Determination 270702

Denial of claim - flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home unit contents were damaged when water inundated the property in January 2011, and the FSP declined the claim as flood damage. AFCA found the loss was caused by flood, which the policy excludes, and the FSP was entitled to decline.

The FSP established the flood exclusion on the balance of probabilities because the initial inundation came from a watercourse behind the home, and a broker acting for the insured was not the FSP's agent.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 270702 Determination Page 1 of 13 Case number: 270702 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim-Exclusion/ condition 22 March 2013 Background 1. The Applicant‟s contents were insured with the Financial Services Provider (FSP) under a home insurance policy. 2. The contents of her home unit in Sinnamon Park, Queensland, were damaged as a result of water inundating her residence in January 2011, following severe weather events. 3. She lodged a claim for her loss with the FSP, who declined liability on the basis the loss was caused by flood which the policy excluded. 4. The Applicant believes she is entitled to indemnity because:  The FSP had made a misrepresentation and failed to act with utmost good faith.  Her loss was not caused by flood, but by events covered by the policy.  The policy provisions were unclear. Summary of Applicant’s position 5. The Applicant is legally represented. For ease of reference, “the Applicant” will be taken to jointly refer to the Applicant and her represe ntative. 6. Her claim should be paid because the FSP made a misrepresentation and failed to act with utmost good faith. In particular:  The FSP failed to provide her “with the best possible option” to protect her from impending and foreseeable risks.  The FSP (through its agent insurance broker) failed to inform her that the insurance she had taken out, was unsuitable or inadequate to her needs.  The FSP failed to offer her a flood option or warning.  The FSP‟s “agent” (the insurance broker) represented t hat the policy was “capable of protecting her contents”. Determination Case No: 270702 Determination Page 2 of 13 7. She is also entitled to damages because the FSP failed to act with utmost good faith by declining her claim without proper investigation. 8. She refers to the following definition of “flood” contained in the FSP‟s policy: “The inundation of normally dry land by water escaping from any watercourse, lake, canal, dam or reservoir. Flood does not include inundation from rainwater that cannot flow into a stormwater drain because the drain is blocked or backed up.” and argues she was unaware she was not covered for flood damage because:  The FSP‟s “representative” did not draw the lack of flood cover to her attention when the policy was taken out.  The PDS does not contain any cross references.  A “reasonable consumer” is unable to decipher what is or is not covered by the policy. 9. Her loss was caused by stormwater because, the Bureau of Meteorology (BOM) had issued warnings of heavy rains and flash flooding shortly before 9.00am on 11 January 2011. 10. She also refers to the following definition of “flood”: “The covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this policy.” and submits:  The sole proximate cause of damage to her property was the releases from Wivenhoe Dam. The FSP‟s definition of flood does not include waters released from dams.  The FSP has not established that her loss was caused by flood because it relies on hydrology reports for locations unrelated to her residence.  The Wayne Tank principle does not apply because there is only one proximate cause for the Applicant‟s loss. 11. Her evidence as to the events that occurred is as follows:  It was raining heavily all day on 11 January 2011.  The rains stopped at about 8.00pm or 9.00pm on 11 January 2011.  She evacuated at about 11.00pm on 11 January 2011 and there was no water in her residence at that time.  Jindalee Creek is about 10-20m from her residence and there is about a 6 - 7m drop to the creek. The water in the creek was high but there was no water in the streets or coming out of drains when she evacuated.  Her residence was inundated to a height of 1.6m. Case No: 270702 Determination Page 3 of 13  The complex where she lives is quite hilly and she has no idea where the water came from, but believes it may have come from a large stormwater drain in her backyard. 12. The Applicant refers to sections 13 and 35 of the Insurance Contracts Act, 1984 (the Act) and the Corporations Act, 2001 . Summary of FSP’s position 13. Pursuant to section 71 of the Act, it was the Applicant‟s broker‟s responsibility to provide her with the PDS and relevant policy documentation. The broker:  Is an independent brokerage; and  Is not the FSP‟s agent, neither does it operate under a binder with it. 14. The policy definition of “flood” is not unusual. 15. The Applicant‟s loss would be excluded as flood damage irrespective of whether her property was damaged by:  Water rising from storm drains; because such water is either river water or a mixture of storm and river water.  Waters released from the Wivenhoe Dam. 16. The FSP relies on the following definition of “flood” : “ The inundation of normally dry land by water escaping from any watercourse, lake, canal, dam or reservoir. Flood does not include inundation from rainwater that cannot flow into a stormwater drain because the drain is blocked or backed up.” 17. The FSP also refers to the following definition of “flood”: “The covering of normally d ry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this po licy.” and submits:  Wivenhoe Dam is a watercourse, so water released from it, is flood water.  While waters were released from the Wivenhoe Dam, the water which caused the Applicant‟s loss had escaped from the Brisbane River. 18. The Applicant has not demonstrated that her loss was caused by stormwater. She is unsure, and was speculating as to the cause of inundation. Case No: 270702 Determination Page 4 of 13 Issues 19. Whether the FSP had made a misrepresentation and/or failed to act with utmost good faith and if so, is the Applicant entitled to indemnity on this basis. 20. Whether the Applicant was clearly informed of the limitations with respect to cover for flood. 21. Whether the Applicant‟s loss was caused by rain and/or stormwater run -off and/or flood (as defined in the policy). Reasons for decision 22. Due to the nature of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 23. The Panel consists of an Ombudsman, a representative with exte nsive experience in the insurance industry and a representative with extensive experience in consumer claims. 24. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 25. On 15 January 2013, the Panel Chair Ombudsman attended onsite where he met with the Applicant and a representative of the FSP. 26. The Panel notes that the Applicant is legally represented and as such, is in a position to be properly appraised of the various statuto ry provisions referred to by the parties in their respective submissions. For the sake of brevity, the Panel will not repeat these provisions here. Relevant policy provisions Applicable “flood” definition 27. Although the parties have both referred to two different policy definitions of “flood” in their respective submissions, they do not dispute that the PDS applicable to the policy under consideration carries the following code: “CV428 REV0 2/08” 28. Having carefully reviewed the PDS identified as “CV428 REV0 2/08”, the Panel considers the following definition of “flood” as being operative for purposes of the policy and the dispute under consideration: “ flood The inundation of normally dry land by water escaping from any watercourse, lake, canal, dam or reservoir. Flood does not include Case No: 270702 Determination Page 5 of 13 inundation from rainwater that cannot flow into a stormwater drain because the drain is blocked or backed up” 29. In light of the above, the Panel is unclear as to the parties‟ reference to the following definition of “flood”: “The cov ering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this policy.” Despite the parties submissions in respect of this wording (note Applicant 12 June 2012 and FSP 2 June 2012) this is clearly irrelevant to this matter. The Panel assumes that the parties have done this in error and will not consider it further. Other relevant provisions 30. The Panel has also considered the following information contained in the PDS: “ About [the brokerage] The [brokerage] Network was established in 1985 to give individual general insurance brokers the opportunity to enjoy the benefits of a larger group, yet still main (sic) that all importance feel of independence… [The brokerage] has entered into an arrangement with [the FSP], the underwriter of this insurance policy, to develop financial products and services that are distributed by [the brokerage‟s] members. This insurance policy is available exclusively to [the brokerage‟s] clients through [the brokerage‟s] insurance brokers who are licensed members of [the brokerage]. [The brokerage] and [the brokerage‟s] insuran ce brokers do not issue, guarantee or underwrite this insurance policy. … Section 2: Cover for your… Contents – Accidental Damage What you are insured against, and what you are not You are insured against, accidental loss or damage (including the Specified Events listed below) to… contents belonging to you… at the situation during the period of insurance. … Specified Events „Specified Events‟ means loss or damage directly caused by the following events (a) to (s): … (q) storm, tempest, rainwater, wind, hail, tornado, cyclone or hurricane, freeze or weight of snow … Additional exclusions applying to this policy Case No: 270702 Determination Page 6 of 13 These additional exclusions apply to cover for your… contents… This policy does not cover: … (b) Loss or damage resulting from or caused by: …  Flood. „Flood‟ means the inundation of normally dry land by water escaping from any watercourse, lake, canal, dam or reservoir. Flood does not include inundation from rainwater that cannot flow into a stormwater drain because the drain is blocked or backed up” . Alleged misrepresentation and failure to act with utmost good faith 31. Having carefully reviewed the material exchanged, the Panel finds the Applicant‟s suggestions that the FSP had made a misrepresentation and/or failed to act with utmost good faith, are untenable. 32. The evidence shows:  The Applicant took out the policy through an insurance broker “RIB”.  RIB is a member of brokerage network that utilises their collective bargaining strength to negotiate and procure insurance products for their individual clients. 33. Apart from a bare assertion that RIB was the FSP‟s agent and also that RIB had allegedly represented that the policy was “capable of protecting her contents”, the Applicant has not provided any evidence to substantiate either of these statements. 34. In any case, the following information before the Panel indicates that RIB was more likely than not acting as the Applicant‟s agent (rather than as agent of the FSP):  The Applicant‟s own evidence is that she chose the FSP‟s policy because “it was recommended by her broker” of 20 years (ie RIB).  The Applicant does not dispute receiving the PDS which clearly states the policy is available exclusively to “clients” of the broker s who are members of the relevant brokerage network.  The FSP has denied, and the Applicant has not provided any evidence showing that RIB was acting under a binder with the FSP. 35. Furthermore, the Panel does not consider it reasonable to conclude that RIB had “apparent authority” to act for the FSP simply on the basis RIB may have made reco mmendations that the FSP‟s policy was “good value for money” or was “appropriate” to the Applicant‟s needs. Given the strict requirements of the Corporations Act (2001) which governs the provision of Case No: 270702 Determination Page 7 of 13 financial services, mere „apparent authority‟ is not suf ficient to establish authority to act on behalf of an FSP. 36. It is clear from the evidence that the broker was not the representative of the FSP but the representative of the Applicant and the Panel need not consider this aspect of the dispute further. 37. Lastly, although the Panel accepts that it was inappropriate for the FSP to have summarily declined the Applicant‟s claim without any or proper investigation, the High Court has clarified that a failure to act with utmost good faith does not, in itself, give rise to a cause of action: CGU Insurance Limited v AMP Financial Planning Pty Ltd [2007] HCA 36. That is to say, the Applicant is not necessarily entitled to damages or to have her claim paid just because the FSP summarily declined her claim. Unawareness of flood exclusion 38. The Applicant‟s claims of being unaware of the flood exclusion (for the reasons cited in her submissions) do not assist her. 39. As she took out the policy through her broker of 20 years and the evidence is that the broker was not acting under a binder with the FSP, section 71 of the Act relieves the FSP from its usual “clearly inform” obligations under section 35 of the Act. 40. In any case, the Panel has reviewed the PDS and notes that whilst there may not have been specific referencing to the flood exclusion in the body of the PDS:  The PDS is nonetheless clearly indexed; indicating events that were not covered may be found at page 59 of the PDS.  The meaning of “ flood ” has been clearly defined fairly early in the PDS.  The relevant exclusion (found at page 60 of the PDS) plainly states the policy does not cover loss or damage caused by flood and also repeats the definition of “flood”. 41. On consideration of these matters, the Panel accepts that had the Applicant read the PDS, she would have had little difficulty in finding and understanding the nature and extent of the policy‟s exclusions and limitations. Proximate cause of damage 42. The Applicant has provided conflicting submissions with respect to the cause of the initial inundation of her home. On one hand, she says that her loss was caused by stormwater inundation. On the other hand, she also maintains that the “sole proximate cause” of her loss was due to waters released from the Wivenhoe Dam. Case No: 270702 Determination Page 8 of 13 43. Notwithstanding her seemingly irreconcilable explanations, the Applicant‟s policy covers her for accidental loss or damage. It is clear that the damage to her property was neither intended nor expected when following the events that occurred in January 2011, so she has effectively established a prima facie claim. Therefore, it is the FSP‟s onus to establish the operation of its flood exclusion, if it is to succeed in declining the claim. 44. The FSP bases its conclusion that the Applicant‟s loss was caused by flood (as defined) on the following:  Hydrology reports commissioned by the Insurance Council of Australia (ICA reports);  Aerial flood mapping images available on the Brisbane City Council website;  A number of hydrology reports with respect to sites unconnected with the Applicant‟s property; and  A belated desktop hydrology assessment report specific to the Applicant‟s property. 45. The ICA reports, the aerial flood mapping images and hydrology reports with respect to locations unconnected with the Applicant‟s property are of limited assistance. Whilst these may be indicative of events generally in the area, they are not of themselves determinative of this dispute. 46. The ICA reports and aerial flood mapping images merely establish that the Applicant‟s property was ultimately inundated by waters that could be regarded as flood; which is not disputed anyway. They do not take into account features or events that may be specific or unique to the Applicant‟s site and essentially, do not assist in determining when the home was initially inundated and the nature of the water that initially inundated the home. 47. Similarly, the hydrology reports in respect of properties unconnected to the Applicant‟s site also do not take into account features or events that may be specific or unique to the Applicant‟s site. 48. Although of more assistance, the hydrology report completed by „W‟, specific to the Applican t‟s residence, was simply a „desktop assessment‟ of data and other accumulated information. There was no site visit, there was no discussion with the Applicant and it was completed some 17 months after the event. 49. W‟s report notes:  An “unnamed tributary” is situated approximately 60m north of the Applicant‟s residence .  This tributary flows to the north-west and drains a catchment size of 5.5 square kilometres upstream of the Applicant‟s site , before discharging into the Brisbane River some 2 kilometres downstream. Case No: 270702 Determination Page 9 of 13  The Applicant‟s residence is elevated between 10.9m AHD (Australian Height Datum) and 11.8m AHD.  Records of rainfall activity at the Archerfield gauge (6.6km south east of the Applic ant‟s residence) purportedly shows: i. The area received continuous rainfall of “moderate intensity” from 9.00am 9 January 2011. ii. The area received some 70mm of rain in the 24 hours to 9.00am 10 January 2011. iii. There was “little rainfall” in the 24 hours to 9.00 am 11 January 2011. iv. Some 60mm of rain fell between 9.30am a nd 3.30pm on 11 January 2011 (ie within a space of 6 hours); with the peak intensity rainfall being alleged to be less than “a 1 year ARI event”.  The “channel bed” of the unnamed tributary is eleva ted at 5m AHD.  As the “channel bed” is 4.6m below the lowest point of the Applicant‟s property, and given a catchment size of 5.5 square kilometres, it is unlikely that the rains which fell on 11 January 2011 was sufficient to rise to a height sufficient t o inundate the Applicant‟s residence.  Interpolating the Brisbane River levels recorded at Jindalee and Oxley Creek Mouth Alert gauges, the Applicant‟s site was likely to have experienced a peak level inundation of 12.3m AHD at 11.30pm on 12 January 2011.  A s the lowest end of the Applicant‟s residence is elevated at 10.9m AHD, her residence was inundated to a height of 1.4m (which is consistent with the Applicant‟s claim). 50. The report does not provide any information as to when the initial inundation of the A pplicant‟s residence likely occurred. 51. The Panel has considered the other information exchanged as well as information in the public domain and observed as follows:  There is no dispute that the front of the Applicant‟s home site generally faces south-west with its rear facing north-east. The site slopes downwards from the south-west to the north-east, towards a low lying area where the FSP‟s hydrologist claims an unnamed tributary exists.  The satellite images of the Applicant‟s area are unclear as to whether a tributary (watercourse) actually exists in the area: i. The “Flood Flag Map” for Sinnamon Park (issued by the Brisbane City Council) appears to recognise the existence of a “waterway” at the rear of the Applicant‟s property. Case No: 270702 Determination Page 10 of 13 ii. The Applicant appears to agree there is a watercourse at the rear of her residence; although she believes it is the Jindalee Creek and located some 10m to 20m from her residence.  According to the ICA hydrology reports, rains in the Brisbane area had generally ceased by the evening of 11 January 2011, with little to no rains falling on 12 January 2011.  Information with respect to rainfall activity specific to the Applicant‟s area on 11 January 2011 is unclear, if not conflicting altogether.  The Applicant says it was raining heavily all day on 11 January 2011, with the rains only stopping at either 8.00pm or 9.00pm on that day.  The FSP‟s hydrologist claims Archerfield received some 6 0mm of rain between 9.30am and 3.30pm on 11 January 2011, with no indication of more rains after 3.30pm on 11 January 2011.  In addition to these inconsistencies, the hydrologist‟s evidence is also inconsistent with public (BOM) records which show that Archerfield only received some 30.8mm of rain in the 24 hours to 9.00am on 12 January 2011. If the hydrologist‟s evidence is correct, the public record ought to have shown that Archerfield received at least 60mm of rain in the 24 hours to 9.00am on 12 January 2011, not 30.8mm.  The Applicant‟s residence was inundated sometime between 11.00pm 11 January 2011 and 11.30pm 12 January 2011. The exact time of the initial inundation remains unclear. In this respect: i. The Applicant‟s evidence is that she evacuated at 11. 00pm on January 2011 . Whilst the water in the “creek” behind her home was high at that time, there was no water in her residence or on the streets, nor was there water coming out of stormwater drains. ii. The FSP‟s hydrologist claims the Applicant‟s residence is elevated between 10.9m AHD and 11.8m AHD, and the Brisbane River at her location would have peaked to a height of 12.3m AHD at 11.30pm on 12 January 2011. 52. As previously stated, on 15 January 2013, the Panel Chair Ombudsman attended on site where he met with the Applicant and a representative of the FSP and he was able to view the topography of the area and clarify a number of issues so as to provide guidance for the Panel in the determination of the issues in dispute. 53. The observation of the Panel Chair Ombudsman was consistent with the Applicant‟s evidence and contrary to the evidence of the FSP‟s hydrologist to the extent that the “unnamed tributary”, being the Jindalee Creek, as identified by the sign at its crossing with O Road, is situated approximate ly 10 to 20 metres north of the rear of the Applicant‟s property. Case No: 270702 Determination Page 11 of 13 54. Whereas W reports that the Applicant‟s residence is elevated between 10.9m AHD and 11.8m AHD, the full extent of this elevation is only revealed by an onsite attendance. 55. There is a single car garage located at the front of the block at the same height level as the street which runs through the complex. To the side of the single car garage are a number of steps down to another level which is approximately 1m below the floor level of the single car garage. 56. The house is a two storey house and the floor level of the lower section of the house is on the ground at this lower level of the block, approximately 1m below the floor level of the garage. 57. The area of the property occupied by the lower level of the house, together with the yard area, is at approximately the same height level. Situated in the backyard, is a significant stormwater drain. 58. The downstairs area of the house is on a concrete slab and consists of a kitchen/dining/lounge room, all part of an open plan together with a laundry and a toilet. The floor of the downstairs area is approximately at ground level. 59. The Applicant confirmed that the inundation of the home was to the level of about 1.4m to 1.6m inside the ground floor level of the home and about 100mm inside the garage, which the Panel Chair Ombudsman observed was at the same height level as the street. 60. The Applicant confirmed that the inundation did not reach the upper level of the home. 61. The Panel Chair Ombudsman also observed that the significant stormwater drain in the backyard is open with only a mesh covering, presumably to prevent large objects falling into the drain. 62. The Panel has had the opportunity to consider all of the evidence including that obtained during the course of the site visit in light of the obligations of the FSP insofar as the policy provisions are concerned. 63. The Panel notes that this is a policy providing coverage for accidental damage and as stated, the Panel is satisfied that the Applicant has established a prima facie case with regard to this matter. 64. The onus then shifts to the FSP to establish that the policy provision in respect of flood applies to exclude the Applicant from any coverage under the policy. 65. It is the Applicant‟s evidence that all rains had stopped at 8.00pm or 9.00pm on 11 January 2011 and when she evacuated at 11.00pm (ie. 2-3 hours after rains had stopped), there was no water in her home or the nearby streets, or water coming out of stormwater drains. Case No: 270702 Determination Page 12 of 13 66. BOM records of rainfall activity at the Oxley, Carole Park and Archerfield alerts suggests that there was little to no rains in these areas since 9.00am on 12 January 2011. This information is not inconsistent with the broad finding in the ICA hydrology reports that all rains in the Brisbane area had likely ceased by the evening of 11 January 2011. 67. In the absence of reliable evidence suggesting that there were further rains after 9.00pm on 11 January 2011, the Panel can only rely on the available material and conclude that there was unlikely to be any further rain (or rain of significance) after that time. 68. It is an accepted hydrological principle that localised storm or rain water inundation would ordinarily occur relatively proximate to the occurrence of intense rainfall. The Applicant‟s own e vidence is that there were still no signs of flooding or overflowing water in her home or local area although rains have already stopped for some 2 hours. 69. The parties acknowledge the existence of a watercourse to the rear of the Applicant‟s residence and a gree that there is an elevation difference of about 5-6m between the watercourse and the residence. 70. A 5-6m elevation difference is relatively substantial and following localised rains, run-off would ordinarily drain into this watercourse before draining into the Brisbane River. 71. In the absence of evidence suggesting further rainfall activity after 9.00pm on 11 January 2011, the Panel accepts on the balance of probabilities, that the initial inundation of the Applicant‟s residence was likely due to the rising level of the water in this watercourse which, in turn, was due to the rising levels of the Brisbane River (mainly following releases from the Wivenhoe Dam). 72. This means that the Applicant‟s residence was likely to have been first inundated by water escaping this watercourse, and such water can appropriately be regarded as flood water for purposes of the policy. 73. The Applicant has made reference to the existence a stormwater drain at the rear of her residence and believes that the water which inundated her home may have come from this drain. 74. When the Applicant left her property, the home had not yet been inundated and thus there is no evidence that the water which inundated her home came from this drain. However, even if this water was the water that inundated her home, the Panel is satisfied that the water from the drain is likely to have been backflow of water from the Jindalee Creek as the creek rose. Further, the Panel is satisfied that backflow of water through a drain is properly categorised as Flood water. 75. The Applicant has also argued that her home was inundated by waters released from the Wivenhoe Dam and that the policy definition of flood does not extend to waters “released” from a dam. Case No: 270702 Determination Page 13 of 13 76. Whilst the policy definition of “flood” (the correct one), does n ot specifically mention water released from a dam, the Panel is of the view that the expression “escaped” is sufficiently wide to include water that is released from a dam into a river. In any case, in the absence of persuasive suggesting otherwise, the av ailable material establishes that the Applicant‟s residence was likely inundated by water which had escaped from the watercourse behind the residence. 77. In the circumstances, the Panel is satisfied that the FSP was entitled to decline liability for the Appli cant‟s loss on the basis that the damage to her property was caused by inundation of water which is appropriately characterised as floodwater. Determination 78. The Panel determines that the FSP was entitled to decline liability in response to the claim.