Dispute over cash settlement amount for storm-damaged building (repair cost versus sum insured)
Summary
The insured claimed the sum insured plus demolition costs for cyclone damage to his home. AFCA found the FSP could settle on repair cost, ordered payment of its $351,411 repair figure plus the cost of fencing and shed repairs, and ordered statutory interest.
Under the policy the FSP may settle on the reasonable cost of repair, and the evidence showed the building could be repaired within the sum insured, so total loss was not established.
Issues
- Claim amount dispute primary · not upheld
“The Applicant is bound by the policy; settlement method is at the FSP's option and the building can be repaired within the sum insured.”
- Delay secondary · upheld
“The FSP has had the benefit of the Applicant's funds since 27 January 2012; nothing suggests it was entitled to withhold the funds.”
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 268609 Determination Page 1 of 6
Case number: 268609
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Claim amount
14 November 2012
Background
1. The Applicant is insured with the Financial Services Provider (FSP) under a
home building and contents insurance policy. The building was insured for
the sum of $400,000 with a policy excess of $1,000. Contents were insured
for $53,000 subject to a $500 excess.
2. On 4 February 2011 the Applicant lodged a claim under the policy for
damage caused to the insured property as a result of Cyclone Yasi which
occurred on 2 February 2011.
3. The FSP arranged for a loss adjuster to attend the property and report on
the damage. The loss adjuster noted the property had suffered substantial
damage and that repairs would most likely exceed the sum insured plus
allowance of 10% of removal of debris. The loss adjuster appointed a
building consultant to prepare a scope of works. Quotations for repairs were
requested based on the scope of works.
4. Following receipt of the scope of works and quotations the FSP deemed the
building could be repaired within the sum insured and proposed settlement
based on the “most competitive” quote of $304,436.
5. The Applicant disputes that the building could be repaired within this amount
and believes there are hidden costs. He requested settlement on the building
sum insured of $400,000 plus 10% of the sum insured to cover demolition of
the property.
6. T o support his position the Applicant obtained his own engineer’s report plus
quotations in excess of $400,000 to repair the building.
7. The FSP confirmed in writing to the Applicant on 27 January 2012 that it was
willing to settle the claim in the amount of $304,436. The Applicant
maintained his position on settlement of the claim for the building sum
insured.
8. The FSP advised that it is not obliged to settle on the sum insured as the
building can be repaired based on the available evidence. Nevertheless, in
an attempt to resolve the differences, the FSP arranged for a quantity
Determination
Case No: 268609 Determination Page 2 of 6
surveyor to provide a comparative cost estimate based on the quotations
submitted and also underwent a process of mediation with the Applicant.
9. Following a further site inspection the FSP accepted that the property had
sustained further deterioration since the initial engineer’s inspection of the
property. It obtained an amended scope of works and offered an additional
$46,975 bringing the total settlement for the building to $351,411.
10. The Applicant maintains his position the claim for the building should be
settled on the building sum insured plus 10% for demolition costs.
Summary of Applicant’s position
11. The Applicant says he was initially advised the building was a total loss and
would be paid the sum insured; based on the available reports and
information the property needs to be demolished.
12. The Applicant asks that the claim be settled on the building sum insured of
$400,000 plus 10% of the sum insured to cover demolition costs and that
payment be made for further accommodation.
Summary of FSP’s position
13. It maintains its position based on the available evidence, and in the absence
of evidence in the contrary. It has been established that the building can be
repaired.
14. Whilst it has agreed to cover the further damage that has occurred
subsequent to the date of loss, this damage could have been avoided had
the Applicant accepted its expert evidence and allowed the commencement
of repairs.
15. It is satisfied that its offer of settlement is fair and reasonable for the purpose
of settling the claim. It wishes to settle the claim on the following basis:
Quotation dated 16 December 2011 - $304,436;
The amended scope of works dated 16 April 2012 - $46,975.
16. The FSP relies on the following policy provisions:
“ Storm
We will cover
Loss or damage caused by storm, including cyclone, hail, wind, snow or rain.
...
Additional benefits for Building cover.
...
Demolition and removal of debris
Case No: 268609 Determination Page 3 of 6
We will cover the costs of necessary demolition of the home or parts of it, and
removal from the home and the site of all the resulting debris.
...
Quality Care
Up to 10% of the sum insured
...
Emergency accommodation
We will cover the costs of similar alternative accommodation for you and any
persons currently living permanently in your home, provided your home is
unliveable.
Up to 10% of the current building sum insured or the cost of accommodation
for up to 12 months from the date of the event, whichever is the smaller
Your sum insured.
Your sum insured is the amount shown in the policy schedule for which we
insure your building, investment property, contents or personal valuables. We
will never pay more than the sum insured for claims unless we say so in a
particular section of this PDS or your policy schedule.
...
How we settle your claim
When we accept your claim:
In all cases where loss or damage has occurred, we will only pay up to the
sum insured shown in the policy schedule. ...
...
Repairing or replacing:
When we agree to pay your claim for loss or damage:
We may choose to pay
the reasonable cost of repair, or
the reasonable costs of replacement to a new condition with property
of the same size and specifications or with items as near to original as
is currently possible, or
a cash amount. If we agree to pay cash, we will pay the amount it
would reasonably cost to repair or replace the property. Where a
building is not being replaced, the amount we will pay will be less a
reasonable deduction for depreciation due to wear and tear and age of
the property.
We will pay
the reasonable additional costs of repairing or rebuilding caused by
changes in building codes, by-laws or ordinances
to match materials, items or construction with those that existed before
the loss or damage occurred and where that is not possible, with the
nearest similar materials, items or construction
only those costs that directly apply to the part of your property that has
suffered loss or damage.”
Case No: 268609 Determination Page 4 of 6
Issue
17. Whether the FSP’s settlement of $351,411 fulfils it s obligation under the
terms of the policy.
Reasons for decision
18. FOS has considered it is appropriate to expedite the dispute in accordance
with clause 8.6 of the FOS Terms of Reference. This is because of the issue
in dispute and substantive quantum involved. This dispute has not been the
subject of a FOS Recommendation and has proceeded directly to
Determination.
19. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
20. There has been an exchange of material between the parties. For the sake
of brevity, the Panel does not intend to recite material in this Determination
except where considered relevant.
21. It is not disputed the Applicant was provided with the Product Disclosure
Statement (PDS). There is also no dispute about the Applicant’s contents
claim which the FSP has settled.
22. What is disputed is the FSP’s offer of settlement for damage caused to the
building as a result of Cyclone Yasi. The Applicant is seeking settlement of
the claim on the building sum insured plus 10% of the sum insured for
demolition costs. The FSP wishes to settle the claim on the cost to repair the
building. The FSP relies on the evidence obtained to support its decision.
23. The Panel notes the attempts by the FSP to resolve this matter including
mediation to which the Applicant has rejected as he seeks settlement of the
claim on his terms.
24. The Applicant obtained his own builders’ quotes and engineer’s report. The
Applicant’s engineer noted that “the extent of rectification and upgrading
required due to damage sustained as well as the general condition of the
structure, does not allow for economical rectification and upgrading.” The
FSP says that this does not amount to saying that the building cannot be
repaired within the sum insured.
25. The Panel notes that the Applicant is bound by the terms of the policy with
the FSP. According to the policy the method by which a claim is settled is at
the FSP’s option. It can either choose to pay:
the reasonable cost of repair, or
the reasonable costs of replacement to a new condition with property of
the same size and specifications or with items as near to original as is
currently possible, or
Case No: 268609 Determination Page 5 of 6
a cash amount. If we agree to pay cash, we will pay the amount it
would reasonably cost to repair or replace the property. Where a
building is not being replaced, the amount we will pay will be less a
reasonable deduction for depreciation due to wear and tear and age of
the property.
26. The FSP obtained two scopes of works for identified repairs. The first scope
of works was done on 29 March 2011. Quotes were obtained based on this
scope of works.
27. In an endeavour to resolve this matter the FSP arranged for an updated
scope of works. A scope of works dated 16 December 2011 was submitted
by another building consultant following his site inspection on 5 December
2011. Two quotes for repairs were obtained based on this scope of works.
The most competitive quote was for the amount of $304,436.
28. The FSP has accepted that repair of additional damage that has occurred to
the property following the claimed event. It has quantified the cost of these
additional repairs using a quantity surveyor.
29. The FSP says its settlement for the total amount of $351,411 is fair and
reasonable. It confirmed that the builder who provided the most competitive
quote is willing to undertake the repair.
30. The Panel notes that the SOW relied upon by the FSP does not include
repairs to fencing or the shed which was included in the initial SOW on which
repair quotes were obtained. On sighting the initial quotes it is expected that
the cost for fencing and shed repairs would not exceed $5,000. Nevertheless
the FSP will need to quantify these costs and include it in its offer of
settlement.
31. Although the Applicant is seeking to have the claim settled as a total loss ,
the evidence before the Panel does not establish this. Indeed the information
provided by the FSP shows the building can be repaired within the building
sum insured.
32. The Panel accepts that the Applicant is bound by the terms of the policy. The
Panel is satisfied that the FSP is entitled to pay settlement less a reasonable
deduction for depreciation as allowed for under the policy but has not applied
this in this instance.
Further accommodation payment
33. The Applicant requested further accommodation payments. The FSP
advised it has paid the Applicant for 12 months of accommodation in
accordance with the policy terms. The Applicant does not dispute the FSP
has paid him accommodation as per the policy The Panel is satisfied the
FSP was entitled to deny any further request for accommodation.
Case No: 268609 Determination Page 6 of 6
Payment of funds into bank account
34. The Panel notes that the FSP wrote to the Applicant on 27 January 2012
offering settlement of $304,436.The FSP advised that it would issue a deed
of release to be signed if the Applicant accepted this amount to enable funds
to be released. The Panel accepts that this was, at that time, the FSP’s
extent of liability.
35. Although further consideration was sought by the Applicant and a further
amount was offered the Panel nevertheless, considers that the FSP has had
the benefit of the Applicant’s funds since 27 January 2012.
36. The Panel accepts the FSP was aware that the Applicant wished to pursue
the matter to the fullest extent. There is nothing to suggest that the FSP was
entitled to withhold the funds whist the Applicant continued with his dispute.
37. The Panel is satisfied that interest on these funds should be awarded.
Determination
38. On the basis of the available information the Panel determines the FSP has
established the Applicant’s entitlement under the policy to pay the
reasonable cost to it for repairs. The FSP has set out in its submission that
its liability is $351,411. However, this amount does not include repairs to
damage fencing and shed repairs. The FSP is to quantify the cost of these
repairs and include this sum in its settlement.
39. The FSP is to also pay interest on the amount of $304,436 at the statutory
rate in accordance with Section 57 of the Insurance Contracts Act from 21