Text of the determination
Case No: 268868 Determination Page 1 of 12
Case number: 268868
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation - Flood vs Flash Flood
7 December 2012
Background
1. The Applicants insured their home and contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 18 August 2010. During this period, the building was insured
up to a sum of $300,000 and the contents for $80,000.
2. On 17 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicants have disputed this.
4. Both the Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicants ’ position
5. The Applicants are represented; for the sake of simplicity, reference to the
Applicants will include their legal representatives.
6. The Applicants submit the following as alternative arguments in response to
the FSP‟s decision:
The FSP misled them about the level of cover and the protection it
provided at policy inception.
The FSP breached its duty of utmost good faith by failing to ensure the
policy the Applicants had taken out was suitable to their needs.
The FSP‟s policy failed to clearly inform them that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4am on 11 January 2011 which resulted in the Wivenhoe
Determination
Case No: 268868 Determination Page 2 of 12
Dam operators elevating their strategy to W4. This decision resulted in
massive discharges of water into the Brisbane River that ultimately
inundated their property.
Summary of FSP’s position
7. In response to the Applicants‟ arguments, the FSP submits the following:
It denies its telephone consultant misrepresented the cover provided
under the policy at the time of the policy‟s inception. Alternatively, the
Applicants are unable to establish any detriment suffered from the
alleged misrepresentation.
The duty of utmost good faith does not extend to an obligation to
ensure a policy is suitable to the Applicants‟ needs.
There is no dispute that the Applicants were furnished with a copy of
the Product Disclosure Statement (PDS) after inception. The policy
structure and layout contained in the PDS enables the FSP to rely on
the exclusion clause of “flood” pursuant to Section 35(2) of the Act.
The loss suffered was a consequence of a flood, which is an excluded
event under the policy.
8. The FSP relies on a number hydrology reports authored by SC and the
following p olicy provisions to deny the Applicants‟ claim :
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
Case No: 268868 Determination Page 3 of 12
with strong w inds including a cyclone, light ning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher , but not exceeding your contents
sum insured .
...
Case No: 268868 Determination Page 4 of 12
...”
Issues
9. Whether the FSP misrepresented the level of cover provided under the
policy to the Applicants at the time of the policy‟s inception.
10. Whether the FSP breached its duty of utmost good faith in allowing the
Applicants to incept this type of policy.
11. Whether the Applicants were “clearly informed” about what the policy did and
did not cover.
12. Whether the cause of the Applicants‟ loss was covered under the policy.
Reasons for decision
13. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
14. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
15. It is appropriate to consider the issues under the various headings.
Alleged Misrepresentation of Policy at Inception
16. The male Applicant incepted the policy with the FSP over the telephone on
18 August 2010. He claims that at the time of inception:
“I was told that I would be covered for storm damage, storm water and storm
water runoff. They did say that flood was available...
I was told that I was covered for flash flooding as well as the storm water. This
statement was what „sold me‟ on the policy.”
17. The FSP supplied a transcript and recording of the policy inception
telephone call and the Panel notes that the Applicants have not disputed its
authenticity. The transcript notes that the representative informed the male
Ap plicant that the policy provides cover for “flash flood and your stormwater
runoff” and that:
“If you‟re looking for a more specific type of flood damage, that is something
separate on the policy”.
18. The Panel can understand that there could be some confusion arising from
the inception telephone call. The Panel‟s view however is clear that the call
Case No: 268868 Determination Page 5 of 12
identified that flash flood and flood was treated differently. It is not in dispute
that the Applicants received a copy of the PDS and Certificate of Insurance.
19. The Certificate of Insurance clearly identifies that flood is not covered under
the terms of the policy.
20. The PDS has an index on the inside cover which highlights the areas of the
policy to which the policyholder might find information. Included in this is
“Words/terms with special meanings” on page 9, for which definitions of
relevant terms in the policy are provided. Flood is included in this on page
10, together with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
21. In addition to this, page 53 directs the reader to “Flood and storm surge”,
which is explained under the broader definition of “Optional covers for extra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
22. A fair reading of section 35(2) of the Act requires that the relevant exclusions
and limitations be provided in clear and unambiguous language such that a
person of average intelligence and education would have little difficulty in
finding and understanding should they choose to read the policy.
23. In the Panel‟s view despite the possible misunderstanding that occurred on
inception of the policy, if the Applicants had read the policy, they would have
little difficulty in finding and understanding the nature of the limitations on
cover and understanding that flood was not covered under the terms of the
policy.
24. In the circumstances the Panel is satisfied that the FSP has met its
obligations under section 35 of the Insurance Contracts Act to clearly inform
the Applicants of the relevant limitations and exclusions.
Water Inundation
The Evidence
25. The FSP‟s policy does not extend cover to circumstances where a loss is
caused by a flood. The policy distinguishes between flood, flash flood and
stormwater run-off (the latter two of which are covered). It extends cover to
damage from sudden flood events “caused by heavy rain that fell no more
than 24 hours prior” to the fla sh flood.
26. The Applicants returned home in the afternoon of 11 January 2011 and
noted that water had inundated the street. It moved up their driveway and
was about 100mm from their home just after 5.00pm. A neighbour later
informed the male Applicant that the water entered the property sometime
between 11.00pm and midnight.
Case No: 268868 Determination Page 6 of 12
27. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicants ‟ property.
The report estimated that there was about $120,000 worth of building
damage and $60,000 of contents damage.
28. MY attributed the loss to “Rainwater” and noted that a hydrologist report was
“Required; Recommended” (sic).
29. The FSP subsequently engaged a hydrologist, SC, to provide a report as to
the damage.
30. SC provided a statutory declaration dated 14 February 2012 to evaluate the
cause of the loss in the region surrounding and specifically affecting the
Applicants ‟ home. He found that:
The terrain data for the Applicants‟ home shows that the proper ty varies
between 4.4m AHD (Australian Height Datum) and 6.7m AHD. The
ground level of the home was elevated (with a brick base) and the ground
level under the home itself was estimated between 5m AHD at the front
to around 5.7m AHD at the rear. The floor level of the home was
estimated to be elevated around 1.2m above the front ground level,
leaving the minimum floor level of the home at about 6.2m AHD.
The terrain data for the Applicants‟ home suggested that it would not
have been “particularly vulnerable ” to significant stormwater or run -off
problems during the period.
A review of the rainwater gauge at the Corinda High Alert rainfall gauge,
approximately 1.5km from the Applicants ‟ property and representative of
its rainfall in the expert‟s opinion, revea led that 85mm of rain fell over 9
and 10 January 2011, with a further 43mm falling on 11 January 2011.
The most intense rainfall on 11 January 2011 fell between 10am and
11am and was 15mm. No rainfall was recorded after 5.00pm on this day.
The overall intensity of the rainfall was low and unlikely to result in run-off
or stormwater inundation to the property.
By 3.00pm on 11 January 2011, the levels of the Brisbane River were
4.4m AHD and this would have been sufficient to inundate the minimum
level of the Applicants‟ property. By 6.00pm the level was at 4.8m AHD
and this would be sufficient to inundate the driveway. These levels are
consistent with the Applicants‟ recollections.
By 11.00pm, the water had risen to 5.5m AHD, which was “sufficient to
inundate the ground level underneath the floor level of the house”. It
continued to rise and reached 6.2m AHD, which would have been
sufficient to enter the home at floor level at about 3.30am on 12 January
2011.
Case No: 268868 Determination Page 7 of 12
The Applicants‟ property was inundated by floodwater from the Brisbane
River and not stormwater run-off or flash flooding (as defined in the
policy).
31. As a result of the report from SC, the FSP denied the claim on the basis that
it considered the cause of the loss to be flooding from the Brisbane River.
32. Since the matter has been referred to the Service, the Applicants have
suggested that the releases of water from the Wivenhoe Dam on 11 January
2011 were a significant factor in the increased water levels in the Brisbane
River and that this was a major influence in the inundation of their home.
Flash Flood vs Flood
33. The Panel accepts that ultimately the Applicants‟ property was inundated by
flood waters from the Brisbane River. The central issue for determination in
this matter is therefore whether the inund ation of the Applicants‟ home was
due to flash flood as defined within the terms of the policy, that is, whether
the cause of inundation was rain that fell no more than 24 hours prior to the
inundation or whether the inundation was flood.
34. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
35. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
36. In view of this, the FSP provided detailed further submissions to FOS in
relation to this dispute. Included with the submissions were the following
documents:
A Reference document (cited 12 June 2012 and amended 11 July
2012) for disputes relating to Queensland Floods (this is a general
reference document) relating to the various submissions the FSP
makes in relation to a number of issues. Not all issues raised in the
reference document appear in the current dispute;
Letter from the FSP‟s hydrologist attaching a Key Conclusio ns
summary for the Applicants‟ property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane”;
Further statement from the hydrologist.
Case No: 268868 Determination Page 8 of 12
37. The Panel has reviewed the reference document. Insofar as the reference
document relates to the current issues in dispute, those matters have been
considered.
38. The FSP maintains that on any reasonable view, the damage sustained to
the downstream properties was the combined effect of all of the rainfall and
not just the rain that had fallen from 4.00am on 11 January 2011 leading to
the implementation of the W4 strategy from 8.00am that day.
39. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011.
40. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
41. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
42. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
43. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
44. The ICA hydrology and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
Case No: 268868 Determination Page 9 of 12
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
45. The Panel agrees with the FSP‟s general submission that the proximat e
cause is a cause determined by common sense evaluation of the relevant
facts. In the event that there are two or more proximate causes, one within
the policy and the other excluded, the policy does not respond. The
proximate cause is not determined by identifying the last event or final trigger
but by determining what is the dominant, effective, direct or efficient cause of
the loss.
46. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
47. With respect to the FSP‟s argument the Panel disagrees. Whilst the Panel
accepts there has been a significant impact on the levels of the Wivenhoe
Dam by the rainfall that commenced falling on or about 9 January 2011 or
earlier, the Panel is satisfied having regard to the information that has been
exchanged and the relevant legal principles, that the heavy rain that
commenced falling on or about 4.00am on 11 January 2011 was a proximate
or effective cause of the adoption of the W4 strategy.
48. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicants’ Inundation
49. SC has provided a further statement including a Key Conclusions statement
dated 7 June 2012.
50. The benchmark level of the Applicants‟ property that is the lowest point of
the structure of the house (or other relevant structure on the land) was 6m
AHD. He considered the benchmark level to be the shed. According to SC,
the Brisbane River reached the benchmark level at 2.38am on Wednesday,
12 January 2011. By 4.00am on 12 January 2011, the River would have
been at approximately 6.2m AHD which is 200mm above benchmark.
51. The property was ultimately inundated to 3.2m above the benchmark by
3.01am on Thursday, 13 January 2011.
52. Examination of the information contained in the further statement shows the
specific point for the benchmark level was set at the front area of the
Applicants‟ garage towards the eastern side of the property.
Case No: 268868 Determination Page 10 of 12
53. The Panel notes SC‟s statement that he had previously referred to the level
of the house at 6.2m AHD as being the benchmark. He revised the
benchmark following a review of the file.
54. The key conclusion statement from SC sits unfavourably with his initial
statement of inundation, which suggests that the home was inundated above
floor level at approximately 3.30am on 12 January 2011. As the floor level
was at 6.2m AHD and this had just been reached by 4.00am in the final
statement, the accuracy of SC‟s calculations must be considered, as must
be the question of whether the home was actually inundated above floor
level at this time.
55. The Applicants have produced no written eyewitness evidence of the time of
inundation, although his neighbour claims that the water reached the home
around 11pm on 11 January 2011. SC stated in his original consideration of
the loss that this fitted well with his calculations, although no damage was
sustained until the water rose above floor level at around 3.30am. As
previously mentioned, this was later revised.
56. The anecdotal evidence of the male Applicant was that the water was rising
fast just after 5.00pm when he left. The suggestion of SC is that the home
was not inundated for another eleven hours or so.
57. Whilst the difference in the respective inundation estimates is only half an
hour, it is of great relevance to the issue of cover for the Applicants and the
estimation of the extent of inundation. In the Panel‟s view, the evidence
suggests that the home was inundated above floor level prior to 4.00am on
12 January 2011. It is also very possible that this inundation occurred prior to
3.30am.
58. To assist in determining this matter, the Panel Chair Ombudsman conducted
a site inspection of the Applicants‟ property on 19 November 2012. Both the
Applicants and the FSP‟s representative were present. The property is
slightly elevated. At the rear of the property there is an open spoon drain (the
male Applicant refers to this as a gully) that runs along the back fence. This
drain collects all the water from the surrounding property and then once
collected this runs across the property to a further spoon drain that runs
down the side of their property. In the boundary between the Applicants‟ and
the neighbour‟s house to the front of the property, the male Applicant
reported significant water flowing through this area during the peak of the
rainfall and afterwards.
59. The garage sits to the rear of the Applicants‟ property. According to the male
Applicant it was almost totally inundated during the floods. Water would have
been running through the garage during the peak rainfall and subsequently.
The garage is on a concrete slab and according to the hydrology report; it is
at 6m AHD. From the garage there is a step down about 200mm to a patio
area. This area is tiled and runs to the back of the house. At this point the
house is elevated. Based on measurements taken during the site inspection,
the floor of the house would be approximately 650 -700mm above ground
level. This would put the benchmark level of the house at about 6.2m AHD.
Case No: 268868 Determination Page 11 of 12
60. The male Applicant confirmed that when he left the area at about 5.00pm,
the water was only a 100mm from entering his gates. It is his neighbour who
believes he observed water entering the house at around 11.00pm.
61. The Panel notes that SC has used different scales in determining the timing
of the inundation. In the first scales, he used three hour readings whilst in the
latest, he has used a four hourly measurement. Looking at the
measurements, in the Panel‟s view, it is possible that the inundation by
4.00am could be up to 6.4m AHD.
62. The Panel is satisfied that the accuracy of the es timation by SC is made to
the best of the information available to him and will vary depending on that
information.
63. For the purposes of this dispute, the Panel accepts that the Applicants‟
property was inundated above benchmark level and that the inundatio n of
the Applicants‟ property at 4.00am on 12 January 2011 was to a level of
6.4m AHD.
64. Accordingly, the Panel is satisfied having considered all of the information
provided, the relevant terms of the policy, relevant legal principles, prior
determinations where appropriate and good insurance practice, it would be
fair in all the circumstances to determine that the inundation of the
Applicants‟ property by 4.00am on 12 January 2011 was as a result of flash
flood in accordance with the terms of the policy and that the level of
inundation at that time was 0.4m above benchmark.
65. Inundation after approximately 4.00am on 12 January 2011 would not fall
within the relevant 24 hour period and would be properly classified as flood.
Any damage as a result of such inundation is excluded under the policy.
Quantum
66. Under the relevant limitations for flash flood and stormwater runoff, the
FSP‟s liability is limited to a maximum amount of 50% of the sum insured. At
the time of the loss, the building was insured for the sum of $300,000 with
contents of $80,000 and therefore under relevant limitations for flash flood,
the maximum liability for damage to the building would be up to an amount of
$150,000 whilst maximum liability for damage to contents would be $40,000.
67. The information exchanged does not allow the Panel to determine the extent
of damage sustained as a result of inundation to a level of 0.4m above
benchmark. The Panel is satisfied that significant damage would have been
occasioned to the contents of the garage as a result of this inundation.
Inundation through the house would have been to a maximum level of 0.2m
or 200mm. At this level of inundation, there would be substantial structural
damage and also substantial damage to contents. It is fair however that the
FSP be given the opportunity to obtain a detailed scope of works to
determine the extent of the loss due to the inundation as assessed and the
parties are asked to work cooperatively together to establish the extent of
Case No: 268868 Determination Page 12 of 12
the loss sustained due to the inundation from flash flood as determined in
this matter.
68. Insofar as the FSP may have paid payment of a compassionate sum to the
Applicants, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassiona te
payment was made, may be entitled to deduct this payment from any
settlement sum.
69. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes “unreasonable for the insurer to have withheld payment”. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
70. The most relevant date for this matter is the date upon which the claim was
denied, being 26 March 2011, and therefore the Panel considers that where
payment is to be made for any item relevant to the claim to the Applicants
direct, interest must be applied from this date.
Determination
71. The FSP is to meet the cost of repairs incurred by the Applicants and the
cost of the replacement of items damaged as a result of the inundation of the
property above the benchmark level of 6m AHD to a level 0.4m into the
garage and 0.2m inside the house. Any payment is subject to the limitations
expressed under the flash flood provision of the policy.
72. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
26 March 2011 (being the date of rejection of the claim) to date of payment
of the claim, in accordance with Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.