Home / Financial Firm (Unknown - Insurer) / Determination 270698

Determination 270698

Claim declined for flood damage under river flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured home was inundated during the January 2011 Queensland floods and the insurer declined the claim under the river flood exclusion. The Panel found the hydrology evidence showed Brisbane River flood, the exclusion applied, and the insurer did not breach its duty of utmost good faith.

The Panel held the river flood exclusion clearly applied to the storm, rain or flash flood cover and the insurer discharged its onus by showing the damage was caused by river flood.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 270698 Determination Page 1 of 9 Case number: 270698 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 5 December 2012 Background 1. The Applicant held a home building policy and a home contents policy with the Financial Services Provider (FSP). 2. On or about 11 January 2011 the Applicant lodged a claim under the policy due to extensive water inundation to the house in Barellan Point following severe weather events in Queensland. 3. The FSP denied the claim on the basis that the damage was caused by river flood, which is specifically excluded under the policy. 4. The Applicant disputes the declinature on the basis the damage arose from the covered event of stormwater inundation. The Applicant further contends that the FSP breached its obligations under Section 35 of the Insurance Contracts Act (1984) “the Act”. Summary of Applicant’s position 5. The Applicant has legal representation; reference to the Applicant includes both himself and his lawyer. 6. The Applicant relies on a Statutory Declaration sworn by him on 13 July 2012. The Panel notes the following from this document:  There was steady rain all day on Tuesday 11 January 2011.  There is a natural stormwater course that runs through the middle of the property. The natural stormwater course is about 60m from the insured dwelling. The large shed is 25m from the rear balcony and the little shed is 19m from the rear balcony. There is also a granny flat 9 metres from the side of the house. The water entered the property from the rear.  The Applicant left the house at approximately 3.00pm on Tuesday 11 January 2011 after receiving a text message to evacuate. Accordingly the Applicant cannot say when the water reached the home.  The water was overflowing from the roof and overhanging gutters because the water came onto the front and rear balconies. The Applicant did not note whether this caused damage due to other factors. Determination Case No: 270698 Determination Page 2 of 9  When the property was evacuated the water was level with the cement slab under the big shed on the property. There was about another 200mm for the water to rise before it went into the shed.  Water marks inside the house indicated that the water rose to the level of the ceiling. The height between the floorboards and the ceiling is 2.4m.  At the front of the home the top level floor is 1m from ground level, at the rear of the property the ground level is 2m from the top floor level.  The granny flat and both sheds were submerged.  The Applicant was distressed when the assessor arrived and had a team of 8 people assisting him clean up. The Applicant was distraught at the prospect of „starting over‟. The Applicant was not in an appropriate state of mind to provide an accurate account of events at the time of the assessor‟s attendance. 7. The Appli cant relies on evidence from a neighbour “CP” and “CF” from which the Panel notes the following:  CP provided the following evidence: “On the 12 January 2011 water started coming in at about 5.30am. There is a stormwater easement that runs through the neighbours property. In heavy rain that certainly runs. He also has dams that fill from heavy rain. The storm water easement was overflowing. The water that entered our property came from the direction of the storm water easement.”  CF provided the following evidence: “[Street name removed] is at a low point. To get out of our property onto the street, we need to go up hill. We are on small acreage and the front garden was being washed away from all the storm water run-off. We had water flowing like rivers down our driveway and coming across the road. We have a natural storm water drain that runs beside and behind our property. Our house is at the front of the property and the gully runs right at the back of the acreage. The council direct water from the suburb through the gully behind our house. Early on 11 th we had ankle deep/knee deep water where the storm water had no where to go. On the opposite side of front of house there is a storm water drain. It‟s about 5m from house – water coming from front of property to gully at back of property. Our second acre there is quite an incline from Gully going up. We watched as the water was running thorough (sic) the gully and it didn‟t seem to stop, even when the rain eased a little. There was so much water running off. Basically we just watched and waited for most of the day. There was such an excessive amount of storm water. Water entered on the 11 not the 12 January 2011”. 8. The evidence provided by CP and CF is in the form of quoted extracts rather than direct statements from these two witnesses. 9. The FSP has breached its duty of utmost good faith under Section 13 of the Act by providing a product that was unsuitable to his needs. The Applicant has suffered a loss due to the policy‟s inadequate coverage of his circumstances. Case No: 270698 Determination Page 3 of 9 10. The Applicant says the policy is confusing with respect to the definitions for river flood, storm and flash flood. The Applicant submits the definitions are oppressive or unusual. Further, there is common law that holds the provision of the document may not be sufficient to clearly inform an insured of relevant provisions if inadequate attention is drawn to certain provisions or if the document is complex and confusing. The Applicant contends that the policy language is unclear and ambiguous and the framework of the provisions is complex and confusing. A person of average intelligence and education would have great difficulty in understanding whether damage caused by wet weather events would be covered under the policy. 11. The Applicant submits that the policy does not meet the requirement to „clearly inform‟. Accordingly, the policy should revert to standard cover which includes flood cover. This is because flood is a prescribed event for the purposes of Section 35 of the Act, as defined by Section 14 of the Insurance Contracts Regulations 1985. The Corporations Act 2001 further requires clear, concise and effective disclosure. 12. The Applicant submits the evidence demonstrates the property damage was the result of stormwater and rainwater runoff. The data obtained from the Bureau of Meteorology indicates that from 9.00am on 10 January 2011 to 9.00am on 11 January 2011 50.6mm was recorded. A further rainfall of 68.2mm was recorded from 9.00am 11 January 2011 until 9.00am 12 January 2011. Accordingly, as the policy covers damage arising from storm the Applicant‟s claim should be paid. 13. The Applicant notes the FSP‟s hydrology report comments on the peak height of the river but not when the property was first inundated. The only statement is that at 3.00pm the water was at the base of the retaining wall. It is the Applicant‟s submission that the property was affected shortly after 3.00pm on 11 January 2011 following a heavy and intense burst of rainfall before being affected by the Brisbane River. Summary of FSP’s position 14. The FSP relies on the following policy provisions which are contained in both the Home and Contents policies: “ Definitions (The Meaning of Some Words) Some words and expressions in this policy have a specific meaning which are given below. Each word is printed in bold where it appears. … “flash flood” means what occurs when there are heavy, intense bursts of rainfall, usually during thunderstorms where so much water falls in a very short time that it cannot get away quickly e nough and collects and flows into your home . but does not include when rainwater on the site :  cannot runoff into a water catchment system , because it is overflowing in flood; and Case No: 270698 Determination Page 4 of 9  mixes with flood water coming from the water catchment syste m and then flows into your home. … “rain” means water that has fallen from the sky on to your building and the site but not water from flash flood . ... “river flood” means when water that is normally contained in a water catchment system increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water into your home . For example water may be deliber ately released by an authority from a dam or reservoir. ... “storm” means violent weather and high winds, sometimes accompanied by rain, hail or snow including a cyclone, tornado or willy willy. ... “water catchment system” means:  a river, creek, or other natural watercourse or lake, whether or not they are in their original state or have been modified, are named or unnamed, or normally dry that only run during periods of rain;  a dam, reservoir, stormwater channel or canal. … 1.12 Storm, Rain or Flash flo od You are insured for damage to your home caused by storm, rain or flash flood. ... We will not pay for damage caused by:  the seas or tidal wave;  river flood ;  erosion or earth movement . ” 15. The FSP has enclosed report from its assessor “C”, the Panel notes the following from this report:  The property is on short stumps. The stumps are approximately 500mm at the front and 1500mm at the rear. The insured premise is on a sloping block with an elevation of 500mm at the front and 1500mm at the rear. The property is in level with the street.  The water depth on the internal ground floor level was noted at 2200mm. Water levels external to the premises reached a depth of 17m.  The Applicant informed C the rain was heaviest in the week preceding the incident and stopped raining on 11 January 2011. The property was inundated on 10 January 2011. Case No: 270698 Determination Page 5 of 9  Inundation of the yard commenced at 3pm.  The water inundating the property was dirty.  The Brisbane River is located approximately 500m East of the insured premises.  There was no damage caused by rainwater entering the property through the roof or by overflow of gutters.  The damage to the building is significant and the total insurable sum of $68,000 is applicable for contents loss. 16. The FSP enclosed a copy of report dated 6 February 2012 from its hydrologist “W”. The Panel notes the following in relation to same:  The property is located 400m west of the Brisbane River. The Brisbane River has defined bed and banks and would be considered a watercourse. An overland flow path flows in a North-Easterly direction through the middle of the subject property and discharges into the Brisbane River about 550m downstream of the subject property. The overland flow path has defined bed and banks and would be considered a watercourse.  There is a small stormwater catchment with an area of up to 1ha on the Southern side of the Applicant‟s street which drains towards the subject property. However, any run-off in the street would be captured in the street drainage system and diverted away from the property.  A total 150mm of rainfall was recorded at the Moggill Alert Station in the period between 12.00am on Sunday 9 January 2011 and 5pm on Tuesday 11 January 2011. No significant rainfall was recorded after 3.00pm on Tuesday 11 January 2011.  The peak hourly rainfall intensity of 23.4mm/hr was recorded in the hour to 11.00am on 11 January 2011. The peak depth of stormwater runoff at the subject property would have occurred within about 30 minutes of the peak rainfall intensity.  The Brisbane River gauge indicates the Brisbane River peaked at 17.72m AHD at 4.56pm on 12 January 2011. The peak Brisbane River water level in the vicinity of the property was 19.1m AHD.  During the major flood event in the Brisbane River, floodwater is able to flow back up the open channel to inundate the subject property. The subject property was not inundated above floor level until after the significant rainfalls ceased in the vicinity of the property.  The subject property was inundated to the peak depth above floor level by floodwater from the Brisbane River. Brisbane River floodwater flowed up to the overland flow path to inundate the subject property.  Recorded peak rainfall intensities in the vicinity of the insured property on 11 January 2011 were not exceptional. In W‟s opinion, the rainfall from local catchment run-off would not have inundated the subject Case No: 270698 Determination Page 6 of 9 property above floor level prior to the arrival of floodwater from the Brisbane River.  The subject property was initially inundated by floodwater from the Brisbane River. 17. The FSP contends that it is the responsibility of the Applicant to ensure he read and understood the policy documentation. The Applicant had a 21 day cooling off period in which to read the policy documentation and cancel same (for a full refund) if it does not meet his needs. The Applicant would have a greater knowledge than the FSP of whether the property was located in a flood prone area. 18. The FSP submits its policy wording is clear and unambiguous regarding the exclusion of river flood and the cover of flash flood. The two types of floods are clearly delineated and can be readily understood. 19. The hydrological evidence available shows that the inundation of the Applicant‟s home, which is in close proximity to the Brisbane River, was caused by the rising of the river water levels not stormwater run-off. The timing of the flooding also coincides with the Brisbane River breaking its banks. The FSP contends that as river flood is excluded from cover, it was entitled to deny liability for the damage resulting from this inundation. Issues 20. Whether the FSP breached its duty of utmost good faith. 21. Whether the FSP was entitled to rely on its policy terms and conditions. 22. Whether the FSP was entitled to decline the Applicant‟s claim. Reasons for decision 23. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 24. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 25. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 26. The Panel considers there are three discrete issues (listed above) which will be dealt with separately. Case No: 270698 Determination Page 7 of 9 Whether the FSP has breached its Duty of Utmost Good Faith 27. The Applicant has alleged the FSP breached its duty of utmost good faith by failing to ensure the policy provided adequate coverage or was suitable to his needs. 28. The Panel considers the Applicant‟ s arguments regarding the duty of utmost good faith are misconceived. There is no legal principle that supports the Applicant ‟s argument that an insurer‟s duty of utmost good faith extends to enquiring and ensuring its policy is appropriate to the insured‟s needs. Such a duty is generally associated with insurance brokers or other authorised parties where case law makes it clear these professionals have a duty to ensure the policy they procure is suitable to their client‟s needs. The FSP does not have the relevant licensing under the Corporations Act 2001 to provide such financial service advice and it would be a breach of the relevant legislation had it done so. 29. Further the Panel notes that:  The policy is a standard home and contents insurance policy that is available to the general public as opposed to being tailored to the Applicant‟s needs, and  The Applicant had a 21 day cooling off period which provided the Applicant with ample opportunity to review the contract and obtain advice on it to ensure it was suitable to his needs. 30. Given this, the Panel does not accept the FSP breached its duty of utmost good faith with respect to offering its standard home and contents insurance policy to the Applicant. Whether the FSP is entitled to rely on its Policy Terms and Conditions 31. The Panel notes there is no dispute the Applicant received the PDS. 32. The Panel has reviewed the submissions from both parties on the matter, and has examined the policy wording. 33. The Panel accepts that the definition of „flash flood‟ is clear and unambiguou s and does not accept the Applicant‟s argument that the definition is ambiguous and unclear. 34. The Panel notes the Applicant‟s contention regarding the definition of „flash flood‟ as being oppressive because it does not include when rainwater on the site cannot run off into a water catchment system because it is overflowing in flood. The Panel confirms that such a definition is consistent with established law authorities on these matters and appropriately clarifies what is meant by „flash flood‟. The Panel does not agree that this term is ambiguous or oppressive. 35. The Panel accepts that the policy definition of „river flood‟ is clear and unambiguous and is satisfied that „river flood‟ is excluded from coverage Case No: 270698 Determination Page 8 of 9 under the insured event of „storm, rain or flash flood‟. Further, the document provides cross-referencing such that a person of average intelligence and education would have little difficulty in locating the „river flood‟ exclusion clause. The FSP clearly informed the Applicant of the exclusion of river flood from cover through the provision of a PDS. 36. The Panel accepts that the „river flood‟ exclusion only applies to the „Storm, Rain or Flash flood‟ insured event under Section 1.12. As there is no reference to „river flood‟ under other insured events of the policy the „river flood‟ exclusion has no application to other insured events under the policy. 37. The Applicant has argued that other aspects of the policy are unclear or unusual, however, the Panel does not consider that any of these arguments to be relevant to the dispute. Whether the FSP was entitled to decline the Applicant’s claim 38. It is an accepted principle of general insurance that an insured bears the onus to prove, on the face of the facts, that they have suffered a loss caused by an event to which the policy responds. Once so established, the onus shifts to the insurer to prove that exclusion applies if it seeks to limit or deny the claim. The Panel also notes that the relevant Certificate of Insurance is annotated to note the Applicant as taking an additional policy option, namely „Accidental Loss or Damage to Your Contents‟ and also for “your building”. The PDS further refines this option by stating that cover for contents and building applies where: „loss or damage that is caused by an uninten ded and unexpected event that is not excluded or limited in sections 1,2,3,4 or 5 of the policy‟. 39. The Panel accepts that the information gathered from the assessor may not be accurate due to the Applicant‟s state of mind and distraction. This is particularly given that the evidence on the cessation of rainfall and inundation of the property, appears to be incorrect when cross checked with the provided witnesses‟ evidence. 40. The Applicant states there was significant rainfall during the days leading up to and on 11 January 2011. However, there is no direct evidence from the Applicant regarding how the inundation occurred, due to the need to evacuate. 41. The only expert evidence regarding the inundation is from the hydrologist W. W notes that the peak rainfall occurred at 11.00am on 11 January 2011 and the peak stormwater runoff at the insured property should have occurred within 30 minutes. There was further no significant rainfall recorded after 3.00pm on 11 January 2011. W formed the view that the rainfall was insufficient to inundate the property prior to the arrival of flood waters. 42. W has indicated that in the major flood event in the Brisbane River, floodwater is able to flow back up the open channel to inundate the subject property. Case No: 270698 Determination Page 9 of 9 43. It would have assisted the Panel if W had calculated the land height of the insured property in metres AHD or the relevant level in metres AHD to calculate when the river broke its banks. However, it is clear from the river gauge levels that the river level had been steadily increasing in the days leading up to the inundation. The Panel further notes that at approximately 3.00pm on 11 January 2011 the river levels reach 10m AHD and then sharply increased to peak at 17m AHD around 4.00pm on 12 January 2011. 44. The Panel is aware that the elevated Brisbane River levels have in many instances caused stormwater drainage paths to surcharge with flood water prior to the overland flow occurring. 45. Based on the limited evidence before it, the Panel does not find that rainfall caused the inundation of the property. The expert evidence indicates the amount of the rainfall and the timing of same is not consistent with the timing of and level of the inundation at the insured property. The Panel notes the water came from the rear of the property where the stormwater flow path is located, the property is in close proximity to the Brisbane River, the property was located in the extent of the Brisbane River flood zone and the timing of inundation occurred at the time of the Brisbane River levels steeply rising. 46. In respect of the cover provided by the policy, as the loss falls within the ambit of „accidental damage‟ (AD) the FSP according to its PDS must provide cover unless the AD is not excluded by reference to section 1, particularly in this instance section 1.12 in which appears the defined event of „Storm, Rain or Flash Flood‟. As flood is an exclusion to section 1.12, the Panel determines the FSP has discharged its onus of proof, via its hydrologist, demonstrating the applicability of the flood exclusion to all the damage within the house. Determination 47. On the basis of the available information the Panel determines the FSP did not breach its duty of utmost good faith to the Applicant. 48. On the basis of the available information the Panel determines the FSP was entitled to rely on its policy terms and conditions. 49. On the basis of the available information the Panel determines the FSP was entitled to decline the Applicant‟s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.