Text of the determination
Case No: 269309 Determination Page 1 of 9
Case number: 269309
General Insurance - Domestic Insurance - Home Building & Contents - FSP
Decision – Flood - Denial of claim
20 August 2012
Background
1. The Applicants held a Home Building & Contents Insurance Policy (the
policy) with the Financial Services Provider (FSP).
2. The insured property in Charlton sustained extensive damage when
inundated by water on 14 January 2011 following the significant weather
events experienced in Victoria in January 2011.
3. The Applicants made a claim for damage and loss of contents following the
inundation of the property. The FSP has rejected the claim as excluded
under the policy exclusion for flood.
4. The Applicants remain dissatisfied with the FSP‟s decision to decline their
claim on the basis the loss is due to the excluded event of “Flood”.
Summary of Applicants ’ position
5. The Applicants in disputing the FSP‟s decision to decline the claim have
sought the assistance of legal representatives “M”. In the interest of brevity
both M and the Applicants will be referred to as “the Applicants” for the
purpose of this determination.
6. The Applicants maintain:
The damage to the property is due to stormwater run-off inundation
arising from the significant rainfall in the area over the period 10
January – 14 January 2011.
The Applicants were present at the insured property when the
inundation commenced on 14 January and noted that the water was
clear. Further, the inundation commenced prior to murky water arriving
from Avoca River.
The Applicants refute the FSP‟ s position that they advised the water
that inundated the property was dirty.
The Applicants do not dispute Avoca River subsequently broke its
banks and inundated the property.
Determination
Case No: 269309 Determination Page 2 of 9
The reports including loss adjusters “C” and hydrologists‟ “F”
commissioned by the FSP are not sufficiently specific to the Applicants‟
circumstances. Further, the loss adjuster “B” is not adequately qualified
to provide an opinion on the cause for the water damage.
The Service should give preference to the hydrology report by “PM”
obtained and relied upon by the Applicants.
The property is in close proximity to the stormwater drainage system so
is more susceptible to stormwater run-off inundating the home.
Summary of FSP’s position
7. The FSP maintains:
The policy is a “Defined Events” contract of insurance which includes
„Storm and rainwater‟ as one of the listed defined events. However, it
excludes from cover under all sections for loss arising from the event
flood.
The Applicants have not made available specific eyewitness accounts
relied upon and accordingly is considered hearsay evidence.
The FSP maintains the information noted in C‟s report is in line with
what the Applicants advised the attending loss adjuster at the time of
the inspection. Further, this information supports floodwater inundation
at or about 7.00pm on 14 January 2011.
PM‟s report does not refer to or provide a time for the alleged clear
water inundation of the property.
PM‟s report provides the Avoca River reached major flood levels at
5.15pm on 14 January 2011, which further confirms inundation
occurring at around 7.00pm would be due to floodwater.
F concluded that all rainfall in the area ceased by 8.00am on 14
January 2011, therefore inundation of the property later in the day was
not the result of direct rainfall.
F‟s hydrology report specifically addresses the cause of water
inundation at the insured property.
The FSP maintains that B does hold adequate qualifications to provide
his opinion in respect to the cause of the water damage.
In the event, it is accepted that stormwater did pool, overflow or
couldn‟t escape through the stormwater drainage system, this would
have mixed with floodwaters and trigger the “Wayne Tank Principle”.
8. The FSP relies on the following policy provisions:
“ Home Building Insurance Policy
What we cover – insured events
You are covered for damage or loss to your home building occurring
during the period of cover and caused by the following events:
Case No: 269309 Determination Page 3 of 9
Yes
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter, guttering
or surface.
No
Damage or loss caused by flood . Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
…
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost
or liability caused by or arising from or involving:
flood,
…
Home Contents Insurance Policy
What we cover – insured events
You are covered for damage or loss to your contents while they are in your
home or at the site, occurring during the period of cover, caused by the
following events:
Yes
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter, guttering
or surface.
No
Damage or loss caused by flood . Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
…
What we do not cover – general exclusions
Case No: 269309 Determination Page 4 of 9
You are not covered under any section of the policy for damage, loss, cost
or liability caused by or arising from or involving:
flood ”
Issues
9. Whether damage to the Applicants‟ property was caused by flood water as
defined by the policy.
10. Whether the FSP was entitled to decline indemnity to the Applicants under
the policy.
Reasons for decision
11. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
12. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
13. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
14. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
15. The Panel is satisfied the parties do not dispute the following:
The Applicants held an active home building and contents insurance
policy with the FSP at the time of loss.
The FSP provided and the Applicants received the relevant policy
documentation including the Product Disclosure Statement (PDS) and
Certificate of Insurance.
The insured property suffered extensive damage due to water
inundation arising from the significant weather events experienced in
the area during January 2011.
The evidence in relation to rainfall readings, river levels, rainfall
periods, timing of the river breaking its banks and levels of inundation
are reasonably consistent within the consulta nts‟ reports relied upon by
the parties.
Case No: 269309 Determination Page 5 of 9
The policy excludes from cover loss or damage arising from flood
however does provide indemnity for damage arising from
stormwater/rainwater inundation.
16. The Panel having reviewed the available evidence is satisfied that the main
issue in contention between the parties is whether the insured property was
initially inundated by stormwater which would give rise to a degree of
indemnity under the policy. The Panel is satisfied that the property was
ultimately inundated by floodwater to the maximum level however
consideration as to whether there was an extent of initial stormwater
inundation has been considered below.
Cause of the Loss
17. The parties to the dispute have each obtained and rely upon information
made available by their appointed consultants. The Panel notes that this
information has been exchanged between the parties, each having had the
opportunity to comment. Accordingly, in the interest of brevity, the Panel will
only reiterate information from these reports it finds necessary in providing
this Determination.
PM’s Charlton Floods - January 2011 dated 3 November 2011
The town of Charlton experienced heavy rainfall between 10 January-
14 January with extensive flooding in the area from the Avoca River
from 14 January onwards.
Total rainfall over this period was recorded at 168.6mm with 66.2mm
falling between 9.00am on 13 January and 9.00am on 14 January.
The highest intensity rainfall recorded was 15mm/hr between 7.00am -
8.00am on 13 January. There was no rainfall recorded after 8.00am on
14 January.
Although the records calculate the rainfall intensity on an hourly basis,
PM maintains that the rainfall periods at Charlton were highly
concentrated in short duration burst e.g. 10 to 12 minute intervals.
Accordingly, if calculated on this basis it would represent 20-50 year
ARI rainfall events as opposed to 1-2 year ARI events (based on hourly
intervals).
Accordingly, overflow from local drainage systems and culverts was
highly likely as these systems are only designed to cope with 2-5 year
ARI rainfall events.
Time of overflow would have to correspond closely with the timing of
the intense rainfall periods and based on this the first stormwater
drainage overflow event would have occurred at around 7.00am on 13
January.
There are two possible sources of rainwater run-off in Charlton, run-off
in the town which does not enter the stormwater drainage system and
run-off from surrounding rural areas.
Case No: 269309 Determination Page 6 of 9
All rainfall that fell on 13 January and 14 January would have become
saturated overland flow and followed natural drainage lines into
Charlton. This would have led to the inundation of Charlton on these
dates prior to the arrival of floodwaters from Avoca River.
Floodwaters from Avoca River would be of high sediment loads
(muddy/mucky) and would not be clear. Clear water inundation would
support that prior to the arrival of floodwaters from Avoca River there
was water sourced from local stormwater.
Depending on the exact locations of the properties, they will have
begun to have been inundated by floodwater sometime on the
afternoon or early evening 14 January. Any inundation before this time
would be from runoff particularly corresponding to times when heavy
rainfall were occurring (13 January and early morning 14 January).
Evidence in respect to water inundation of properties which occurred
particularly before 5.00pm on 14 January should be taken into account.
C’s Report
Date of inspection 28 January 2011.
Inundation did not occur until around 7.00pm on 14 January 2011 with
water dirty in nature.
Water entered the property from both the south and north.
Depth of inundation around 12” or 30cm.
Seems clear that it is floodwater inundation.
F’s Flood and Stormwater Investigation Report March 2011
Charlton has a history of flooding.
Catchment area to Avoca River is 274,945 hectares to Charlton
Township. Since the river is narrow and shallow, a significant
catchment to the river is likely to cause frequent flooding within the
area.
Hourly rainfall data indicates the maximum rainfa ll recorded was
15mm/hr which corresponds to a 1 in 2 year ARI rainfall event.
The town is reasonably flat with a fall of 0.1% across town north to
south.
Site inspections were undertaken on 16 and 17 February in the
presence of homeowners. There were minor inconsistencies observed
regarding the time and date of inundations. Almost all advised water
started inundating dwellings between 3.00pm-6.00pm on 14 January.
The level of water continued rising until the occupants were evacuated
around 8.00pm on 14 January.
The last rainfall recorded in the area ceased at 8.00am on 14 January
and therefore the rising water level was not due to direct rainfall.
Case No: 269309 Determination Page 7 of 9
There is a reasonable stormwater drainage network present around the
property to cater for minor flows. The pr operty‟s boundary is 200mm
higher than the gutter except for the driveway crossover which is
50mm. The driveway however grades up 150mm to the front of the
house.
The Applicants advised the consultant that he left the property around
10.00pm on 14 January when water started seeping through the
floorboards at the insured property.
F notes that there was an absence of rainfall for more than 10-12 hours
prior to the inundation, the water rose to a maximum level of 150mm
above floor level.
F formed the opinion that the inundation of the property was due to
floodwaters from Avoca River.
18. In view of the issues arising in this dispute, the Panel Chair Ombudsman and
a member of the Panel conducted a site inspection of the property in the
presence of the Applicants and a representative of the FSP on 27 June
2012. The Panel notes the following information from the site inspection:
The insured property (dwelling) stands on stumps and concrete slab
with an estimated elevation of 500mm from surrounding ground level.
There exists a slight slope from front to back of the property.
There is a shed at the rear of the property which houses contents,
machinery, vehicles and tools owned by the Applicants. Also,
constructed at the rear of the property are greyhound kennels with
these structures (shed and kennels) constructed at ground level.
The Applicants remained at the property and witnessed water pooled
around the property by 6.45pm; the water came down Jenkins Street
(rear of property) and from the direction of the railway line north-west of
the property.
Subsequently, water came down Davies Street through the drainage
infrastructure and rose to about 200mm through the floorboards within
their home. The water that entered their home rose very rapidly after
6.45pm.
19. The Panel notes that the hydrology reports relied on do not seem to have
considered the impact of the work undertaken at the Cha rlton- St Arnaud
Road on the natural flow of the water from the floodplain to the Avoca River.
The Ombudsman, Panel member, FSP representative and a number of local
residents visited the area as part of the site inspection. The road has been
raised to allow access to the airport during floods. In doing so, it dissects the
natural floodplain. Although, a number of pipes/culverts have been
positioned under the road they are not sufficient to cope with the overland
flow and according to locals the flow is diverted initially east of Armstrong
Road and eventually through the town. This information was provided by a
number of local residents independently of the Applicants to the
Ombudsman and Panel member in the presence of the FSP representative.
The site visits undertaken by the Panel representatives of the Charlton area
Case No: 269309 Determination Page 8 of 9
and more specifically individual properties including the Applicants have
assisted the Service in gaining a greater understanding of the topography
and impact of the stormwater runoff in the area prior to the arrival of
floodwater from Avoca River.
20. Given the elevation of the buildings and timing of inundation it is unlikely the
inundation of the Applicants‟ home was due to stormwater runoff alone. More
likely the peak level of inundation was due to a combination of flood and
stormwater runoff which would be excluded under the policy.
21. The policy however covers stormwater runoff or water escaping any water
main, drain, pipe, street gutter, guttering or surface. In the event of the
inundation being due to a combination of overland flow and water escaping
the stormwater drains near the property (regardless of the source of the
water) then the policy will cover the loss.
22. The Panel having considered the evidence in this matter accepts that most
likely th e initial inundation of the Applicants‟ property i.e. the yard, shed,
garage and kennels would have been due to water escaping the stormwater
drains. Although there is no precise calculation of this level of inundation the
Panel, considers it fair in the circumstances to assess their inundation to a
height of 100mm.
23. It is not in dispute that the inundation of these structures did result in
damage to contents, machinery, and tools etc. The Applicants advised that
the FSP‟s assessor had noted and made a list of this loss.
24. Based on the information made available to the Service and the first hand
evidence gathered by the Panel representatives, the Panel is satisfied that
the Applicants‟ home was not likely to be inundated due to stormwater
runoff. However, as noted above the Panel is satisfied that the shed and
kennels would have on the balance of probabilities been inundated by
stormwater runoff up to the estimated level of 100mm prior to the arrival of
floodwaters.
25. The Panel determines that the FSP is obliged under the policy to provide
indemnity for loss or damage arising from “ Storm and rainwater including
storm water runoff from areas surrounding the site, or water escaping from
any water main, drain, pipe, street gutter, guttering or surface ”.
26. The Panel is mindful of the fact that it has not been provided with sufficient
information which would allow it to come to an informed decision as to the
extent/degree (monetary) of the FSP‟s liability under the claim arising from
the initial stormwater inundation of the shed and kennels.
27. Accordingly, the Panel urges the parties to act in a cooperative manner to
establish the extent of damage to the insured property limited to the shed
and kennels arising from the initial stormwater inundation.
Case No: 269309 Determination Page 9 of 9
Determination
28. On the basis of the available information the Panel determines that the FSP
is liable under the policy to provide indemnity to the Applicants (within 30
days of receiving this determination) in line with the matters discussed
above.
29. The FSP is to pay to the Applicants interest at the statutory rate, in line with
the Insurance Contracts Act 1984 , upon the final settlement figured agreed
between the parties from 28 March 2011 (date of final decision) to final
settlement of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.