Home / Financial Firm (Unknown - Insurer) / Determination 269507
Determination 269507
Cash settlement amount for storm-related building damage
Summary
Homeowners disputed the FSP's $4,368.61 cash settlement for storm and flood-related cracking after the FSP had accepted liability. AFCA found the offer met the policy obligations but ordered interest on the amount for the delay in payment.
The FSP's scope of works and quote were fair and cover the extent of its liability, and the delay in paying an accepted amount warrants interest.
Issues
- Claim amount dispute primary · not upheld“I determine the FSP offer of settlement fulfils it obligations under the terms and conditions of the policy for event related damage.”
- Delay secondary · upheld“I accept there has been a delay and the Applicants have not had the benefit of these funds. This delay can be remedied by payment of interest.”
Subjects and remedies
pay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 269507 Determination Page 1 of 7
Case number: 269507
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Claim amount
14 November 2012
Background
1. The Applicants incepted a home building and contents insurance policy with
the Financial Services Provider (FSP) on 7 June 2010.
2. On 31 March 2011, the Applicants lodged a claim under the policy as result
of damage to the home building from a storm event that occurred on 11
January 2011. It was reported cracking had occurred to external and internal
walls.
3. The FSP arranged for a loss adjuster attend the property and report on the
damage. It was reported much of the cracking to walls was minor. A
consulting engineer was appointed to report on the cause of cracking. The
Applicants also had arranged for a building consultant report on the damage.
4. On 1 July 2011, the Applicants were verbally advised the claim was rejected
as the damage resulted from subsidence which is excluded by the policy.
5. This was disputed by the Applicants through their solicitor and a review was
requested through the FSP‟s I nternal Dispute Resolution processes (IDR).
Following which, the FSP accepted resultant damage caused by
flood/stormwater runoff. The FSP arranged for a scope of works to be
obtained.
6. The FSP arranged for an engineer to attend the property to qualify the
repairs works required as the Applicants did not believe the FSP was
including cracking to external brick work.
7. Based on the obtained a scope of works and quote the FSP on 6 July 2012
offered a cash settlement in the amount of $4,368.61. The FSP advised the
policy excess of $500 was waived on a “without prejudice” basis and in lieu
of any claim for interest.
8. The Applicants have rejected th e FSP‟s sett lement offer as they do not
believe it is indicative of the cost to repair event related damage.
Determination
Case No: 269507 Determination Page 2 of 7
Summary of Applicants ’ position
9. The Applicants‟ solicitor has presented the submission on the Applicants‟
behalf.
10. The solicitor has stated that it is evident from the chronology of events there
has been delay and misleading communication by the FSP.
11. They rely on the damage referred to in its submission when requesting IDR.
The damage included moisture seeping and consequent damage to grouting
in the tile are in the lounge room, articulation of the slab, numerous cracks in
the mortar joints as well as in the plasterboard.
12. The new reports relied upon by the FSP dismiss the cracking as minor and
play down the repair work required or state that the cracks are so minor as
not to need repair.
13. They say that even if the cracks are minor; based on the photographic
evidence it is clear most are not, the cracks are there and need to be fixed
as it was prior to the insured event.
14. The Applicants say the house was in excellent condition in the preceding 10
years with only one hairline crack approximately 1cm long in the mortar.
They say if the slab is not stabilised any work done on the house is wasted
money.
15. The solicitor has advised that it is clear from the Applicants‟ obser vations the
house is still moving and are concerned was to what happens down the track
if breaks pipes or rusts the reo in the block work or slab and expands them
to being exposed through external cracks.
16. It is advised the Applicants have not been paid any money by the FSP.
Accordingly they ask that compensation be awarded pursuant to clause
9.3(b) of the Services Terms of Reference on the basis of the delay with
payment.
Summary of FSP’s position
17. In accordance with policy terms and conditions, it has agreed to pay the
Applicants a cash settlement in the amount of $4,368.61 on what it would
cost to repair and reinstate building repairs. The quote obtained represents
the fair and reasonable cost to it for repairing the property.
18. The FSP says the Applicants have expressed an opinion that the repair
quote provided, based on engineering reports, is insufficient to repair and
reinstate the property. The Applicants have not provided any expert
evidence to support that view.
Case No: 269507 Determination Page 3 of 7
19. The mere act of complaining about the quote and settlement offer is
insufficient to support the Applicants‟ assertion that the offer does not
accurately reflect the extents of its liability in the claim.
20. The FSP says the Applicants have not satisfied the onus upon them to show
the cost of any repairs and reinstatement in respect of event related damage
is any greater than the allowance provided and offered to them.
21. The FSP relies on the following policy provisions:
“ THE INSURANCE COVER PROVIDED
If your home is damaged by one of the insured events listed below, we will at
our option:
repair the damaged portion of your home,
rebuild or replace your home,
pay you the amount we would have paid for repair or replacement,
less the excess shown on your certificate of insurance.
...
EXCLUSIONS APPLICABLE TO YOUR POLICY
IN RESPECT OF ALL SECTIONS IN THE POLICY, WE WILL NOT
COVER YOU FOR DAMAGE, LOSS OR LIABILITY CAUSED BY,
ARISING FROM OR INVOLVING ANY OF THE FOLLOWING:
...
Wear and tear, lack of maintenance or inherent defect, including
gradual deterioration.
...
Loss of or damage to property occasioned by its undergoing any
process involving the application of heat where there was no flame.
Structural defects or faulty workmanship, settling shrinkage or
expansion.
the action of the sea, tsunami, erosion, landslide or subsidence. ”
Issue
22. Whether the FSP ‟s settlement offer of $4,368.61 fulfils its obligations under
the terms and conditions of the policy.
Reasons for decision
23. FOS has considered it is appropriate to expedite the dispute in accordance
with clause 8.6 of the FOS Terms of Reference. This is because of the issue
in dispute and quantum involved. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination by an
Ombudsman.
Case No: 269507 Determination Page 4 of 7
24. There has been an exchange of material between the parties. For the sake
of brevity, it is noted intended to recite material in this Determination except
where considered relevant .
25. In correspondence to the FSP dated 2 November 2011, the Applicants‟
solicitor raised issue with exclusion relied upon by the FSP. It was indicated
the FSP had not clearly informed the Applicants of the exclusions and as
such failed under its obligations of section 35 of the Insurance Contacts Act
1984 (the Act). It was argued that the Applicants were entitled to standard
cover as set out under the Insurance regulations. The exclusions referred to
by the FSP were not contained under standard cover.
26. It would appear the solicitor has indicated the FSP had an obligation in
discussions with the Applicant‟s to inform them of the policy exclusions.
27. The Applicants‟ solicitor has not a rgued this when referring this to the
Service. I note it is not disputed the Applicants were provided with the
Product Disclosure Statement (PDS) which set out the terms and conditions
of the policy.
28. It is well established law that in most circumstances the provision of the
policy documentation will be sufficient to satisfy section 35 the Act and the
obligation to clearly inform. Where however, the policy is unclear or
ambiguous, or contains confusing wording it is necessary to look at the
whole circumstances that have led to the inception of the policy to determine
whether the FSP has satisfied its obligations under section 35 of the Act.
29. There is no obligation for the FSP to inform of all the terms and conditions of
the cover provided in a conversation. It has provided a PDS which sets out
the terms and conditions which it is required to do. It is the A pplicants‟
obligation to read the PDS to ensure they have the appropriate cover and to
contact the FSP if they are unclear on anything. There is nothing to suggest
that the Applicants had any misunderstanding with the content of the terms
of cover provided to them.
30. The crux of the Applicants‟ dispute refeferd to the Service is they have
rejected the FSP‟s cash settlement offer of $4,368.61. They say the cash
settlement offer is insufficient to enable repair of the home to the condition
prior to the claimed event. They disagree with the scope of works on which
the offer is based.
31. I note the FSP waived the policy excess of $500 on a waived on a “without
prejudice” basis and in lieu of any cl aim for interest. I can only assume this
was due to the delay with it obtaining all relevant information on which to
base its offer.
32. Nonetheless, the FSP says the settlement offer is based on a scope of
works for the required repairs which has been established following
inspections undertaken by its appointed engineers and builders. It considers
the quote and scope of works to be fair and reasonable.
Case No: 269507 Determination Page 5 of 7
33. The FSP has referred to policy exclusions in its submission. These are noted
under the “Summary of FSP‟s Position. In particular the FSP says the policy
excludes damage arising from or involving settling, shrinkage, expansion or
subsidence.
34. The FSP relies on the evidence from two engineers to assess and evaluate
the damage caused by the storm event. It has established the cost of repairs
for rectification of the damage.
35. The FSP says under the policy it retains the option to repair, replace or pay
the cost of what it would cost it to repair or replace the damage. It has
offered to provide a cash settlement in the amount of $4,368.61.
36. It is argued by the Applicants the scope of works is deficient in the
rectification of damage. They have indicated that even if cracks are minor;
which they disagree with, the buildings needs to be repaired to the standard
it was before the insured event.
37. Further, the Applicants also hold the FSP liable for the cost in the
stabilisation of the slab. They rely on the report provided by MCS who was
appointed by the FSP to report on the cause of earth movement.
38. In the MCS report dated 23 June 2011, it was advised:
“The founding soil is saturated and because of the water table run-off from the
hills to the east, in my opinion, will remain saturated for several more months.
The Extremely reactive founding soil has softened through saturation, causing
it to lose its load capacity.
The concrete slab has articulated (differential displacement or „movement‟)
and, in my opinion will continue to articulate until the soil dries out.
In my opinion, cracking of mortar joints will continue until the slab stabilises.”
39. According to the Applicants there was only one hairline crack in the mortar in
the preceding 10 years and unless the slab is properly stabilised any repairs
undertaken are a waste of money.
40. The Applicant‟s arranged for the building to be inspected by a building
consultant (JH) they appointed. The inspection took place on 1 April 2011
and the report is dated 27 April 2011.
41. I note the following contributing factor in relation to identified cracking:
normal building differential movement
non installation of control/expansion/articulation joints at 8.0m centres
as per standards
wall areas exposed to thermal movement (north and west facing) as not
protected by verandas as per front and left side elevations.
42. JH indicated cracking was well within allowable tolerances as per AS 3700
Masonry Structures and Australian Standards. He also indicated it was his
opinion that the recent flooding occurrence was not the cause of the recent
Case No: 269507 Determination Page 6 of 7
cracking and movement. However, it may have had a slight contributing
factor in this event.
43. I note with some concern that the Applicants‟ solicitor in the correspondence
dated 4 September 2012 that “ ... it is clear from the observations of our
clients that the house is still moving”.
44. In my view if there is still damage or movement occurring to the property
some 20 months after the insured event there are obviously other factors at
play.
45. Indeed, from the information provided I would ascertain that if further
damage is occurring it may be as a result of settling shrinkage, expansion or
subsidence and are causes excluded by the policy. There is no satisfactory
evidence to show that further damage was due to an insured event.
46. Although the Applicants have indicated they are dissatisfied with the offer of
settlement and scope of works they have not obtained any co ntradicting
expert opinion or report.
47. It is not dispute the FSP is entitled at its option how a claim will be settled,
either repair, replace or pay the cost it if for repair or replacement.
48. I have sighted the scope of works relied upon by the FSP as well as the
quote for the repair of this damage. I am satisfied the scope of works and
quote covers the extent of the FSP‟s liability to the circumstances of the
claim. I do not propose to interfere with the FSP‟s settlement offer.
49. It has been asked that the Service give consideration to awarding
compensation pursuant to clause 9.3(b) on the basis of delay as the
Applicants have not paid any money.
50. The FSP says that the investigation of the claim has not been unduly
delayed by it or its representatives.
51. The awarding of compensation under clause 9.3 of the FOS Terms of
Reference is :
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for consequential
financial loss or damage up to a maximum amount of $3,000 per claim made
in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for non-financial loss
but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference wi th the Applicant‟s expectation of
enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual‟s privacy rights -
injury has occurred to the Applicant‟s feelings or humiliation has been
suffered by the Applicant.
Case No: 269507 Determination Page 7 of 7
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
(i) consequential financial loss; or
(ii) non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability.
d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS‟s
ability to make an interest award under paragraph 9.5. ”
52. The FSP has not provided a succinct argument but I note the Applicants‟
policy excludes consequential loss and as such any loss that may be
considered under 9.3(a) is barred.
53. However the FSP has not indicated as to why payment has not been made
to the Applicant for its accepted liability which it made on 6 July 2012. I
accept there has been a delay and the Applicants have not had the benefit of
these funds. This delay can be remedied by payment of interest.
Determination
54. On the basis of the available information I determine the FSP offer of
settlement fulfils it obligations under the terms and conditions of the policy
for event related damage.
55. I determine the FSP is to pay interest as allowed for under section 57 of the
Act on the amount of $4,368.61 from 6 July 2012 until settlement of the
claim. The interest rate at 6 July 2012 was 6%.