Home water inundation claim declined as flood
Summary
The applicants' Brisbane home was inundated on 12 January 2011 and they claimed it was flash flood or stormwater runoff covered by the policy, with damage in excess of $400,000. AFCA found the inundation came more than 24 hours after the heavy rain, so it was excluded flood, and no compensation for delay was payable.
The flash flood and stormwater cover requires inundation within 24 hours of the heavy rain, and the hydrology evidence placed the inundation outside that window, so the flood exclusion applies.
Issues
- Claim denial primary · not upheld
“the inundation occurred outside the relevant 24 hour period, that inundation would properly be classified as flood and excluded from cover.”
- Product terms interpretation secondary · not upheld
“The Panel is satisfied that if the Applicants had read the policy, they would have had little difficulty in finding the relevant limitations and exclusions.”
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 269470 Determination Page 1 of 9
Case number: 269470
General Insurance - Domestic Insurance - Home Building - Flash flood - FSP
Decision - Denial of claim - Flood
21 December 2012
Background
1. The Applicants insured their home and contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 6 November 2010. During this period, the building was
insured up to a sum of $484,000 and the contents for $108,000.
2. The Applicants lodged a claim with the FSP on 16 January 2011 following
the inundation of the Applicants’ property by water on 12 January 2011.
3. The FSP denied the Applicants’ claim on the basis that the damage was due
to flood and that flood was an exclusion under the terms of the policy. The
Applicants disagree with the FSP and maintain that the inundation of the
property was as a result of storm water runoff and/or flash flood and is
therefore covered within the terms of the policy.
Summary of Applicants ’ position
4. Their claim is for cover under the policy event of “flash flood and stormwater
run- off”. Their loss was caused by heavy and sustained rain falling within the
24-hour period prior to inundation.
5. They dispute the FSP’s argument that the inundation was due to rain that fell
more than 24 hours before the inundation.
6. The Hydrology Report commissioned by the Insurance Council of Australia
(ICA report) indicates that heavy rain fell in the Brisbane area from 6am –
4pm on 11 January 2011. The flash flooding was the result of this rain event.
7. Their home was inundated at or around 12 noon on 12 January 2011.
Therefore, the loss occurred within 24 hours of the rain event.
8. In the dam’s area the relevant rain event started at 4.00am on 11 January
2011 and the emergency release of water from the dam started at about
8.00am. Hence, the rain event or runoff causing the inundation started at
4.00am and extended to at least 8.00am. In this case, it is unclear when to
Determination
Case No: 269470 Determination Page 2 of 9
start measuring the 24-hour period for the purposes of the policy
interpretation.
9. Either way, while water releases from the Wivenhoe Dam (the dam) may
have contributed to water issues, there was nowhere for water to flow to as
the river was full. Rain falling heavily on 11 January 2011 was the main
cause of flash flooding in their premises and this damage should be covered.
10. Also, they contend their policy is vague and lacks clarity around what is
covered. The definition of flash flood is so loose and unclear that they are
unable to interpret it in any other way other than to say they are covered.
11. The Applicants believe the total damage to the property would be in excess
of $400,000 but in their dispute notice have indicated that they believe
$50,000 of that damage would be due to flash flood and storm water.
Summary of FSP’s position
12. In response to the Applicants ’ arguments, the FSP submits the following:
a. The policy structure and layout enables it to rely on the exclusion
clause of “flood” pursuant to Section 35(2) of the Insurance Contracts
Act 1984 (the Act).
b. Data from rainfall and river level gauges, compared to the Applicants’
reported time of inundation, shows that the risk property was inundated
by the rising levels of the Brisbane River, which was caused by rain
which fell over the river’s catchment more than 24 hours earlier.
The Applicants have not presented expert evidence to contradict the
findings of its hydrology consultants (W). W confirms that inundation
from waters of the Brisbane River was caused by rain which fell more
than 24 hours earlier.
In the alternative, it notes that the broad approach of the Financial
Ombudsman Service (FOS) states that heavy rain which fell between
4am – 8am of 11 January 2011 led to the W4 strategy water releases
being implemented.
Therefore, any property inundated after 8am on 12 January 2011 would
have been damaged by flood and not flash flood or stormwater runoff
as defined in the policy. This is the risk property’s case.
c. The Applicants have no grounds to warrant compensation for non-
financial loss.
13. The FSP relies on a number of hydrology reports authored by staff members
of W and the following policy provisions to deny the Applicants’ claim :
Page 4 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
Case No: 269470 Determination Page 3 of 9
...
Flood and storm surge not included not included... ”
Pages 10-12 of the Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the ground;
...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood; ...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Case No: 269470 Determination Page 4 of 9
Flash flood and stormwater run - off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...”
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
Page 53 of the PDS
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to
your home or contents caused by flood
or storm surge which happens during the
period of insurance at the property
address.
We will pay up to the:
home sum insured, if your home is
insured;
contents sum insured, if your
contents are insured for damage
caused by flood or storm surge,
We will pay for loss or damage in the
same way and in the same amounts as
We will not pay for loss or
damage to:
paths, driveways, paving,
retaining walls (whether or
not part of the home), tennis
courts or other playing
surfaces;
shade or sail cloth;
fabric awnings, swimming
pool and spa covers or liners
and the like;
glasshouse whether or not
constructed principally of
glass;
water in swimming pools or
spas; ...”
Case No: 269470 Determination Page 5 of 9
we do under insured events cover.
Issues
14. Whether the Applicants wer e “clearly informed” about what the policy did and
did not cover.
15. Whether the cause of the Applicants’ loss was covered under the policy.
16. Whether the Applicants are entitled to compensation for non-financial loss.
Reasons for decision
17. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS’s Terms of Reference. This dispute has not
been the subject of a FOS Recommenda tion and has proceeded directly to
Determination.
18. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
19. It is appropriate to consider the issues under the various headings.
Whether the Applicants were “clearly informed” about what the policy did and
did not cover
20. The Applicants argue that the policy is vague and lacks clarity around what
is covered. They also argue the definition of flash flood is unclear to the point
it can be construed as providing cover for their claim.
21. There is no dispute between the parties that the Applicants had received the
policy documentation (including the PDS and COI).
22. The Applicants have raised issues in respect of the PDS which are
substantially the same as issues already raised in previous Determinations
and addressed fully by the Panel. The Panel intends to adopt the approach
adopted in those previous matters.
23. In summary, the Pan el has reviewed the FSP’s policy on a number of
occasions. The policy is indexed with relevant sections covering the insured
events. The policy sets out the definitions of storm and flash flood and
stormwater runoff.
24. The policy clearly identifies that flood and storm surge is an optional cover
but otherwise flood is excluded from cover. The COI also clearly identifies
Case No: 269470 Determination Page 6 of 9
that flood and storm surge is not covered with respect to the Applicants ’
policy.
25. A fair reading of Section 35(2) of the Act requires that any relevant limitation
and/or exclusion be in language that is clear and unambiguous such that a
person of average education and intelligence would have little difficulty in
finding and understanding if they have read the policy. The Panel is satisfied
in this matter that if the Applicants had read the policy, the Applicants would
have had little difficulty in finding the relevant limitations and exclusions and
little difficulty in understanding the nature of those limitations and exclusions.
Accordingly the Panel is satisfied that the FSP has met its obligations to
clearly inform in accordance with Section 35 of the Act.
Water Inundation
The Evidence
26. The FSP has relied on expert evidence of hydrologist SC and senior
engineer DC, staff members of W.
27. The Panel considers the following information from the hydrology report
entitled “Investigation of the January 2011 Inundation Event - Brisbane” is of
relevance to this dispute:
In the Brisbane River catchment above Wivenhoe Dam, rainfall
commenced at approximately 6am on 9 January 2011. These inflows
contributed to a peak outflow from Wivenhoe Dam occurring at
approximately 12 midnight on 12 January 2011.
Significant dam discharges occurred later than 24 hours after the start
of the rainfall event that led to the significant inflows into the dam. Any
inundation associated with Brisbane River flows below the dam would
be attributable to the rain event that commenced at approximately 6am
on 9 January 2011.
Damage directly associated with Brisbane River inundation within
Brisbane after 6am on 12 January 2011 was caused by flood.
Whereas, inundation before 6am on 12 January 2011 may be partially
attributable to rainfall that fell within the catchments downstream of
Wivenhoe Dam in the preceding 24 hours.
28. SC provided a site specific report and Key Conclusions Statement dated 7
June 2012. According to the Key Conclusions Statement:
The height of the property varied from 7.1m AHD to 8.9m AHD. The
benchmark level of the property that is the lowest point of the structure
of the house on the land is considered to be at 8.8m AHD. The
statement notes the benchmark level is elevated (no apparent storage
areas).
The effect of the W4 releases first reached the vicinity of the property at
2.39pm on Tuesday 11 January 2011 at 4.00am on 12 January 2011,
Case No: 269470 Determination Page 7 of 9
the W4 releases would have been at approximately 6.9m AHD which is
1.9m below benchmark.
The waters eventually reached benchmark level of the Applicants’
property at 3.56pm on Wednesday 12 January 2011 before peaking at
9.2m AHD being 0.4m above benchmark level at 12.24am on Tuesday
13 January 2011.
29. DC presented a statement dated 2 July 2012, which in summary concludes
that the inundation of the subject property was the rising level of the
Brisbane River, which was caused by rain which fell over the river catchment
more than 24 hours earlier. The Panel notes this report is based on a
definition of Stormwater Flooding from the CSIRO.
30. The loss assessor’s report says the following:
All rooms are affected and many contents have been destroyed.
Water first entered the property at 11am on 12 January 2011.
The property is 200m away from the Brisbane River. The water peaked
at 1.4m, above ground level, 1m above floor level.
Water inundated the property for 4 hours.
31. The Applicants rely on the following information from the ICA Report:
There were three generally distinct and significant rainfall periods
across the Brisbane City Local Government Area (LGA) during the
period 9 – 13 January 2011.
The Brisbane City rainfall events occurred from around 9am – 9pm on 9
January 2011, 6 – 10am on 10 January 2011 and 6am – 4pm on 11
January 2011. Only the third event was of significant severity.
Floodwaters down the Brisbane River over the period 9 – 14 January
2011 were made up of releases from the dam and floodwaters from
Lockyer Creek and Bremer River.
It is concluded that releases from the Wivenhoe Dam were the principal
immediate cause of flooding along the reach of the Brisbane River
downstream of the dam.
Intense rainfalls occurred over the catchment areas upstream of
Wivenhoe and Somerset dams affected and exacerbated the nature of
flooding in the Brisbane City LGA over the period 10 – 14 January 2011.
32. The Panel notes the Applicants in correspondence to FOS received on 13
January 2012 indicated that their contention was that the flash flooding
occurred at their address commencing at 13:00 on 12 January 2011. The
Applicants maintain that this was the result of the significant rain event that
had occurred between 06:00 and 16:00 on 11 January 2011 and argue that
this is within the relevant 24 hour flash flood period as provided under the
particular terms of the policy.
Case No: 269470 Determination Page 8 of 9
33. The central issue for Determination in this dispute is whether the inundation
of the Applicants’ home on 1 2 January 2011 was due to flash flood as
defined within the terms of the policy, that is whether rain that fell no more
than 24 hours prior to the inundation of the Applicants’ property was the
proximate cause of the inundation.
34. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between 4.00 –
8.00am on 11 January 2011 was a proximate cause of the W4 strategy
being invoked and therefore a proximate cause or trigger that led to the
flooding of many of the properties along the Brisbane River.
35. At that time, the Panel noted that in relation to the approach each dispute
would depend upon the individual and unique factors relevant to the dispute
and in that regard the parties were invited to make further submissions in
relation to disputes before FOS.
36. The submissions by both parties address the relevant issues with respect to
the memorandum. Having considered all of the issues, the Panel accepts
that whilst the level of the Brisbane River may have been increasing under
the W3 strategy, it was in fact the heavy rain that commenced falling at
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on that same day. Continual rain from 4.00am
over the Wivenhoe Dam together with rain over the Brisbane River and rain
that commenced at approximately 6.00am over the Bremer River all
contributed to the ultimate inundation of properties downstream of the
Wivenhoe Dam and in the Panel’s view, this was the proximate cause of the
inundation of the Applicants’ property.
37. In order for the Applicants to succeed however, it is necessary for the
Applicants to establish that the inundation of the property occurred within 24
hours of the commencement of the heavy rainfall.
38. The Applicants maintain that the property was not inundated until 13:00 on
12 January 2011. The evidence of SC is that by 4.00am on 12 January 2011
the river level was at a height of 6.9m AHD and would have been 1.9m
below the relevant benchmark level.
39. The Panel notes that in fact at 6.9m AHD the river level would have been
below the lowest level of the property set at 7.1m AHD.
40. The Panel further notes SC ’s comments that the property would have first
been inundated at 3.56pm on 12 January 2011. This would be well outside
the relevant 24 hour period.
41. Although the Applicants have argued that the property was inundated within
24 hours of heavy rain falling, the relevant flash flood provision of the
Applicants’ policy requires that the inundation be due to a sudden flood
Case No: 269470 Determination Page 9 of 9
caused by heavy rain that fell no more than 24 hours prior to the flash flood
or storm water runoff.
42. In the Panel’s view, the inundation was due to the rain that commenced
falling at 4.00am on 11 January 2011. The relevant 24 hours would therefore
require the inundation to occur before approximately 4.00am on 12 January
2011.
43. The Applicants own statements and the hydrology information, in particular
the Key Conclusion Statement from SC are consistent in that the Applicants’
property had not been inundated within that relevant 24 hour period and was
not inundated until sometime in the afternoon of 12 January 2011.
44. In the circumstances as the inundation occurred outside the relevant 24 hour
period, that inundation would properly be classified as flood and excluded
from cover under the terms of the policy.
Non-financial loss compensation
45. The Applicants argue they should be compensated for the dela y in
acceptance and payment of their claim.
46. Since the Panel is satisfied that the FSP is entitled to deny liability for the
claim, there is no basis for compensation due to delay in acceptance or
payment.
Determination
47. Based on the available information, the Panel determines that:
The Applicants were “clearly informed” about what the policy did and
did not cover.
The Applicants’ loss is not covered under the policy.
The Applicants are not entitled to compensation for non-financial loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.