event “Storm, rainwater or run - off” with the page number indicating where this event is found. The Insured event “Storm, rainwa ter or run- off” as expressed in the PDS has been included earlier in this determination. Further, the index has a subheading in bold type “When we will not pay a claim under your policy”. Included at point 2 in this section is the wording which excludes flood as defined and refers to the page number where the definition is found. Case No: 271273 Determination Page 10 of 11 53. A fair reading of section 35 requires the relevant exclusions and limitations to be in clear and unambiguous language such that a person of average education and intelligence would have little difficulty in finding and understanding if they read the policy. Given the policy is clearly indexed, the relevant exclusion identified and included in the “COI”, t he Panel accepts that the Applicants would have had little difficulty in finding and understanding the nature of the relevant exclusions if they had read the policy and the Certificate of Insurance. Accordingly, the Panel is satisfied the FSP has met its obligation under Section 35 of the Act to clearly inform of the relevant exclusions and limitations. Whether the FSP was entitled to decline the Applicant’s claim for damage arising from water inundation 54. The Applicants have provided submissions that the drainage systems on the property were blocked and it was the rainfall unable to drain away that first inundated the property. However, as of the time of evacuating the property at 5.30pm on 11 January 2011 the property was not inundated. 55. The hydrologist has noted that the subject property was not inundated above floor level when the Applicants left the premises at 5.30pm and concluded therefore that local stormwater runoff could not have inundated the property above floor level, as the rainfalls were not particularly severe and the floor level of the home is approximately 4.8mAHD. 56. The Panel has considered the rainfall data, in particular the peak rainfall intensity of 18.5mm/hr recorded at 10.30am on 11 January 2011. The Panel notes that the rainfall run-off would usually be expected to have peaked within 1 hour of the rainfall. Furthermore, the rainfall substantially reduced after approximately 3-4pm that day. 57. Given the rainfall to 3-4pm did not cause inundation by the time the Applicants evacuated at 5.30pm, the Panel considered it unlikely that the subsequent rainfall could have inundated the property above floor level. 58. The river data indicates the level of the Brisbane River rose steeply after 3.00 - 4.00pm on 11 January 2011 but did not reach a level capable of inundating the property until 12.00am on 12 January. 59. The evidence provided by the hydrologist that the property was inundated by riverine flooding appears consistent with the limited eye witness evidence available that there was no inundation of the property at 5.30pm on 11 January 2011. The Panel is satisfied that most likely the initial inundation of the property above floor height was due to flood. 60. T he Panel has also considered the Applicants‟ contention that water from their drains has first inundated the property. The Applicants have stated that the drains were overflowing in the week prior to the loss. The male Applicant states that the blocked drains overflowed with stormwater and caused the initial damage. Case No: 271273 Determination Page 11 of 11 61. However the Applicants have not provided any evidence in support of their contention. The Applicants have not said when this drain inundation occurred, nor how or where the overflow may have entered the property. Neither have they provided any eyewitness statements concerning this. 62. Given the floor level of the house is reported to be some 300mm above the surrounding ground, and the surrounding ground is higher than the street level, there is no compelling evidence that overflow from the drains could have entered the property. 63. Based on all of the evidence available the Panel is of the view that on the balance of probabilities the property was inundated by water overflowing from the Brisbane River. Such water is properly characterised as flood which is excluded under the policy exclusion of flood. Determination 64. On the basis of the available information the Panel determines the FSP did not misrepresent the policy at inception. 65. On the basis of the available information the Panel determines the FSP did not breach its duty of good faith. 66. On the basis of the available evidence the Panel determines the FSP has met its obligations under Section 35 of the Act. 67. On the basis of the available evidence the FSP was entitled to decline the Applicant‟s claim for damage arising from water inundation . Case No: «reference_id» Determination Page 1 of 1