Claim denied for ceiling and chimney movement (run-off and policy conditions)
Summary
A homeowner claimed for spare-bedroom ceiling cracking and chimney movement caused by run-off water, and the FSP denied it on policy conditions and soil movement. AFCA found the run-off insured event established, apportioned liability 80/20 for the applicant's failure to maintain the building, and ordered a scope of works and repair.
Run-off is an insured event, and the FSP must prove the precautions and maintenance conditions to deny; the 80/20 apportionment reflects about twelve months of partial failure to maintain.
Issues
- Claim denial primary · upheld
“Run-off is an insured event and the FSP's denial is rejected; the applicant's failure to maintain the building reduces payment to 80/20.”
- Product terms interpretation secondary · not upheld
“The FSP's argument that footing movement over time fell outside the run-off cover was rejected.”
Subjects and remedies
home or building damagerepair or rectify
Text of the determination
Case No: 268884 Determination Page 1 of 6
Case number: 268884
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Insured Event - Run-Off - Policy Conditions - Take
Reasonable Precautions - Maintain Buildings in Good Repair - Breach
9 August 2012
Background
1. This is a review of a Recommendation by the Service’s Case Manager dated
30 May 2012 in favour of the Financial Services Provider (FSP). The
Applicant has rejected the Recommendation and in accordance with the
Terms of Reference the matter has been referred to me for Determination.
2. The relevant background, summaries of the parties’ position and issues in
dispute are set out in paragraphs 1 to 11 of the Recommendation and in the
interest of clarity and completeness I will restate same.
3. The Applicant holds a home building insurance policy with the FSP.
4. On 17 September 2011, the Applicant lodged an on-line claim with the FSP.
He gave the following details:
“A noticeable shift in the chimney structure at the property, causing cracking
to the ceiling. There has been a small crack in the ceiling for a while, but it is
becoming quite pronounced, and there is an obvious shift in the brickwork. I
am concerned that the brick chimney stack may fall into the house. I am not
aware of what costs wo uld be involved to stop further damage.”
5. On or about 9 January 2012, the Applicant contacted the Financial
Ombudsman Service (FOS). He stated that he has received no assistance
from the FSP and asked that it expedite and resolve the claim.
6. In its Notice o f Response dated 13 February 2012, the FSP “acknowledged
that during the initial phases of the claim, progress was lacking”. It
apologised to the Applicant and said that it “has [now] given the matter
priority in an effort to determine the cause of the damage to provide an
outcome to the Applicant.”
Determination
Case No: 268884 Determination Page 2 of 6
7. On 9 March 2012, the FSP denied the claim stating, among others:
“On this occasion we are unable to accept your claim because your policy
specifically excludes any loss or damage which is not caused directly by an
insured event, the policy also states that you must take all reasonable
precautions to preve nt any further loss or damage.” (sic)
8. In denying the claim, the FSP relied on the report by W Engineer and
highlighted the policy exclusions c to g under the insured event “9. Storm,
rainwater or run- off”.
Summary of Applicant’s p osition
9. In his submission to FOS dated 23 April 2012, the Applicant says that W
Engineer’s report does not support the view th at policy exclusions 9(c) and
(g) apply.
10. He contends that “As with all Insurance Contracts, unless liability is
specifically excluded it is not appropriate for the exclusionary clauses to be
given a wider reading, but they must be strictly construed.”
Su mmary of FSP’ s position
11. The FSP says that it denied the claim “on the basis that the loss had
occurred due to movement of the footings over an extended period of time,
and therefore could not be attributed to one of the defined events”.
12. It further says that under the insured event of storm, loss due to soil
movement and shrinkage or expansion of the land is excluded from cover.
Issue
13. Whether the FSP must indemnify the Applicant.
Reasons for Decision
14. There has been a full exchange of information and each party has had the
opportunity to address the issues that have been raised.
15. I have read all of the exchanged information and I have carefully considered
the parties’ submissions including the Applicant’s further submission
received by the Service on 3 July 2012.
Case No: 268884 Determination Page 3 of 6
16. In making her Recommendation the Case Manager set out her reasons in
paragraphs 14 to 26 and I will restate same:
“Damage Caused By Insured Event “Run -Off ”
“14. During my telephone call with the Applicant on 17 May 2012, I noted that
he has not alleged an insured event and has not submitted expert evidence.
15. The Applicant said that the damage to the property was caused by the
insured event of “rainwater or run - off”. He said that this is supported by W
Engineer’s report which the FSP obtained.
16. W Engineer’s report relevantly reads:
“ 2. Discussion.
The damage to the spare bedroom ceiling and the movement in the chimney
and at the front verandah piers are all part of the same problem.
It is our opinion that water from the top side of the road has run across the
road and ponded at the front left hand corner of the residence, then
penetrating beneath the footings allowing the chimney and the front corner of
the residence to subside. We have assumed here that the existing chimney
footings bear onto active clay material, otherwise no settlement would have
occurred.
The verandah piers have been pushed outwards as the corner of the house
has settled pushing the verandah rafters forward which has applied pressure
to the verandah columns and this pressure has been released at the weakest
point which is at the top of the brick piers.
To prevent the water from ponding at the front of the residence we
recommend approaching the council to kerb and gutter the road in front of the
house. In addition a small contour bank should be installed across the front
yard and driveway to divert water to the drain to the right of the residence. ”
17. The insured event of “rainwater” is defined in the policy as “rain falling
naturally from the sky onto the buildings and/or ground”. On the other hand,
the insured event of “run - off” is defined in the policy as “rainwater that had
collected on or has flowed across normally dry ground or has overflowed from
swimming pools or spas”.
18. W Engineer’s report refers to water from the top side of the road running
across the road and ponding at the front of the residence. I am satisfied that
this falls within the insured event of “run - off”.
19. Therefore, in my opinion, the Applicant has established a prima facie
claim.
Breach of Policy Condition
20. However, I note that there is overwhelming evidence proving that cracks
have already been occurring for a long period of time before the Applicant
contacted the FSP.
21. The First Report from the FSP’s assessor C dated 31 January 2012
relevantly reads:
“…our enquiries were undertaken with the insured’s baby sitter, [R].
[R] stated she had been employed by the insured for approximately five (5)
years and had formally moved into the dwelling as the insured’s “live in” baby
sitter the day prior to our attendance.
Case No: 268884 Determination Page 4 of 6
[R] recalled the Spare Bedroom, the subject of this claim, was previously the
Office, however the insured converted the room into a Spare Bedroom when
they asked her to move in.
[R] recalls there has been a crack evident in the ceiling in the Spare Bedroom
since she has been employed at the risk address. [R] also advised that over
the last 12 months the ceiling has dropped, with the situation worsening
substantially since Christmas 2011.
We subsequently spoke with [the Applicant], via telephone, who advised he
purchased the property in August, but cannot recall whether the year was
2006 or 2007. Noting the original inception dated of this Policy was 22 August
2006, together with the fact that [R] has worked at the property since 2007,
we suspect the correct year was 2006.
In 2009, [the Applicant] recalls sighting a hairline crack in the ceiling of this
room and filled with No More Gaps”.
22. Further, the Applicant had admitted during claim lodgement that “there
has been a small cra ck in the ceiling for a while”.
23. I also note W Engineer’s report which suggests that the damage to the
property has been occurring for a long period of time, thus:
“ The damage to the residence, or alternatively the movement of the chimney
could have been occurring since the residence was built, this question would
probable be better answered by the original owner.” (sic)
24. While the policy covers the insured event of “run -off ” , the policy is subject
to certain conditions. Pages 47 and 48 of the Product Disclosure Statement
state:
“ Conditions of cover
…
3. Taking precautions
We will not pay for loss… damage of you do not:
take all reasonable precautions to prevent the loss…or damage;
…
maintain your buildings in good repair;” .
25. Based on the evidence before me, I am satisfied that cracks have been
occurring in the insured property since 2007 and the Applicant has failed to
take reasonable precautions to prevent further damage and to maintain the
insured building in good repair.
26. In my opinion, the Applicant has breached the above conditions and
therefore, the FSP is entitled to deny the claim”.
17. As noted by the Case Manager the Applicant is required to establish the
damage was caused by an insured event. If it is established that damage
has been caused by an insured event, the FSP then carries the burden of
proving that an exclusion applies and on the basis of that exclusion it is
entitled to deny the policy.
18. In its response dated 8 May 2012, the FSP allege that the loss occurred due
to movement of the footings of the building over an extended period of time
and therefore could not be attributed to one of the defined events. I disagree.
Case No: 268884 Determination Page 5 of 6
19. The Case Manager referred to the engineer’s report from W set out in
paragraph 16 of her Recommendation. That report clearly attributes the
damage to the penetration of water from the front left hand corner of the
property beneath the footings causing the chimney in front corner of the
residence to subside. The engineer made recommendations in respect of
prevention of water from the ponding at the front of the residence. I am
satisfied that the ponding of the water referred to by the engineer falls within
the insured event of “rainwater or run - off”.
20. As noted by the Case Manager, the obligation then falls on the FSP to prove
that an exclusion applies.
21. The only exclusion which would appear to be relevant falls within condition 3
as set out in paragraph 24 of the Recommendation namely failing to take
reasonable precautions to prevent loss or damage or failing the obligation to
maintain the buildings in good repair.
22. In his further submissions dated 3 July 2012, the Applicant disputes the
allegation that he failed to take reasonable precaution to prevent that
damage or that he failed to maintain the buildings in good repair. He points
out that there is no evidence the building was not maintained in good repair,
save for the cracking. He initially repaired the cracking with gap filler but after
significant rainfall in mid to late 2011 the cracking became more pronounced
and the chimney gave signs of movement.
23. The FSP’s assessor at the time of original inspection conferred with the
Applicant’s baby sitter Ms KR. She had lived at the property for
approximately five years and recalled that there was a crack evident in the
ceiling in the spare room, which became her bedroom, from about the time
she moved in. However, over the previous twelve months, substantially since
Christmas 2011, the problem had considerably worsened.
24. Having regard to clause 8.2 of the Terms of Refere nce I am required, among
other things, to make a Determination that is fair in all the circumstances.
25. Whilst I am in a partial agreement with the Case Manager that cracks have
been occurring at the property since 2007 I also accept that the most severe
cracking occurred during the twelve months prior to the claim and in
particular after the heavy rainfall in or around Christmas 2011.
26. In my opinion, the damage was substantially caused by the rainwater run-off
over a period and that there was a degree of contribution on the part of the
Applicant in respect of the deterioration of the property albeit for a period of
approximately twelve months.
27. In accordance with the Terms of Reference 8.2 I intend to a portion damage
80/20 in favour of the Applicant.
Case No: 268884 Determination Page 6 of 6
Determination
28. I determine that the FSP is required to obtain a scope of works to rectify the
cause of damage to the spare bedroom ceiling and to rectify the cause of
movement to the chimney in accordance with its engineer ’ s report.
29. Upon receipt of the scope of works the FSP is to obtain three independent
quotations for the cost of rectification. Upon receipt of the quotations, the
FSP is to settle the Applicant’s claim by repair by the lowest quoting
contractor. In the event that the Applicant does not agree to the carrying out
of the work by the lowest quoting contractor or does not agree to a cash
settlement equivalent, the matter can be referred back to the Service for
further consideration.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.