Storm damage to roof denied as wear and tear, gradual deterioration and lack of maintenance
Text of the determination
Case No: 270701 Determination Page 1 of 10
Case Number: 270701
General Insurance – Domestic Insurance – Home Building – Storm damage –
Policy exclusion – wear and tear, gradual deterioration – structural defect –
Insurance Contracts Act 1984 – Sections 35 and 46
13 August 2012
The Applicants have legal representation. For clarity and convenience, the
submission of the Applicants and their representative will together be referred to as
‘the Applicant’.
Background
1. The Applicants insured their home building under a Home Insurance policy
against loss or damage caused by insured events for $588,500 with a $500
policy excess. The policy commenced on 21 July 2010 and had been renewed
annually to 21 July 2012; however, the policy was cancelled on 21 August
2011.
2. The Appli cants’ property is located at Cooroy which is in the Queensland
Sunshine Coast area.
3. On 25 January 2011, the Applicants reported damage to their house that had
been caused during a storm and heavy rain on or about 11 January 2011.
4. The Applicants submit that their locality suffered severe wind and rain storms
which caused damage to the metal roof of their house. The heavy rain and wind
also caused roof guttering to overflow and water to be blown under the eaves
and into the interior of the house.
5. The damage to the roof allowed water to escape into the roof cavity also
causing damage to the interior ceilings and walls.
6. The FSP accepted liability for some of the internal damage but has denied
liability for the damage to the roof on the grounds that the roof was not
damaged by the storms but had suffered wear, tear and gradual deterioration
over a period of time.
7. The Applicants contend that the roof was not damaged prior to the storm
events. A quotation for the cost of repairs has been submitted for the amount of
$26,754.02.
Determination
Case No: 270701 Determination Page 2 of 10
Summary of Applicants ’ Position
8. The Applicants maintain that they did not receive a copy of Product Disclosure
Statement (PDS) at the time the policy was taken out. The male Applicant
contacted the FSP to ask for a copy of the PDS but he does not believe the
FSP sent one. The Applicants only recall receiving the PDS after the event
subject to their claim.
9. The Applicants submit that flooding affected the Sunshine Coast from around
the 9 January 2011 for about a week. There was torrential rain a nd driving wind
prior to and after that which caused the flooding and damage to properties in
the area.
10. The wind got under the roof and slowly worked its way along and pulled the
roof off the structure. The Applicants could hear it rattling the roof but the wind
was so fierce that they could not get onto the roof to fix it.
11. Water was coming through the middle of the roof and caused damage to the
power cables and stereo system.
12. The guttering collapsed and ended up on the ground in some areas of the
house as a result of the ongoing volume of water running into it off the roof.
Mould began to appear in one of the bedrooms and in the laundry during the
rain.
13. The FSP has declined the claim for the damage to the roof and guttering on the
basis the damage was caused to the property as a result of a failure to maintain
the property, structural defects and faulty design of the building.
14. The FSP appointed a building consultant, PB, to attend their property and
examine the roof for defects. PB did not enter the roof space to confirm that the
roof had not been properly maintained. He maintained that this caused the
damage.
15. In view of this, the Applicants arranged their own building reports. Two builders
went into the roof space and had a look inside and noted the mould from the
wet and where damage occurred. Both agreed that there was nothing wrong
with the structure of the roof. Neither builder could see where there was a
maintenance problem but stated that the high winds had pulled the roof off the
structure.
16. The Applicants were not aware of any damage to their property before the
claim because:
there had been no noticeable leak or defect affecting the roof and
guttering before the January 2011 events;
there had been no trigger to alert the Applicants to inspect the building
looking for a defect;
the Applicants regularly inspected the roof and there were no defects that
could be readily observable;
Case No: 270701 Determination Page 3 of 10
if there were defects or a lack of maintenance (which is disputed) there
was no way that they could have known about any of the alleged pre-
existing effects;
building reports they obtained dispute that the damage to the roof was
caused by a lack of maintenance and instead points to the strong winds
and torrential rain experienced in the area.
17. Section 46 of the Insurance Contracts Act 1984 (the Act) provides that if a claim
is made in respect of a loss that occurred in whole or in part as a result of a
defect or imperfection in a thing and the insured was not aware of the defect or
a reasonable person in the circumstances could no t be expected to have been
aware of the defect or imperfection the insurer may not rely on an exclusion
clause that refers to the condition of the thing before the contract was entered
into.
18. Therefore, the Applicants claim for damage to their roof and guttering should be
paid for the following reasons:
(a) They dispute that the damage was caused by a lack of maintenance or
faulty workmanship and instead point to the building reports that point to
the damage being caused by extreme weather.
(b) On the information they have been provided it has been asserted that
there was a lack of maintenance over the property that caused the
damage to the roof and guttering. The Applicants remain uncertain as to
the type of maintenance or remedial building work that the FSP states
would have prevented the damage suffered to the roof and guttering in
light of driving wind and torrential rain that the property experienced in
January 2011.
19. The Applicants submit that at the Tewantin gauge, which is approximately
10km east of Cooroy, wind speeds were recorded as:
9 January 2011 52km/h
10 January 2011 54km/h
11 January 2011 43km/h
20. The FSP’s loss assessor appointed a building consultant to provide a
‘causation report on the damage to the internal ceilings and soffit linings of the
property.’ The builder was not asked to provide a report as to the cause of the
damage to the roof.
21. In any event, the report does concede that the Applicants may not have
reasonably been aware that there was a maintenance issue to the roof.
22. Further, the loss assessor did not assess the damage to the roof and
photographs relied upon by the loss assessor and the FSP were taken well
after the event.
Case No: 270701 Determination Page 4 of 10
23. The Applicants submit that the FSP does not have evidence that the Applicants ’
roof was not adequately maintained, or was damaged due to either structural
defect or faulty design.
24. The FSP also submits that the Applicants needed to rectify the loosened roof
fixings which ‘ has occurred from more then (sic) one event’.
25. The FSP has not explained how it concluded that the loosened roof fixings
were caused by more than one event, particularly when taking the extreme
wind conditions of 9 January 2011 into consideration.
26. In a letter dated 31 January 2012 from the FSP to the Applicants, it is stated
that the building consultant advised that:
‘...there have been no storm created openings to your roof and that the issues
to your roof are wear and tear as well as rust and have advised there has
been previous attempts to rectify this with the application of silicone.’
( emphasis added)
27. This was the first time that rust was raised as grounds to deny the Applicants’
claim. It does not appear that the word ‘rust’ is written in any of the builders’
reports. Therefore, ‘rust’ is not a reasonable basis for denying their claim.
28. The FSP h as relied on statements of what is damaged at the Applicants’
property to point to the cause of the damage. The FSP alleges that the
presence of rotting timber indicates this has occurred previously and has not
occurred from one storm event, however, the FSP provides no reasoning for
this statement.
Summary of FSP’s Position
29. Following the initial inspection by its external loss assessor, a building
consultant was appointed to provide a report as to the causation of the
damages. In its report dated 23 February 2011 it states, in part:
there was damage to the living room, bedroom 4, laundry and bathroom
which was due to a combination of poor fixing of roof screws as well as
the soffit being flooded by the gutters overflowing back in to the soffit area
and storm driven rain being blown under the barge capping;
the damage was not caused by a storm created opening.
30. Based on the builder’s report, the FSP accepted the damages due to the
overflow of gutters and wind driven rain to the internals and damage to a home
theatre system.
31. However, it does not accept the damages to the roof as this damage was
reported to be due to wear and tear and lack of maintenance carried out on the
property.
Case No: 270701 Determination Page 5 of 10
32. The Applicant provided a report from builder, ’C’ that stated the damages have
been caused by the storms and high winds. However, it does not confirm that
the roof damage has been solely caused by this one event but rather has
occurred over a numerous events.
33. As the damages are not consistent with being caused by one storm event but
over a period of time, the FSP has denied the Applicants’ claim to the roof
however has accepted all the internal damage caused by water entry.
34. Further, the FSP’s builder and the Applicants’ builder reported that the screw
holes had become elongated and new rubber seals required as the seals had
deteriorated. These are maintenance issues allowing water entry into the
house, not a storm created opening.
35. On the 30 January 2012, the FSP’s builder stated:
‘As discussed by phone earlier today I can confirm that our roof inspection
revealed that the roof is showing signs of wear and tear from normal
conditions, and there was no storm created opening to the roof. The
photographs that we sent will confirm our findings.’
36. The photographs provided by its builder clearly show the roof has not been
maintained and is in a poor condition. There is an onus of the Applicants to
maintain the property in good condition.
37. The photographs confirm that the Applicants, and a reasonable person, would
be aware of the condition of the property and therefore would not be entitled to
relief under Section 46 of the Act. Further, the style of the roof is easily viewed
by sight from the ground.
38. Therefore, the FSP’s decision to deny the Applicants’ claim relating to the
damage to the roof to be as a result of a pre-existing condition and that the
denial is justified.
39. The FSP relies on the following policy/contract provisions:
‘Insured events we will pay
...
9. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
‘storm’ means violent wind (including cyclones and tornadoes) thunderstorms and
hail which may be accompanied by rain or snow.
‘rainwater’ means rain falling naturally from the sky onto the buildings and/or ground.
...
We will not pay for loss or damage:
...
Case No: 270701 Determination Page 6 of 10
h. caused by wind, rainwater, hail or snow entering the buildings through an open
window or door or any opening not made by the storm, unless the loss or damaged is
caused by run-off;
...
When we will not pay a claim under your policy
1. This policy does not cover loss, liability, injury or damage:
...
f. Wear and tear
arising out of depreciation, gradual deterioration, wear and tear;
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design, structural
defects or poor workmanship;
2. Unless we state differently in your policy, we will not pay for:
...
b any loss or damage which is not caused directly by one of the insured events;’
Issues
40. Whether the FSP clearly informed the Applicants of the cover provided by their
policy;
41. Whether the roof of the Applica nts’ house was damaged by the insured event
‘storm’; or
42. Whether the damage to the roof was the result of wear and tear and lack of
maintenance.
Reasons for Decision
43. The onus of proof is on the Applicants to establish, on the balance of
probabilities, that they have suffered a loss caused by a risk insured against.
Once the Applicants have established that the loss was prima facie caused by
a risk insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
44. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material other than when
relevant.
Provision of PDS to the Applicants
Case No: 270701 Determination Page 7 of 10
45. Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to a claim is a prescribed event in relation to
the contract, an insurer may not refuse to pay an amount equal to the Act
unless it can prove that before the contract was entered into, the insurer clearly
informed the insured in writing of the relevant provisions of the contract, or that
the insured knew or a reasonable person in the circumstances could be
expected to have known of such provision.
46. The Applicants state the FSP did not provide them with a copy of the PDS until
after the storm event. The FSP disputes this allegation.
47. In support of its contention that it did post a copy of the PDS to the Applicants,
the FSP has submitted records confirming that a copy of the PDS was posted
to the Applicants in July 2010.
48. I have reviewed the records submitted and am satisfied the FSP did post a
copy of the PDS to the Applicants at his recorded mailing address on or about
22 July 2010.
49. The PDS clearly informs the Applicants of the terms and conditions of the policy
of insurance.
Cause of damage to the roof of the Applicants’ house
50. There is no dispute that during the month of January 2011 there were severe
storms and heavy rainfall at the Applicants’ locality. Relevant data for the
rainfall and wind are:
Date Rainfall mm Wind speed km/h
9 January 2011 75 52
10 January 2011 217 54
11 January 2011 29 43
51. The Bureau of Meteorology Beaufort Wind Scale describes the winds as:
Units in km/h Descriptive term Description on Land
40 – 50 Strong winds Large branches in motion;
whistling heard in
telephone wires; umbrellas
used with difficulty.
51 – 62 Near gale Whole trees in motion;
inconvenience felt when
walking against wind.
52. These records confirm that on 9, 10 and 11 January 2011 the Applicants
locality experienced severe weather conditions.
Case No: 270701 Determination Page 8 of 10
53. The Applicants submitted two reports from builders who inspected and reported
on the damage to the roof of their house.
54. Builder C inspected the roof on 6 May 2011 and found the following as a direct
result of the storms and high winds:
‘ Existing zincalume roofing has become loose causing the screw holes to
become elongated allowing rain to enter the home.
Up to 75% of screws require new rubber seals which have disintegrated from
the roof sheets moving.
Approx. 30% of screws will not tighten down as the constant movement has
created over sized holes in the timber battens and rotting has set in.
Insulation has become water soaked and starting to cause mould issues in the
ceiling space.
Several plaster ceiling sheets have begun to sag from recurring moisture and
rain entering the home.
Several soffit linings are requiring replacement due to water damage.
Removal and subsequent replacement of solar panels, AC units and TV
antenna is required to perform repair
It is of my professional opinion that the existing roof sheets need replacing and the
large majority of soffit linings. Upon further inspection it is more than likely several roof
battens will require replacing also’ .
Cost to complete repairs $26,739 including GST.
55. Builder ‘B’ inspected the roof on 16 August 2011and reported:
‘Water penetration is evident t o the internal of the dwelling as well as the external
linings.
On inspection it is evident that the roofing screw fixings have become loose the
majority of rubber seals are damaged allowing water penetration.
The movement in the roof sheet has created larger holes in both the roof sheet and
the roof batten.
External soffit linings have collapsed in places, remaining linings show signs of
mould damage.
Roof insulation has been wet and needs to be removed and replaced.’
The builder also stated that the roof needed to be replaced. The total cost of
repairs is $26,220 including GST.
56. The FSP appointed a builder to determine the cause of damage to internal
plasterboard ceilings and external soffit linings. In his report dated 23 February
2011 he stated:
Case No: 270701 Determination Page 9 of 10
‘Dam age to these areas is due to a combination of poor fixing of roof screws as
well as soffits being flooded by the gutters overflowing back in to the soffit area
and storm driven rain being blown under the barge capping.
...
The damage has not been caused by a storm created opening.’
57. The FSP wrote to its loss assessor stating:
‘The issues not relating to storm such as – loose roofing, elongated roof screws
and deteriorated rubber seals is not storm created and need to be rectified by the
insured as they have occurred from movement – rot has occurred indicating this
is not from one event and is maintenance related issue.’
58. The Applicants house was subjected to extremely strong winds and torrential
rain for the period 9 to 11 January 2011. The Applicants have sta ted that before
the storm event there had not been any entry of water into their house.
However, during the storm period rainwater did escape into the interior of their
house.
59. The FSP has stated that the loose roofing, elongated screws and deteriorated
rubber seals was not storm related and need to be rectified by the insured as
they have occurred from movement...’ (my emphasis)
60. On the balance of probabilities that movement was caused by the strong winds
over the three days. There is no evidence of former entry of water which would
surely have occurred if the roof was badly maintained.
61. Further, the FSP states that rotting of the battens indicates that it had occurred
previously and not from the one storm event. However, the incidence of rot was
reported by the Applicants ’ builder who inspected the roof five months after the
storm event. This time frame could possibly allow for rot to set into the battens.
I note that on the roof, there was a solar system which required regular
inspection by the Applicants.
62. Further, the FSP has not investigated the extent of the batten rot, that is, was it
widespread or only localised.
63. The FSP belatedly, that is, in its IDR letter dated 31 January 2012, stated that
rust contributed to the entry of water into the house. However, it has not
submitted any evidence in support of this.
64. I am satisfied that storm caused the damag e to the Applicants’ property.
Therefore, the onus shifts to the FSP to establish that, on the balance of
probabilities, the damage to the roof was caused by e vents that are excluded
from the cover provided by the policy.
65. The FSP relies on the policy exclusions in respect to wear and tear, lack of
maintenance and rust to deny liability for the Applicants’ claim. For the reasons
above, I do not consider that the FSP can rely upon those exclusions.
Case No: 270701 Determination Page 10 of 10
Determination
66. Based on the evidence submitted, I find that the FSP has not established that
on the balance of probabilities, the damage to the roof of the Applicants’ house
was the result of wear and tear, gradual deterioration or inherent defects.
67. Accordingly, I determine that the FSP is to indemnify the Applicants for the
replacement of the roof of their house.
68. The Applicants submitted two quotations for repairs and I further determine that
the Applicants select one of the builders to complete the required works. If the
quoted price is increased by the builder, the revised quote is to be referred
back to the FSP for approval, or, if agreement is not reached, back to this
Service for a Supplementary Determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.