Home / Financial Firm (Unknown - Insurer) / Determination 269325
Determination 269325
Flood exclusion used to deny stormwater inundation damage to strata building
Summary
The body corporate of a strata building claimed for lower ground floor damage from January 2011 inundation, which the FSP denied under the flood exclusion. AFCA found the FSP had not proven the earlier inundation was flood, so it must indemnify the lower ground floor damage with statutory interest, but not damage above that level.
Once the insured established a prima facie claim, the onus shifted to the insurer to prove the flood exclusion applied, and it did not do so for the initial stormwater inundation.
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 269325 Determination Page 1 of 6
Case number: 269325
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
17 December 2012
Background
1. The Applicant is the body corporate for a block of residential units in St
Lucia, and is represented by “MB”. For convenience, both the Applicant and
its representative will be referred to as „the Applicant‟ throughout this
Determination.
2. The Applicant held a residential strata insurance policy with the Financial
Services Provider (FSP). The policy covered the unit building for accidental
loss or damage and was current at the time of the loss.
3. The insurance policy was arranged with Underwriting Agency “CH”, which
issues policies on behalf of the FSP. For clarity, CH is an agent of the FSP,
not the Applicant, for the purpose of the policy.
4. The lower ground floor of the building was inundated with water in January
2011 due to the extreme weather event affecting Queensland at the time,
and the Applicant lodged a claim through CH for resultant damage to the
building.
5. The FSP denied liability on the basis that the damage was caused by flood,
which is excluded under the policy.
6. The Applicant disagrees with the decision, saying that the building
experienced two separate inundations and because the initial inundation was
not due to the excluded event of flood but stormwater run-off, the FSP
should pay for the damage it caused.
Summary of Applicant’s position
7. The Applicant accepts that inundation above ground floor level of the
building was due to flood and understands that damage caused by this
inundation is not covered.
8. However the Applicant says that building‟s lower ground floor, which serves
as a car park, was initially and separately inundated with stormwater and this
occurred before the arrival of floodwater from the river.
Determination
Case No: 269325 Determination Page 2 of 6
9. The Applicant says one of the residents of the building stayed at the building
during the entire event and has provided a statement which supports her
position that the car park was initially inundated before the arrival of the
floodwater.
10. Further, she took photographs which show that the lower ground floor of the
building was completely inundated on 12 January 2011 by 6.13am before
the time the FSP‟s hydrologist states the floodwater inundation commenced.
11. She says that a claim for the neighbouring property, against a policy with the
same provisions as that of the FSP‟s, has now been settled. The insurer in
that case recognised a two-stage inundation event where the initial damage
was caused by blocked and inadequate drains .
12. The Applicant wants the FSP to pay for the damage caused by the initial
inundation.
Summary of FSP’s position
13. The FSP says that hydrologist “W” inspected the Applicant‟s property and
produced a report which confirms that the inundation was caused by flood.
14. It says that W also confirmed that the rainfall in the lead up to and during the
inundation was insufficient to produce any significant amounts of stormwater
runoff and that the property was inundated only once.
15. As flood is excluded under the policy, it is entitled to deny liability for the
damage caused by the inundation.
16. The FSP relies on the following policy provisions:
“ General definitions – meaning of some words
...
Flood
Means when water that is normally contained in a Water Catchment System
increases because of rainfall or snow melt (whether in the immediate region
or elsewhere) or is deliberately released by an authority, and the water
overflows onto land that is not normally covered by water.
...
Exclusions – what we do not insure
...
1 We will not pay for loss or damage:
a caused by Flood ”
Case No: 269325 Determination Page 3 of 6
Issues
17. Whether the Applicant‟s building experienced more than one inundation
event.
18. Whether all of the inundation of the Applicant‟s building was caused by flood.
Reasons for decision
19. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
20. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
21. An insured bears the onus to establish, on the face of the facts, that they
have suffered a loss caused by an event to which the policy responds. Once
so established, the onus shifts to the insurer to prove that a policy exclusion
applies if it seeks to deny or limit its liability for the claim.
22. The policy provides cover for accidental loss or damage which occurs to the
insured property (building and common area contents) that occurs during the
period of insurance.
23. The policy does not include a definition of accidental; however the
Macquarie Dictionary describes the word to mean “happening by chance or
accident, or unexpectedly” .
24. As it is not in dispute that the Applicant‟s building was damaged in January
2011, that the inundation of the property happened by chance and
unexpectedly, or that the policy was current at the time of the loss, the Panel
is satisfied that the Applicant has established a prima facie claim under the
policy.
25. The onus now shifts to the FSP to prove that an exclusion applies.
One or two inundation events
26. The Applicant says that there were two separate inundation events. She
says that the first event was the inundation of the lower ground level of the
building and occurred between 12.00am and 6.13am on 12 January 2011.
27. She says that this initial inundation occurred well before the second
inundation of the building which caused damage to the part of the building
above the ground level and which she concedes was caused by flood and
therefore not covered.
Case No: 269325 Determination Page 4 of 6
28. In support of her position, the Applicant has provided a statement from a
resident of the unit building who she says was present during both events.
29. The Applicant admits that when the second inundation occurred, she had left
the property but says that at 6.13am on Wednesday 12 January 2011 she
took photographs which show the driveway and lower ground floor (car park)
of the building already full with water, as well as water still present in the
gutter of the street in front of the building.
30. The Applicant has pointed out that although the photographs were taken at
6.13am on 12 Januar y, it doesn‟t follow that inundation commenced at
exactly that time and could have occurred at any time from late Tuesday (11
January) afternoon until just prior to the photographs being taken.
31. The Panel has reviewed the photographs provided by the Applicant and
accepts that when they were taken, the car park of the building and the
driveway into the car park was full of water. Furthermore, after examining
metadata associated with the photographs, the Panel is convinced that they
were taken at 6.13am on 12 January 2011.
32. The FSP engaged hydrologist W to inspect the Applicant‟s building and
report on the inundation.
33. In response to the Applicant‟s assertion that the building has been inundated
twice, the FSP asked W to clarify the number of inundations experienced by
the building, to which W stated that:
“ The subject property was inundated only once. ”
34. When asked about the cause and timing of the inundation, W answered:
“The subject property was inundated by Brisbane River floodwater which over
flowed from Toowong Creek along Sandford Street at approximately 0730
hours on Wednesday (12 January)...”
35. The position adopted by the FSP, based on the evidence provided by W,
that there was only one inundation which commenced at approximately
7.30am on 12 January 2011 is clearly at odds with the position of the
Applicant — which the Panel accepts as outlined in paragraph 31 — that at
6.13am on 12 January 2011 the lower ground floor car park of the building
was full of water.
36. After considering the matter, the Panel is satisfied that there were two
separate inundations, the first of which filled the car park sometime prior to
6.13am on 12 January 2011 and the second of which occurred at
approximately 7.30am.
Was all of the inundation caused by flood?
37. When asked to provide an explanation for what was depicted in the
Applicant‟s photographs, the author of the W report initially stated the
photographs included no metadata which would confirm the time at which
Case No: 269325 Determination Page 5 of 6
they were taken. He later stated that there was metadata included with the
photographs but it only showed the data at which the photographs were
emailed to him and did not include information about the date/time they were
taken.
38. W has stated that the Applicant‟s property could not have been inundated by
stormwater runoff, because:
The intensity of the rainfall recorded in the vicinity of the property was
not severe enough to result in inundation of the lower ground floor by
stormwater runoff.
The rainfall data suggests that a more intense rain burst,
26.95mm/hour, occurred on Sunday, 9 January 2011, in the vicinity of
the Applicant‟s property.
If the Applicant‟s property had been inundated by stormwater runoff on
late Tuesday night (11 January 2011) and early Wednesday morning
(12 January 2011), then the Applicant‟s property would have
experienced similar damage on Sunday (9 January 2011), which it did
not.
The catchment draining to the Applicant‟s property is small and highly
urbanised which indicates that stormwater runoff would occur shortly
after the peak rainfall intensity, which occurred at 11am on Tuesday 11
January 2011.
The rainfall in the vicinity of the Applicant‟s property was not severe,
less that 1 year ARI, which indicates that storms with a similar intensity
of rainfall would occur several times a year.
39. As previously mentioned, the Applicant has established to the satisfaction of
the Panel that inundation of the car park occurred prior to 6.30am on 12
January 2011.
40. The Panel notes that the FSP (and W) have provided a significant amount of
information to argue that any inundation of the Applicant‟s lower ground car
park area could not have been caused by stormwater runoff, but was caused
at approximately 7.30am by flood.
41. The FSP has not addressed the issue raised by the Applicant that the
inundation of the lower ground floor could have occurred at any time from
late Tuesday 11January 2011 until 6.13am 12 January 2011. Based on the
height of the water in the photograph, inundation is likely to have occurred
sometime prior to the photograph being taken.
42. After considering the submissions from both parties, the Panel is not
satisfied that the FSP has proven that the initial inundation of the lower
ground floor of the Appli cant‟s building was caused by flood as defined under
the policy. The inundation as evidenced by the photographs could have
resulted from stormwater runoff, most likely occurring sometime prior to
6.13am 12 January 2011.
Case No: 269325 Determination Page 6 of 6
43. The FSP‟s policy provides cover for accidental loss and damage. Accidental
loss and damage is often described a loss or damage caused by a sudden,
unexplained event. There is no doubt the initial inundation of the Applicant‟s
property before 6.13am 12 January 2011 was sudden and unexpected.
44. The Panel is satisfied the Applicant has established a prima facie claim
within the terms of the policy. As the FSP have not addressed the issue of
their inundation before 6.13am 12 January 2011, then they have not
discharged the onus on the balance of probabilities to establish that the
initial inundation was due to the excluded event of flood.
45. Accordingly, the Panel finds that the FSP is required to indemnify the
Applicant for the damage to the lower ground floor of the building caused by
water inundation prior to 6.13am 12 January 2011.
46. The Applicant has confirmed that her claim and this dispute was about the
damage to the building and equipment in the lower ground floor level of the
unit building as per her e-mail to the Service dated 19 March 2012. She
accepts that flood water from the Brisbane River arrived sometime after the
initial inundation of the lower ground floor of her building, and has confirmed
that damage to the next level up from the lower ground floor (which she
describes as the ground floor level) was not part of her claim.
47. This is consistent with the hydrology provided and the Panel is satisfied that
the inundation to the building above the lower ground floor level was, on the
balance of probabilities, caused by floodwater from the Brisbane River,
sometime after the initial inundation of the lower ground floor.
48. Accordingly, the Panel finds that the FSP is not liable for any damage
caused to the building above the lower ground floor level.
Determination
49. On the basis of the available information the Panel determines that the FSP
is required to indemnify the Applicant for damage to the lower ground floor
level of the building complex.
50. The Panel also determines that pursuant to Section 57 of the Act the FSP is
required to pay statutory interest on any cash settlement of the claim,
calculated from 14 December 2011 being the date at which the FSP issued
its final decision letter to the Applicant confirming that its denial of the claim
was upheld.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.