Home / Financial Firm (Unknown - Insurer) / Determination 268609

Determination 268609

Dispute over cash settlement amount for storm-damaged building (repair cost versus sum insured)

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$351,411
Non-financial loss—
Amount claimed$440,000
SourceAFCA PDF

Summary

The insured claimed the sum insured plus demolition costs for cyclone damage to his home. AFCA found the FSP could settle on repair cost, ordered payment of its $351,411 repair figure plus the cost of fencing and shed repairs, and ordered statutory interest.

Under the policy the FSP may settle on the reasonable cost of repair, and the evidence showed the building could be repaired within the sum insured, so total loss was not established.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 268609 Determination Page 1 of 6 Case number: 268609 General Insurance - Domestic Insurance - Home Building - FSP Decision – Claim amount 14 November 2012 Background 1. The Applicant is insured with the Financial Services Provider (FSP) under a home building and contents insurance policy. The building was insured for the sum of $400,000 with a policy excess of $1,000. Contents were insured for $53,000 subject to a $500 excess. 2. On 4 February 2011 the Applicant lodged a claim under the policy for damage caused to the insured property as a result of Cyclone Yasi which occurred on 2 February 2011. 3. The FSP arranged for a loss adjuster to attend the property and report on the damage. The loss adjuster noted the property had suffered substantial damage and that repairs would most likely exceed the sum insured plus allowance of 10% of removal of debris. The loss adjuster appointed a building consultant to prepare a scope of works. Quotations for repairs were requested based on the scope of works. 4. Following receipt of the scope of works and quotations the FSP deemed the building could be repaired within the sum insured and proposed settlement based on the “most competitive” quote of $304,436. 5. The Applicant disputes that the building could be repaired within this amount and believes there are hidden costs. He requested settlement on the building sum insured of $400,000 plus 10% of the sum insured to cover demolition of the property. 6. T o support his position the Applicant obtained his own engineer’s report plus quotations in excess of $400,000 to repair the building. 7. The FSP confirmed in writing to the Applicant on 27 January 2012 that it was willing to settle the claim in the amount of $304,436. The Applicant maintained his position on settlement of the claim for the building sum insured. 8. The FSP advised that it is not obliged to settle on the sum insured as the building can be repaired based on the available evidence. Nevertheless, in an attempt to resolve the differences, the FSP arranged for a quantity Determination Case No: 268609 Determination Page 2 of 6 surveyor to provide a comparative cost estimate based on the quotations submitted and also underwent a process of mediation with the Applicant. 9. Following a further site inspection the FSP accepted that the property had sustained further deterioration since the initial engineer’s inspection of the property. It obtained an amended scope of works and offered an additional $46,975 bringing the total settlement for the building to $351,411. 10. The Applicant maintains his position the claim for the building should be settled on the building sum insured plus 10% for demolition costs. Summary of Applicant’s position 11. The Applicant says he was initially advised the building was a total loss and would be paid the sum insured; based on the available reports and information the property needs to be demolished. 12. The Applicant asks that the claim be settled on the building sum insured of $400,000 plus 10% of the sum insured to cover demolition costs and that payment be made for further accommodation. Summary of FSP’s position 13. It maintains its position based on the available evidence, and in the absence of evidence in the contrary. It has been established that the building can be repaired. 14. Whilst it has agreed to cover the further damage that has occurred subsequent to the date of loss, this damage could have been avoided had the Applicant accepted its expert evidence and allowed the commencement of repairs. 15. It is satisfied that its offer of settlement is fair and reasonable for the purpose of settling the claim. It wishes to settle the claim on the following basis:  Quotation dated 16 December 2011 - $304,436;  The amended scope of works dated 16 April 2012 - $46,975. 16. The FSP relies on the following policy provisions: “ Storm We will cover Loss or damage caused by storm, including cyclone, hail, wind, snow or rain. ... Additional benefits for Building cover. ... Demolition and removal of debris Case No: 268609 Determination Page 3 of 6 We will cover the costs of necessary demolition of the home or parts of it, and removal from the home and the site of all the resulting debris. ... Quality Care Up to 10% of the sum insured ... Emergency accommodation We will cover the costs of similar alternative accommodation for you and any persons currently living permanently in your home, provided your home is unliveable. Up to 10% of the current building sum insured or the cost of accommodation for up to 12 months from the date of the event, whichever is the smaller Your sum insured. Your sum insured is the amount shown in the policy schedule for which we insure your building, investment property, contents or personal valuables. We will never pay more than the sum insured for claims unless we say so in a particular section of this PDS or your policy schedule. ... How we settle your claim When we accept your claim: In all cases where loss or damage has occurred, we will only pay up to the sum insured shown in the policy schedule. ... ... Repairing or replacing: When we agree to pay your claim for loss or damage: We may choose to pay  the reasonable cost of repair, or  the reasonable costs of replacement to a new condition with property of the same size and specifications or with items as near to original as is currently possible, or  a cash amount. If we agree to pay cash, we will pay the amount it would reasonably cost to repair or replace the property. Where a building is not being replaced, the amount we will pay will be less a reasonable deduction for depreciation due to wear and tear and age of the property. We will pay  the reasonable additional costs of repairing or rebuilding caused by changes in building codes, by-laws or ordinances  to match materials, items or construction with those that existed before the loss or damage occurred and where that is not possible, with the nearest similar materials, items or construction  only those costs that directly apply to the part of your property that has suffered loss or damage.” Case No: 268609 Determination Page 4 of 6 Issue 17. Whether the FSP’s settlement of $351,411 fulfils it s obligation under the terms of the policy. Reasons for decision 18. FOS has considered it is appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is because of the issue in dispute and substantive quantum involved. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 19. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 20. There has been an exchange of material between the parties. For the sake of brevity, the Panel does not intend to recite material in this Determination except where considered relevant. 21. It is not disputed the Applicant was provided with the Product Disclosure Statement (PDS). There is also no dispute about the Applicant’s contents claim which the FSP has settled. 22. What is disputed is the FSP’s offer of settlement for damage caused to the building as a result of Cyclone Yasi. The Applicant is seeking settlement of the claim on the building sum insured plus 10% of the sum insured for demolition costs. The FSP wishes to settle the claim on the cost to repair the building. The FSP relies on the evidence obtained to support its decision. 23. The Panel notes the attempts by the FSP to resolve this matter including mediation to which the Applicant has rejected as he seeks settlement of the claim on his terms. 24. The Applicant obtained his own builders’ quotes and engineer’s report. The Applicant’s engineer noted that “the extent of rectification and upgrading required due to damage sustained as well as the general condition of the structure, does not allow for economical rectification and upgrading.” The FSP says that this does not amount to saying that the building cannot be repaired within the sum insured. 25. The Panel notes that the Applicant is bound by the terms of the policy with the FSP. According to the policy the method by which a claim is settled is at the FSP’s option. It can either choose to pay:  the reasonable cost of repair, or  the reasonable costs of replacement to a new condition with property of the same size and specifications or with items as near to original as is currently possible, or Case No: 268609 Determination Page 5 of 6  a cash amount. If we agree to pay cash, we will pay the amount it would reasonably cost to repair or replace the property. Where a building is not being replaced, the amount we will pay will be less a reasonable deduction for depreciation due to wear and tear and age of the property. 26. The FSP obtained two scopes of works for identified repairs. The first scope of works was done on 29 March 2011. Quotes were obtained based on this scope of works. 27. In an endeavour to resolve this matter the FSP arranged for an updated scope of works. A scope of works dated 16 December 2011 was submitted by another building consultant following his site inspection on 5 December 2011. Two quotes for repairs were obtained based on this scope of works. The most competitive quote was for the amount of $304,436. 28. The FSP has accepted that repair of additional damage that has occurred to the property following the claimed event. It has quantified the cost of these additional repairs using a quantity surveyor. 29. The FSP says its settlement for the total amount of $351,411 is fair and reasonable. It confirmed that the builder who provided the most competitive quote is willing to undertake the repair. 30. The Panel notes that the SOW relied upon by the FSP does not include repairs to fencing or the shed which was included in the initial SOW on which repair quotes were obtained. On sighting the initial quotes it is expected that the cost for fencing and shed repairs would not exceed $5,000. Nevertheless the FSP will need to quantify these costs and include it in its offer of settlement. 31. Although the Applicant is seeking to have the claim settled as a total loss , the evidence before the Panel does not establish this. Indeed the information provided by the FSP shows the building can be repaired within the building sum insured. 32. The Panel accepts that the Applicant is bound by the terms of the policy. The Panel is satisfied that the FSP is entitled to pay settlement less a reasonable deduction for depreciation as allowed for under the policy but has not applied this in this instance. Further accommodation payment 33. The Applicant requested further accommodation payments. The FSP advised it has paid the Applicant for 12 months of accommodation in accordance with the policy terms. The Applicant does not dispute the FSP has paid him accommodation as per the policy The Panel is satisfied the FSP was entitled to deny any further request for accommodation. Case No: 268609 Determination Page 6 of 6 Payment of funds into bank account 34. The Panel notes that the FSP wrote to the Applicant on 27 January 2012 offering settlement of $304,436.The FSP advised that it would issue a deed of release to be signed if the Applicant accepted this amount to enable funds to be released. The Panel accepts that this was, at that time, the FSP’s extent of liability. 35. Although further consideration was sought by the Applicant and a further amount was offered the Panel nevertheless, considers that the FSP has had the benefit of the Applicant’s funds since 27 January 2012. 36. The Panel accepts the FSP was aware that the Applicant wished to pursue the matter to the fullest extent. There is nothing to suggest that the FSP was entitled to withhold the funds whist the Applicant continued with his dispute. 37. The Panel is satisfied that interest on these funds should be awarded. Determination 38. On the basis of the available information the Panel determines the FSP has established the Applicant’s entitlement under the policy to pay the reasonable cost to it for repairs. The FSP has set out in its submission that its liability is $351,411. However, this amount does not include repairs to damage fencing and shed repairs. The FSP is to quantify the cost of these repairs and include this sum in its settlement. 39. The FSP is to also pay interest on the amount of $304,436 at the statutory rate in accordance with Section 57 of the Insurance Contracts Act from 21 January 2012.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.