Home / Financial Firm (Unknown - Insurer) / Determination 270155
Determination 270155
Claim for vermin proofing after cyclone roof repairs declined
Summary
The Applicant's cyclone-repaired rental property was invaded by protected micro bats, and he claimed the cost of vermin proofing from the FSP. AFCA found no evidence of faulty workmanship or an insured event and determined the FSP was entitled to deny the claim.
The policy does not cover fixing faults or upgrading to a better standard than before the loss, and the Applicant bears the burden of proving an insured event or defective repairs.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to deny liability of this claim; the Applicant has not established the bat infestation was due to faulty workmanship or an insured event.”
- Repairs or contractors secondary · not upheld
“The FSP's contractor confirmed the roof was fitted according to building guidelines, and vermin proofing was not a requirement of the replacement.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 270155 Determination Page 1 of 7
Case number: 270155
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Faulty repairs
3 September 2012
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Background as set out in the
Recommendation is accurate and is as follows.
2. In March 2006 the Applicant’s rental premises were damaged during
Cyclone Larry. The FSP accepted liability for a claim under the Applicant’s
residential property insurance policy and authorised repairs including to
replacing the roof.
3. In October 2011 the Applicant informed the FSP that micro bats had
occupied the roof of his premises. According to his handyman the bats were
entering the property due to faulty repairs when the roof was replaced. The
Applicant required the FSP to vermin proof his property.
4. The FSP denied the Applicant’s additional claim on the ground that following
investigation of the repairs no faulty workmanship could be found and the
bats were entering through areas not damaged during the cyclone.
5. The Applicant did not agree with the FSP’s decision, hence the dispute,
which was the subject of a Recommendation. The Recommendation was in
favour of the FSP and was not accepted by the Applicant. The FSP accepted
the Recommendation. In the circumstances, the matter has been referred to
me for Determination.
Summary of Applicant’s p osition
6. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicant’s position as set out in
the Recommendation is accurate and is as follows.
7. The Applicant states:
The builder appointed by the FSP to rectify the damage including roof
replacement failed to ensure protection agains t micro bats.
Determination
Case No: 270155 Determination Page 2 of 7
He has been advised that any competent builder or roofer can fully seal
a roof against micro bats. He had reminded the FSP of this, hence it is
the FSP’s problem to remove and prevent the bats from entering the
roof.
He assumes the FSP denied his additional claim as it cannot locate the
builder who was one of many tradesmen who visited the area for work
then disappeared.
He is unable to comment on whether the FSP opted for a basic no frills
roof replacement and was cost cutting given the numerous claims by
other post cyclone Larry.
On the balance of probabilities he says a professional roofer would
have given him the choice of either a basic job or a costly job including
sealing against vermin.
He was denied the option to get his own roofer by the FSP who
selected the tradesman.
8. The Applicant rejected the Recommendation and provided a letter dated 24
July 2012 with enclosures to which I will refer later in this Determination.
Summary of FSP’ s position
9. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP’s position as set out in the
Recommendation is accurate and is as follows.
10. The FSP refers to the following policy terms:
“What is not insured under your Building or Commo n Contents cover
Other building defects
We do NOT cover the cost of replacing or repairing
x building defects or faults or fixing building design problems
...
How claims are paid
Your Building and Common Contents claims
...
We will not:
x pay extra to repair or replace an item to a better standard, specification or
quality than it was before the loss or damage
x fix a fault that existed before the loss or damage occurred.”
11. The FSP states:
The Applicant failed to provide a report from the contractor who advised
him that faulty workmanship resulted in the bats gaining access to the
property.
Case No: 270155 Determination Page 3 of 7
A qualified professional contractor was appointed to inspect the
Applicant’s property.
The contractor commented that the bat infestation was not the result of
faulty workmanship or even the original cyclone event, but rather was
an issue of inadequate vermin proofing in the original design of the
building.
12. The FSP submits that as the loss claimed was not due to faulty
workmanship, the original insured event or any insured event, it is not
required to cover the Applicant’s claim.
13. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position.
Issue
14. Whether the FSP was entitled to deny the claim for the cost of vermin
proofing the Applicant’s property.
Reasons for Decision
15. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
16. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
17. The Applicant is seeking a benefit under the policy. Insurance law
established that he then has the burden of establishing on the balance of
probabilities that he is entitled to that benefit. Accordingly he has the burden
to show the bats are entering the property as a result of an insured event
such as the cyclone or faulty repairs after the cyclone.
18. I have reviewed all the evidence submitted by the parties both before and
after the Recommendation and read all the relevant material carefully and
save where I make note specifically, I am satisfied the evidence in support of
the positions of the parties is as set out in the Recommendation is accurate
and is as follows.
The evidence
19. When the Applicant reported the claim on 20 October 2011, the FSP noted
“the Applicant had a handy man lo ok at the roof and he states its because
the roof was not connected to the building properly”.
Case No: 270155 Determination Page 4 of 7
20. The FSP ’s file note dated 24 November indicates the Applicant would not
provide a report from this handy man.
21. The Applicant did submit a fax from a property services company signed by
the principal, PM. The fax dated 7 October 2011 provides the following
information:
PM discussed the problem with a contractor RB who advised the cost
to rectify the problem will be cost about $4,000 to $5,000, as there were
quite a lot of holes to cover and it will need scaffolding.
RB didn’t want to do the job as the bats are a protected species and
“there is quite a big fine if you dot the wrong thing.”
A pest control company did not wish to take on the job, as a special
license is required which they do not have.
The Department of Environment and Resource Management said the
way to get rid of the bats is to do what is set out in a Bar Removal
information Sheet that had been sent earlier to the Applicant by PM.
Other people who had the same problem had informed PM that they
opened the roof for 3 days and once the bats had gone all the holes
can be sealed.
22. I note PM does not actually comment on why the bats are entering the roof
and the fax does not say the bats are entering the roof because of the faulty
workmanship of the FSP’s repairmen after the cyclone.
23. The FSP does not appear to have contacted that repairmen but has
commissioned a building contractor (contractor) to inspect the Applicant’s
property on 9 November 2011 and report on his findings.
24. In his report of 14 November 2011 the contractor provided the following
information in relation to the roof construction.
No damage or defects to the roofing section were apparent.
There was no cladding to the underside of the rafter sys tem to the front
of the roofing system on the western side of the building above the
concrete veranda systems roof.
There was no sign of any fixings or any evidence to show there had
ever been sheeting or cladding to this veranda area of eave which is an
open void.
This eave lap is not part of the upper roofing system and would not
have been part of the roof system requiring replacement by previous
contractors conducting works.
25. The contractor also provided the following information in relation to the bat
infestation in the roof.
It was obvious that due to the size of the bats they are not only gaining
access into the roof through the eave void but also any rise in the
custom orb corrugated iron is large enough for them to gain access.
Case No: 270155 Determination Page 5 of 7
They are living in different areas of the roof.
Due to their size there is no simple way to stop the bats from gaining
access to almost any home they chose to reside in.
The bat may be protected specie and the contractor suggested the
Applicant contact Parks and Wildlife to have the bats removed.
26. The FSP’s file notes of 23 and 24 November 2011 show the Applicant’s
agent was invited to seek a report from a builder selected by the Applicant
and subject to the builder confirming a structural defect was evident with the
roof the FSP would give further consideration to the claim. However, the
Applicant advised that his handyman might not be appropriately qualified to
provide such a report notwithstanding his opinion was valued. The notes
show he would not submit a report from the ha ndyman.
27. The FSP’s file notes dated 25 November further reveal that the consultant
builder confirmed that to his knowledge vermin proofing was not a
requirement of any building regulations at the time the repairs were done.
28. The consultant considered the contractor responsible for replacing the
Applicant’s roof had installed it correctly and according to relevant building
guidelines.
29. He also advised the FSP that vermin proofing is a maintenance issue for this
property and the only time vermin proofing is required is when a whole new
home is being built and not when repairing an older home which did not have
vermin proofing previously.
30. After the Recommendation the Applicant made a number of points in his
letter dated 24 July 2012 to which the FSP has chosen not to respond.
31. The Applicant makes the point that he was denied the option to have his own
repairer and that this is a breach of the Code of Conduct 3.14. The Applicant
has not provided a copy of the Code. My research of the Code shows the
following:
3.14 Where we have selected and directly authorised a repairer, we will:
a) accept responsibility for the quality of workmanship and materials;
b) handle any complaint about the quality or timeliness of the work or
conduct of the repairer as part of our complaints handling process.
32. The Code does not say the Applicant cannot be denied the option to get his
own roofer. Rather, in my view the Code provides that once a repairer is
chosen the FSP will be responsible for his work which the FSP does not
deny here but rather says its policy provided that it did not have to repair the
roof to a better standard than what it had been pre cyclone and as the roof
had no bat proofing then, it was not obliged to provide it after the cyclone.
33. FOS knew that the “handyman was not qualified to make a formal report” as
this was in the FSP’s notes sent with its Notice of Response.
Case No: 270155 Determination Page 6 of 7
34. The Applicant has made the point earlier that “the original contractor cannot
be traced” but I make no adverse finding in this regard as it is the FSP’ s
case that his work was not responsible for the bats entering the property and
the FSP had adduced evidence in this regard from an independent expert
who has inspected the property and provided a report dated 14 November
2011.
35. The Applicant has also attached other material from the original claim file.
However, the concern he was to be cash settled is not relevant to the subject
matter of this claim. Rather the concern of the FSP then was that if repairs
did not start then further damage might occur.
36. I have looked carefully at the quote of F who “may have bat proofed the roof”
but the quote makes no reference to that detail of work so this is just
speculation and not compelling evidence.
37. Finally, the report from RB “recommended property owner involvement” bu t it
does not follow that had owner involvement taken place that the roof would
have been vermin proofed then or that the bat infestation would not have
occurred. Rather RB wanted involvement about the tie downs as; “it is
difficult to assess and recommend a suitable tie down method for the nailing
plate without further exploratory work and potentially extensive modifications
to these walls.”
Conclusion
38. The Applicant has the burden of proof to establish the bat infestation is an
insured event in the policy or has been caused by the substandard repairs
done after the cyclone.
39. The FSP’s argument is that it acknowledges it is responsible for the standard
of work carried out by contractors authorised by it to rectify that insured
damage, but there has not been faulty workmanship in this case.
40. To support its argument it has arranged for a contractor to inspect the roof in
November 2011 and he has concluded there is no damage or defects.
41. Further, the FSP argues it was not obliged by regulation or by its own policy
to vermin proof the property as its policy says it does not have to fix a fault
that existed before the damage occurred. Its expert says the property was
not vermin proofed before the cyclone. The Applicant has not denied this.
The FSP’s policy provides t hat it does not have to repair the roof so that it
was better than it was before the cyclone.
42. The Applicant argues that had he been consulted that he would have had
the roof vermin proofed but there is no evidence that he would have (as the
policy did not have to cover that cost) and the contemporaneous reports
indicate the roof was already in poor condition.
43. I agree a competent builder can seal a roof against bats but there was never
an obligation for this FSP to pay for this under regulation or pursuant to its
Case No: 270155 Determination Page 7 of 7
policy nor is there evidence from the Applicant that he would have paid for
the extra cost.
44. Finally, although the Applicant says the work done after the cyclone was not
done well as the roof was not bat proofed he has not addressed the relevant
policy terms, nor has he provided any independent expert evidence to
support his position. PM does not address the cause at all nor has the handy
man provided a report if he is not sufficiently qualified nor has an
independent report been provided. It is clear from PM’s fax that others have
seen the roof but no report from them is provided either.
45. Fina lly, I do not accept that the FSP denied the Applicant’s additional claim
on the ground the contractor responsible for replacement of the roof may not
be able to be located. Rather all the evidence before me is that the claim
was denied, as it is simply not covered under the terms and conditions of the
policy.
46. The FSP’s contractor confirmed the roof had been fitted according to
building guidelines. Additionally it was not a requirement that the roof be
vermin proofed as part of its replacement.
47. In conclusion, in my view, the Applicant has not established the bat
infestation in his property was due to building defects or faulty workmanship
by the contractor when replacing the roof after the cyclone and that his claim
fails for the reasons set out above.
Determination
48. On the basis of the available information and for the reasons stated, I
determine that that the FSP was entitled to deny liability of this claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.