Text of the determination
Case No: 267218 Determination Page 1 of 14
Case number: 267218
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
28 November 2012
Background
1. The Applicants held a Home Contents policy with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 25 January 2010. During this period, the contents were
insured up to $204,000.
2. On 15 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation to the home in Chelmer following severe weather
events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”.
4. The Applicants dispute this and say that the water inundation arose from the
insured event of storm water run-off and/or flash flood.
5. Both the Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicants ’ position
6. The Applicants rely on assessor report from “C” (provided by another insurer
who assessed the damage to their home building for the same event) from
which the Panel notes the following:
The property is a single story split level home on stumps. The habitable
floor level is 840mm above the surrounding ground level.
The rain was heaviest over 10-11 January 2011 and finally stopped at
6.00pm on 11 January 2011.
The water came from the storm drain 50m behind.
7. The Applicants rely on hydrology report from “W” which was also
commissioned by the building insurer. The Panel notes the following from
this report:
Determination
Case No: 267218 Determination Page 2 of 14
The inundation above the lower floor level at the rear of the house
occurred at approximately 7.00pm on 11 January 2011. The insured
property was inundated to a maximum depth of 2.5m above the main
floor level and 3.7m above the lower floor level (at the rear of the
home). W calculates the main floor level as 6.7mAHD and the lower
floor as 5.5m AHD.
On 11 January 2011 the rain filled Faulkner Park and about 4pm the
water from Faulkner Park had entered the property but not the dwelling.
The park may have experienced localised inundation d ue to
floodwaters backing up through piped stormwater network after 12pm
on Monday 10 January 2011. However, the widespread inundation
occurred on the morning of Tuesday 11 January 2011 due to
floodwaters and later on Tuesday by stormwater from rainfall in the
local catchment.
The nearest rainfall gauge is Corinda High Alert which recorded little
rainfall after 5pm on 11 January 2011.
Inundation of the property above floor level was caused by floodwaters
from the Brisbane River. The lower floor level of the house is 5.5m
AHD, this is below the estimated level for direct overflow of floodwaters
from the Brisbane River (5.8m AHD). It is possible that the lower floor
level was inundated by floodwaters backing up through the stormwater
drainage system prior to overland flood. The maximum depth of
inundation by backflow through the stormwater drainage system would
be 0.3-0.4m prior to inundation to higher level by direct overflow of
floodwaters.
The main floor level of the house was inundated by floodwaters flowing
overland from the Brisbane River to the subject property.
8. The Applicants rely on a report prepared by “B”. B resides in the
neighbourhood. The Panel notes the following from this report:
Water first accumulated in Faulkner Park at approximately 10.00am on
11 January 2011.
The report contains a number of observations relevant to B‟s own
premise which is higher than the Applicants‟ address in “L Street”.
B notes that at 12.00am on 11 January 2011 there was water fully
across the road and into properties on the north side at the eastern end
of L Street.
Water entered B‟s property at 2.30am on 12 January 2011.
Water continued to rise after 11.30am on 12 January 2011. A
photograph of the Applicants‟ property taken at approximately 11.00am
on 12 January 2011 indicates the water level about mid-way up the wall
of the property.
A photograph of the Applicants‟ property taken on 13 January 2011
indicates the water is up to the roof line of the property. A photograph
of the Applicants‟ property taken at 10.00am on 1 4 January 2011
Case No: 267218 Determination Page 3 of 14
depicts the water has having subsided but a good deal of mud/silt on
the weatherboards and on the paving around the property.
The rainfall data for Archerfield Queensland indicates rainfall on 10
January 2011 as 61mm, on 11 January 2011 as 28.4mm and on 12
January 2011 as 30.8mm.
A number of newspaper articles have been enclosed which indicate
issues with backflow in the stormwater drainage systems from Faulkner
Park. A photograph taken on 18 October 2011 has been enclosed
indicating the water technology company working on the drainage pit.
An inspection of Faulkner Park on 26 January 2011 indicated that the
sewer manhole lid had blown. A large amount of clay material indicates
the drainage inlet may have been blocked prior to storm event. This pit
is critical to drainage of Faulkner Park as it is located at the lowest point
in the park.
9. The Applicants submit the following as alternative arguments in response to
the FSP‟s decision:
a. Their building was insured with another insurer who has made a
payment for inundation up to 40cms above ground level due to water
escaping from stormwater drains. However, this insurer did not pay for
inundation above 40cms as this was deemed to be caused by flood.
b. Their property was inundated prior to the Brisbane River overland flow
on 12-13 January 2011 from the Brisbane River. The y have provided
evidence the inundation commenced in their yard at 4.30pm on 11
January 2011 and by 7pm on the same day it was close to the home.
c. The damage was due to “Flash flood and stormwater run- off”, which is
an insured event.
10. The Applicants note the following in relation to the FSP‟s hydrologist‟s Key
Conclusion Statement prepared by “SC”:
Paragraph 3.1 and 4 agrees with the Applicants‟ observations.
Paragraph 5.1 states the river level at 4am on 12 January 2011 would
have been 2m above the benchmark level at their property with W4
releases.
Paragraph 6 states the peak height above the benchmark level was
4.3m at 12.24am on Thursday 13 January 2011. The graph shows the
peak height without W4 releases would have been 1.5m lower and
would have occurred approximately 4-4.5 hours later. At this level, the
large storage area above the ceiling of the lower living area would not
have been inundated.
In relation to paragraph 7, the level at the back of the house is the
lower living area consisting of 2 bedrooms plus a bathroom/laundry.
11. The Applicants have provided a CD Rom of video and photographs depicting
the local area and the extent of the flooding.
Case No: 267218 Determination Page 4 of 14
12. The Applicants seek to be indemnified for their claim.
Summary of FSP’s position
13. In response to the Applicants‟ arguments, the FSP submits the following:
a. The Applicants‟ loss was not caused by flash flood and stormwater run -
off as defined in the policy.
b. The FSP contends that even if flash flood caused the damage then
flood was also a proximate cause of loss and the Wayne Tank principle
would apply to defeat the whole loss.
c. The FSP contends that the rainfall which led to the releases of water
from the Wivenhoe Dam was the result of cumulative rainfall from 9
January 2011 and not a one off rainfall event on 11 January 2011. The
flooding therefore occurred more than 24 hours after the rainfall.
d. The flooding resulted from elevated river levels that occurred prior to
the W4 releases and due to the W4 releases. Further, the failure of the
dam operators to follow the manual was an intervening act which broke
the chain of causation. The operator‟s actions do not fall within policy
coverage.
e. The Applicants‟ loss was caused by „flood‟ as defined in the policy.
f. The payment of the Applicants‟ building claim by the other insurer was
due to very different policy terms and conditions.
g. The Applicants‟ property was damaged prior to the W4 releases.
h. The FSP‟s original claim decision sho uld be upheld.
14. The FSP has enclosed its assessment report of the property from which the
Panel notes the following:
The date of loss is noted as 12 January 2011.
The reserve set for the loss is $120,000
Damage cause by Flood – River.
Hydrologist report recommended.
It should be noted that the photographs attached to this report are allegedly
not of the Applicants‟ home. The FSP notes that these photographs were not
determinative of its findings on inundation.
15. The FSP relies on a number of hydrology reports authored by SC from which
the Panel notes the following:
The insured property varies from 3.8m AHD from the rear to 6.6m AHD
to the front of the property. The ground level under the house varies
from 6.25m AHD to 4.7m AHD. The floor level at the front of the
property is 6.7m AHD and is elevated above ground level at 0.3m. The
lower floor level is approximately 5.5m AHD.
Case No: 267218 Determination Page 5 of 14
The property backs onto Faulkner Park which is approximately 2m
lower than the insured property and varies between 2.5m AHD and 4m
AHD.
The stormwater infrastructure in L Street includes curb and channelling
immediately adjacent to the property. There are stormwater pits
approximately 130m to the east of the property. There is a little local
catchment leading directly to the property and a local catchment to the
North of L Street. SC notes that the surface area collecting rainfall that
would drain directly into the insured property is not very large. Further,
the terrain information suggests it would be unlikely that the property
would experience significant stormwater problems from stormwater or
other local run-off during rainfall intensities experienced during the
January 2011 event.
The rainfall which caused the Brisbane River to rise had fallen more
than 24 hours earlier than the inundation of the property.
The Brisbane River reached a level of 3.8m AHD at approximately 1pm
on 11 January 2011. This would have been sufficient to inundate the
minimum level of the property but not the home. By 4.00pm on 11
January 2011 the level of the Brisbane River would have been
approximately 4.6m AHD which would have been sufficient to inundate
the rear of the property up to 0.8m. Again the home was not inundated
by this time.
By 7.00pm on 11 January 2011 the Brisbane River had reached a level
of 5.1m AHD which would have been approximately 0.4m below the
level of the patio at the rear of the property (which is 5.5m AHD). By
9.30pm the Brisbane River reached a level sufficient to inundate the
lower floor level of the home.
By 3.00am on 12 January 2011 the Brisbane River reached a level of
6.7m AHD which would have been sufficient to inundate the floor level
at the front of the home.
At the peak of the flood at midnight on 12 January 2011, the floor was
inundated to 3.7m AHD on the lower level and at the front to 2.5m
AHD.
In response to the other insurer‟s hydrologist, SC states that two
separate events of stormwater surcharging and overland flood are
provided. SC notes both are associated with the rising levels of the
Brisbane River. Once the Brisbane River reached 5.8m AHD it would
have resulted in overland flow.
SC considers that by 11pm on 10 January 2011 the Brisbane River
reached 2.5m AHD which would have been sufficient to backflow the
stormwater drains and commence the inundation of Faulkner Park.
The FloodWise property report indicates the height levels of the insured
property vary between 3.8m AHD and 6.6m AHD. There was no
minimum habitable floor level for the home. The property is also in an
overland flow path.
Case No: 267218 Determination Page 6 of 14
The manhole in Faulkner Park has an elevation of less than 2.5m AHD.
The Brisbane River exceeded this level at 11.00pm on 10 January
2011 and by 10.00am on 11 January 2011 would have reached a level
of 3.2m AHD.
Brisbane River levels rose through the day on both 11-12 January 2011
peaking at midnight on 12 January 2011. Throughout this period,
backflow would have occurred via the stormwater system, followed by
direct flow from the Brisbane River in areas where the top of bank
levels were exceeded.
The estimated time difference between observed peak gauge levels
and time of peak release from Wivenhoe Dam (10 .00pm on 11 January
2011) for the Oxley Creek mouth alert was 21 hours and 30 minutes.
The estimated water particle travel time pre-8.00am on 11 January
2011 releases at the Oxley Creek mouth alert was 20 hours 30
minutes.
SC has provided a Key Conclusions Statement from which the Panel
notes the following:
i. The normal Brisbane River level is 1.5m AHD.
ii. The minimum land level at the property is 3.8m AHD and the
maximum land level at the property is 6.6m AHD. The
approximate benchmark level is 4.9m AHD.
iii. The Brisbane River reached the approximate benchmark level at
6.17pm on Tuesday 11 January 2011. W4 contributed
approximately 0.1m to the benchmark level of inundation.
iv. W4 first reached the property at approximately 2.32pm on
Tuesday 11 January 2011.
v. The peak contribution of W4 releases to inundation was 2m.
vi. The peak contribution of W4 releases to the Brisbane river pre-
4am on 12 January 2012 is 1.3m.
vii. With the W4 releases the river level at 4.00am on 12 January
2011 would have been approximately 6.9m AHD. This is 2m
above the benchmark level.
viii. SC notes he revised the benchmark level for the home which
represents the level of the back of the house.
16. The FSP has enclosed a copy of the Certificate of Insurance which covers
the Applicants‟ contents up to $204,000 .
17. The FSP relies on the following policy provisions to deny the Applicants‟
claim:
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
Case No: 267218 Determination Page 7 of 14
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
Case No: 267218 Determination Page 8 of 14
What is covered What is not covered
Flash flood and stormwater run - off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
Page 53 of the PDS
Issue
18. Whether the FSP was entitled to decline the Applicants‟ claim for loss of
contents resulting from the inundation.
Reasons for decision
19. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommenda tion and has proceeded directly to
Determination.
20. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
Case No: 267218 Determination Page 9 of 14
21. It is appropriate to consider the issues under the various headings.
Evidence from Building Damage Claim
22. The Panel has considered the various reports submitted by the Applicants
commissioned by the other insurer for the claim for damage to the building.
23. The Panel notes that the evidence provided is generally consistent with the
evidence for this dispute. The Panel also notes the report provided by B in
respect of his observations.
24. It is important to note that the cover provided by the FSP‟s policy differs from
the cover provided by the other insurer. However of note is that, other than
an initial level of damage from „drains‟, the experts are at one in considering
that the major damage was caused by water which is properly characterised
as floodwater.
25. Further, the evidence provided by B appears to support the origin and nature
of that water.
26. Given that the FSP‟s policy does not provide cover for floodwater escaping
from drains, the initial level of inundation would not be payable by the FSP,
irrespective of the cover provided by the other insurer. Further, having
considered the evidence in its entirety, the Panel is of the view that the
damage to the Applicants‟ contents was damaged by water which is properly
characterised as floodwater.
27. The Panel accepts that t he FSP‟s policy excludes flood, however it does
provide cover for a particular type of flood, being flash flood.
28. Therefore, the central issue for Determination in this dispute is whether the
inundation of the Applicants‟ home on 11 January 2011 was due to flash
flood as defined within the terms of the policy, that is whether rain that fell no
more than 24 hours prior to the inundation of the Applicants‟ property was
the proximate cause of the inundation.
29. On 21 May 2012 FOS issued a memorandum to all releva nt stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
30. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
Case No: 267218 Determination Page 10 of 14
31. In view of this, the FSP provided detailed further submissions to FOS on 12
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter from the FSP‟s hydrologist attaching a key information sheet for
the Applicants‟ property;
Hydrologist report “Investi gations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement of Key Conclusions from hydrologist SC dated 7 June 2012.
32. The Panel has reviewed the reference document. Insofar as the reference
document relates to the current issues in dispute, those matters have been
considered.
33. The FSP maintains that on any reasonable view, the damage sustained to
the downstream properties was the combined effect of all of the rainfall and
not just the rain that had fallen from 4.00am on 11 January 2011 leading to
the implementation of the W4 strategy from 8.00am that day.
34. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011.
35. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
36. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am on 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an i ncrease in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
37. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
Case No: 267218 Determination Page 11 of 14
38. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
39. The ICA hydrology and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
40. The Panel agrees with the FSP‟s general submission that the proximate
cause is a cause determined by common sense evaluation of the relevant
facts. In the event that there are two or more proximate causes, one within
the policy and the other excluded, the policy does not respond. The
proximate cause is not determined by identifying the last event or final trigger
but by determining what is the dominant, effective, direct or efficient cause of
the loss.
41. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
42. With respect to the FSP‟s argument the Panel disagrees. Whilst the Panel
accepts there has been a significant impact on the le vels of the Wivenhoe
Dam by the rainfall that commenced falling on or about 9 January 2011 or
earlier, the Panel is satisfied having regard to the information that has been
exchanged and the relevant legal principles, that the heavy rain that
commenced falling on or about 4.00am on 11 January 2011 was the relevant
cause of the adoption of the W4 strategy.
43. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicants’ Inundation
44. SC‟s statement indicates the effect of the W4 releases first reached the
vicinity of the Applicants‟ property at 2.32 pm on Tuesday 11 January 2011.
He estimated that the property was first inundated by the Brisbane River at
Case No: 267218 Determination Page 12 of 14
6.17pm on 11 January 2011 and by 4.00am on 12 January 2011, the
property was inundated up to 2m above the relevant benchmark level.
45. The relevant ben chmark level was SC‟s estimate of the lowest point of the
buildings on the ground. It should be noted that the prior reports by SC
indicated that the lower floor level was inundated by 9.30pm on 11 January
2011 and the upper floor level (at 6.7m AHD) was inundated at 3.00am on
12 January 2011. W‟s report indicates a similar timing but also notes that the
flood waters rose at 170mm per hour.
46. The Panel notes that the ultimate inundation of the property was 4.3m above
the benchmark level. SC identified this peak inundation occurred at
approximately 12.24am on Thursday 13 January 2011.
47. The Panel accepts the possibility that these assessments may not be
entirely accurate.
48. In order to gain a fuller understanding of the events the Panel Chair
Ombudsman undertook a site visit where he met with the Applicants and a
representative of the FSP.
49. The house is split level, with the land sloping significantly to the back
towards Faulkner Park. Inside there is an upper level of the split level
property through the lounge room etc. There is a step down into the back
sun room/craft room. According to the Applicants they kept a lot of tools,
craft equipment, industrial sewing machines, knitting machines and wool etc.
in this area. This room is significantly lower approximately 1.2m lower than
the upper level.
50. At the time of the flood, the Applicants were having a garage built. As a
result, the tools were in the craft room. There is a swimming pool area at a
lower level, and a garden shed at the very end of the yard. The male
Applicant advised that they had left the property by the time the house was
inundated. They accept that water was first seen rising in the yard around
4.00pm on 11 January. They also described their neighbours saying that
they saw water gushing from the storm water drains in Faulkner Park like a
fountain.
51. At a height of 6.9m AHD this would mean that the lower floor, at a height of
5.5m AHD was inundated up to 1.4m; the upper floor at a height of 6.7m
AHD would have been inundated by approximately 200mm.
52. There is some confusion as to the exact benchmark level. SC in his latest
Key Conclusion Statement suggests that the benchmark level is 4.9m AHD.
At the site inspection, the FSP‟s representative suggested that this was the
height of the veranda or lower floor level. The Panel does not accept this.
The Panel accepts that the lower floor level was at a height of 5.5m AHD
and the upper floor level at 6.7m AHD. It is unclear where 4.9m AHD exists
but it is possible this was either the height of the pool pump or a n exterior
shed.
Case No: 267218 Determination Page 13 of 14
53. In any event, the Panel is satisfied that the relevant height for the purpose of
this Determination is the height that the water reached at 4.00am on 12
January 2011. The Panel accepts that that height based on the hydrology
reports was approximately 6.9m AHD and would therefore have inundated
the property on the upper floor level to a height of approximately 200mm and
the lower floor level to a height of approximately 1.4m.
54. The flash flood provisions of the policy are clear. They provide p ursuant to
the policy, cover for 50% of the contents sum insured. The contents were
insured for a total sum of $204,000 and therefore the maximum liability
under the policy would be limited to $102,000.
55. The Panel accepts that the parties are unable to provide an exact estimate
of the loss sustained. It is apparent from the site inspection that the
Applicants lost significant contents in the lower level and a large number of
tools utilised by the Applicants. The Applicants also lost a significant amount
of furniture, refrigerators, stoves etc. on the upper level. Much of the loss
sustained would have been caused as a result of inundation to a height of
200mm. The Panel notes the Applicants have had pieces of furniture
restored.
56. In the circumstances, the Panel believes it is reasonable that the FSP be
given the opportunity of having a scope of works performed to determine the
extent of the loss suffered by the Applicants. Once obtained, the parties are
asked to work cooperatively together to reach agreement as to the cost of
repairs and/or replacement of the items lost on the lower floor level and
upper floor level as a result of the inundation sustained up to 4.00am on 12
January 2011.
57. Insofar as the property was inundated after 4.00am on 12 January 2011,
such inundation would fall outside the relevant 24 hour period to attract flash
flood cover and would be appropriately classified as flood and excluded
under the terms of the policy.
58. The Panel has also considered the issue of interest.
59. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
60. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP‟s fault.
61. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes “unreasonable for the insurer to have withheld payment”. An
Case No: 267218 Determination Page 14 of 14
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
62. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
63. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other informa tion. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
64. In the Panel‟s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicants had withheld information from the FSP that
would have led to an alteration of its decision.
65. Accordingly, the Panel determines that it is appropriate that the FSP in this
dispute pay interest from the day upon which the FSP determined to deny
liability of the Applicants‟ claim, until payment of the claim.
Determination
66. The FSP is to meet the cost of the replacement of the items damaged as a
result of the inundation of the Applicants‟ property in accordance with the
limitations expressed within the terms of the policy and on the basis of
maximum height of inundation of the property to a level of 6.9m AHD.
67. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
23 November 2011 (being the date of rejection of the claim) to date of
payment of the claim, in accordance with Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.