Text of the determination
Case No: 266325 Determination Page 1 of 12
Case number: 266325
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
18 October 2012
Background
1. The Applicant holds a Home Building and Contents policy with the Financial
Services Provider (FSP). The policy covers the building up to $297,800
subject to an excess of $100.
2. On 6 May 2011 the Applicant contacted the FSP to make a claim as a result
of a cyclone that occurred on 5 May 2011. As a result of the claim, the FSP
arranged for the insured property to be assessed.
3. The FSP accepted the damage to the bed pointing, hips, ridges and ceiling
but denied the claim to repair the roof sarking damage on the basis it was
not the result of the cyclone but damaged over time.
4. The Applicant disputes the declinature of the sarking on the basis that the
damage occurred due to storm and should be covered.
Summary of Applicant’s position
5. The Applicant relies on expert engineering report from “P”. I note the
following from this report:
P did not observe chips, cracking or major movement of the tiles at the
time of inspection.
There was no major structural damage identified to the visible roof
framing at the time of inspection, however visible water staining to 10%
of the trusses was evident.
Sarking foil is installed directly above the trusses with a supportive
mesh to stop sagging of the foil between trusses. An inspection of the
foil revealed the sarking was in good condition with only a small
number of holes noted throughout the entire dwelling.
The roof battens are nailed through the sarking foil into the timber
trusses causing penetration in the sarking. However the sarking
installation is of good workmanship and in accordance with the building
regulations at the time of construction. Minor surface corrosion to the
Determination
Case No: 266325 Determination Page 2 of 12
exposed aluminium layer of the sarking foil had occurred. Further, the
small perforations in the sarking foil were minor in nature and had not
compromised the performance of the sarking insulation.
P observed numerous water staining patches to the soffit lining and
gyprock plasterboard throughout the dwelling. The majority of the water
staining patches were located directly under the timber trusses and
towards the outer perimeter of the dwelling.
P was informed the leaks first commenced after Cyclone Yasi. During
periods of heavy rainfall water continues to leak at two locations within
the dwelling, being the kitchen and back patio.
The white decorative casings surrounding the columns near the front
entry of the dwelling have shifted which indicates that the columns are
damaged. P opined this had arisen from wind pressure on the awning
which had caused the casing to shift.
P notes that it cannot directly relate the issues to Cyclone Yasi as the
event occurred over 15 months ago. However it is not uncommon for
tiled roof to become problematic after suffering wind or debris impact
damage. Tiles can crack under high stresses and the cracks are not
always visible.
In P‟s opinion rain water was either blown under the laps of the
concrete roof tiles due to wind pressures or found gaps in the tiles to
pass through. The majority of the water ingress and damage is towards
the outer perimeter of the dwelling. It is therefore likely that roof tiles
are allowing water ingress to occur, enter the ceiling cavity which then
causes concentrated water effects down the sarking foil insulation to
the outside walls. Water entry into the ceiling cavity may occur by the
water falling down the outer surface of the sarking foil then being blown
up under the overlapped sarking or through small holes in the sarking
itself.
The observed damage is the kind likely to re -occur in future cyclonic or
high wind pressure events.
6. The Applicant relies on report provided by a roofer, “R”, from which I note the
following information:
R has 30 years roofing experience in the North Queensland area and
has experience with repairs after Cyclone Winifred.
In R‟s experience, the damage viewed at the insured property,
indicates the roof has lifted and moved due to severe updraft
associated with cyclonic conditions.
The tiles are loose from movement and cracked in places.
The corners of the ridges have lifted approximately 40mm in places.
The roof is unstable and more damage is being created through leaks
apparent in the eaves and ceiling.
Case No: 266325 Determination Page 3 of 12
7. Th e Applicant relies on an email dated 4 September 2012 from the FSP‟s
building assessor “O” from which I note the following:
There were many loose tiles with quite a few cracked watercourses.
The cracks occur during excessive movement or pressure of the tiles
against each other.
The roof frame is in very good condition and some minor upgrading to
comply with the current building code.
8. Cyclone Yasi has caused impact damage to the tiled roof which has led to
cracking and loosening of the tiles. The timber structure and trusses are in
good condition and do not require replacement.
9. The Applicant has noted the following differences between the FSP‟s experts
“A”, “B”, “C” and O:
A stated that “high wind pressure may have blown the water under the
tiles to damage t he ceiling”. The Applicant presumes the high winds
were from cyclone Yasi but also queries whether this would have also
damaged the sarking.
A fails to note the damage to bed and pointing of the hips and ridges.
There is also no notation of the cracked patio posts.
C stated the sarking is in very poor condition. Water blowing up under
head laps has contributed to the rotting of the sarking.
C also states that bed and pointing to hips and ridges were badly
cracked due to movement of tiles during high winds. However C fails to
note the cracked and moved patio posts.
O‟s report notes heavy duty sarking under the roofing. Further, that
corrosion of the sarking was caused by water being blown over the lap
to the sarking itself. O also found evidence of further damage to the
property most likely caused by high winds.
O recommended replacing roof and membrane as well as reinstating
soffits including reaffixing decorative patio posts.
B provided a report that noted the roof „sacking‟ has deteriorated but
does not state the reason why they believed it was deteriorated.
However, B did note that high wind and rain from cyclone Yasi has
blown back under the roof tiles through sacking.
10. The Applicant disputes that the sarking/sacking was damaged prior to
Cyclone Yasi as the roof did not leak after Cyclone Larry. The Applicant
contends that if Cyclone Larry was responsible for the damage that there
would have been leaks prior to Cyclone Yasi.
11. The Applicant notes that P‟s report indicates the sarking is in good condition.
Further it is not uncommon for tiled roofs to become problematic after
suffering wind or debris impact damage.
Case No: 266325 Determination Page 4 of 12
12. The Applicant notes he prefers O to complete works to repair the roofing,
soffits and ceiling interior. O has indicated there would be an increase to the
original quote of around 3% to the sum of $38,182. The FSP has already
paid $5,500 for the internal damage. The Applicant also seeks replacement
of his roof with a co lour bond roof and reimbursement of the cost of P‟s
report in the sum of $3,200.45.
Summary of FSP’s position
13. The FSP relies on the following policy terms and conditions:
“Home insurance – What IS covered
...
Storm, hail or rainwater
...
General exclusions applicable to your policy
You are not covered under any section of this policy for damage, loss or
liability caused by, arising from or involving any of the following.
...
- Water entering your home:
- as a result of your failure to perform adequate maintenance on your
home, or a structural defect or faulty design or workmanship.
...
- Wear and tear, lack of maintenance or inherent defect
- Rust, corrosion, mildew, wet or dry rot, rising damp or seepage and
other signs of failure to keep your home in good orde r and repair.”
14. The FSP relies on report by builder, A, from which I note the following:
The cause of the damage is listed as strong winds caused by cyclone
Yasi.
A could not find any damaged roof tiles to the roof and the gutters were
clean of debris.
Due to water stains and mould to the soffits, A believed the water may
have overflowed the back of the gutters onto the top of the soffit sheets.
The tiles appear to be in good condition and A formed the view that
high wind pressure may have blown water under the tiles to damage
the ceilings.
15. The FSP relies on a report by roofing company, C, from which I note the
following:
The tiles and battens are in good condition and do not need replacing.
The sarking is in poor condition.
Case No: 266325 Determination Page 5 of 12
Water had blown up under head laps and has contributed to the rotting
out sarking. The sarking is old and of poor quality.
Debris on all water courses was backed up behind all security clips
which was causing water to drip over sides of tiles onto sarking and
therefore onto ceilings.
The bed and pointing to hips and ridges is badly cracked due to
movement of tiles during high winds and is in need of rebidding and
pointing.
16. The FSP relies on a report by building company, O, from which I note the
following:
The roof has concrete tiles with a heavy duty sarking underneath.
There were many leaks within the roof space ranging from minor to
moderate. All leaks appear to be stemming from water ingress through
the tile overlaps and then through the sarking either by being blown up
over the overlapped sarking as shown or through small holes in the
sarking.
There was evidence of further damage to the property most likely
caused by high winds, being the two patio posts at the front of the
home.
Leaks to the roof space have caused damage to the internal ceilings
mostly due to original installation methods being exposed by strong
winds and rains. The sarking is not overlapped in accordance with
manufacturer‟s recommendations thus allowing water to be blown up
over one layer past the next.
The leaks in this roof range most likely started during Cyclone Larry
and have continued through Cyclone Yasi. Some of the staining on the
ceiling sheeting from within the ceiling space appears to have been
there for several years and some have arisen within 12 months.
The Applicant showed O the previous letter from the FSP based on the
prior inspections. O disagrees with the findings of these prior
inspections and believed the conclusions result from inadequate
inspections.
To fix the problems in a professional manor, the installed roof
membrane will have to be removed totally and everything from the
sarking to the roof tiles could then be replaced as per manufacturer
recommendations. O recommends that colorbond roofing may be more
appropriate for the geographical lo cale of the insured‟s residence.
17. The FSP relies on a report from an insurance repair service, B, from which I
note the following:
B inspected the property on 5 October 2011.
Evidence showed the roof sarking under the tiled roof has deteriorated.
Case No: 266325 Determination Page 6 of 12
Due to the high wind and rain from cyclone Yasi, rain has blown back
under the roof tiles through the deteriorated sarking allowing water to
enter into the roof cavity, onto the gyprock ceiling causing damage to
the garage, „message‟ room and bedroom 2 ceiling sand water stains to
the eaves of the dwelling.
Due to high winds from the cyclone the plasterboard around the front
column has lifted up and needs to be reinstated.
18. The FSP determined it was liable for repair to the bed point, hips ridge and
ceiling.
19. The FSP notes the following in relation to the experts:
A concluded that the roof tiles were in good condition and the cause of
the damage was high winds blowing water under the tiles, causing
damage to the ceilings.
C concluded the tiles and battens were in good condition and did not
require replacement. C noted the sarking was in poor condition and
concluded the damage was caused by water blowing up under the tile
overlaps and water backing up due to the debris and dripping over the
side of the tiles.
O noted the leaks in the roof were due to water ingress through the tile
overlaps and then either being blown up over the sarking or leaking
holes in the sarking. O also noted the installation method of the sarking
being exposed by high winds and that the internal damage has been
occurring over a period of time.
20. Consequently the FSP contends that the manner in which the sarking had
been installed had made the property easily susceptible to storm activity.
21. The FSP acknowledges there is some difficulty in reconciling the differing
opinions of the experts. The reports from A and C are consistent in stating
the roof tiles are in good condition. The reports of C and O agree that there
has been damage to the sarking.
22. Based on the expert reports the FSP concluded the da mage occurred when
water came up under the tiles and leaked through holes in the sarking. The
roof was already subject to poor installation which made it vulnerable to the
elements. Further, measures such as anti-ponding boards were not used to
prevent water entry to the soffits. The FPS submits the lack of preventative
measures caused water damage.
23. The FSP submits that whilst some of the damage to the building was caused
by storm, hail and rainwater that much of the damage was not due to a
single insured event but rather occurred over a period of time and was
damaged as the result of wear and tear, rust, corrosion, wet or dry rot, lack
of maintenance and inherence defect, all of which are specifically excluded
under all sections of the policy.
Case No: 266325 Determination Page 7 of 12
24. The proximate cause of the loss must be caused by an insured event
detailed in the policy booklet. The damage to the sarking is not the result of
the insured event and the roof does not require replacement as a result of
the event.
25. O has not recommended the roof required replacement due to cyclone event
and accordingly it cannot provide cover for same.
26. The Applicant‟s expert, P, has noted issues with the roof sarking. In
particular, small holes in the roof sarking and some corrosion. P has not
provided any statement to address the effect that the passage of water
would have on the sarking nor evidence that may explain why the sarking is
in good condition even if water has passed over it. Further, P does not
necessarily attribute the cracking in the roof tiles to the relevant cyclone
event or that there were cracked tiles found on the roof
27. The Applicant‟s expert, R, has not explained how the cyclone event had
damage the Applicant‟s roof or made comments regarding the roof
installation method, the utility or lack of utility of cautionary measures for
water prevention in the roof (for example anti-ponding boards) or condition of
the sarking.
Issues
28. Whether the FSP was entitled to decline the Applicant‟s claim for patio
columns, replacement roof and rectification of sarking.
29. Whether the FSP is liable for the cost of P‟s expert report.
Reasons for decision
30. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case
31. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
32. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
33. The parties do not dispute the following:
The Applicant held a valid policy covering the insured building during
the relevant period of damage.
Cyclone Yasi caused damage to the building.
Case No: 266325 Determination Page 8 of 12
The policy covers storm damage to the building.
The roof bed pointing, hips, ridges and internal ceiling were damaged
as a result of the insured event of storm.
34. I note there appears to be three items of damage to which the FSP has not
agreed. These are the front patio columns, the sarking and the request for a
replacement roof due to damaged tiles. I shall deal with each separately
below. The Applicant has also requested reimbursement of expert report
fees which will be dealt with separately as it is a discrete issue.
Patio Columns
35. The Applicant‟s expert P provided evidence that the white decorative casings
surrounding the columns near the front entry of the dwelling had shifted
which indicates damage has occurred. P opined this had arisen from wind
pressure on the awning which had caused the casing to shift.
36. O considered there was evidence of damage to the two patio posts which he
believed was most likely caused by high winds.
37. B provided evidence that due to the cyclone, the plasterboard around the
front column has lifted up and needs to be reinstated
38. A and C did not report on the patio columns and there is no evide nce of
whether either expert inspected these items.
39. Based on the evidence before me, only P, O and B specifically addressed
the issue of the patio column and all three indicated it was damaged as a
result of Cyclone Yasi and/or strong winds.
40. Accordingly, I consider the FSP is liable for the rectification costs to the patio
columns.
Sarking
41. Expert P considered the sarking to be in good condition and built in
accordance with regulations at the time of construction. He noted there were
only a small number of holes noted throughout the entire dwelling which
were minor in nature and did not compromise the sarking performance.
There was minor surface corrosion to the exposed aluminium layer of the
sarking foil.
42. Expert C stated that the sarking was in poor condition, was old and of poor
quality. C notes that the water blowing up under head laps had contributed to
the rotting out of the sarking. C further noted that water was dripping over
sides of tiles onto the sarking and therefore onto ceilings.
43. Expert O believed the leaks were from water ingress through the tile
overlaps and then through the sarking either by being blown up over the
overlapped sarking as shown or through small holes in the sarking. O notes
Case No: 266325 Determination Page 9 of 12
the installation methods were „exposed b y strong winds and rains‟. The
sarking is not overlapped in accordance with manufacturer
recommendations which allow the water to be blown up over one layer past
the next.
44. Expert B states the roof sarking under the tile roof has deteriorated and that
rain has blown back through the deteriorated sarking.
45. Experts A and R do not mention the condition of the sarking in this regard.
46. The only expert who states the sarking is in poor condition is C. Experts P, B
and O note that there is some deterioration to the sarking but either describe
it as minor and not affecting sarking performance or do not state what type of
deterioration and its affect on sarking performance. P contradicts C by
stating that the sarking is in good condition and installed in accordance with
building regulations at the time of construction.
47. P and C do not particularly state how water got through the sarking and onto
the ceiling below. B provides a limited explanation of how the water
proceeds through the sarking.
48. For these reasons I prefer the more detailed evidence of O that the water
has gone through the sarking due to it being blown up over the overlapped
sarking and through small holes. The installation methods were „exposed by
strong winds and rains‟ and the sarking was not overlappe d in accordance
with manufacturer recommendations.
49. The primary issue with the sarking is that the installation method was
exposed by strong winds and rains which allowed water to be blown through
the overlapped sarking (the overlapping of which is not in accordance with
manufacturer recommendations). It is unclear whether the sarking would
have met the requirements of the building regulations at the time of
construction according to O and whether the manufacturer recommendations
pre-date the construction of the residence. P is the only expert who
addresses this issue and notes that the sarking has been installed in
accordance with the relevant building regulations at the time of construction.
50. There is insufficient evidence to establish that the sarking has been
improperly installed at the time of construction. Accordingly, there is
insufficient evidence relating to the exclusions of structural defective, faulty
workmanship or inherent defect.
51. Bearing in mind that the issue had arisen previously with the sarking and as
the water has apparently entered due to being blown past the overlapped
sarking I am unable to find the wear and tear of the sarking has been a
material cause of the water ingress.
52. However the experts have not provided evidence that the holes through the
sarking or the minor deterioration are caused solely due to Cyclone Yasi.
The experts only state how the water got through the sarking. Accordingly,
Case No: 266325 Determination Page 10 of 12
there is no evidence upon which the FSP would be liable for the cost of
replacing the sarking.
Replacement of the Roof
53. I note the following policy terms and conditions:
“Paying your claim
How we pay a claim for your home
Where we pay a claim for your home, we will choose to do one of the
following:
- Repair your home,
- Replace the damaged portion of your home,
- Compensate you the amount it would have cost us for repair
replacement.
...
Matching building materials
Where we repair your home we will try to return your home to the same
condition as when new, or when last renovated by matching building materials
as far as we can.
Where we cannot achieve an exact match, we will use materials that match
the damaged or lost materials as near as possible in our opinion. We will only
do this to the room where the loss or damage occurred.
We will not pay for matching building materials in order to create a uniform
effect throughout your home.”
54. The experts were somewhat divided on whether the tiles were in good or
poor condition. C and A stated the tiles were not damaged but B indicated
the tiled roof has deteriorated – but not the basis for this opinion.
55. P has indicated that it would not be uncommon for high winds or debris
impact to cause the tiles to crack under high stress. Further the cracks are
not always visible.
56. R has noted the roof lifted and moved due to se vere updraft associated with
cyclonic conditions. The tiles are loose from movement and cracked in
places. The corners of the ridges have lifted approximately 40mm in places
and he considered the roof unstable. I note R attached a diagram indicating
cracked tiles which were close to the agreed areas of storm damage such as
the ridging.
57. O‟s report was finalised by recommending a colorbond roof be installed.
However, in an email to the Applicant O confirmed there were many loose
tiles with quite a few cracked watercourses. The cracking had further
occurred due to excessive movement or pressure of the tiles against each
other.
Case No: 266325 Determination Page 11 of 12
58. I accept based on the evidence before me that the roof tiles were most likely
damaged through cracking and loosening from cyclonic winds as a result of
cyclone Yasi.
59. The policy provides cover for damage to the roof tiles caused by such an
insured event. However, the policy would only require the FSP to pay for the
cost of repairing those damaged tiles. The FSP would not be required, on
the basis of the policy, to replace the roof with a new colorbond roof.
60. It is unclear how many tiles were cracked and/or loosened due to the high
winds and therefore the cost of replacement is not fully known. I further note
the Applicant has indicated he has commenced undertaking repairs.
61. I consider the FSP would still be liable to compensate the Applicant for the
amount it would have cost the FSP to repair or replace those broken or loose
tiles together with the other agreed roof repairs. However, the cost of all
these works will need to be established first prior to any payment being
considered. I note that R‟s diagram m ay be instrumental in assisting the
parties ascertain the number of broken and loose roof tiles which required
replacement or repair.
Expert P’s Costs
62. I have considered P‟s report contained useful and substantive detail
regarding the cause of damage. Whilst the FSP did not authorise the report,
I am empowered under Terms of Reference 9.4 to allow costs incurred in
pursuing the dispute matter. However, this is limited to $3,000 unless
exceptional circumstances apply.
63. Whilst P‟s report was useful and containe d substantive technical detail it is
not the only report on which I have relied to consider the case. I do not
consider that this report falls under exceptional circumstances.
64. I am of the opinion that it is fair and reasonable however to award the
Applicant $3,000 towards the report cost of $3,200.45 in the circumstances.
Determination
65. On the basis of the available information I determine the FSP is liable for the
rectification costs to the front patio columns. The FSP shall make payment of
same within 28 days of the Applicant‟s acceptance of this Determination.
66. On the basis of the available information I determine the FSP is not liable for
the replacement cost of the sarking.
67. On the basis of the available information I determine the following should
occur:
(a) The Applicant obtain a quotation from R regarding the cost of
roofing repairs previously agreed by the FSP as well as the cost of
Case No: 266325 Determination Page 12 of 12
replacing broken tiles and repairing loose tiles. The Applicant shall
provide such a quotation within 21 days of accepting this
Determination.
(b) The FSP may obtain its own quotation(s) regarding the cost to
repair the roofing items previously agreed and the cost of replacing
broken tiles and repairing loose tiles. The FSP shall provide copies
of such quotations to the Applicant within 21 days of the Applicant‟s
acceptance of this Determination.
(c) The FSP review all quotations and determine the reasonable cost
for all repairs required to the roof as outlined in this Determination.
The FSP is to make a decision on the cost of repairs within 14 days
of receiving all quotations (“determination of costs”).
(d) FSP shall cash settle the Applicant the cost for roofing repairs (as
previously agreed) together with the cost of repairing or replacing
tiles broken or loosened during the cyclone Yasi event. The FSP
will cash settle the Applicant within 7 days after making a
determination of costs.
68. I further determine the FSP shall make payment of $3,000 towards the cost
of P‟s report incurred by the Applicant. The Applicant shall produce a copy of
the invoice in the sum of $3,200.45 to the FSP to verify the cost incurred and
paid. Once the FSP has been provided with this invoice it will reimburse the
Applicant the sum of $3,000 within 7 days, together with interest at the
statutory rate upon the sum of $3,000 from the date upon which the
Applicant paid P‟s account until the date of settlement.