Determination 267586

Denial of further liability for faulty repairs after cash settlement and release

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant accepted a cash settlement and signed a release for water damage to floors, then the repairs proved faulty and the FSP refused further responsibility. AFCA found the FSP had continued managing the claim after the release and ordered it to arrange rectification of the repairs.

The FSP's conduct after the deed of release was inconsistent with relying on it, so estoppel and unconscionability applied.

Issues

Subjects and remedies

home or building damagerepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 267586 Determination Page 1 of 6 Case number: 267586 General Insurance - Domestic Insurance - Home Building - Service - Delay in claim handling – Faulty Repairs 31 July 2012 Background 1. The Applicant commenced a Quality Care Building Insurance Policy (the Policy) with the Financial Services Provider (FSP) in 2005 to cover her home and contents. The policy was renewed annually and covered the building for $476,500 and contents for $98,500 subject to $100 excess. 2. On 23 October 2009 the Applicant lodged a claim for water damage to the parquetry flooring within the kitchen and family room of the property. 3. Following an assessment by Building Consultants ‘ LS ’ , the FSP accepted the claim. The Applicant was cash settled a sum of $55,540 pursuant to a Deed of Release (the Release) signed by the Applicant. 4. The Applicant holds the FSP responsible for faulty repairs by the repairer and seeks rectification under the policy. 5. The FSP says it is discharged from any further responsibility arising from the claim by virtue of the Release and is not liable for any additional damage arising from the claim. Summary of Applicant’s position 6. Once the claim was assessed by ‘ LS ’ and accepted, the Applicant was advised to obtain quotes for the repairs to the floor. After ‘ LS ’ obtained an independent report by ‘ IV ’ , the quote from ‘ AF ’ was approved. 7. Due to the FSP’s failure to pay ‘AF’s’ deposit as agreed and the alleged harassment of the builder by the FSP, ‘ AF ’ no longer wished to carry out the works and withdrew. 8. The FSP then appointed ‘ FG ’ to complete the repairs to the floor. Repairs were completed in August 2010. 9. 2-3 weeks after the completion of repairs, the Applicant noticed areas of the floor where the surface coat had begun to peel. The floor was inspected by ‘ FG ’ , who found no leaks, but high levels of moisture in the timber. Determination Case No: 267586 Determination Page 2 of 6 10. The FSP sent an assessor who provided a report and additional photographs to the FSP. The Applicant says the FSP had advised at this point that they would appoint a repairer to rectify the repairs. 11. As the floor conditions were worsening several weeks later, the Applicant contacted the FSP, who finally advised that as the repairs were authorised by the Applicant, the FSP was not responsible to rectify the repairs. The Applicant was responsible for arranging rectification repairs by FG. 12. The Applicant maintains that the FSP authorised repairs by ‘ FG ’ and is responsible for ensuring the repairs are completed satisfactorily under the claim. Summary of FSP’s position 13. The FSP is entitled to rely on the Release dated 3 June 2010. The Applicant ’ s completion of the Release discharges the FSP from any further responsibility arising from the claim and any subsequent repair. 14. The FSP says the Applicant authorised repairs by ‘ FG ’ . 15. The completion of the Release constitutes full and final settlement of the claim. The FSP bears no further responsibility. 16. The FSP relies on the following terms of the Release dated 3 June 2010: “ I [Applicant] hereby discharge and absolve the said Company (FSP) from any further liability or obligation under Policy Number ( ‘X’ ) so far as any claim which I may now or at any time hereafter be entitled to make in respect of an incident of ESCAPING LIQUID which occurred on 8 th October 2009 ” . Issues 17. Whether the FSP has settled the Applicant’s claim in accordance with the terms and conditions of the Policy. 18. Whether the Deed of Release precludes the Applicant from any additional indemnity under the policy. Reasons for decision 19. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination by an Ombudsman. Case No: 267586 Determination Page 3 of 6 20. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity comment. 21. The evidence indicates that the following took place throughout the claims process:  Upon the claim being lodged, the FSP appointed ‘ LS ’ to inspect the damage and the claim was accepted in full.  The Applicant obtained two quotations for the repairs while ‘ LS ’ obtained a third quotation.  ‘ LS ’ commissioned a report by ‘ CF ’ , floor covering consultants, dated 14 January 2010. Based on this report, ‘ LS ’ approved the quotation by ‘ VF ’ .  ‘ VF ’ required the FSP to pay a 50% deposit prior to commencing repair work. As this was not paid at the agreed time, ‘ VF ’ withdrew from the job.  ‘ FG ’ was then appointed to complete repairs.  The FSP decided to cash settle the Applicant for the repairs. The Release was executed on 3 June 2010.  Repairs were completed by ‘ FG ’ in August 2010.  A few weeks after the completion of repairs, the Applicant noticed that the floor had started to lift and split.  The FSP obtained an independent report by ‘ SB ’ , Building Consultants, on 15 April 2011. ‘ SB ’ concluded that there was no moisture issues evidence to have caused the new damage. Further, ‘ SB ’ found that the damage was due to defective building work and faulty workmanship, as: i. ‘ FG ’ had failed to acclimatise the flooding to the room; ii. The flooring was laid whilst the concrete slap was still damp; iii. ‘ FG ’ failed to provide a 10mm gap between the floorboard and restraining surfaces.  ‘ FG ’ inspected the damage to the flooring and concluded that the cause was external moisture and not defective building work on their part.  It is estimated that rectification work will cost $45,000. 22. The FSP says the Applicant appointed ‘ FG ’ to complete repairs and it is the Applicant’s responsibility to ensure ‘ FG ’ completes any rectification works that are required. Further, ‘ LS ’ say they did not oversee ‘FG’s’ repairs, which were authorised and managed solely by the Applicant. 23. On this basis and the Release, FSP says they have no further obligations under the claim. Case No: 267586 Determination Page 4 of 6 24. The Applicant says ‘ FG ’ was appointed by ‘ LS ’ after ‘ VF ’ withdrew from the claim. She asks the FSP to ensure the rectification works are undertaken without further delay as the condition of the floor keeps deteriorating. 25. There remains a question as to who appointed ‘ FG ’ to conduct the work. The parties point their fingers at each other. ‘ FG ’ provides conflicting information in relation to who authorised the repairs. However, the evidence suggests:  ‘ VF ’ notified the Applicant of ‘ FG ’ when they elected to withdraw from the work.  ‘ LS ’ had previously worked with ‘ FG ’ and considered them reputable repairers.  The Release was drafted by ‘ LS ’ based on the quotation by ‘ FG ’ , which was addressed to ‘ LS ’ . ‘ LS ’ subsequently forwarded to quotation to the FSP.  Payment under the Release is made directly to ‘ FG ’ , not the Applicant.  ‘ LS ’ continued to correspond with ‘ FG ’ throughout the repair process and kept the FSP informed of the progress of the repairs. 26. I have considered the FSP’s claims file and claim notes. In particular, I note an email from ‘ LS ’ to the FSP dated 26 July 2010 which states: “Further to our telephone conversati on on Thursday 22 July 2010 regarding the claim, I can advise I called over to the property the following day to sight the new parquetry flooring and I have attached some photographs for your record. I spoke with the flooring contractor [G] who advised he anticipates the sanding and coating of the parquetry should be completed by 20 July 2010. ... I will continue to oversee the implementation of repairs and should you have any questions in relation to this advice, please do not hesitate to contact me.” 27. Despite the FSP’s submissions to the contrary, the evidence suggests that ‘ LS ’ authorised and managed the repairs conducted by ‘ FG ’ and were involved in the repair process throughout the claim, months after the Release was executed. 28. In the circumstances, the FSP must accept responsibility for the quality of the workmanship and arrange the rectification of the repairs. To refuse to do so would be a breach of good industry practice and the voluntary General Insurance Code of Practice (the Code), which according to the policy, the FSP adopts. The Code says: 3.13. Where we have selected and directly authorised a repairer, we will: a) accept responsibility for the quality of workmanship and materials; b) handle any complaint about the quality or timeliness of the work or conduct of the repairer as part of our complaints handling process. Case No: 267586 Determination Page 5 of 6 Deed of Release/ Doctrine of Estoppel 29. Upon execution and delivery of a deed the party making the deed is absolutely bound by it and cannot thereafter resile from it or recall it. Hooker Developments Pty Ltd v Trustees of the Christian Brothers [1977] 2 NSWLR 109 at 118. 30. However for a deed to be valid, both parties to the deed must have a mutual understanding of the terms of the agreement. 31. The doctrine of estoppel, broadly put, is concerned to ensure that a person who leads another to act to his or her detriment in reliance on a statement made by that person should be held responsible to the actor. The statement may take the form of an express promise or representation or may be inferred from the conduct of a person. (Page 159 of Business Law of Australia [7th Edition]). 32. The FSP relies on the Release to say they no longer have any responsibility for issues arising from the claim. However, the FSP’s conduct thro ughout the claim’s process, even after the execution of the Release, was inconsistent with the rights under the release the FSP now seeks to rely on. If, after the Release was signed, the FSP had advised the Applicant that she must supervise the repairs, she could have chosen someone to advise her. Instead, she was entitled to believe she could rely upon ‘LS’. 33. Once the Applicant reported new damage, the FSP assessed the new damage, obtained an independent report to determine the cause of the damage and obtained new repair quotations. While the release was signed on 3 June 2010, ‘ LS ’ and the FSP were involved in the claim until 8 June 2011, when the claim was reviewed and the FSP decided to close the file on the basis that the Applicant had signed a Release. 34. In the circumstances, it would be unconscionable for the FSP to fail to continue to manage the claim and seek to rely on the Release, when it continued to manage the claim a year after the execution of the Release. 35. I find that the FSP has acted in a manner inconsistent with the terms of the release by representing to the Applicant that it was managing the claim. The Applicant has been prejudiced, as she continued to rely on the FSP’s representation that it was managing the repairs and the claim. 36. If it was clear that there would be no further involvement by the FSP upon execution of the Release, the Applicant: a. May not have signed the release; b. Would have had the opportunity to manage the repairs and attend to rectification of any errors immediately upon the defects being noticed. 37. The defective work was neglected for nearly 12 months while the FSP continued further assessments, prior to informing the Applicant to pursue her own rectification in June 2011. Case No: 267586 Determination Page 6 of 6 38. In addition, it is worth noting that it is the failure on the part of the FSP that lead to the withdrawal of ‘ VF ’ , who was originally authorised by the FSP to conduct repairs . If not for the FSP’s error in paying ‘ VF ’ as agreed, it is likely that the repair works would have been completed to Australian Standards, noting that ‘ VF ’ had already allowed the timber to acclimatize for several weeks at the time of default. Furthermore, even if ‘VF’s’ repairs had been faulty, there would be no question that any rectification would have been covered by the claim. 39. Therefore, it would be unjust and unconscionable to allow the FSP to now withdraw from the claim and rely on the Release to the detriment of the Applicant. 40. I am satisfied that it is fair in all the circumstances that the FSP continues to manage the claim and indemnifies the Applicant for the loss which has arisen from defective repairs. Determination 41. On the basis of the available information I determine that the FSP is not entitled to deny the Applicant’s claim. 42. I determine that the FSP must arrange for the rectification of the repair works to the Applicant’s floor within 2 weeks of the acceptance of this Determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.