Determination 267442

Cash settlement of flood-damaged rental home and scope of repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2014-01-23
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$285
Non-financial loss—
Amount claimed$598,730
SourceAFCA PDF

Summary

The applicant disputed the FSP's cash settlement for flood damage to her rental home after its preferred builder would not guarantee repairs, and sought the full policy limit plus loss of rent. AFCA ordered the FSP to fund and guarantee repairs under a new scope of works, pay $285.44 extra loss of rent and interest, and declined compensation.

Having initially elected to repair, the FSP could not later rescind that election to cash settle, and the policy pays the cost of repair rather than the full sum insured.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 267442 Determination Page 1 of 15 Case number: 267442 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Dispute Over Scope of Works for Flood Damage 24 December 2013 Summary Description:  Dispute under a landlord/investor policy following inundation of rental property during the January 2011 Queensland flood. The FSP having initially agreed to repair the property subsequently determined to cash settle the claim when the preferred builder refused to provide a guarantee for the work. Basis of Determination:  The information establishes the property was repairable.  The settlement sum was inadequate to meet the likely cost of repairs. Determination:  It is fair in the circumstances, having initially agreed to complete the repairs, the FSP now undertake the repairs subject to a fresh SOW.  The FSP is to contract CP or another repairer to prepare a new SOW and complete repairs.  The parties may agree to cash settlement based on the new SOW.  The FSP to pay an additional $285.44 for loss of rent subject to Applicant providing proof of loss. Background 1. The Applicant held a home and contents landlord/investor policy with the Financial Services Provider (FSP) from 17 September 2003. The policy provided building cover for the Applicant‟s tenanted rental home for up to $544,300. Determination Case No: 267442 Determination Page 2 of 15 2. On or about 11 January 2011, the insured property in Coomera Waters was damaged in the floods that affected much of Queensland at the time. A claim was lodged and the FSP agreed to indemnify the Applicant for the damage. 3. Whilst initially intending to repair the damage, the FSP ultimately decided to cash settle the Applicant for the estimated cost of repairs to the rental home, totalling $207,441.44. The FSP paid an additional amount for loss of rent on the property, totalling $12,194.56. 4. The Applicant is dissatisfied with the settlement as she prefers to have the home repaired or the full sum of the policy limit paid out. She further seeks additional sums for the loss of rent incurred, which she considers was less than what she was entitled to. Summary of Applicant’s position 5. The Applicant says that her home was totally immersed in floodwater for about four days and she should be settled to the limit of the policy. 6. The FSP has settled her based on quotes from its repairer and assessor but neither will commit to undertaking the repair and these quotes are incomplete, with many items not fully quoted and no GST or other items included. The FSP will not consider the quote from her preferred repairer to cover all of the damage. 7. She believes that the home needs to be demolished and this means it is a total loss and the full sum of the policy limit ($544,300) should be paid. 8. The loss of rent was incorrectly calculated as the FSP did not allow enough t ime, noting that the home is still not repaired and deducted agent‟s fees which have not been incurred. 9. She also seeks reimbursement of (unquantified) expenses, compensation for delay, stress and inconvenience and interest on the claim. Summary of FSP’s position 10. The FSP says that it has settled the Applicant in accordance with the terms of the policy. It has paid a reasonable sum to cover the cost of repairs, in accordance with the estimates prepared by its builder and loss adjuster. 11. The Applicant is not entitled to a full payout of the policy sum insured and is only entitled to have the necessary repairs done (or paid for) to bring her home back to its pre-incident state. Part of the settlement is limited due to the pre-existing condition of the home and other issues with it that are not related to the flood event and for which the FSP is not liable to cover. 12. The loss of rent has been paid in accordance with the policy and exceeds the Applicant‟s maximum entitlement. Case No: 267442 Determination Page 3 of 15 13. The FSP relies on the following policy provisions: Page 20 of the Product Disclosure Statement (PDS) “ Additional features When we accept a claim under your policy for an insured incident that happens in the period of insurance, you may also be entitled to these additional features. 1a. Loss of rent caused by an insured incident We cover When you have home cover If an insured incident damages the home to the extent it cannot be lived in, we will pay the rent you lose for the reasonable time it should take to repair or replace the home so it can be lived in again. When you have contents cover If an insured incident damages your contents to the extent the home or unit cannot be lived in, we will pay the rent you lose for the reasonable time it should take to repair or replace the contents so the home or unit can be lived in again. Limit The most we will pay for this feature is: - 52 weeks lost rent or - 10% of the home sum insured for a home claim or - 10% of the contents sum insured for a contents claim whichever is less. We will pay this in addition to the sum insured for the home and contents. We do not cover Loss of rent: - beyond the period it should reasonably take to replace or repair the home or unit so it can be lived in again or 52 weeks (whichever is less) - if you do not intend to repair or rebuild the home - if you do not intend to repair or replace your contents - if you were planning or had applied to demolish the home before the insured incident happened - if the reason for the loss of rent is damage to the unit building - if the home or unit wa s not occupied by a tenant paying rent at the time of the loss or damage, but we will pay rent if the home or unit would have been rented during the time taken to repair the home or contents and you give us evidence of this. ...” Page 34 of the PDS Case No: 267442 Determination Page 4 of 15 “ What you are not covered for This section details what is not covered under any part of your policy. We do not cover loss or damage: ... Erosion or subsidence Caused by or as a result of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover subsidence damage to the home if you have home cover and the damage is caused by: - insured event 7 (burst pipes, leaks and overflows) - these insured events if the damage occurs within 72 hours of the event happening: • insured event 2 (explosion) • insured event 5 (earthquake and tsunami) • insured event 6 (storm and flood). ” Page 42 of the PDS “ We do not cover: ... Extra costs following an insured incident Consequential losses or extra costs following an insured incident, including but not limited to: - loss of income or wages - cost of your time to prove your loss or to help us assess your claim - the cost of hiring appliances after yours are lost, damaged or stolen - professional, expert, legal, consulting or valuation costs unless you obtained our prior written authority to incur these costs - cost of replacing or reapplying pest control chemicals and baits in or around the home - loss of water from a bursting or leaking pipe or water container unless this is covered by an additional feature or option under this policy. ” Pages 46-47 of the PDS “ How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to the home, unit or contents we will decide if we will: - repair damage new for old or - replace home or contents new for old or - pay you what it would cost us to repair or replace the home or contents new for old. Case No: 267442 Determination Page 5 of 15 The meaning of new for old is defined below. We will not: - pay extra to replace the home or contents to a better standard, specification or quality than it was before the loss or damage occurred except as stated in „new for old‟ on the next page - fix a fault that existed before the loss or damage occurred. New for old means: - new materials, new items we replace or repair with new items or new materials that are available at the time of replacement or repair from Australian suppliers. - new for old, regardless of age we replace or repair new for old regardless of age, with no allowance for depreciation. For example, a leather lounge which was purchased 5 years ago for $5,000 and now worth $2,000, will be replaced with a brand new leather lounge equivalent to your old lounge when it was new. Cover is not limited to $2,000. - same type, standard and [specification] as when new we replace or repair to the same type, standard and specification as when new. If the same is not available, it means of a similar type, standard and specification when new. It can be a different brand. New for old does not: - include paying the extra cost of replacing or purchasing an extended warranty on any home or contents item or - mean of a better standard, specification or quality than when new. ” Page 49 of the PDS “ Home claims How we settle home claims If we agree to pay a claim for loss, theft or damage to the home, we will decide if we will: - repair damage new for old or - rebuild the home new for old or - pay you what it would cost us to repair or rebuild the home new for old. When we repair or rebuild the home We will do our best to obtain new materials that are the same type, standard and specification as when new. If the same is not available, we will use new materials of a similar type, standard and specification that are commercially available and compliant with the latest building regulations. When we cannot match materials If we cannot find new materials to match undamaged parts, we will use the closest match available to us. ▼ Case No: 267442 Determination Page 6 of 15 If you are not satisfied with the materials we find as the closest match: ▼ ▼ If we agree, you can pay the extra cost of replacing undamaged parts of the home to achieve a uniform appearance. Or we will pay you what it would have cost us to repair or rebuild the damaged part. Repairing or rebuilding damaged parts We will only repair or rebuild the parts that are damaged by an insured incident. You cannot claim to replace undamaged parts of the home to create a uniform appearance, such as when: - one garage door is damaged we will only replace or repair the damaged one, not other doors - roof tiles are damaged we will only replace the damaged ones, not the undamaged tiles, even if the undamaged tiles are faded and do not match the new ones used for repairs - roof sheeting is damaged we will only replace the damaged roof sheeting, not the undamaged roof sheeting, even if the closest match available to us is a different shade or colour to the undamaged roof sheeting - an external wall is damaged we will replace the damaged parts of the wall, not undamaged areas of the wall or other sides of the home. ” Pages 58-60 of the PDS “ Terms explained The following list explains the meaning of terms used in this policy. When any of the following terms appear in this policy, regardless of whether their first letter is a capital or in lower case, their meaning is shown on the following pages. ... rent The amount of rent (after deducting any managing agent‟s commission that applies) that a tenant pays to occupy the home or unit. If the home or unit is unoccupied, it is the amount a tenant would pay, based on an assessment by a qualified property management agent agreed to by us. ” Issues 14. Whether it was appropriate for the FSP to cash settle the Applicant‟s claim. 15. If so, whether the amount offered was fair in all the circumstances. Case No: 267442 Determination Page 7 of 15 16. Whether the amount paid for the Applicant‟s loss of rent was in accordance with the terms of the policy. 17. Whether an award for compensation is appropriate. 18. Whether other expenses and interest should be paid. Reasons for decision 19. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of nature and complexity of the matter. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 20. This decision has been made by a Panel consisting of an Ombudsman, and two Panel members with experience in insurance industry matters and consumer claims. 21. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 22. It is not in dispute that the FSP has made payment of $207,441.44 for the cost of repairs and $12,194.56 for the loss of rent portions of the claim. The Applicant seeks up to the policy limit of $544,300 for the repair of the home and $54,430 for the loss of rent, in accordance with the limits of the policy. 23. Whilst the potential payment sought by the Applicant exceeds the limits permitted within the Terms of Reference for the Service, the parties have not raised any objections to the Service‟s ability to consider the dispute. Insofar as any award i s to be made in the Applicant‟s favour, the Panel is satisfied that such a payment cannot exceed the limit of $280,000 imposed by the Terms of Reference. Cash settlement for the repair of the home 24. The Applicant suggests that she should be entitled to the full payout sum of the policy on the basis that the home was a total loss after the flood. 25. There is no evidence to suggest that the home is not salvageable but even in the event that this was the case, the Panel is not of the view that this entitles the Applicant to be paid the full sum insured under the policy. The amount of $544,300 is a specific limit for the amount of cover available under the terms of the policy but it is not an automatic settlement amount in the event of the home being irreparably damaged. 26. In the Panel‟s view, the FSP is only obliged to pay what is required to repair or restore the home, up to the limit of the sum insured. Case No: 267442 Determination Page 8 of 15 27. The Applicant‟s home was severely damaged as a result of the flood events that affected Queensland in 2011. A claim was lodged and accepted by the FSP. It arranged for experts to visit the property and compile a scope of work (SOW) for the repair of the home. 28. The original SOW was prepared by loss adjuster “BL” for builder “NH” and totalled $220,402. Prior to work starting on the home, concerns were expressed about the structure and the movement of the footings at the residence and the FSP retained structural engineer “MC” to report on these issues. 29. MC provided a report dated 26 August 2011. The expert noted that:  The floor was uneven and slightly high in the centre of the rooms, some doorways were misaligned and there was evidence of movement in the internal linings;  The vertical joint (VJ) boards used in the home had buckled in many areas and the wall linings in the eastern room had cracked and appeared water damaged;  Outside, the bearers had separated slightly over the stumps and there were signs that the home had been re-levelled in the past. There was a height difference in two rows of stumps supporting the front verandah but the stumps and floor framing was in a “relatively good condition”. The concrete slab was severely cracked and showed evidence of previous repair work;  Whilst the framing and support stumps appeared unaffected by the flood, there was unevenness i n the floor levels and damage to the wall linings consistent with “increased moisture content under the residence”. According to MC, this caused a swelling of the soil and lifting of the internal stumps;  The sub- floor area was considered to be “relatively well ventilated and drained” and the soil showed signs of returning to normal after the flood event;  The cracks in the slab were attributed to concrete shrinkage which was not attributed to anything unnatural but had caused differential movement between cracked sections;  These cracks may have allowed greater water penetration into the soil beneath but any effect was likely minor;  The sagging and separation of the bearers was attributed to the age of the structure and not the flood;  MC recommended that: i. The VJ boards be reinstated/replaced; ii. The floor should be re-levelled by installing shims to account for the height difference in the stumps; and iii. The damaged internal linings should be repaired. Case No: 267442 Determination Page 9 of 15  Given the reactive ground conditions and heightened level of moisture, MC considered that movement in the stumps would continue for a period of time. MC suggested that the levels of the stumps should be re-checked 12 months or so after rectification is done. 30. Following receipt of this report, the FSP‟s building consultan t recommended to the FSP that the claim be cash-settled, based on the findings of this report and the reservations of NH (the FSP‟s preferred builder) to proceed with the building work. The FSP therefore decided to cash settle the claim rather than complete the repairs and advised the Applicant accordingly. 31. Of particular note, NH was concerned about the stumps at the home and did not know whether they were “installed to an engineer[‟]s satisfaction or not”. NH did not feel that the work could be guaranteed as MC noted the possibility that the home could be affected by further movement. This might enable cracking to occur in the home in the future. 32. The reduction in the settlement was explained through the revision of some items from the original quote, including the internal wall linings (which were allowed for in the replacement of the plaster and VJ boards) and the windows which would be assessed on a case -by-case basis and not simply replaced. 33. The Applicant objected to the offered cash settlement and the reduction in value for the permitted repairs. Chief amongst her concerns were that the settlement quote used as a basis for the payment was heavily based on “provisional” estimates and therefore could not be relied upon as an accurate guide for the true value to reinstate the home. 34. She later obtained her own estimate to complete the job from “CP”. This quote was for $283,811.73. 35. Upon receiving this quote, the FSP arranged for it to be reviewed by its experts and ultimately increased its settlement offer to $207,441.44. Re- evaluations and/or amendments were made as to the provisional sums originally estimated for the pool fence, VJ walls, posts, vinyl floors, fan lights and a review of the drainage lines. Other items were also added to the quote. 36. The FSP made further payment to the Applicant for the additional $6,803.87 permitted in its revised quotation. It is of the view that this is sufficient to adequately repair the Applicant‟s home. 37. The Applicant addressed issues with which she remained unhappy in her submissions on the matter:  She says the house is not structurally sound – she notes that she brought this to the FSP‟s attention and contends that it was due to the flooding of the area. It was after the inspection by MC that the FSP‟s agent chose not to repair the home and the FSP offered to cash settle instead. She believed that a structural engineer would be required to prepare a quote for this damage; Case No: 267442 Determination Page 10 of 15  The revised quote from BL/NH did not include the replacement of the floorboards in the home, the front staircase, windows and window frames, drainpipes, awnings, gutters, garage doors and lattice work, wooden picket fencing, external wood panelling, asbestos costs (where work will affect the ceiling/roof) and worksite costs. 38. In response, the FSP has provided an extensive catalogue of photographs of the home to attest to its condition. The FSP is of the view that much of the home was in a poor state and that this was evident in areas that were not immersed in the flood water. 39. Whilst it is accepted that the home was not in perfect condition, the FSP has not detailed through expert opinion what damage was and was not flood related. 40. The Panel accepts that the report from MC addresses that there were some areas of the home that had problems and that some movement might be expected over the ensuing 12 months, there was no suggestion that the repairs could not be attended to on the existing foundations. 41. The Panel accepts the home did have signs of wear and tear, which MC suggested were generally consistent with the age of the property. There is no expert evidence to suggest that the items sought by the Applicant should not be included in any repair of the home. 42. The FSP‟s policy provides “new for old” replacement and specifies that: “... - new for old, regardless of age we replace or repair new for old regardless of age, with no allowance for depreciation. For example, a leather lounge which was purchased 5 years ago for $5,000 and now worth $2,000, will be replaced with a brand new leather lounge equivalent to your old lounge when it was new. Cover is not limited to $2,000. - same type, standard and [specification] as when new we replace or repair to the same type, standard and specification as when new. If the same is not available, it means of a similar type, standard and specification when new. It can be a different brand. ” 43. There is no persuasive evidence that the home was not in an acceptable state at the time of the loss and the Panel is satisfied that the repair of the home should be conducted. 44. The Panel is concerned by the FSP‟s reliance on the quote from BL/NH, particularly since the FSP‟s builder elected not to attend to t he repairs after the initial inspection and quote. Although items were considered after this time and included (chiefly as a result of the quote submitted by CP), the ultimate settlement figure was reduced from the initial estimate even after additional items were factored in Case No: 267442 Determination Page 11 of 15 45. In circumstances where the FSP intends to cash settle a claim, it is imperative that it sources a workable quote which the Applicant may rely upon and for which the quoting contractor is prepared to attend to the work. NH made it quite clear in correspondence with the FSP that it would not attend to and could not guarantee the work and that it remained concerned about the prospect of further movement at the property. 46. The issues relevant to movement are explored by MC in its report. In consideration of this, the Panel is not of the view that the structural engineer‟s report gave cause for the FSP to avoid its responsibilities on the property. 47. There was no suggestion that the home had suffered any serious damage outside of that caused by immersion in water. Some age-related problems were identified, although there is no suggestion that the home was derelict or unfit for habitation prior to the flood event. The problems highlighted were not issues that should put consideration of the Applica nt‟s claim at risk. 48. MC identified that there may be an impact on the levels of the stumps over the ensuing 12 months. In light of this information, the FSP may have been better served in deferring the repairs for 12 months and then ensuring that the repairs were commenced when the soil had returned to normal. 49. If it was to choose a cash settlement option, noting that NH did not want to complete the work, the FSP could have arranged another repairer prepared to do the job and then given the Applicant the option to go with this repairer, wait the 12 months for the land to dry out or take a cash settlement. 50. If the Applicant was to wait 12 months (which in the Panel‟s view would not have been unreasonable), the FSP then had the provision under the policy to pay loss of rent through this period. This would likely have been a more prudent course than covering possible rectification repairs likely if the foundations were to shift after repairs were complete. 51. In its submission, the FSP acknowledges that it initially authorised repairs to be undertaken by its preferred builder. It later offered the Applicant the option to cash settle, however after considering the quantum of settlement she decided not to. 52. In the Panel‟s view, having elected to undertake repairs at the outset, the FSP was not entitled to later enforce a cash settlement on the Applicant. It appears that its change of position was influenced by NH‟s reluctance to undertake the work and his unwillingness to guarantee the work; having indicated its initial willingness to undertake repairs it is inappropriate for the FSP to rescind its election. 53. In the Panel‟s view, this is unfair to the Applicant, particularly noting that the property and the surrounding grounds were immersed in floodwater for several days, and the builders uncertainty about the repair process. Case No: 267442 Determination Page 12 of 15 54. The issues in relation to the settlement of the soil were highlighted by MC on 26 August 2011. There has been more than two years since this date to allow for the soil to settle and therefore should be no impediment to the repairs being undertaken at the property. 55. To this end, the Panel is of the view that the FSP should indemnify the Applicant for the repair of the home and that it would be fair in the circumstances that the FSP should undertake and gua rantee this work, pursuant to the terms of the policy. 56. As NH does not wish to attend to the work, the Panel is satisfied that CP (or another suitable builder) should attend to the work under the FSP‟s direction. 57. In relation to the discrepancies between the quotes, the Panel accepts that the BL/NH quote leaves open the possibility of further work (windows, floors etc) that would likely increase the value of the final repair job if these items were deemed necessary for replacement/repair. 58. The FSP considered that the floors could be sanded back and would remain usable, albeit with stains evident. The Panel is not persuaded that this would be a suitable solution and the floors may need to be replaced as there is no persuasive evidence that the floors were stained prior to the flood event. The Applicant should not have to compromise on the quality of the repair work. 59. There is evidence of paint degradation on aspects of the exterior of the home and some of this is above the water line. The FSP‟s policy allows for the replacement of new for old and therefore the less than ideal condition of the home should not be cause for the FSP to avoid its responsibilities. If the relevant flood affected areas can be suitably repaired through painting, then this will be appropriate, however if it cannot be done then the FSP must attend to replacement. 60. The areas of the home that were not flood affected (i.e. damage that occurred above the water line for where the flood peaked) need not be repaired and these issues will remain the responsibility for the Applicant. 61. To fully attend to this work and to account for the period of time that has elapsed since the loss, a new SOW should be prepared to account for the repair of the property. With the exception of the separated bearers and the pre-existing cracking of the slab (identified by MC), the FSP should cover the balance of the repairs required at the home, except where those repairs relate to items not immersed in floodwater. 62. Once the new SOW has been completed the FSP is to source a builder who will complete the repair work and provide appropriate guarantees. At that stage, should the Applicant elect to cash settle or have her own preferred builder complete the work, the amount of settlement should be based on the cost that fairly represents the actual cost of repairs as quoted by a builder who would undertake the work. Case No: 267442 Determination Page 13 of 15 63. As the Applicant has been paid $207,441.44 already, it will be her responsibility to pay this amount to the repairer, with the FSP to pay any balance required to complete repairs satisfactorily. Alternatively the Applicant can choose to refund the settlement monies of $207,441.44 to the FSP and the FSP will be responsible to meet the cost of the repairs. Loss of rent 64. The FSP says that it paid the Applicant the sum total of $12,194.56 for loss of rent following the loss. 65. The agreed weekly rental value for the property (prior to the flood event) was $240 per week. From the weekly rental, the FSP deducted an agent‟s commission of 9.9% or $23.76. The FSP claims to have obtained this figure from the Applicant‟s rental agent and deducted in accordance with its entitlement under the policy. It based its settlement payments to the Applicant on a weekly figure of $216.24. 66. The policy relevantly states that rent is defined as: “ The amount... (after deducting any managing agent‟s commission that applies) that a tenant pays to occupy the home or unit. If the home or unit is unoccupied, it is the amount a tenant would pay, based on an assessment by a qualified property management agent agreed to by us. ” 67. In effect, the deduction for commission is to represent the net amount of loss suffered by an insured for a period during which a loss of rent is incurred. 68. The Applicant disputes the entitlement of the FSP to do this, stating that she was not paying commission and the FSP should not be entitled to deduct it. The FSP sought evidence from the Applicant to establish that she was not paying commission and in the absence of this, reiterated that the deduction would remain from the settlement amount paid. 69. The FSP has no direct evidence in support of the contention that the rent commission was assessed at 9.9% per payment, other than file notes of telephone records suggesting a call was made to the Applicant‟s agent. 70. Noting that the policy conditi ons require “an assessment by a qualified property management agent”, the Panel is not satisfied that a casual telephone enquiry meets this requirement. 71. The Applicant says that she did not retain an agent and therefore did not incur the fee throughout the rental period. 72. Subject to the Applicant providing evidence of the actual weekly rental received (such as a bank statement showing the amount of $240.00 being paid to her) the Panel is of the view that the agreed weekly rental figure of $240 should have been paid by the FSP. Case No: 267442 Determination Page 14 of 15 73. The Applicant further argues that the FSP should be liable for up to 10% of the sum insured ($54,430) in relation to the payment of the rent as this is the policy stipulation. 74. The policy allows the FSP to pay the lesser of 10% of the sum insured for the building ($54,430) or the weekly rental amount calculated over a 12- month period ($12,480). Accordingly, the Panel is satisfied that the maximum payout for loss of rent payable to the Applicant is $12,480. 75. As the FSP has already paid $12,194.56, the Panel is of the view that it should contribute an additional $285.44, subject to the payment proof as noted above. Compensation 76. The Applicant also raised the issue of compensation as part of her claim, in consideration of the time taken to resolve her matter, lack of communication and the difficulties she experienced with the FSP. 77. The Service provides that compensation may be awarded in circumstances where: “...an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant‟s expectation of enjoyment or peace of mind has occurred...” 78. The FSP suggests that compensation was not warranted as it had difficulty contacting the Applicant throughout the claims process, noting that she was ill for a time, and the general delays and difficulties encountered as a result of the flood crisis. 79. The Panel accepts that this matter has been difficult for the Applicant and that she has encountered some inconvenience in her dealings with the FSP and in the resolution of the claim. 80. It is normal in any insurance claim for the insured party to experience a degree of inconvenience. In circumstances such as those experienced with the Queensland floods, the Panel is of the view that this would have been magnified for many people, many of whom were left homeless. 81. Whilst the Applicant has been frustrated by the settlement offer and the difficulties encountered, the Panel is not persuaded that the circumstances faced by the Applicant were so exceptional as to suggest that an award of compensation is appropriate. Determination 82. On the basis of the available information, the Panel determines that the FSP should retain CP or another contractor to prepare a new scope of works and repair the Applicant‟s home as stipulated in the body of this document. The Case No: 267442 Determination Page 15 of 15 Applicant will need to contribute the sum already paid to her of $207,441.44 to the repairer who is to complete the work or refund the sum to the FSP to allow it to meet the cost of repairs. 83. The FSP must cover any balance required to ensure that the repairs are completed satisfactorily and guaranteed. 84. Should the Applicant prefer not to have the repairs compl eted by the FSP‟s agents, she is at liberty to retain the cash settlement if she chooses, with the FSP to pay any balance necessary based on a revised scope of works. If this is the case, the FSP will not be bound to offer a guarantee on the repair work. 85. Should the claim be cash settled, the FSP is to pay interest on the balance of the settlement from 5 March 2012 (being the date on which it made its additional payment to the Applicant) until date of settlement. 86. The FSP must also pay an additional $285.44 to cover the Applicant to the extent permitted under the policy for loss of rent, subject to appropriate proof. 87. The Panel does not require the FSP to pay any compensation to the Applicant and considers that the balance of the items permitted is adequate compensation in the circumstances. 88. In relation to the payment for loss of rent, the FSP must pay interest at the statutory rate from 6 December 2011 until the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.