Refusal to advance refinance funds under variation letter; facility termination and break costs; incorrect fees
Text of the determination
Case No: 270795 Determination Page 1 of 8
Case number: 270795
Credit - Business Finance - Commercial bills - Charges - Incorrect fees/ costs
Credit - Business Finance - Commercial bills - Financial Difficulty - Decline of
Financial Difficulty Request
Credit - Business Finance - Commercial bills - FSP Decision -
Maladministration in loan management
Credit - Business Finance - Commercial bills - Instructions - Failure to follow
instructions/agreement
31 March 2014
Background
1. This dispute concerns whether:
the Financial Services Provider (FSP) misled the Applicants about
what amount it would advance, and the terms on which it would make
an advance, under a letter of variation;
the Applicants ’ facili ties were in default and the FSP was entitled to
terminate them; and
the FSP met its obligations to the Applicants as customers
experiencing financial difficulty.
Conclusions in Recommendation
2. The case manager delivered a Recommendation dated 16 December 2013 on
the issues in dispute. The Recommendation was in favour of the FSP and I
attach a copy of the Recommendation to my Determination. I have adopted
the terminology and definitions used in the Recommendation in my
Determination.
3. The case manager concluded i n the Recommendation that:
The FSP did not mislead the Applicants about the amount it would
advance to them under the letter of variation or the conditions upon
which it would do so. Since the Applicants failed to satisfy one of the
conditions set out in the letter of variation, the FSP was entitled to
refuse to advance the funds as stated in the letter of variation;
Determination
Case No: 270795 Determination Page 2 of 8
It was not established that the Applicants were charged an
establishment fee as contemplated by the letter of variation, and the 30
November 2009 charge to which the Applicants referred was a fee in
relation to a different account and an unrelated transaction;
The FSP incorrectly increased the fees applied to bill facility 2 between
29 January 2010 and 28 July 2010 and ought, as it had offered, to
refund $13,479.02 to the Applicants. The (incorrect) charging of these
fees did not obligate the FSP to advance funds in accordance with the
letter of variation;
The Applicants’ facilities were in default and the FSP was entitled
under the contract terms to terminate the facilities and, in particular, to
charge break costs of $72,194 upon the termination of bill facility 2;
The FSP met its obligations to the Applicants as customers in financial
difficulty; and
Apart from refunding fees of $13,479.02 that it overcharged to bill
facility 2, the FSP is not required to compensate the Applicants in
relation to the matters the subject of the dispute.
4. The FSP accepted the Recommendation but it was rejected by the Applicants.
Further submissions
5. After the Recommendation was rejected, the Applicants ’ representatives
made further submissions that can be summarised as follows:
The case manager did not state what type of contractual term the
Applicants ’ obligation to confirm that all statutory payments (that is,
Australian Taxation Office obligations) are up to date and not under
arrangement, comprised. However, it seems that the case manager
wrongly concluded it was a condition or fundamental term of the
variation letter, and in reaching this conclusion, incorrectly relied on
documents which post-dated the execution of the variation letter;
The FSP had an agreement with the Applicants that it would pay
registration fees associated with certain transactions. In breach of that
agreement, on 30 November 2009, the FSP debited $4,393.60 for
registration fees to an account held by another company in the
Applicants ’ group. The $4,393.60 represents money belonging to the
Applicants which could have been applied to the $5,000 Establishment
Fee due under the variation letter. In these circumstances, the
Applicants “have substantially complied with the requirement in the
Variation to pay the Establishment Fee” and the FSP ought to comply
with its obligations under the variation letter;
The General Conditions do not form part of the variation and the FSP
was accordingly not entitled to purport to rely on them to conclude that
Case No: 270795 Determination Page 3 of 8
the Applicants were in default of their facilities and to thereafter
terminate the facilities;
In particular, the Applicants met the terms of various letters of demand
the FSP sent and remedied the alleged defaults from time to time and
there was therefore no default upon which the FSP could rely when it
terminated the facilities. Further, if facilities were overdrawn, this arose
from the FSP providing incorrect, misleading and deceptive information
about the status of the accounts and the amounts due. Had the FSP
given them the correct information, the Applicants could have made the
appropriate deposits to the correct accounts and avoided the
terminations and all that flowed from them, including the imposition of
break costs of $72,194; and
The FSP behaved in a way to suggest it was bound by the variation
letter from 11 January 2010. This included taking steps to increase fees
on the facilities as provided for in the variation letter. Given these acts
of part performance, the FSP was obliged to meet its obligations under
the variation letter, including providing funds to the Applicants in
accordance with the variation letter. In failing to do so, it breached the
variation letter and is required to compensate the Applicants for their
loss.
6. The FSP responded to the Applicants’ representatives’ submissions, and I
refer to this in my analysis below.
Ombudsman’s consideration
7. I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken
into account all the material submitted by the parties, both before and after the
Recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties.
8. I have carefully considered the case manager’s Recommendation, together
with the parties’ further submissions.
9. I am satisfied that the case manager’s Recommendation con tains an accurate
summary of the background to this dispute, the parties’ positions, the issues
to be determined, any applicable paragraphs of the Terms of Reference and
any relevant law.
The variation letter and the General Conditions
10. Having reviewed the available information, I am satisfied that the Applicants
were required by the variation letter to provide “confirmation [that] all statutory
payments (ie ATO obligations) are up to date and not under arrangement” a nd
since they did not do so, the FSP was not required to meet its obligations
under the variation.
Case No: 270795 Determination Page 4 of 8
11. The Applicants’ representatives have provided detailed submissions a s to why
the requirement for confirmation about their clients’ statutory (ATO)
obligations comprises a warranty only, and not a condition or fundamental
term, going to the root of the variation. The Applicants say that their breach of
this warranty may have entitled the FSP to sue for damages, but did “not
entitle the [FSP] to terminate the variation, or to cease discharging its
obligations under the variation”.
12. I agree with the FSP’s submissions that the categorisation of the Applicants’
obligation to provide confirmation of their statutory payments as a condition or
a fundamental term on the one hand, or a warranty on the other, has no
bearing on the FSP’s contractual entitlement to refuse to provide the
additional funds or to take the other steps contemplated by the variation letter.
This is because the FSP has not sought to terminate or treat as terminated
the contract arising from the Applicants’ acceptance of the variation letter on
the basis of their failure to provide confirmation of the statutory payments, or,
indeed, at all.
13. I am satisfied that the FSP treated the Applicants’ failure to comply with the
obligation under the variation letter to provide confirmation of their statutory
payments as comprising a “Default Event” under clause D2 of the General
Conditions. Under clause D3 of the General Conditions, this Default Event
relieved the FSP of the obligation to provide the additional funds and to attend
to the other steps contemplated by the variation letter.
14. This of course raises the issue of whether the General Conditions apply to the
contract that arose when the Applicants accepted the variation letter. The
Applicants say that the General Conditions do not form part of the variation for
the following reasons:
The variation letter dated 22 December 2009 was first presented to Mr
C at the meeting on 11 January 2010 when the documents relating to
the variation were executed. None of the variation letter or the
attachments to that letter were provided prior to the meeting; and
None of Mr C or the other directors of the group of which the
Applicants are a part were provided with the General Conditions prior
to executing the documents relating to the variation. The General
Conditions were provided after the documents had been executed and
they therefore do not form part of the variation.
15. In response to the Applicants ’ su bmissions, the FSP says that its officer, Mr F,
who conducted the meeting at which the variation documents were executed,
is no longer in its employ and so it is unable to obtain a statement of his
recollection of the matter. However, having reviewed its file, I am satisfied
that the FSP holds several acknowledgments by the directors of the
Applicants that they had previously received, read, and understood the
General Conditions booklet. Importantly, one of those acknowledgments was
contained in the Business Finance Agreement dated 9 Nove mber 2006,
pursuant to which the facilities the subject of the variation were originally
provided. There is a similar acknowledgement on pages 11 -12 of the variation
Case No: 270795 Determination Page 5 of 8
letter in the following terms: “Each Borrower ... acknowledges receipt of, has
read and understood the previously provided [General Conditions ] Booklet...”.
16. Since the Applicants have admitted executing the documents relevant to the
variation, and even in the absence of the FSP being able to locate a signed
copy of the variation letter, I am nonetheless satisfied, on balance, that at the
time of execution of the variation, each of the Applicants expressly
acknowledged receipt of the General Conditions booklet. In all the
circumstances, I am satisfied the General Conditions were incorporated into
the variation contract.
17. I note that in rejecting the Recommendation, the Applicants’ representative s
said, twice, in their letter dated 15 January 2014 that “all statutory payments
to be made by the Applicants have been up to date and not under any
arr angements”. The Applicants do not say when the statutory payments were
brought up to date, or when they were otherwise released from, or satisfied,
any arrangement. It is clear from the Applicants ’ email overtures to the FSP
that as late as 30 November 2010, more than ten months after execution of
the variation documents in early January 2010, the Applicants had still not
demonstrated to the FSP that their ATO obligations were up to date. In these
circumstances, I attach no significance to the Applicants ’ apparent later
rectification of matters with the ATO.
18. The Applicants criticise the Recommendation on the basis that the case
manager ignored their submissions in relation to the construction of the letters
of demand upon which the FSP relied to terminate the facilities. They say that
on their correct interpretation of these letters, the Applicants had satisfied the
demands and there was no default at the time the FSP purported to terminate
the facilities. The FSP rejects this on the basis that one or more of the
Applicants’ accounts – whether held in their own names, or accounts in
respect of which they were liable as guarantors – was in default at all relevant
times and it was entitled to rely on this to terminate the facilities.
19. Having reviewed the statements of account, and even allowing for the errors
in the balances of the unpaid bills accounts the FSP conceded in its letter
dated 7 February 2014 which FOS copied to the Applicants, I am satisfied that
at all relevant times, the Applicants had, under D2 of the General Conditions,
committed a Default Event either on their own accounts, or as guarantors of
other group- members’ accounts, and the FSP was entitled to refuse to
advance the additional funds or perform other steps under the variation, and
indeed, to terminate the facilities. In reaching this view, I have had regard to
the history of the Applicants’ facilities both before, and after, the execution of
the variation documents and to the fact that the restructure contemplated by
the variation letter was intended to bring the Applicants’ irregular accounts
into order.
The $4,393.60 “fee for registration of documentation”
20. During the case manager’s investigation, the Applicants’ representative s
referred to a $4,393.60 charge de scribed as “Fee for Registration of
Documentation” debited to G Pty Ltd’s business overdraft account on 30
Case No: 270795 Determination Page 6 of 8
November 2009 and said that their clients had instructed this represented the
Establishment Fee for the variation. They said that that the debit on this date
was consistent with Mr F’s statement to Mr C in late November 2009 that the
finance the subject of the variation had been approved.
21. During the case manager’s investigation, the FSP said the charge comprised
fees payable for the registration of documents at the titles office and was not
an establishment fee. Although the fees were in fact payable in relation to
another company in the Applicants ’ group of companies, pursuant to an
internal arrangement within the group, the fees were posted to G Pt y Ltd’s
business cheque account, and had no bearing on or relationship to the
variation.
22. In rejecting the Recommendation, the Applicant s’ representatives said:
In 2006, the Applicants settled on two property transactions in
Queensland. The FSP lost the documents that were to be lodged for
registration and it was not until 2009 that it lodged the documents;
In March 2009, the FSP agreed to pay all the registration fees on the
transactions;
In light of this, the FSP was not entitled to charge the $4,393.60 fees
debited to G Pty Ltd’s business overdraft account on 30 November
2009. This amount therefore belongs to the Applicants which was
available to the FSP to pay most of the Establishment Fee under the
variation letter; and
The Applicants have accordingly substantially complied with the
requirement in the variation letter to pay the Establishment Fee.
23. In response, the FSP said:
It agreed to bear the professional costs and disbursements associated
with creating new transaction and transfer documents, and to pay titles
office fees – such as delay fees – that went beyond fees for which the
group members would ordinarily have been responsible;
It did not agree to pay costs and fees for which the group members
would have been responsible in any event, had the documents been
lodged with the titles office within a reasonable time of the transactions
occurring;
The group members would always have been liable for the $4,393.60
fees debited to the G Pty Ltd business cheque account on 30
November 2009 and that remains the position; and
The fees are in no way connected with the variation letter or the
Establishment Fee payable thereunder.
Case No: 270795 Determination Page 7 of 8
24. Since it was not an issue raised in this dispute, I do not reach a conclusion in
relation to the FSP’s entitlement to charge the disputed registration fees on 30
November 2009. I am satisfied, however, that the fees have nothing to do with
the variation and re ject the argument that their charging to G Pty Ltd’s
business overdraft account constitutes “substantial compliance” with the
requirement in the variation letter to pay the Establishment Fee. The position
remains that the Applicants did not provide “confir mation [that] all statutory
payments (ie ATO obligations ) are up to date and not under arrangement” and
the FSP was not therefore not required to provide the additional funds or
attend to the other steps contemplated by the variation letter.
The alleged substantial acts of performance
25. The Applicants say that once they had signed the documents comprising the
variation on 11 January 2010, the FSP implemented changes including
changing line fees, acceptance fees, yield rates, and changing the maturity
date for a bill facility. The FSP thereby demonstrated it considered itself
bound by the variation and required the Applicants to comply with their
obligation to pay additional fees, and it, too, should have met its obligations
under the variation by advancing funds to the Applicants as per the variation.
26. The Applicants say these acts of part performance by the FSP indicate that it
did not consider their obligation to provide confirmation that their statutory
payments were up to date represented a condition p recedent to the variation
taking effect, or even a condition or fundamental term of the variation, and so,
the FSP was obliged to advance the funds in accordance with the variation.
27. In response, the FSP says the alleged acts of part performance in part relate
to another facility which is not the subject of this dispute , and in relation to the
facility (bill facility 1) which was a subject of the dispute, the change to line fee
contemplated by the variation did not occur. The FSP says that it imposed a
line fee, and increased the acceptance fee, on bill facility 2 and is unable to
identify the bases on which it did so. It offered to refund the charges
attributable to these changes to the Applicants in June 2013, but they did not
accept its offer. It did not impose the line fee, or increase the acceptance fee,
on bill facility 2 in part performance of the variation, since the variation in fact
provided for bill facility 2 to be terminated.
28. Having reviewed the available information, I am unable to conclude that there
was any change to the facilities the subject of the variation letter which
reflected an act of “part performance” by the FSP.
29. I am not, however, satisfied that the refund of $13,479.02 which the FSP
offered to the Applicants on 13 June 2013 in respect of the line fee, and the
acceptance fee increase, imposed under bill facility 2 from 29 January to 28
July 2010 would properly compensate the Applicants for their loss associated
with these charges.
30. My legal counsel requested the FSP to calculate the interest it would be
appropriate to pay the Applicants to compensate them for interest accrued on
bill facility 2 from when the fees were incorrectly debited to the facility until the
Case No: 270795 Determination Page 8 of 8
facility was refinanced on 16 March 2012. My legal counsel also requested
the FSP to calculate what compensation it considers would be appropriate for
interest incurred since then on the refinanced (increased) bill facility 2.
31. In response, the FSP suggested that the appropriate compensation payable
to the Applicants as at 21 March 2014 is $25,943.44, comprising:
a. $13,479.02 on account of the unexplained increase in the acceptance
fee and the unexplained implementation of the line fee on bill facility 2
for the period 29 January to 28 July 2010; plus
b. $12,464.42 for interest charged on the fees referred to at subparagraph
a, above, to 21 March 2014.
I attach a copy of the FSP’s assumptions, and calculations, in that regard.
32. I consider that the FSP’s assumptions and calculations are sound, and in all
the circumstances, require the FSP to compensate the Applicants for the
increase to the charges on bill facility 2 in the first half of 2010 by paying them
$26,000. I have “rounded up” the FSP’s figure slightly to account for interest
accrued since 21 March 2014. If they accept this Determination, I require the
FSP, within 14 days of notification of such acceptance, to pay the $26,000
into an account the Applicants nominate.
33. I have considered the further information provided by the parties, but it does
not change my view that, save for the amount of compensation due to the
Applicants for the increased charges to bill facility 2, the case manager’s
Recommendation was correct.
Determination
34. I determine in favour of the FSP in relation to the claims made by the
Applicants, but require the FSP to pay $26,000 to the Applicants to
compensate them for increased charges made to bill facility 2 between 29
January and 28 July 2010.
Case No: 270795 Recommendation Page 1 of 12
Case number: 270795
Credit - Business Finance - Commercial bills - Charges - Incorrect fees/ costs
Credit - Business Finance - Commercial bills - Instructions - Failure to follow
instructions/agreement
16 December 2013
Background
1. The dispute is brought by Mr C as director of the companies G Pty Ltd and
BL Pty Ltd for his family business and family trusts. The companies owned
and operated commercial and residential property in QLD. They had
accounts and facilities with the Financial Services Provider (FSP) dating
back to 2001.
2. In December 2009 the Applicants had existing commercial bill facilities with
the FSP and sought to refinance some of the existing loan facilities.
3. The FSP’s letter of variation dated 22 December 2009 (the letter of variation)
provided for the following if it proceeded:
Existing commercial bill facility (bill facility 1) for $1,210,000 to
continue.
Matured commercial bill facility (bill facility 2) for $1,300,000 to be
increased to $1,676,000.
Repay the business overdraft (the overdraft) which had a debit
balance at that time of $251,312.
4. In April 201 0, the Applicants’ overdraft was in default. Over the next four
months, the Applicants’ other business facilities defaulted and they were
required to pay the loans down to rectify the defaults.
5. The Applicants have now refinanced their facilities to another lender and
there is no outstanding loan to the FSP.
6. This dispute is about whether the parties were bound by the letter of
variation.
Recommendation
Case No: 270795 Determination Page 2 of 12
Summary of Applicants’ p osition
7. In December 2009, based on the letter of variation which they accepted, they
entered into a refinance agreement with the FSP for some of their existing
loan facilities. They intended to refinance two commercial bill facilities (bill
facilities 1 & 2), one which had recently matured and the other to mature
shortly. They also required an additional $376,000 to clear the overdraft.
8. Despite signing the letter of variation on 11 January 2010, the additional
$376,000 was not provided to clear the overdraft. They say that the terms of
the letter of variation were not clear and they did not understand that if they
did not comply with the conditions, then the additional funds would not be
advanced to them. In addition, information they failed to provide was not
subject to a condition of the letter of variation but a warranty.
9. In April 2010, they were informed by the FSP that the overdraft was in
default and it required immediate repayment. They requested six months to
sell commercial properties to clear the arrears.
10. Their commercial bill facilities defaulted due to the FSP’s errors. Further, the
F SP failed to follow the Applicants’ instructions that they had funds available
to rectify defaults.
11. Due to all the defaults which were primarily beyond their control, they paid
excessive default interest and fees on their accounts.
12. They tried to work with the FSP and managed to pay down 40% of their
facilities over a 12 month period. However, the FSP was not willing to
refinance their facilities and was unreasonable in its demands for repayment.
13. They are seeking that default interest and break costs be refunded to them.
They calculate this refund at $294,564.72.
Summary of FSP’ s position
14. By letter of variation dated 22 December 2009 it agreed to a restructure of
the Applicants’ facilities as follows:
Provide a bank bill business loan in the amount of $1,676,000 (the
business loan);
Repay the overdraft which was limited to $195,000, which as at 24
December 2009 had a debit balance of $251,312;
Continue bill facility 1 limited to $1,210,000 with an increase in the
acceptance fee and an increase in the line fee;
Repay bill facility 2 in the amount of $1,300,000 which at that time had
expired; and
Case No: 270795 Determination Page 3 of 12
Provide an amount of $124,687.15 in credit funds.
15. The letter of variation included a number of specific conditions which were to
apply to the Applicants’ facili ties. In particular, one of the specific conditions
was as follows:
“Confirmation to be provided all statutory payments (ie ATO obligations) are
up to date and not under arrangement.”
16. The letter of variation also required application of the FSP’s General
Conditions Booklet version 3 (the General Conditions), which included that
the Applicants were required to comply with the terms of the letter of
variation. The Applicants were not able to satisfy the FSP that ATO
obligations were up to date during the relevant period. The failure to provide
this confirmation constituted a Default Event under the General Conditions.
17. As the specific conditions were not complied with, the FSP was not prepared
to advance the business loan to the Applicants and the overdraft was not
able to be cleared.
18. There were a number of other defaults on the Applicants’ facilities over the
next few months. It appropriately notified the Applicants in writing of the
defaults and that loans were immediately due and payable.
19. It identified that between 29 January 2010 and 28 July 2010 it increased fees
on the Applicants’ accounts inappropriately. It calculated the fees had been
overcharged by $13,479.02 which it offered to reimburse to the Applicants.
All other fees were correctly charged in accordance with the terms and
conditions of the facilities.
Issues
20. Did the FSP mislead the Applicants about the amount it would advance to
them following the signing of the letter of variation or the conditions required
for the advance? If so, what are the consequences?
21. Did the FSP terminate the Applicants’ facilities in error or in breach of any
obligation it owed to them? If so, what are the consequences?
22. Did the FSP charge interest, fees or break costs to the Applicants’ accounts
which were not in accordance with the terms and conditions of the accounts?
If so, what are the consequences?
23. Did the FSP meet its obligations to the Applicants as customers
experiencing financial difficulty?
Case No: 270795 Determination Page 4 of 12
Reasons for Recommendation
Did the FSP mislead the Applicants about the amount it would advance to
them following the signing of the letter of variation or the conditions required
for the advance?
FOS’s approach to misleading conduct claims
24. FOS can investigate a claim that a financial services provider misled an
Applicant and caused them to suffer loss. If FOS finds that the Applicants
were misled, we will assess how much worse off they are as a result of
relying on the misrepresentation. The remedy for misleading conduct is not
to make the misrepresentation come true.
25. For the Applicants to succeed with this claim in this dispute, FOS needs to
be satisfied that:
The FSP misrepresented the funds it would advance to the Applicants
when they signed the letter of variation and the conditions upon which
it would do so; and
The Applicants relied reasonably on the FSP’s representation to their
detriment, leading to them incurring a loss.
26. FOS is not a court of law. We do not have the power to take or test
evidence on oath, or to require third parties to give evidence. When we
assess disputes, we consider available documents, the recollections of the
parties, and all relevant circumstances. We give more weight to
contemporaneous documentary information.
27. Generally speaking, FOS considers that if a person signs a document that
they know contains contractual terms and which they understand will affect
their legal relationship with a financial services provider, then the person is
legally bound by those terms. It is irrelevant whether or not the person read
the document before signing it. However, an exception to this rule is where
the person was misled into signing the document.
What do the Applicants say about the letter of variation?
28. The Applicants say that on 11 January 2010, they signed the variation
agreement to refinance their existing loan facilities. They say that certain
parts of the agreement which included new fees and charges were
implemented, but the additional funds of $376,000 were not advanced to
them in accordance with the agreement.
29. In April 2010, they then received a letter of default in relation to the overdraft.
They were surprised to receive this as they thought the overdraft would be
brought up to date and repaid with the advance of the additional funds.
30. They say that the construction of the letter of variation was unclear and it did
not entitle the FSP to refuse to vary the funding arrangements agreed to in
Case No: 270795 Determination Page 5 of 12
circumstances where the Applicants did not provide the appropriate
confirmation about their ATO obligations. They say that their failure to
provide this confirmation was only a “warranty” and not a “specific condition”
of the agreement. They completed all the other steps required for the
variation to become effective and the FSP accepted payment of an
establishment fee, indicating that the agreement was in place between the
parties.
31. The FSP also applied a new line fee of 1% and new margin rate of 2.1%,
despite not advancing the additional funds. They say they also got charged
an establishment fee of $5,000 despite the FSP failing to advance the funds.
32. The FSP’s failure to advance the funds as agreed constituted a repudiation
of the variation agreement. Therefore, the Applicants are entitled to
damages as a result of this repudiation.
What does the FSP say?
33. The FSP says that the letter of variation expressly states that the obligation
to provide confirmation that statutory payments are up to date is a “specific
condition” applying to the funds which were to be advanced to the
Applicants.
34. Further, the terms and conditions applying to the letter of variation as
contained in the General Conditions required the Applicants to comply with
each lender arrangement. Their failure to confirm that all statutory payments
were up to date amounted to a Default Event, and upon occurrence of a
Default Event, the FSP was not required to advance the funds.
35. It cannot identify the establishment fee of $5,000 being charged to the
Applicants. It also concedes that the line fee and margin rate were
increased as claimed between 29 January 2010 and 28 July 2010.
Analysis of information
The tax liabilities
36. The FSP has provided copies of its internal system note, diary notes and
lending file for the Applicants’ loan facilities. My review of the lending file
confirms that the Applicants had a commercial relationship with the FSP
dating back to 2001.
37. In 2008, additional funds were approved and advanced to the Applicants to
assist with excesses on their accounts. Further, the Applicants
acknowledged in May 2009 that they had a poor company cash position
which was a result of excessive personal drawings on their accounts. In
November 2009, the FSP indicated to the Applicants that a default letter
would shortly be issued in relation to the continual excesses on their
accounts.
38. I have reviewed the letter of variation dated 22 December 2009 but signed
by the parties on 11 January 2010. The FSP’s lending file contains entries
Case No: 270795 Determination Page 6 of 12
from November 2009 indicating that the restructure of facilities as requested
by the Applicants was only approved subject to certain conditions which
were to be included in the letter of variation. In summary, the advance of the
funds was agreed to by the FSP to regularise the Applicants’ excesses
which had been in place for some months. Therefore, the Applicants’
facilities and accounts had been out of order for some time and, despite
undertakings by the Applicants that they would bring the accounts into order,
this had not taken place. Accordingly, they required the advance of further
funds to bring their accounts into order.
39. It appears that the FSP had been quite tolerant of the excesses on the
accounts. Therefore, when it agreed to restructure the facilities it decided to
impose some conditions upon the loan increase as set out in the letter of
variation.
40. The letter of variation does include specific conditions on page 3 in a box
entitled in bold “The specific conditions applying to your Facilities have been
varied as follows “. The third paragraph clearly states:
“ Confirmation to be provided all statutory payments (ie ATO obligations) are
up to date and not under arrangement.”
41. Further, the letter of variation states in the final heading on page 9 under the
heading entitled in bold “When does this variation take effect” that;
“...these changes will become effective 30 days from the date of this letter,
provided our requirements listed under “What do I need to do before this
variation becomes effective?” have been satisfied.”
42. It is my view that the wording of the letter of variation expressly states that
the obligation to provide confirmation that the tax liabilities are up to date is a
“specific condition” of the agreement. I do not regard the conditions as
unclear.
43. The FSP’s internal diary notes indicate th at it was on notice of the
Applicants’ tax liabilities at the time of the restructure. It was on that basis
that it imposed the conditions in the letter of variation. I have reviewed
emails exchanged between the parties in the early months of 2010 following
the signing of the letter of variation in relation to the Applicants’ tax liabilities.
In March 2010, the Applicants provided some information to the FSP about
the group’s tax situation. They undertook to provide further details from their
accountant which was provided to the FSP on 24 May 2010.
44. On 25 May 2010 the FSP sent an email to Mr C following receipt of the letter
from the Applicants’ accountant. The FSP said as follows:
“I do not consider the information as a satisfactory explaining of the cu rrent
Tax position, and such provides no verification of the quantum of liability.
Please confirm if you wish to instruct your accountant to provide the Bank
with suitable information as requested by the Bank.”
Case No: 270795 Determination Page 7 of 12
45. The Applicants sent a letter to the FSP on 2 June 2010 explaining their tax
liabilities. However, they indicated that the ATO had still not resolved the
issue and the liabilities expected were still only estimates. As at 4 July 2010,
they indicated to the FSP that they were still dealing with the tax issues.
46. The FSP agreed to allow the Applicants until 18 July 2010, to provide further
information as requested. From the information provided, it appears that the
Applicants failed to provide the verification of their complete tax liabilities that
the FSP required as a condition of the refinance.
47. Therefore, the Applicants’ failure to satisfy the “specific condition” entitled the
FSP to refuse to advance the funds as stated in the letter of variation. On
the available information, I do not consider that the FSP has misled the
Applicants about the amount it would advance to them upon the signing of
the letter of variation or the conditions upon which it would do so.
The establishment fee
48. The Applicants say that they were charged an amount of $4,393.60 in
respect of “Fee for Registration of Documentation” on 30 November 2009.
They have provided a copy of a statement for the overdraft to confirm this
amount was charged to the account on 30 November 2009. They say that
this was an establishment fee as stated to be payable in the letter of
variation. Accordingly, if the FSP accepted payment of the establishment
fee it was obliged to act in accordance with the terms of the letter of
variation.
49. The FSP acknowledges that the letter of variation refers to an establishment
fee of $5,000 representing the applicable costs of the variation. It has been
unable to identify any instance of the establishment fee of $5,000 being
charged to the Applicants’ accounts. Further, it says that the amount of
$4,393.60 d ebited from the Applicants’ overdraft was payable for registration
of mortgage documentation in respect of a separate business loan account
for one of the Applicants’ company accounts and was not an establishment
fee.
50. I have reviewed the terms of the letter of variation. As it was signed by the
Applicants on 11 January 2010, it is not clear why the FSP would be entitled
to charge an establishment fee on 30 November 2009. Further, the letter of
variation refers to specific fees and charges which will be charged to the
Applicants’ accounts in accordance with the terms of the agreement. It
refers to the payment of a Deferred establishment fee which may be payable
if the Applicants closed their loan within 3 years of the opening of the
account. The fee of $5,000 would be payable if the loan was closed within 1
year of the opening of the loan account.
51. Based on all the available information it has not been established that the
amount charged to the Applicants’ account on 30 November 2009 was an
establishment fee as contemplated by the terms of the letter of variation. I
am satisfied that it was a fee in relation to a different account.
Case No: 270795 Determination Page 8 of 12
Other fees incurred
52. The Applicants also say that in accordance with the terms of the letter of
variation the FSP applied a new line fee of 1% and new margin rate of 2.1%
to its accounts, despite not advancing the increased funds. The Applicants
say that if the fees were imposed, the FSP was obliged to advance the funds
as agreed.
53. The FSP acknowledges that between 29 January 2010 and 28 July 2010 it
increased the fees to bill facility 2, but that it has been unable to identify the
basis upon which the fees were increased. Pursuant to the letter of variation
it was required to increase the fees to bill facility 1 in the event that the
conditions were met as outlined above. It has determined that the
Applicants were overcharged an amount of $13,479.02 in this respect, and
offered to refund this amount to the Applicants.
54. The Applicants refused the refund as outlined above. I co nsider that the
FSP was not entitled to charge the increased fees in accordance with the
agreement contained in the letter of variation and accordingly, it is fair and
reasonable for the FSP to refund the amount of $13,479.02 to the
Applicants.
55. However, despite the FSP charging these fees in error as outlined above, I
do not consider the charging of the fees obligated the FSP to advance the
funds in accordance with the letter of variation.
Did the FSP terminate the Applicants’ facilities in error or in breach of any
obligation it owed?
56. The Applicants say that in April 2010 they received correspondence from the
FSP informing them that the overdraft was in default and they were required
to clear the outstanding arrears immediately. This came as a surprise to
them as they thought the advance of the funds pursuant to the letter of
variation had cleared the overdraft.
57. They met with the FSP on 17 May 2010, and it was confirmed that as the
conditions for the refinancing had not been met and the funds had not been
advanced in accordance with the letter of variation, they would require a
period of six months to sell commercial property to clear the arrears.
58. The Applicants say that over the next four months the FSP continued to
default their facilities, creating Unpaid Commercial Bill accounts (the Unpaid
Commercial Bill Accounts). It inappropriately created these accounts when
they had funds to pay the required amounts and as a result they incurred
default interest on the accounts. They also say that they incurred excessive
break costs as a result.
59. They allege this conduct by the FSP resulted in further defaults and a letter
of demand that they received on 9 November 2010 required them to rectify
Case No: 270795 Determination Page 9 of 12
the defaults within 7 days. They continued to try and work with the FSP for
over 12 months, selling commercial properties to pay down the debt.
However, the FSP was not willing to refinance their loans and they
refinanced to another lender in 2012. They calculate total financial loss to be
$294,564.
What does the FSP say?
60. The FSP has confirmed that the failure to confirm that all statutory payments
were up to date and not under any arrangements resulted in the FSP not
advancing the funds to rectify the overdraft defaults. There were also other
facilities held by the Applicants which were in arrears as at 23 July 2010. It
sent a letter to the Applicants dated 23 July 2010, requiring all arrears to be
repaid immediately. It further required the defaults to be rectified prior to the
maturity dates of the bill facilities, being 20 October 2010.
61. However, as at 20 October 2010, the defaults had not been rectified and bill
facility 2 was terminated, incurring break costs of $72,194, in accordance
with the terms of the facility. It was not prepared to refund the break costs.
62. There were other instances of default which were appropriately conveyed to
the Applicants in writing. On the basis of the conduct of the accounts which
had been of concern for years and that it continued to appropriately notify
the Applicants of the defaults on their accounts, the FSP was not prepared to
refinance or restructure the Applicants’ accounts.
Analysis
63. There was a long standing business relationship between the parties and
many meetings were held with the Applicants over the course of the
relationship, in particular from 2010 onwards, to work with the Applicants to
improve their accounts. The FSP maintains that various loans were in
default, and that accordingly the Applicants’ bill facilities were terminated in
accordance with the conditions of the accounts.
64. I have reviewed the letters of demand forwarded to the Applicants from the
FSP dating from April 2010, after it was apparent that the conditions of the
letter of variation had not been met by the Applicants. I have also reviewed
the relevant General Conditions and in particular clause D2 at page 9, which
specifically states that the failure to pay any amount due under a facility
constitutes a “Default Event”. More specifically, the General Conditions
provide at page 9 :
“A Default E vent occurs if any one or more of you or anyone who gives a
Security do not pay the Lender any amount due under, or breach, any Lender
Arrangement or any Security.”
65. The FSP sent a letter of default to the Applicants dated 23 July 2010,
requiring further arrears on their accounts to be rectified immediately. The
Applicants were put on notice in this letter that the bill facilities would be
terminated if all defaults were not rectified prior to maturity on 20 October
2010.
Case No: 270795 Determination Page 10 of 12
66. I consider on the information provided that the Applicants were in default in
relation to their facilities on 23 July 2010, 30 August 2010 and later on 20
October 2010, when the bill facilities were terminated. Further, as at 23 July
2010, when the Applicants’ facilities were in default, the FSP was entitled to
reverse unpaid interest and charges to the Unpaid Commercial Bill
Accounts.
67. The FSP sent a letter of demand to the Applicants dated 2 August 2010,
demanding immediate repayment of the amounts in the Unpaid Commercial
Bill Accounts. It also required immediate repayment of the overdraft arrears
which at that time amounted to $136,053.07. It required immediate
repayment by the next maturity date for the facilities, being 30 August 2010.
68. I consider that the Applicants did not comply with the letters of demand that
they received from the FSP and rectify all outstanding arrears at any stage.
In such circumstances, the FSP was entitled to terminate their facilities in
accordance with the terms and conditions of the accounts.
Break costs
69. FOS accepts that the right to recover the costs incurred as a result of a fixed
rate loan being repaid early will be determined by the terms and conditions
of the loan contract.
70. When the bill facilities were terminated as a result of the default event, the
FSP charged a break cost of $72,194, which the Applicants say they should
not have to pay.
71. I have again reviewed the General Conditions and note that at page 5 in
paragraph B2 in a heading entitled “Break Costs” it says:
“ You promise to pay the Lender’s break costs if you have a fixed rate facility
of any type or a floating rate cash advance facility under an Agreement where
the rate is set for certain periods, and for any reason, you do not fully draw it
after having given a drawdown notice, or all or any part of the facility is or
required to be repaid or terminated during a period for which interest rates are
set. This is called a prepayment.”
72. There was no error made by the FSP in terminating their facilities and
therefore in accordance with the provision above, the FSP was entitled to
charge break costs for bill facility 1 when it was terminated.
Did the FSP charge interest, fees or charges to the Applican ts’ accounts which
were not in accordance with the terms and conditions of the accounts?
73. FOS is a dispute resolution scheme and does not provide an audit service to
Applicants. It is not FOS’s role to audit the Applicants’ accounts to
determine whether all interest, fees and charges incurred on the accounts
were appropriately charged in accordance with the terms and conditions of
the accounts.
Case No: 270795 Determination Page 11 of 12
74. The FSP has acknowledged that fees were charged to the Applicants’
accounts that were not in accordance with the terms and conditions of those
accounts, these fees being the increase in the acceptance fee and line fee
for bill facility 2. It has calculated these fees to have been an amount of
$13,479.02. As stated above, it is appropriate for the FSP to refund these
fees to the Applicants.
Financial difficulty
75. Clause 25.2 of the Code of Banking Practice states that a subscribing
financial services provider should try to assist customers to overcome any
financial difficulties they have with any credit facility. They are required to
work with their customers in this respect. The customers are also required
to co-operate and work with the financial services provider if they want
assistance to overcome their financial difficulty. The reference to customers
also includes small business customers.
76. The Applicants say that the defaults on their accounts occurred due to the
FSP’s failure to advance the funds pursuant to the letter of variation as
outlined above. Further, it asked the FSP to refinance their facilities and it
was willing to work with the FSP to achieve this. However, the Applicants
say the FSP continued to send them default notices and was not willing to
work with them to assist them in their financial difficulty.
77. In order to give genuine considerat ion to a customer’s request for assistance
(be it specifically requested or implied from the conduct of the accounts),
FOS expects that a financial services provider will first obtain information
about the customer’s financial position, and take into account the customer’s
financial circumstances when offering any form of assistance.
78. As already outlined above, the parties had been in discussions about the
status of the Applicants’ loan facilities and accounts for some time prior to
the signing of the letter of variation. The FSP was on notice that the facilities
were in arrears and as a result had issued demands upon the Applicants. I
have reviewed the FSP’s internal diary notes and it does appear that the
FSP was requesting information about the Applicant s’ financial position on a
regular basis throughout 2010 and 2011.
79. The Applicants requested that the FSP give consideration to a refinance of
their facilities in June 2011. On 30 June 2011, the FSP advised that it was
prepared to consider the Applicants’ request for refinance if they provided
financial information including Accountant prepared Financial Statements for
the group for the year ending 30 June 2011. This was requested to be
provided by 15 September 2011.
80. Despite this request the information provided was not sufficient for the FSP
to agree to a refinance, but it did give the Applicants a period of forbearance
to undertake a refinance to another financial services provider.
81. On the basis of the FSP’s attent ion to obtaining financial information about
the Applicants’ financial situation, I consider that it did work with the
Case No: 270795 Determination Page 12 of 12
Applicants to try and assist them to overcome their financial difficulties. It
also provided them with time to arrange refinance with another financial
services provider and it therefore met its obligations to assist them at that
time.
Recommendation
82. On the basis of the available information I recommend that:
The FSP did not mislead the Applicants about the amount it would
advance following the signing of the letter of variation or the conditions
upon which it would do so.
The FSP did not terminate the Applicants’ facilities in error or in breach
of any obligation it owed to the Applicants.
The FSP was entitled to charge the Applicants break costs.
The FSP has acknowledged that fees in the amount of $13,479.02
have been incorrectly charged to the Applicants’ accounts which it
should refund.
The FSP met its obligations to the Applicants as customers
experiencing financial difficulty.