Text of the determination
Case No: 270345 Determination Page 1 of 12
Case number: 270345
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Fraudulent claim
27 February 2014
Summary
Description
A claim under a Home Building and Contents policy following inundation of
the property in January 2011 during the severe weather events in
Queensland.
The FSP has declined the claim arguing a breach of duty of disclosure, the
Applicants have not been truthful and frank and breach of duty of utmost
good faith.
Basis of Determination
At the time of the renewal of the policy, the FSP was aware of the state of
the roof and the Applicants were not required to disclose a matter that the
FSP knew or might reasonably be expected to have known in the course
of its business.
The evidence establishes that the property was inundated following heavy
rain throughout the area at the time of the inundation. The Applicants have
established a prima facie claim under the terms of the policy.
The FSP has not established the application of the flood exclusion.
Whilst the Applicants have a claim under the terms of the policy, the Panel
is not persuaded that the Applicants have established that the damage
claimed is due to the inundation of the property in January 2011.
Determination
The FSP is entit led to deny liability for the Applicants‟ building claim in
accordance with the terms of the policy.
It would not be appropriate for FOS to make a Determination with respect
to the Applicants‟ contents claim given the procedures available to FOS,
which would be more appropriately dealt with by a Court.
Determination
Case No: 270345 Determination Page 2 of 12
Background
1. The Applicants held a home building and contents policy with the Financial
Services Provider (FSP).
2. In January 2011, the Applicants‟ home and contents in Coolana were
damaged following severe weather events in Queensland.
3. The FSP assessed the claim and initially settled some items. However,
following further investigation the FSP refused further liability on the basis
the Applicants had failed their duty of disclosure in not advising the home
was not watertight and structurally sound, they had not been truthful and
frank and therefore failed to act with the utmost good faith, as is required
under Section 13 of the Insurance Contracts Act 1984 (the Act).
4. The Applicants rejected the FSP‟s refusal of the claim for building and
contents loss on the basis they had a dispute before FOS at the time of the
loss, for a previous water inundation event from 2008 (case 39962) and
therefore there was no duty of disclosure breach as the FSP was aware of
the condition of the property.
5. Further, the Applicants say they have cooperated with the FSP‟s requests
and the FSP is liable for the claim.
6. The matter was referred to FOS for review.
Summary of Applicant s’ position
7. The Applicants are represented. For clarity and convenience in the
Determination, the submissions of the Applicants and their representative
will hereafter be referred to as those of “the Applicants”.
8. The Applicants say that there has been an unreasonable delay with the
claim and the FSP has denied various items unreasonably.
9. The male Applicant does not use the tools as tools of trade as he is
effectively retired. Rather, he uses the tools for personal hobbies and in
helping out the community.
10. They have not failed their duty of disclosure as alleged, noting the 2008
claim dispute was still before FOS at the time the policy was renewed and
therefore the FSP was aware of the state of the building. There can be no
failure to disclose something the FSP already knows.
11. They seek indemnity under the policy for the loss with interest pursuant to
Section 57 of the Act. They also seek compensation for the unreasonable
delays and stress resulting from the FSP‟s handling of the matter.
12. For clarity, the specific submissions of the Applicants will be addressed
under separate headings later in the Determination.
Case No: 270345 Determination Page 3 of 12
Summary of FSP’s position
13. The FSP says that it partially settled some of the 2011 claim in good faith but
its investigations have revealed that much of the claimed damage relates to
wear and tear and where the Applicants failed to repair the home after the
2008 claim.
14. Further, the property was inundated with flood water, meaning the items
outside are not covered under the policy as flood is a policy exclusion.
15. The Applicants have the legal onus to establish prima facie that they are
entitled to cover for the claimed building and contents items. They have
failed to establish an entitlement to cover for the majority of the items.
16. The Applicants have provided misleading statements about various issues
and this constitutes a breach of the utmost good faith. For example the
Applicants claim to have replaced items that were settled during the 2008
claim yet they cannot prove the items were replaced and there is evidence
some of the items in the current claim including the bicycles are in fact the
original bicycles claimed in 2008.
17. The FSP says it has also been prejudiced by the Applicants‟ failure to repair
the home following the 2008 claim.
18. The Applicants have also claimed for a number of computers. It has not
been established that the Applicants owned the number of computers
claimed or that they were damaged as described.
19. The Applicants also failed to disclose that the home was not structurally
sound at the time of the 2011 renewal and accordingly it is entitled to refuse
liability on the basis it would not have insured the Applicants had it known
the home had not been repaired.
20. Further, the FSP says the Applicants‟ demands are frivolous and vexatious
and FOS may consider they are lacking in substance.
Issues
21. Whether the Applicants failed their duty of disclosure.
22. Whether the external loss was caused by flood.
23. Whether the Applicants have been truthful and frank.
24. Whether the Applicants have acted in the utmost good faith.
25. Whether the FSP has met its liability for home building and contents loss
under the policy.
Case No: 270345 Determination Page 4 of 12
Reasons for decision
26. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to elevate the dispute in accordance with the Operational
Guidelines to the Terms of Reference. This is because of the potential
amount of the claim and the issues to be considered. This dispute has not
been the subject of a Recommendation and has proceeded directly to
Determination.
27. The decision has been made by a Panel of three decision makers, including
an Ombudsman and decision makers with experience in the insurance
industry and consumer rights.
The policy
28. The Panel has reviewed the terms and conditions of the Product Disclosure
Statement containing the details of cover for the building and contents.
29. The Panel is satisfied the policy covers loss due to the storm but specifically
excludes loss caused by flood, broadly defined as water escaping a
watercourse, lake or channel.
30. In the event of a claim, the policy requires that that insured be truthful and
frank and provide proof of loss and ownership of items if requested.
31. The policy also requires that an insured keep the home in a good state of
repair.
Previous claim and dispute
32. The Applicants had a 2008 storm claim that resulted in a dispute before
FOS. That dispute (number 39962) resulted in a Determination that stated
the FSP was required to settle a ride on mower and cover the repair of
stumps at the insured address. The FSP reportedly cash settled these items
in March 2011.
33. The Determination also canvassed a large number of items including the
roof, the existence of sheds on the property and a number of contents items.
34. Determination 39962 (relating to the 2008 event) was issued in the weeks
after the subject 2011 storm event had occurred.
Whether the Applicants failed their duty of disclosure
35. The FSP submits that the Applicants had an obligation to ensure the home
was structurally sound and well maintained and failed to disclose this was
not the case at the time of the January 2011 policy renewal.
36. The FSP says the Applicants had not repaired the leaking roof and within a
few days of the renewal water was able to enter the building and cause
further loss resulting in the subject claim and dispute. Had it known the roof
had not been repaired it would not have offered to insure the Applicants.
Case No: 270345 Determination Page 5 of 12
37. Th e FSP provides a Statutory Declaration from „MS‟ which outlines that the
insured was asked to confirm that the home was “ watertight, structurally
sound, secure and well maintained” . The statement goes on to outline that
the assessments of the property after the event stated the home was in a
serious state of disrepair and water had entered the property due to a lack of
maintenance.
38. MS states that had the Applicants disclosed the home was not watertight
and structurally sound, the FSP would have clarified the condition of the
home and in the Applicants‟ case, the FSP would not have entered into a
contract of insurance until the structural issues had been remedied.
39. The Panel has reviewed the Certificate of Insurance for 2011 and the
relevant section of the F SP‟s Underwriting Guidelines. Given the state of the
roof at the time of the loss, the Panel accepts that under normal
circumstances the FSP may have been able to rely on Section 28(3) of the
Act to reduce its liability.
40. However, as argued by the Applicants, the issue of the roof repair was in
dispute for the 2008 event that was still being considered by FOS in January
2011. Determination 39962 specifically discusses the roof and although that
aspect of the claim was ultimately found in the FSP‟s favour, t he fact
remains it was an issue in dispute at the time of the renewal, noting
determination 39962 was issued by FOS after the renewal of the policy.
41. Section 21 of the Act states that an insured is not required to disclose a
matter the insurer knows or might reasonably be expected to know in the
course of its business.
42. The Panel finds that the FSP cannot argue it had no knowledge of the
potential issues with the structural integrity of the home at that time of the
2011 renewal given the claim and specifically the roof was an issue in
dispute under dispute 39962. Accordingly, the Panel finds that the FSP
cannot rely on Section 28 of the Act to reduce its liability.
Whether the external loss was caused by flood
43. The FSP says that any loss caused by floodwater from the nearby creek is
excluded under the terms and conditions of the policy. The FSP refers to the
engineering report by „C‟, dated 28 April 2011, which states that floodwater
inundated the yard, and shows a „nearmap‟ image with arrows of the
reported flow direction coming from the nearby watercourse. It was also
reported that while floodwater did inundate the yard, it did not enter the
house, reaching a height of only 650mm.
44. A further report from C, dated 26 July 2011 states the property is
approximately 1.3km from Plain Creek.
45. The FSP provides the dispute numbers of 40 decisions where FOS has
found losses were caused by flood, where there were no site specific
hydrology reports. The Panel notes that a site specific hydrology report is not
Case No: 270345 Determination Page 6 of 12
always required when the issue of flood is being considered. However, there
must still be convincing evidence that flood was the cause for the Panel to
conclude the exclusion applies to the claim.
46. The Applicants say there was extremely heavy rain at the time of the event
and the loss was caused by the insured event of storm and that the FSP has
not provided any site specific hydrology to support its submission the loss
was caused by flood, as alleged.
47. The Panel is aware that there was heavy rain around the Lowood area
(close to Coolana) in January 2011 and the Applicants have provided some
rain data from the Mount Tarampa rain station showing 102mm and 134mm
of rain fell on 10 and 11 January 2011, respectively.
48. At law the onus to establish a prima facie claim rests with the insured. That
is, the insured bears the onus to establish they have suffered a loss to which
the policy responds. If an insured can establish a prima facie claim under a
policy of insurance and the insurer seeks to rely on an exclusion in the policy
to defeat the claim, then the onus shifts to the insurer to establish the
exclusion applies to the circumstances of the claim.
49. As is applies to this claim, the Applicants say the property was damaged by
a storm and they have provided some evidence of significant rain around the
location. The Panel is satisfied this is sufficient to establish a prima facie
claim under the policy.
50. The FSP therefore bears the onus to establish the loss was caused by flood,
broadly defined as water escaping a watercourse.
51. In the Panel‟s opinion, the FSP has failed to establish the loss was caused
by flood. A photograph showing arrows of the reported flow does not
adequately prove on the balance of probabilities that damage was first
caused by floodwater.
52. It may well be that floodwater inundated the property initially or after an
earlier flow of rainwater runoff. However, the evidence before the Panel as to
the origin of the water is insufficient to draw any conclusion as to whether
flood or runoff caused the initial damage at the property and accordingly, the
Panel finds the FSP has failed to establish the flood exclusion applies to the
claim.
Whether the Applicants have been truthful and frank
53. The FSP says that on numerous occasions the Applicants have failed to be
truthful and frank about aspects of the claim, as is required under the policy.
54. The FSP says the Applicants have attempted to claim items that they cannot
establish were replaced after the 2008 claim and claim some of the same
items again.
Case No: 270345 Determination Page 7 of 12
55. The FSP says the Applicants have provided misleading statements in
relation to the repair of the stumps, roof and the driveway after the 2008
event.
Driveway
56. The Panel has reviewed the available evidence in relation to the driveway.
The Applicants say that after the 2008 event they had the driveway repaired.
57. In the male Applicant‟s Statutory Declaration, dated 23 May 2013, he states
that $120,000 was borrowed from the bank to undertake repairs and „AB‟
was paid to do work on the drive, roof and stumps. The male Applicant
states that AB brought in subcontractors to do the work on the drive in late
2009.
58. The female Applicant says she did not see the driveway being done but did
see machines at the property and confirms the driveway was “nicely redone”.
59. Engineer C‟s report, dated 26 July 2011 includes satellite image of the
Applicants‟ driveway from 5 June 2010 and it appears to be in the same
condition as in the post 2011 event photographs. C reports the driveway was
“in poor condition prior to the event” in 2011.
60. C reports that various satellite images from 2009 and 2010 reveal that no
significant work was done to the driveway and certainly no professional
rectification of the driveway has taken place.
61. The male Applicant was interviewed by an agent of the FSP on 26 May 2011
and at that time he confirmed he had been cash settled for the driveway
during the 2008 claim. He said the driveway was re-gravelled by “a fel low
down at Rosewood” and he could not remember the name off hand as it was
two years ago. He confirmed he had had a receipt as he has receipts for
everything, having been in business for 30 years.
62. When it was put to the male Applicant that satellite images did not support
his comments that the driveway had been re-gravelled, he pointed to some
blue metal and noted “I have me own machine” . When asked about the
contractor from Rosewood, he confirmed he was not at home when the
driveway was re-gavelled and he came back to a new driveway and it was in
good condition.
63. During the interview, the male Applicant pointed to some blue metal, noting
that was left over from the driveway.
64. The FSP‟s investigator contacted AB, who confirmed he supplied and laid a
“roadbase” driveway at the Applicants‟ property.
65. The FSP provided a Statutory Declaration from Senior Home Assessor „AW‟,
dated 6 June 2011, which says he attended the Applicants‟ property on 17
February 2010 in relation to the 2008 claim. He says in reviewing the
external assessment reports for the 2011 claim he noted the driveway was
the same as when he attended the property in 2010.
Case No: 270345 Determination Page 8 of 12
66. The Panel notes that to date the Applicants have not provided receipts for
the driveway work reportedly undertaken in late 2009.
67. In response to the FSP‟s concerns the Applicants say the satellite images
provided by the FSP are not clear and should not be relied upon.
68. In reviewing the evidence, the Panel is concerned that there is little evidence
that work of any significance was done on the driveway. While all the
satellite images provided by the FSP are not perfectly clear, the June 2010
image is clear and does show the driveway was largely in the same state as
after the 2008 event.
69. Further, the Panel is concerned that the male Applicant initially said the work
was done by someone from Rosewood and he could not remember the
name. Later he said that AB did the work and that AB is a friend who lives
nearby and has done work for them before.
70. Based on the material before the Pane l, it is not persuaded that any works of
significance were undertaken on the driveway after the 2008 claim as
alleged.
Quotations and invoices
71. The Applicants have provided a number of quotations and invoices for work
completed and contents items, and clai m that the FSP‟s building consultant
(„CC‟) was given a number of receipts and some paper work in support of
their claim in January 2011.
72. The FSP obtained an Affidavit from CC dated 3 June 2011, which states that
he assessed the property on 29 January 2011 and at no time during the visit
was he given receipts or paperwork of any kind by the Applicants regarding
building work and contents items.
73. Another assessor „NKB‟ provides a Statutory Declaration dated 3 June 2011,
which states he inspected the Applican ts‟ property on 1 February 2011 and
notes many items were scattered around outside and at no time did he ask
the Applicants to move items for viewing. He says no items or documents
were taken from the Applicants at this time.
74. The conflicting accounts leave the Panel in a position where it is unable to
confirm whether or not relevant documentation to support the Applicants‟
claim was given to CC or not.
Maintenance
75. The Applicants submit that they took a loan of $120,000 (other times referred
to as $100,000) to do some maintenance work on the home, including the
roof and stumps.
76. The FSP‟s first assessment from engineer C, dated 28 April 2011,
concludes:
Case No: 270345 Determination Page 9 of 12
“There is substantial damage to contents at the insured address however it is
our finding that a lot of the machinery has been kept out side, the Customer is
a retired sign writer and as such a majority of the items were associated with
his trade and it appears are not now used to generate a sustainable income or
for full time trade purposes, we note there are general building tools which are
kept in a container, however whipper snippers, mowers etc that are
considered home tools were kept in an external environment [mowers tucked
under the house].
Bikes had been outside for an extensive period of time and were in over
grown grass and damage is not considered to be from single identified event.
We confirm damage to fences were the result of flood waters through the
property.
We confirm there has been deterioration to the drive but this has only been
exacerbated by the flood conditions and was already in a deteriorated
condition pre the flood event [nearmaps imagery].
There has been no storm created opening, there has been no over flowing of
gutters or water leaking from apparatus, the damage to the ceiling, walls,
dishwasher and other contents internally has been caused due to rust,
corrosion, lack of maintenance, wear, tear and deterioration of the corrugated
iron roof covering.
When we compared current damage to previous photos on record it is
consistent wi th the damage observed previously…” [sic]
77. In C‟s report of 26 July 2011 various photographs of the home are provided,
showing the roof and external walls were in a deteriorated state. The report
states:
“…the house is in a serious state of disrepair and i n need of major renovation,
we observed incomplete works, rotting, corrosion, wear, tear, lack of
maintenance and deterioration... ”
78. In relation to the stumps, the report states:
“…The Customer advised us that the house had been restumped, restumping
is an activity that requires a Building Consent to be issued by the Territorial
Authority, we have seen no evidence of Building Consent for this work
claimed to have been done.
Piers were in to rammed earth and there was no sign of concrete backfilling
as required with plastic soils. Soils has washed from around the piers
however this was consistent with the photos from the 2008 event where the
loose soils had washed out and not been replaced with either compacted
backfilling or concrete backfilling…” [sic]
79. The Applicants provided another Statutory Declaration dated 18 December
2012, from „TR‟ (a carpenter who has worked at the property) and it states:
“…contrary to previous engineers report the stumps are not level due to
stump foundations being compromised by flood waters that came through…”
Case No: 270345 Determination Page 10 of 12
80. C‟s statements in relation to the stumps are not consistent with the Statutory
Declarations of AB, who says he compacted the soil and then put concrete
around the stumps and TR who appears to say that water caused the issue.
81. The problem before the Panel is that the engineer is of the opinion that the
work attributed to AB after the 2008 claim did not appear to have been done.
Again, the Panel is left in a position where it cannot confirm with any
certainty what, if any, works were undertaken on the stumps before 2011.
82. There is a receipt on file for stump work dated 3 October 2010 to the value of
$11,565. 35 from „IBS‟ (AB‟s business).
83. However, taking into account the inconsistent information provided in
relation to AB‟s work on the driveway, the Panel is not satisfied it can place a
great deal of weight on the Statutory Declaration or documentation of AB.
84. In conclusion, it is clear from the available reports that the home was in a
state of disrepair and required extensive maintenance at the time of the loss.
The Applicants report they had borrowed funds and had done some repairs;
however, based on the FSP‟s reports there are unanswered questions as to
the state of the home and property at the time of the January 2011 event.
Other items
85. The parties are also in dispute as to the existence and value of a number of
items under the claim. These include a shed, bicycles, computers, tools and
whether some of the items claimed should fall under the tools of trade limit in
the policy.
86. The FSP says that the tools of trade limit applies as the male Applicant was
employed as a sign writer, noting he has a business and there are
advertisements for the male App licant‟s business.
87. The FSP also has concerns with a number of bicycles currently being
claimed, noting bicycles were settled for $1,306 after the 2008 event. The
bicycles were not replaced and appear to have been left outside and have
succumbed to wear and tear. The FSP also notes that the Applicants have
provided Statutory Declarations from „CT‟, one of which says he repaired „4‟
bicycles while the other says he repaired „5‟ after the 2008 claim. Details on
the repairs are vague and the Applicants have not been able to provide
receipts for the work.
88. At interview the male Applicant reported that after 2008 he replaced one
bicycle for around $1,000, purchased some others and paid $110 to repair
other bicycles.
89. Further, there is dispute between the parties as to whether the Applicants
were told they could dispose of items following the 2011 event.
Case No: 270345 Determination Page 11 of 12
Discussion
90. In this case, the parties are in starkly different positions as to what work had
been completed between the 2008 and 2011 events, with some
inconsistencies in the available evidence. The examples of the driveway and
stumps have already been discussed, as cases in point.
91. Further, the parties are in dispute as to the merits of the contents claim. The
FSP says that some items were left outside and were in a deteriorating state
before the loss. The FSP also has concerns as to whether some items
covered during the 2008 claim were replaced prior to the 2011 claim.
92. Although the Applicants have provided some evidence in the form of
Statutory Declarations, the Panel finds, on balance, that the evidence
provided by the FSP in particular the evidence of their assessors and
engineers to be more persuasive. The Panel finds that the evidence
establishes that most likely the house was in a serious state of disrepair and
in need of major renovation prior to the events of January 2011.
93. Although it is possible that there was some damage sustained to the stumps
of the property in January 2011, the engineers‟ report suggests that the
damage was consistent with the photos take n from the 2008 event. The
available evidence supports the view that the Applicants had not repaired the
driveway as claimed following the 2008 event and the Panel is not satisfied
that the Applicants have established any additional damage to the driveway
in the 2011 event.
94. In the circumstances, the Panel is satisfied that insofar as the Applicants‟
claim is with respect to repair of the driveway and roof and stumps, that the
FSP is entitled to deny those aspects of the claim in accordance with the
terms of the policy.
95. Insofar as other items are claimed such as damage to the shed, bicycle and
tools, the Panel is concerned as to the inconsistencies in the information
provided. For example the Panel notes that a claim for the bicycles was
previously settled after the 2008 event. The assessor identified bicycles that
had been left outside and appeared to have been there for some time. There
is concern that the bicycles may not have been replaced or may have been
subject to significant wear and tear prior to the current event. The affidavit
support offered by the Applicants refer to repairs but is inconsistent. The
Applicants refer to replacement purchases and limited repairs. There are
issues as to whether the Applicants were retired or still operating his
business. This affects the claimable amount for the tools of trade. There is
no evidence to support the loss of the large number of computers claimed.
96. Given the serious concerns the Panel has with respect to the inconsistent
evidence available, the Panel is of the view that it would not be appropriate
for FOS to reach a conclusion of the merits of this aspect of the dispute
given the terms of reference. In the Panel‟s view, this aspect of the dispute
would be best dealt with by a Court where the inconsistent evidence could
Case No: 270345 Determination Page 12 of 12
be tested and the various witnesses available to be interviewed and cross-
examined with respect to the extent of the contents lost.
Determination
97. The Panel determines the FSP is entitled to deny liability with respect to the
Applicants‟ claim for damage sustained to the driveway and with respect to
damage sustained to the roof and stumps.
98. Insofar as the balance of the Applicants‟ claim i s concerned, in particular the
Applicants‟ claim with respect to the loss of contents, the Panel determines
pursuant to section 8.7(a) (ii)(B) of the FOS Terms of Reference that given
the procedures available to FOS, it would not be appropriate for FOS to
make a Determination with respect to this aspect of the dispute and that this
would be best dealt with by a Court.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.